CIS7:2014
CIS7:2014
CIS7:2014
STANDARD
INDUSTRI
PEMBINAAN
(CONSTRUCTION INDUSTRY STANDARD)
CM
CIS 7:2014
MY
CY
CMY
Descriptors: quality of workmanship, structural, architectural, mechanical and electrical, external works, benchmark,
site inspection, field testing, sampling
Copyright
Lembaga Pembangunan
Industri Pembinaan Malaysia
CONSTRUCTION INDUSTRY DEVELOPMENT BOARD MALAYSIA
Ibu Pejabat CIDB, Tingkat 34, Menara Dato Onn, Pusat Dagangan Dunia Putra
No 45, Jalan Tun Ismail, 50480 Kuala Lumpur.
Tel : 603-4047 7000 Fax : 603-4047 7070
http://www.cidb.gov.my
QUALITY ASSESSMENT SYSTEM FOR BUILDING
CONSTRUCTION WORK
Chief Executive
Construction Industry Development Board Malaysia
Level 34, Menara Dato Onn
Pusat Dagangan Dunia Putra
No 45, Jalan Tun Ismail
50480 Kuala Lumpur
Malaysia
No part of this publication may be reproduced or transmitted in any form or by any means, whether
mechanical or electronic including photocopying and recording without the written consent of
CIDB.
Committee representation iv
Foreword v
SECTION 1: GENERAL
1.1 Introduction 1
1.3 Definition 1
1.3.1 Approved standards 1
1.3.2 Competent person 1
1.3.3 Component 1
1.3.4 Elements 1
1.3.5 QLASSIC 1
1.3.6 Qualified person (QP) or principal-submitting-person (PSP) 1
1.3.7 Superintendent Officer (SO) 1
SECTION 3: ASSESSMENT
3.1 Weightage 4
3.3 Sampling 5
ii
Annexes
Acknowledgement 56
iii
This Construction Industry Standard (CIS) was developed and reviewed by the Construction
Industry Development Board Malaysia with the assistance of the Technical Committee and
working groups on Quality Assessment System for Building Construction Works which comprises
representatives from the following organisations:-
iv
The Malaysian Construction Industry Standards (CIS), hereby referenced as CIS 7:2014, was
developed as a quality assessment system for building construction works standard by the
Technical Committee on Quality Assessment In Construction with the assistance of Construction
Industry Development Board Malaysia (CIDB), which acted as a moderator and facilitator for the
technical committee throughout the development process of this standard.
While the CIS 7:2014 on quality assessment system for building construction works adopts several
components with reference to CONQUAS The BCA Construction Quality Assessment System
(Eighth Edition 2012): Building and Construction Authority, Singapore, it is also dependent on new
or updated information and developments concerning this subject area made available through
the Technical Committee and Working Groups.
The use of this CIS 7:2014 is voluntary and compliance with this document does not in itself
confer immunity from legal obligations.
SECTION 1: GENERAL
1.1 Introduction
Quality Assessment System for Building Construction Works is an independent method to assess and
evaluate primarily on the quality of workmanship of building projects based on this standard.
The following normative reference is indispensable for the application of this construction industry
standard. The latest edition of the normative reference (including any amendments) shall apply.
1.3 Definition
For the purpose of this Construction Industry Standard, the following definitions apply.
Approved standard shall mean standard specified by the qualified person for the project.
1.3.3 Component
General building works are divided into four different components: structural, architectural, mechanical
and electrical (M&E), and external works.
1.3.4 Elements
A subdivision of a component, for example concrete for structural works, tile finishing for architectural
works, drains for external works, performance for M&E works and others.
1.3.5 QLASSIC
A QP as defined in the Uniform Building By-Laws 1984 (Amendment 2007). Hereon, wherever QP
appears in this document, it also refers to PSP.
The SO shall be the person appointed to administer the contract during construction.
Quality Assessment System for Building Construction Works was designed and developed to enable the
user to achieve any of the following objectives:
b) to have a standard quality assessment system for quality of workmanship of building projects
c) to assess quality of workmanship of a building project based on the industrys acceptable standards
Quality Assessment System for Building Construction Works is intended to complement the normal
contractual drawings and specifications in a project. It is not intended to be used independently as
working specifications. Unless specified in the building contract, qualified persons should not use
Quality Assessment System for Building Construction Works to decide if the building or parts of the
building project are in accordance with the relevant by-laws. It is still the responsibility of the qualified
person to ensure that the quality of the construction works conforms to approved standards, practices,
specifications and drawings.
This standard sets out the quality of workmanship for the various aspects of the construction elements
for the general building works. The Quality Assessment System for Building Construction Works covers
four main components: Structural works, Architectural works, M&E works and External works.
Assessments on the workmanship are carried out based on this standard and marks are awarded if
the workmanship complies with the standards. These marks are then summed up to give a total quality
score (%) for the building project.
However, the assessment excludes works such as piling, foundation and substructure works, which are
heavily equipment-based and called under separate contracts or subcontracts.
The building is assessed primarily on workmanship standards achieved through site inspection and field
testing. For structural and M&E works, assessment is carried out throughout the construction process.
For completed building projects, the assessment is done for architectural, M&E fittings and external
works.
Apart from site inspection on finishing works, the assessment also includes field tests, test results on
the material and the functional performance of selected services and installations. These tests help to
ascertain the quality of building workmanship for occupants in relation to safety, comfort and aesthetics.
These defects may surface only after sometime.
In line with CIDB Act (Amendment 2011), it is a prerequisite that all projects, which applied for QLASSIC
assessment, shall submit a declaration document by the SO on the compliance to Section 33C of the
said act.
In general, the assessor determines the samples (elements or locations) to be assessed prior to each
assessment. The samples are selected from floor plans and site plans. The selected samples shall be
The scoring will be done on the works that are inspected for the first time. Rectification and correction
carried out after the assessment will not be rescored. The objective of this practice is to encourage
contractors towards doings things right the first time and every time.
When an assessed item does not comply with the corresponding quality standards, it is considered
to have failed and an X will be noted in the assessment form. Likewise a is given for an item
meeting the given standards. A NA will be given to indicate that the item is not applicable. The score
is computed based on the number of over the total number of items assessed.
The quality standards for building construction work are divided into four main components:-
a) Structural works
The structural integrity of the building is of paramount importance as the cost of failure and repairs are
very significant. The assessment of structural works comprises:
ii) Test result of compressive strength of concrete and tensile strength of steel reinforcement
iii) Non-destructive testing of the uniformity and the cover of hardened concrete
b) Architectural works
Architectural works deal mainly with the finishes. This is when the quality and standards of workmanship
are most visible.
Architectural works encompass floors, internal walls, ceilings, doors, windows, fixtures, external walls,
aprons, perimeter drains, structure car parks and car porches.
c) M&E works
The quality of M&E works is important in view of its increasingly high-cost proportion and its impact on
the performance of a building. The assessment covers electrical works, air-conditioning and mechanical
ventilation works (ACMV), fire protection works, sanitary and plumbing works, and other basic M&E fittings.
d) External works
External works cover the general external work elements in building construction such as the link-
ways/shelters, drains, road works, footpaths, turfings, playgrounds, gates and fences, swimming pools,
hardscapes and electrical substation, guard house and bin centre.
The assessment for building construction work is carried out through a sampling and statistical approach.
3.1 Weightage
The weightage for structural, architectural, M&E and external works are allocated in accordance to four
categories of buildings (see Table 1).
Component Residential Building Non-Residential Building
Note:
Category C is without centralised cooling system, Category D is with centralised cooling system.
The weightage system is aimed at making the score quantitative and represent the quality of workmanship
of a building project. It has taken into consideration the distribution between the cost proportions of the
four components in the various buildings and their aesthetic considerations.
The total quality score of a building project is the sum of marks awarded to the four components in each
category of a building.
ii) Category B (Stratified housing) Flats, apartments, condominiums, service apartments, small
office home office (SOHO) and town houses
The QLASSIC assessors are accredited and regulated by CIDB. They are updated with the latest relevant
information on a regular basis to ensure consistency and effective implementation of the assessment.
3.3 Sampling
As it is impractical to assess all elements in a building project, the assessment is carried out through a
sampling approach. The sampling, which is based on the gross floor area (GFA) of the building and 10 m
length section or per location for external works is to ensure that the assessment adequately represents
the entire building project.
Assessment of structural works is carried out during construction of the building project. The assessment
covers performance testing.
Reinforced Concrete Structure Weightage Cast In-situ Weightage Precast
Elements (%) (%)
Formwork 20 0
Rebar 15 5
Finished concrete 25 35
Concrete quality 5 0
Steel reinforcement quality 5 0
Precast specific requirement - 20
NDT UPV test for concrete uniformity 15 20
NDT Electro-covermeter test for 15 20
concrete cover
Total 100 100
Note:
If total precast concrete volume exceeds 20% of total structural concrete volume, assessment will be carried out for precast
concrete construction. The marks will be distributed proportionately between cast in-situ assessment and precast concrete
assessment based on the respective concrete volume percentage. The qualified person (check with the current UBBL) is
required to declare the concrete volume for reinforced concrete and precast concrete construction.
For a typical reinforced concrete structure, selection of samples for assessment is based on Table 3.
Each sample represents a beam, column, slab or reinforced concrete wall.
1. Structural
elements
GFA/1,500 m2 GFA/500 m2
-
(Min 30 samples; max 50 samples) (Min 30 samples; max 50 samples)
50% weightage
provided for
100% testing declaration by
QP
2. Concrete
compressive
strength 50% weightage
provided for
(Min 30 samples; max 50 on-site (Min 30 samples; max 150 on-site
100% on-site
verification of test records) verification of test records)
verification of
test records
50% weightage
provided for
Every bar size and welded steel fabric per supplier per project declaration by
QP
3. Steel
reinforcement
tensile strength 50% weightage
(Min 30; max 150 on-site provided for
verification of mill certificates) 100% on-site
verification of
test records
4. NDT - UPV
GFA/5,000 m2
test for concrete -
(Min 2 sets; max 20 sets)
uniformity
5. NDT - Electro-
GFA/5,000 m2
Covermeter test -
(Min 2 sets; max 20 sets)
for concrete cover
Note:
1. The computed number of elements to be checked must be evenly distributed throughout the entire block and cover
at least 50% of the floors in a block. It should also, as far as possible, cover the different types of structural elements.
2. Concrete compressive and steel reinforcement tensile strength - self testing with declaration by qualified person. On-
site verification by assessor.
There is no assessment of precast components at the precast yard. The assessment is applicable for all
types of precast components at site.
The assessment of the non-destructive tests, i.e., on concrete uniformity and cover for steel reinforcement,
is to minimise the risk of carbonation and steel corrosion, which affect the durability of the concrete
structures.
If the structural works consist of structural steelworks which, constitute more than 20% of the structural
cost, assessment will be required for the latter and the marks will be distributed proportionately. This
applies to prestressing works as well. In any case, the distribution should follow the cost composition for
these three types of structural works in the projects.
The weightage for structural steelwork and prestressed concrete are allocated as per Table 4. If the
structural steel in all structural works is to be casted, the assessment shall be performed prior to the
covered works.
The selection of sample for structural steel works assessment is based on the following guidelines:
Assessment of architectural works is carried out upon completion of the building project and before the
handover of the project.
Note:
A weightage of 3% is automatically awarded to projects, where skim coat or prepacked plaster is used. This is to encourage
the use of these products in the industry.
A location for Internal Finishes assessment is a functional space of a building such as a room, hall, toilet,
kitchen, corridor or lobby. Locations are further categorised into three types:
- Principal locations are major functional places such as halls and rooms
- Service locations are utility areas such as toilets, kitchens, balconies and yards
The total number of locations will be distributed according to Principal, Circulation and Service
based on the percentage set out in the four categories of buildings in Table 9.
Scoring of internal finishes is based on the defects groups shown in Annex E Defects Group for
Assessment of Architectural Works (Internal Finishes). In general, any item which is not available in
a project will not be considered for scoring. For such cases, the architectural score will be prorated
accordingly.
Principal 40 40 60 60
Service 40 40 15 15
Circulation 20 20 25 25
Note:
For other types of building, the distribution of percentage shall be in accordance to Category C.
An item under assessment will be considered to have failed if it does not meet the standards. In addition,
any item found to be defective functionally such as evidence of water seepage in the window, slab,
ceiling or roof, is considered to have failed the assessment. Likewise for a particular defect that is found
excessive in an item (for instance, excessive cracks on a wall).
For the assessment of external wall, a minimum 50% of the total number of building will be assessed.
For a building, the external wall will be divided into four walls for assessment.
The use of skim coat or prepacked plaster for all plastering works and wet area water tightness test
(WTT) are based on the declaration by the project QP. Further site evidences of WTT need to be
provided.
10
Assessment of M&E works is carried out upon completion of the building project and before the handover
of the project. The assessment covers basic M&E fittings and performance testing.
The assessment covers the following area, with their weightages allocated in accordance with the four
categories of projects (see Table 10).
Electrical works 15 15 20 20
ACMV works 10 10 20 25
Fire protection works NA 10 10 10
Plumbing & sanitary
works 25 25 25 20
Basic M&E fittings 50 40 25 25
Subtotal 100 100 100 100
Weightage A 60 60 50 50
Verification records 50 50 50 50
Functional/
performance test 50 50 50 50
11
Electrical
1. Main cables 1 1
2. Surface conduits 1+ 1+ 1+ 1+
3. Concealed conduit
system 1+ 1+ 1+ 1+
4. Cable tray, ladder
and trunking 1+ 1+ 1+
5. Distribution board 2+ 2+ 2+
6. Wiring system 1+ 1+ 1+ 1+
ACMV
1. Air handling unit 1+
2. Pump 1
3. Cooling tower 1
4. Chiller 1
5. Pipework 1
6. Split unit/ Window
air conditioner 3+ 3+ 2+ 2+
7. Air conditioner comfort 2+ 2+ 1+ 1+
8. Ductwork 3+ 3+
9. Fire-rated duct 1 1
10. Dampers 1+ 1+
11. Fire Dampers 1 1
Fire protection
1. Wet/Dry riser 1+ 1+ 1+
2. Sprinkler 1+ 1+
3. Fire alarm 1 1
4. Hose reel 1+ 1+ 1+
Plumbing and sanitary
1. Concealed pipes 2+ 3+ 1 1+
2. Exposed pipes 2+ 4+ 4+ 4+
3. Water tank 1 1 1 1
4. Pump and motor 1 1+ 1+
Minimum Sample 15 20 27 32
Maximum Sample 22 35 40 47
Note:
1. Remarks: means to be repeated for additional samples required.
12
Assessment of external works is carried out upon completion of the building and before the handover
of the project.
c) Roadwork and parking bay - 10 m length section per sample and minimum 2 samples
on the ground
d) Footpaths and turfing - 10 m length section per sample and minimum 2 samples
e) Playground - 1 location
f) Court - 1 location
g) Fence and gate - 10 m length section per sample and minimum 1 sample
Each item in the external works will be assessed separately and all the listed locations must be assessed,
where applicable. The total QLASSIC score for external works shall be the marks achieved divided by
the total achievable marks.
13
Up to 3 m 6 mm
14
Assessment
Item Element Standard Tolerance Method
3. Condition of i. Formwork must be free from Visual
formwork, props and defects
bracing
ii. Before concreting, the interior Visual
must be free from debris
2. Anchorages and lap Required leg length and not Steel measuring
lengths less than that specified 5 mm tape
3. Cover provision According to specification Measurement
tape
15
Up to 3 m 6 mm
Steel
3 m to 4.5 m 9 mm measuring
tape
4.5 m to 6 m 12 mm
Up to 3 m 6 mm Steel
measuring tape,
3 m to 6 m 9 mm spirit level
and L-square
4.5 m to 6 m 12 mm
16
Assessment
Item Element Standard Tolerance Method
v. Squareness of precast
member - difference between
the greatest and shortest
dimensions should not exceed
the following:
17
Assessment
Item Element Standard Tolerance Method
18
4. Cast-in steel i. Tolerance for position of cast-in steel 6 mm from Steel measuring
items/welded and items centre line tape
bolted connection location in
drawings
19
Assessment
Item Element Standard Tolerance Method
20
21
22
4. Beam position i. Beams shall not deviate from their Steel measuring
specified positions relative to the tape
column to which they are connected
by more than 5 mm
24
1. General i. Finishing
requirements No stain marks Visual
25
5. Carpet Surface should be stretched firm 3 mm per Spirit level and steel
and even 1.2 m wedge
26
v. Jointing
Edges to be straight, aligned and Visual
consistent
2. Plaster finishes No visual cracks Visual
3. Tiled finishes Joints are aligned between tiles and Visual
consistent size
27
5. Wall paper Wall paper should be stretched and 3 mm per Visual and spirit
even surface 1.2 m level
Joints should not be visible Visual
Edges should be neatly laid and Visual
finished
Proper anchoring at all edges Visual
28
1. General i. Finishing
requirements No stain marks Visual
29
v. Accessories Defects
Accessories with good fit and no Visual
stains
No sign of corrosion Visual
No missing or defective accessories Visual
Screws levelled and flushed. No Visual
over-tightened screws
For timber frame, no additional
timber strip added for site adjustment Visual
should be detected
V. WINDOW
31
32
v. Accessories Defects
No missing accessories Visual
No sign of corrosion Visual
No damages/defects Visual
VII. ROOF
1. General i. Finishing
requirements No stain marks Visual
Good paint work Visual
ii. Rough/Uneven/Falls
Smooth and with no tool marks Visual
Even and level, especially with no Visual
potential of stripping
Falls in right direction Visual
iv. Joint/Sealant/Alignment
Consistent joint width, neat and Visual
aligned
v. Chockage/Ponding
No sign of chockage and ponding Visual
vi. Construction
No sign of leaking Visual
Proper dressing for any protrusion Visual
Neat and secured installation of Visual
fixtures
Water ponding < 3 mm Spirit level and steel
2. Flat roof
wedge
Surface to level to avoid tripping Visual
Proper dressing for any protrusion Visual
Openings to be sealed to prevent Visual
pest invasion
Clean and no stain marks Visual
33
34
EXTERNAL FINISHES
VIII.
Ite.m Standard EXTERNAL WALLSTolerance Assessment Tool
1. General i. Finishing
requirements No stain marks Visual
Consistent colour tone and good Visual
paintwork
No rough/patchy surface Visual
ii. Cracks and Damages
No visible damages/ defects Visual
iii. Alignment and Evenness
Walls should be aligned and not Visual
wavy
Edges to be straight and aligned Visual
iv. Jointing
Consistent and neat marking Visual
35
Assessment
Item Element Standard Tolerance Method
1. General i. Finishing
requirements No stain marks Visual
No patchiness and brush marks Visual
ii. Cracks and Damages
No visible cracks and damages Visual
iii. Alignment and Evenness
Finishes must be even, level, Visual
aligned and consistent
iv. Fall/Gradient
Free flowing and no water ponding Visual
v. Joints and Gaps
Consistent joints width and neat Visual
2. Drain cover/ Level and do not warp or rock Visual and physical
inspection Gap between drain covers Steel measuring tape
chamber Gap between sides of drain Measuring tape
No sign of corrosion on the drain 510 mm wide Visual
grating 510 mm wide
Fixtures installed must be safe, Visual and
secured and functional physical
36
Assessment
Item Element Standard Tolerance Method
37
1. Main cables
Support Cables adequately supported and Visual
properly fastened on cable tray/ladder
3. Concealed
conduit
Installation Conduit system properly protected Visual
from damages and blockages
Metalic conduit earthed properly Visual
Termination of conduit to distribution Visual
board/outlet boxes effectively
connected with brass bushes
Conduit properly bent without Visual
distortion and free from damages
Coupling joints fastened Visual
38
Cable tray,
4. ladder and
trunking
Installation All parts are protected against Visual
corrosion
Metallic trunking properly earthed Visual
No sharp bending Visual
Basic colours for identification of Visual
electrical trunking provided (either
by painting over the whole length/
use coloured identification board)
Support Support/brackets at appropriate Visual and physical
interval rigidly fitted
Screw used properly fastened Visual and physical
Fire barrier Fire barrier properly done Visual
Distribution
5. board
Circuit diagram Circuit diagram provided Visual
Proper labeling for panel Visual
39
6. Wiring system
Installation Installed neatly and systematically Visual
Conform to space factor Visual
requirement (30% for duct, 40%
for conduit, 45% for trunking)
Cable termination No reduction of the number of Visual
cable strands at all terminals
No wiring joints for final subcircuit Visual
All elements No visible damages Visual
40
41
4. Chiller
Location and Location and pipe layout installed Visual
installation as per approved building
drawing
Chiller to be levelled when placed Visual
on plinth or vibration isolators
Chiller fixed securely in position Visual
Correct model, make and Visual
capacity
Pipe support and Pipes supported properly by Visual
label hangers or brackets
Pipe connections follow specified Visual
flow direction
No leakage No sign of leakage Visual
All elements No visible damage Visual
42
6. Split unit/window
air conditioner
Installation Units are levelled when placed on Visual
plinth
Drainage provided/units slightly Visual
tilted for condensation
Drain hose connected to the drain Visual
pipe
Cool air is not blocked by beam, Visual
shelving or other built-in furniture
in the room
Seal penetration Proper sealant of wall or roof Visual
opening after pipes are installed
Leakage No sign of leakage from pipe Visual
All elements No visible damages Visual
8. Ductwork
Paints Exposed ductwork and hanger Visual
properly painted to approved
colour code
Support Ductwork properly supported Visual
All elements No visible damages Visual
43
10. Dampers
Access door Damper/splitter damper can be Physical
adjusted freely between the open
and close position
Access door provided to all Visual
dampers
All elements No visible damages Visual
44
1. Wet/dry riser
Landing valve Landing valve must be accessible Visual
Landing valve strapped and
padlocked Visual
Labeling for riser door Visual
Landing valve painted red for wet Visual
riser/yellow for dry riser
Automatic air release valve Visual
provided at the highest mark of
rising main
Pipe and pipe Riser pipes properly supported Visual
support Labeling and painting for riser pipe Visual
Bonding to earth provided for Visual
rising main
Wall/floor Proper wall/floor penetration Visual
penetration
All elements No visible damages Visual
2. Sprinkler No obstruction and painting to Visual
Installation sprinkler heads
Correct sprinkler heads used in Visual
correct locations
Pipe support Pipework properly supported Visual
Wall/floor Proper wall/floor penetration Visual
penetration
45
3. Fire Alarm
Installation Fire alarm wiring in GI conduit Visual
Paints Good condition and finishing Visual
paintwork for panel and conduit
Fire alarm zoning Fire alarm zoning diagram Visual
diagram provided near panels/subpanels
All elements No visible damages Visual
4. Hose reel
Installation Hose reel cabinet properly labeled Visual
Hose reel pipe properly fixed with Visual
hanger and bracket
Hose reel operation instruction Visual
fixed on hose reel drum or door
Paints Good condition and finishing Visual
paintwork
46
3. Water tank
Installation All openings properly covered Visual
Joints and pipe connections are Visual
watertight
Not located below sewerage pipes Visual
47
48
49
50
51
I.
Item i. EXTERNAL WORKS
1. General i. Finishing
requirements No stain marks Visual
Consistent colour tone and good Visual
paintwork
No rough/patchy surface Visual
iv. Functionality
Securely fixed, functional and safe Visual and physical
52
53
i. Gate
Piers and gate to be vertical, Visual
perpendicular and straight.
Gate to be parallel and aligned
i. Overflow drain
No chockage Visual
i. Floor
Fall in the right direction Visual
No water ponding Visual
No sign of delamination Physical and visual
54
55
The committee which developed the Malaysian Construction Industry Standard consists of the
following representatives:
Technical Committee
Ir. Mukhtar Che Ali (Vice Chairman) Construction Industry Development Board
Malaysia
The late Ir. Kor Chan Wah Master Builders Association Malaysia
Brid. Gen. Sr. Haji Mohd Amin Mohd Din Royal Institution of Surveyors Malaysia
Sr. Joshua Kang Wee Leng
Ar. Dr. S C Vadiveloo National House Buyers Association of Malaysia
Mr. Chang Kim Loong
56
Sr. Joshua Kang Wee Leng (Chairman) Canaan Building Inspection Sdn Bhd
Sr. Joshua Kang Wee Leng Canaan Building Inspection Sdn Bhd
57