5.fluidic Proposal BAKTI Project
5.fluidic Proposal BAKTI Project
5.fluidic Proposal BAKTI Project
No Depth of
Scalable Modular
Discharge (DoD)
System Limitation
Power Cells
Ventilation Fans
PBMS
GPRS Modem
Comm Control Board
Washable Filters
EBMS
Energy Cells
Leonics
Outback
Morning Star
SMA
*The above devices have been tested and confirmed for system integration and
Fluidic open for any new device system integration as required
2017 Fluidic Inc. | Proprietary and Confidential
Fluidic Experince
1. Start from 2011 we success deploy morethan 570 sites for backup
telecomunication Equipment
NO AREA QTY
1 Bangka Belitung 13
2 Banten 43
3 Bengkulu 24
4 Jabodetabek 5 2. In 2016 we success install total capacity 23MWh battery in 90 villages across all indonesian
5 Jambi 8 Island supporting ESDM / PLTS Project
6 Jawa Barat 82
7 Jawa Timur 49
8 Kalimantan Barat 39 NO AREA QTY
9 Kalimantan Selatan 34 1 Bangka Belitung 1
10 Kalimantan Tengah 36 2 Kep Riau 1
11 Kalimantan Timur 29 3 Riau 3
12 Kalimantan Utara 1 4 Bengkulu 2
13 Lampung 29 5 Sumatra Barat 9
14 Aceh 28 6 Lampung 5
15 Riau Kepulauan 2 7 NTT 12
16 Riau Daratan 10 8 Kalimantan Tengan 7
17 Sulawesi Tengah 2 9 Kalimantan Utara 3
18 Sumatra Barat 10 10 Sulawesi Selatan 6
19 Sumatra Selatan 24 11 Sulawesi Tenggara 15
20 Sumatra Utara 111 12 Maluku 6
Summary 579 13 Maluku Utara 2
14 Papua 13
15 Papua Barat 9
2017 Fluidic Inc. | Proprietary and Confidential Summary 94
Fluidic Experince
3. Start from 2014 until now we success to rentall 4. Middle of 2016 we install for BTS high value with high
system for backup telecomication Equipment. Community issue (high theif) site.
Physical Characteristics
Number of Cabinets 1
Cabinet Dimensins HxWxD 2200 x 800 x 1000 mm
Weight - Cabinet 160 kg
Weight - Energy Cells 800 kg 400 kg
Weight - Power Cells 64 kg -
Energy Cell Container Material UL90HB, ABS Plastic
Environmental Protection IP55 Outdoor Enclosure with Fans
Fluidic TP / SI
Fluidic TP / SI
Design Power System
Site Power Requirement R
Capacity (Power) Planning and Site Load Profile R Site Preparation & Infrastructure
Power System Specification R
CME, Foundation R
Fluidic Battery Sizing Recommendation R S Battery Foundation and Layout S R
PV Sizing Recommendation S R DC Panel/Distribution Box S R
Supply of Information for Fluidic Dimension and Pad Specification R S Power Wiring Diagram S R
Design of Fluidic Layout on Site S R Community issue S R
Power System Layout S R
Power Operation & Maintenance and Spare Part Return and Replacement Transport & Insurance (Land, air, water)
Maintenance Tools R Transport & Insurance for Fluidic Battery to Site R
Data Transmission Cost for Fluidic Monitoring System (pulsa) S R Transport for Level 3 (site visit) R
Fluidic Monitoring System (NOC) R S
Create Work Order (Manage Ticket) for each Alarm Occurs at FluidicIQ R S
Fluidic Technical Support will Identify the Alarm and fix through remote R S Implementation
In case the Alarm couldn't be fixed by remote, the Field Service Team need to visit the Site for Installation, Comissioning & Acceptance for PV R
Trouble Shooting with Fluidic Support Team Guidance as well as for identify the Faulty Part S R Installation, Comissioning & Acceptance for Battery R
that need replacement
Field Service Team to packing the Faulty Part accordance Fluidic Standard Packaging S R
Return the faulty part from the Site to Fludic Facility S R BAST/Acceptance
Repair the faulty part at Fluidic Facility R S
Acceptance for power R
Deliver the repaired/replacement part to TP / SI Warehouse at Jakarta R S
BAST documentation for power R
Deliver the repaired/replacement part from TP / SI Warehouse to Site S R
Install and integrate the repaired/replacement part into the Fluidic System S R Post Acceptance
High Level Engineering/Developer Support (L3) R S L1 support of Fluidic Battery S R
L2 support of Fluidic Battery S R
System Training and Manual (Jakarta) L3 support of Fluidic Battery R S
Fluidic Installation Training R S
Fluidic Installatiion Manual R S Note:
X Responsible/Take the Lead
Fluidic Operation and Maintenance Training R S
S Support/Assistance
Power Cell
Energy Cell
Power Cell with Standard Power Cell with Extra or Weight Unit Specification
Packing / 4 Unit Pallet Packing with Standard Packing
Cabinet KG 168
Energy Cell KG 20
Power Cell KG 24
Item Description # Unit per Packing Fluidic Standard Packing Extra Cost for Non Standard Packing
(with Pallet - Wooden Crate) - IDR
Cabinet per Cabinet Included 300,000
Item Description Extra Cost for Non Standard Packing FE44 Configuration FE20 Configuration
(with Pallet - Wooden Crate) - IDR # Extra Packing Extra Cost (IDR) # Extra Packing Extra Cost (IDR)
1,600,000 800,000
If required, for more specific and custom application, the System Integrator can
consult to Fluidic
Flexible metal pipe 3/4 inch diameter for connection pipe from the PVC conduit to
5 the battery (0,5 m at top foundation to battery cable entry) and from the PVC m 40
conduit to shelter (1.1 m from existing soil to cable entry at bottom of shelter wail)
7 Vinyl Black / Accessories for pipe connection for Power Cable & Grounding Cable pcs 20
8 Vinyl Red / Accessories for pipe connection for Power Cable & Grounding Cable pcs 20
9 Skun 50 mm pcs 6
12 Dynabolt Pcs 4
13 Rj45 Pcs 4
Note : the above Installation Materials is for the standard distance from the Battery location to the Panel Box. Each Fluidic Cabinet
will require the above quantity