Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

PS PDF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

NCEES PRINCIPLES AND PRACTICE OF SURVEYING (PS)

EXAM SPECIFICATIONS
Effective Beginning with the October 2005 Examinations

The exam is a 6-hour open-book exam. It contains 67 multiple-choice questions in the 4-hour
morning session, and 33 multiple-choice questions in the 2-hour afternoon session. Examinee
works all questions.
The exam uses the US Customary System (USCS) of units.

Approximate
Percentage of the
Knowledge Examination

I. Standards and Specifications 15%


A. Federal statutes, laws, rules and regulations
B. U.S. Public Land Survey System
C. U.S. National Map Accuracy Standards
D. ALTA/ACSM Surveys
E. Geodetic control network and mapping accuracy standards
F. FEMA

II. Legal Principles 25%


A. Common/case law boundary principles
B. Sequential and simultaneous conveyances
C. U.S. Public Land Survey System
D. Controlling elements in legal descriptions
E. Riparian and littoral rights
F. Property title issues (e.g., encumbrances, interpretation,
deficiencies)
G. Sovereign land rights (e.g., navigable waters, eminent domain)
H. Prescriptive rights/adverse possession
I. Easement rights
J. Parol evidence

III. Professional Survey Practices 30%


A. Research 8%
1. Public/private record sources
2. Project planning (e.g., photogrammetric, geodetic, boundary)
3. Control datums and easement rights
4. Control network accuracy standards
B. Field Procedures 8%
1. Instrument operations and usage
2. Monumentation (e.g., identification, classification,
perpetuation)
3. Survey control (e.g., boundary, topographic, photogrammetric)
4. GPS operations
5. Construction staking

1
C. Calculations and Compilations 7%
1. Mapping methods and/or projections
2. Graphical terrain representations
3. Geoid, ellipsoid, and orthometric heights
4. State Plane Coordinate Systems
5. GPS data reduction and analysis
6. Control network calculations, analysis and adjustments
7. Determination of bearings/azimuths
8. Area/volume calculations
9. Horizontal and vertical alignment calculations
10. Construction staking calculations (e.g., plan interpretation)
D. Documentation 7%
1. Survey maps/plats
2. Survey reports
3. Descriptions

IV. Business/Professional Practices 15%


A. Project planning (e.g., parameters, costs)
B. Contracts
C. Risk management (e.g., liability, safety procedures, insurance)
D. Ethics
E. Communications (oral, written, graphical)
F. Quality assurance procedures

V. Types of Surveys 15%


A. ALTA/ACSM surveys
B. Control and geodetic surveys
C. Construction surveys (e.g., construction calculations and staking)
D. Boundary surveys
E. Route and right-of-way surveys
F. Topographic surveys by field methods
G. Topographic surveys by photogrammetry

You might also like