Concrete Quantity Calculation: Project Title
Concrete Quantity Calculation: Project Title
Concrete Quantity Calculation: Project Title
PROJECT TITLE:
ITEM NO.
Description Quantity
Mixture Class AA
Bag (in kg) 40kg
Volume 10.000
Cement 12.000
Sand 0.500
Gravel 1.000
Order: 120.000 bags of Cement
5.000 cu.m. of Sand
10.000 cu.m. of Gravel
CONCRETE QUANTITY CALCULATION
PROJECT TITLE:
ITEM NO.
QUANTITY OF CEMENT, SAND, GRAVEL FOR SLAB AND WALLS PER SQUARE METER
AREA
Description Quantity
Mixture Class A
Bag (in kg) 40 kg. cement