DIKE CREST (ELEV.=15.

73m)
2
1

1
1

BOULDER FILL
125mm DIA. TO 250mm DIA.

2
1

TOP OF CAPPING BEAM (ELEV.=10.12m)

Ø12@250 B
1 TYPICAL CROSS SECTION DETAIL 3

12 SCALE: 1:50
4 - Ø10 B
4

6 - Ø16 B
1

Ø10@250 B
2

TYPE II, SHEET PILE(6.00L.M.) 3 CAPPING BEAM DETAIL


12 SCALE: 1:15

t REINFORCEMENT SCHEDULE & ESTIMATED QUANTITIES


height
REINFORCEMENT
CONCRETE
BAR DIMENSIONS (mm) TOTAL UNIT VOLUME
SPACING TOTAL
width width MARK
SIZE
QUANTITY SHAPE LENGTH WEIGHT
WEIGHT
3
(m )
(mm) (mm) b c HOOKS (m) (kg/m)
a (kg)

2 CROSS SECTION OF STEEL SHEET PILE B 16 6 AS SHOWN A 1000 - - - 6.00 1.579 9.474
DRAWN NOT TO SCALE 1
12
B 10 4 250 C 300 500 - 4.01 2.47
2 102 0.616
0.54
B 4 250 B 300 - 6.00 5.34
3 12 1000 102 0.890

PROPERTIES OF STEEL SHEET PILES B


4
10 4 AS SHOWN A 1000 - - - 4.00 0.616 2.46

GRAND TOTAL 19.748 0.54


BAR BENDING DIAGRAM
a
SECTION WIDTH HEIGHT THICKNESS SECTION AREA WEIGHT WEIGHT MOMENT OF INERTIA SECTION MODULUS
mm mm mm cm/m kg/m kg/m2 cm /m cm /m b b
a b
a a
A
11 400 100 10.5 61.2 48 120 8740 874 B C