Testing of Turbo Generator: Chapter-1Introduction
Testing of Turbo Generator: Chapter-1Introduction
with gearbox. The rotor was excited by thyristor converter system located in an
independenttest room and the operation was controlled from the test gallery.The
following first two tests will be conducted on the stator and rotor before
assemblingand the third and final routine tests will be conducted after assembling
the turbo generator.a.
1.4. THEME
Testing is an activity, which basically evaluates a component, and or a product
(builtup of component assemblies) as to whether it has the technical capability that
has been builtinto it by way of design, materials, and technological processes
employed whilemanufacturing and workmanship.
Type tests. b.
Routine tests.c.
Process tests
The characteristics of testing:
1)
The definition and objective of the project as well as the design of the project
which is followed by the implementation and testing phases is studied in detail.
Finally the project
has been concluded successfully and also the future enhancements of the project w
ere shown.The organization of the project is as follows by1.
Introduction2.
Literature survey3.
System development4.
Analysis of a turbo generator is studied and the precise results are shown in order
toensure that the turbo generator chosen is deliverable good.