Pilecapsinthesecondthirdofthebuildingwerepoured.
Reinforementforthepilecapsinfinalthirdofthebuildingcontinuetobeinstalled
Slabreinforcementinthesecondthirdofthebuildingarebeinginstalled.
TheinstallationofU/Gsewerlines,electricalconduits,pilecapsandcolumnscontinuesintheGreatHouse
Villas
Villa4slabwaspouredandcontinuestobecured.Wallbarsarebeingerrectedforvilla4.Fourconcretecylindersamplesweretakentothelabtobetested.
Curingofvilla3slabendedthisweek.Splicelengthsforhorizontalwallbarsinvilla3werecorrected.
Wallbarsforvillas13havebeenerected.
Cottages
Installationoftheundergroundplumbingforcotteges4,3,2werecompletedthisweek.
MainResturauntBuilding
Excavationandinstallingofundergroundplumbingareongoing.
Fillingandcompactionforoutdoordininigpavillionareunderway.
Spa
TherenovationworksbytheSpacontinues.
Excavationforstarcasecompleted.
Workonplantersareongoing.
RetainingwallWCottages
Retainingwallbythecottageswaspoured.
RetainingWallEntertainmentPavillion
Reinforcementofretainingwallwasplacedandthenbaseofwallpoured.
SingleCellCulvert
Pipesweredivertedaroundtheareatoallowforexcavation.
Areawaspumpedtoremovethewaterthatseepedthroughtthedam
Fillingoftheareaiscurrentlytakingplace.
Compaction
CompactionandtestinginSectionAandCsouthofGreatHouseareongoing.Fillingforthe12thand8threspectivelyarealsoongoing.
CompactionandtestinginSectionB7greenareaareongoing.
Compactionandtestingofmainresturauntoutdoordinningpavillionongoing.
Attheendofweek26approximately62%oftheestimateledfillmaterialhasbeenplaced.
Intheweek28,fillworkandcompactiontestsareexpectedtocontinuesouthoftheGreatHouse,greenareasandalsoontheroadways.Theinstallationoftheundergroundplumbingformainrestaurantwillcontinue.Placementofreinforcement
willcontinueintheGreatHouseandisexpectedtocommenceforthecottages.ErectionofwallbarswillcontinueontheremainingGreatHousefoundation.Aconcretepourforthesecondthirdofthegreathousecanbeexpectedinthecoming
week.
ErectionofthewallbarsfortheEPretainingwallareexpectedtocontinueintoweek28.
Formworkforwallsareonsiteandsoerectionofformworkinthevillascanbeexpectedtocommence.
Meetings,DrawingsandOtherInformation
Comments
MeetingsandDiscussions N/A
Drawings/Sketches CD_OleanderCivilSetAddedendum2
ExtractSitePlanC3.01
Attachements
CompactionTestResults
Photos Sitephotographsattached
Ownerorrepresentativecausesofdelays N/A
Contractororrepresentativecausesof
N/A
delays
Fieldchange N/A
Dailysafetymeeting N/A
AccidentReport N/A
Works
Date Comments
CompactionoffillcontinuessouthofGreatHouse.
Installationofpilecaps,columncagesandtiebeamscontinueintheGreatHouse.
MSLcontinueswithinstallationofundergroundpipesforgrinderpumpsbythecottages.
Totalofsixgrinderpumpshavebeeninstalledtodate.
Theinstallationofconduitscontinueinthelaundrypod.
Monday(30102017)
TheinstallationofformworkcontinuefortheVilla4foundation.
Villa3wallbarscontinuetobeerected.
Excavationforthesinglecellculvertpauses.
Sewagelinebrokenduringexcavationforthesinglecellculvert.
Thediversionofpipescontinuesouthofthesinglecellculvertconstruction.
CompactingoffillcontinuessouthofGH.
Installationofpilecaps,columncagesandtiebeamscontinueintheGreatHouse.
MSLcontinueswiththeinstallationofU/GpipesforgrinderpumpsbytheCottages.
FoundationforVilla4hasbeenpoured.
ConcreteCylindersamplingwasdoneforVilla4foundation.
Atotalofsixgrinderpumpshavenowbeeninstalled.
Tuesday(31102017)
ErectionofVilla3wallbarscontinuetobeerected.
WorkonADSmanhole2hasbegan.
Sharpeningtheedgesoftheplantersatthespa.
Excavationforthesinglecellculvertcontinues.
Damagesewagelinebythesinglecellculverthasbeenrepaired
Thediversionofpipescontinuesouthofthesinglecellbridgeconstruction.
CompactingoffillcontinuessouthoftheGreatHousecontinues.
Installationofpilecaps,columncagesandtiebeamscontinueintheGreatHouse.
PilecapPC8alonggridlineEGHwaspoured
ErectionofwallbarsforVilla4hasbegun.
Atotalof7grinderpumpshavenowbeeninstalled.
CorrectiontothesplicelengthsonVilla3aretakingplace.
Wednesday(01112017)
WorkonADSmanhole2continues.
Workonplantersandthespacontinues.
SettingoutforMainResturantbuldingisongoing.
Excavationforplumbinginmainresturauntbuildinghasbegun.
CompactionfortheoutdoorDinningPavilioncontinues.
Fillingforthesinglecellculvertbegan.
Thediversionofpipescontinuesouthofthesinglecellbridgeconstruction.
CompactingoffillcontinuessouthofGHcontinues.
Installationofpilecaps,columncagesandtiebeamscontinueintheGreatHouse.
ErectionofwallbarsforVilla4continues.
CorrectiontothesplicelengthsonVilla3havebeencompleted.
CompactionfortheMainResturantoutdoordinningpavilioncontinues
CompactionTestswereconductedonasectionoftheMainresturantoutdoordinningpavillion.
SettingoutforMainResturantbuldingisongoing.
Thursday(02112017)
Excavationforplumbinginmainresturauntbuildingcontinues.
WorkonADSmanhole2continues.
PlacingofreinforcmentforEPretainingwallhasbegun.
Fillingforthesinglecellculvertisongoing.
Excavationatspaforstaircaseisongoing.
CompactingoffillcontinuessouthofGreatHousecontinues.
Installationofpilecaps,columncagesandtiebeamscontinueintheGreatHouse.
Pilecapsinthesecondthirdofthegreathousewerepoured.
ErectionofwallbarsforVilla4continues.
CompactionfortheMainResturantoutdoordinningpavilioncontinues.
Excavationforplumbinginmainresturauntbuildingcontinues.
InstallationofplumblingforMainResturantBuildingcontinues.
Friday(03112017)
Fillingformainresturauntoutdoordinninghallhasstarted.
FillingandcompactioninSectionBsouthofgreathousebegan.
FIllingandCompactionofSectionAandCisongoing.
PlacingofreinforcmentforEPretainingwallcontinues.
Fillingforthesinglecellculvertisongoing.
Trenchforsinglecellculvertisbeingpumpedout.
CompactingoffillcontinuessouthofGreatHousecontinues.
Installationofpilecaps,columncagesandtiebeamscontinueintheGreatHouse.
Slabreinforcementforthesecondthirdofthegreathouseisbeingplaced.
ErectionofwallbarsforVilla4continues.Slabalsocontinuestobecured.
FillingandcompactioninSectionBsouthofgreathousecontinues.
FillingandcompactioninSectionAandCsouthofgreathousecontinues.
Saturday(04112017)
Baseofretainingwallbyentertainmentpavillionwaspoured.
Fillingforthesinglecellculvertisongoing.
Trenchforsinglecellculvertisbeingpumpedout.
Excavationforplumbinginmainresturauntbuildingcontinues.
InstallationofplumblingforMainResturantBuildingcontinues.
Fillingformainresturauntoutdoordinninghallisongoing.
CompactionfortheMainResturantoutdoordinningpavilioncontinues.
GeneralSitemanagement
Item Comments
Health&Safety Workersonsitearegearedinclosedtoeshoes,safetyvestsandhardhat.
1..Dckneedstoensurethattrashcansareplacedandutilizedbythenorthernendofthesitetoreducetheaccumilationofwastenearthecoast.
EnvironmentalIssues
2.dckneedstoensurethatthetruckwashthatisbuilthasafiltersystemthatwillnotallowforoiltogetintothesea/canal.
ElectriciansneedstoensurethatconduitsbeinginstalledareinstalledaspernotesonS0.01.concretecoverforrebararebeingcompromisedduetoimproperinstallation.
Boxedoutbaseplatesarenotpreventingconcretefromcoveringthesteelandthereforewillstillneedtobedrilledfortheinstallationoftheactualbaseplates.
Manholesarenotbeingconstructedasperapproveddrawings.InconcsistentstructuraldetailsthatdifferfromthosesubmittedinSI068C.Dumpingdryconcretematerialintofloodedtrenchesraises
ConstructionIssues
concernsaboutthestrengthoftheconcretebeingused.
Termitetreatmentsarebeingcarriedoutwhenthegroundiswet
Concretepoursarebengdonewithoutnotice.Thismakesitimpossibletoperformqualitycontrolchecks.
ListofRecommendations/Instructions
1 dckhasbeeninstructedtodeliverdumpticketstotheIBEC'sofficeonaweeklybasis.
2 dckshouldhaveatruckwashstand/serviceareaforheavyequipmentandtrucksgoinginandoutofthesite.
3 dckhasbeenaskedtopaykeenattentiontotheGeneralNotesonStructuraldrawingsasitrelatestoconduitinstallation.
4 dckhasbeeninstructedtoensurethatthegroundisresonablydrybeforetermitetreatment
HM/OSiteIssues
Termitetreatmentisbeingappliedoverwetandheavilysaturatedfill
01/11/2017(Email)
materialatthebaseoftheconcreteslabs,henceresultinginalesseffective
solutionforthefoundation.
Theexistingstormdrainsshouldbemaintained,andwherethefillworksdo
19/09/2017(Email)
notallowthis,DCKshouldprovideprovisionsstormwaterflowstoavoid
floodingareassurroundthesite(theresort).
Manholesarenotbeingconstructedasperapproveddrawings. 01/11/2017(Email)
InconcsistentstructuraldetailsthatdifferfromthosesubmittedinSI068C.
Wehavenotreceiveddumpmaterialtickets.Thebuilding&environmental 19/09/2017(Email)
permitareissuedtoHalfMoon(notthecontractor)andtherefore
Thematerialisnotbeingplacedseparately,andthereforewearenotclear
19/09/2017(Email)
oncompactiontestingparameterstobeused.Shouldweusethehigher
value,compactiontestarenotlikelytoachievepassingresults.
Surveyinformationisnotbeingdeliveredinatimelymanner. 19/09/2017(Email)
StillawaitinginstalledasbuiltsforSDpipes.
dckneedstoensurethatthetruckwashisbuiltandthatithasafiltersystem 27/09/2017SiteMeeting
thatwillnotallowforoiltogetintothesea/canal.
dckhasnotbeenprovidingconcretepourdatesandsocylindersamplesare 04/11/2017(Email)
notbeingtakenforGreatHouseslabpoursamongotherslabs.
Pickershavebeenassignedtoremove
Fillmaterialgradationdoesnotnotmatchthespec.Wehaveobserved
19/09/2017(Email) bouldersbeforecompactionoffill
instancewherematerialbeinginstalledisoutsideoftheallowable
(WeekofOct9,2017)
parameter.
Fillmaterialgradationisaconcernattheupperlayers.Pipesarebeing 11/10/2017SiteMeeting
19/09/2017(Email)
installedinfillwithboulders/largerthan2.Thereisconcernofpotential (dcktodoonsitechecks)
damageofserviceswherethereisinadequatebeddingmaterial.
Spoketodckrepresentative dckhashiredaconcrete/steel
Electriciansneedstoensurethatconduitsbeinginstalledareinstalledasper 04/10/2017 supervisortoassistwithchecksbefore
notesonS0.01concretecoverforrebarsarebeingcompromiseddueto &25/10/2017 pours
improperinstallation&nospacingsareleftbetweenconduits.
CompactionTests
95.3% 12.9% 6
96.0% 13.4% 6
91.7% 12.6% 6
95.3% 11.6% 6
96.1% 12.7% 6
95.2% 10.8% 6
95.1% 12.3% 6
91.8% 13.5% 6
95.3% 14.3%
93.8% 13.1%
95.4% 14.7%
97.4% 10.6%
96.3% 12.4%
97.2% 11.3%
SectionA RETEST 8th 112.2% 8.9% 6
92.6% 11.2%
100.2% 9.4%
93.3% 10.0%
94.0% 12.4%
101.1% 10.6% 6
99.4% 11.2% 6
94.6% 13.3% 6
96.2% 10.7% 6
93.8% 11.6% 6
94.5% 11.4% 6
96.5% 11.1%
97.5% 9.6%
95.0% 12.0%
95.5% 10.9%
95.8% 12.6%
95.0% 11.4%
96.2% 12.7%
94.3% 13.1% 6
97.5% 11.6% 6
93.1% 13.3% 6
93.3% 14.3% 6
92.2% 15.0% 6
96.1% 12.3% 6
100.2% 11.5% 6
93.5% 14.6% 6
95.3% 14.0% 6
97.8% 13.4% 6
99.7% 12.4%
95.2% 13.0% 12
98.4% 12.8% 12
98.4% 12.7% 6
98.0% 14.0% 6
96.9% 14.0% 6
96.4% 13.4%
98.0% 12.9% 6
95.2% 14.5% 6
100.1% 12.5% 6
95.7% 14.2% 6
A
B
C