WSA 03-2002 Water Supply Code of Australia (Hunter Water Edition) Version 1
Comparison with
WSA 03-2011 Water Supply Code of Australia (Hunter Water Edition) Version 2
PART 1
FIGURE HW 1.2 WATER SUPPLY PLANNING AND DESIGN REQUIREMENTS
TABLE HW 2.4 WATER SUPPLY DESIGN DEMANDS
rural houses 350 0.96 2.25 2.16 2.02 4.36 1.15 2.48 1.8 1.73 3.49
flats/units 130 0.36 2.20 0.78 2.02 1.58 1.15 0.90 1.76 0.63 1.27
industrial light 4,200/ha 11.5/ha 1.20 13.8/ha 1.30 18.0/ha 1.15 15.9/ha 1.14 13.1/ha 17.0/ha
industrial medium 9,660/ha 26.5/ha 1.20 31.8/ha 1.30 41.3/ha 1.15 36.5/ha 1.14 30.2/ha 39.2/ha
industrial heavy 25,000/ha 68.5/ha 1.20 82.2/ha 1.30 156.2/ha 1.15 94.5/ha 1.14 78.1/ha 148.35/ha
commercial 4,200/ha 11.5/ha 1.20 13.8/ha 1.90 26.3/ha 1.15 15.9/ha 1.14 13.1/ha 24.9/ha
DEMAND CATEGORIES
Unaccounted
Clubs Hotels
Average Day
Extreme Day
Commercial
Institutions
Industrial
Domestic
Domestic
Colleges
Gardens
Schools
Peak &
Motels
Parks
Time
0:00 0.24 0.48 0.81 0.18 0.18 0.45 0.25 0.20 1.00
0.30 0.19 0.45 0.79 0.14 0.14 0.44 0.25 0.20 1.00
1.00 0.18 0.42 0.78 0.11 0.11 0.43 0.25 0.20 1.00
1.30 0.16 0.40 0.76 0.10 0.10 0.42 0.25 0.20 1.00
2.00 0.16 0.37 0.75 0.11 0.11 0.41 0.25 0.20 1.00
2.30 0.16 0.38 0.75 0.14 0.14 0.41 0.25 0.20 1.00
3.00 0.16 0.38 0.75 0.15 0.22 0.42 0.25 0.20 1.00
3.30 0.17 0.32 0.75 0.17 0.35 0.43 0.25 0.20 1.00
4.00 0.17 0.27 0.75 0.19 0.64 0.45 0.25 0.20 1.00
4.30 0.18 0.28 0.75 0.21 0.82 0.48 0.25 0.20 1.00
5.00 0.22 0.29 0.75 0.23 0.98 0.53 0.25 0.20 1.00
5.30 0.24 0.35 0.77 0.28 1.15 0.62 0.50 0.20 1.00
6.00 0.30 0.40 0.82 0.51 1.25 0.74 0.80 0.20 1.00
6.30 0.44 0.61 0.87 1.70 1.32 0.92 1.00 0.20 1.00
7.00 0.60 0.81 0.97 1.80 1.37 1.06 1.15 0.30 1.00
7.30 0.73 1.00 1.02 1.80 1.42 1.18 1.30 1.50 1.00
8.00 1.18 1.19 1.20 1.82 1.45 1.26 1.40 1.90 1.00
8.30 1.47 1.26 1.20 1.85 1.47 1.31 1.45 2.20 1.00
9.00 1.79 1.33 1.20 1.85 1.50 1.30 1.50 2.20 1.00
9.30 1.86 1.31 1.20 1.85 1.50 1.28 1.45 2.20 1.00
10.00 1.95 1.28 1.20 1.85 1.50 1.25 1.40 2.20 1.00
10.30 1.88 1.22 1.22 1.85 1.50 1.23 1.40 2.20 1.00
11.00 1.82 1.16 1.25 1.85 1.50 1.20 1.35 2.20 1.00
11.30 1.68 1.12 1.25 1.85 1.50 1.18 1.35 2.20 1.00
12.00 1.56 1.07 1.26 1.87 1.50 1.17 1.30 2.20 1.00
12.30 1.34 1.03 1.27 1.90 1.50 1.16 1.30 2.20 1.00
13.00 1.20 0.98 1.28 1.90 1.50 1.16 1.25 2.20 1.00
13.30 1.14 0.96 1.30 1.90 1.50 1.17 1.20 2.20 1.00
14.00 1.14 0.93 1.26 1.88 1.50 1.18 1.20 2.50 1.00
14.30 1.13 0.95 1.24 1.85 1.50 1.19 1.20 2.50 1.00
15.00 1.14 0.97 1.22 1.85 1.48 1.21 1.20 2.50 1.00
DEMAND CATEGORIES
Unaccounted
Clubs Hotels
Average Day
Extreme Day
Commercial
Institutions
Industrial
Domestic
Domestic
Colleges
Gardens
Schools
Peak &
Motels
Parks
Time
15.30 1.18 0.98 1.20 1.80 1.47 1.24 1.25 2.50 1.00
16.00 1.20 0.99 1.20 1.75 1.44 1.30 1.25 2.40 1.00
16.30 1.36 1.12 1.10 1.63 1.41 1.38 1.25 2.00 1.00
17.00 1.48 1.24 1.05 1.50 1.35 1.48 1.25 0.30 1.00
17.30 1.62 1.40 1.03 1.10 1.30 1.56 1.25 0.20 1.00
18.00 1.73 1.55 1.00 0.75 1.22 1.61 1.25 0.20 1.00
18.30 1.86 1.70 1.00 0.60 1.13 1.64 1.30 0.20 1.00
19.00 1.86 1.84 1.00 0.48 1.04 1.66 1.35 0.20 1.00
19.30 1.76 1.93 1.00 0.40 0.95 1.62 1.40 0.20 1.00
20.00 1.54 2.02 1.00 0.39 0.86 1.46 1.45 0.20 1.00
20.30 1.37 1.94 0.95 0.32 0.75 1.25 1.45 0.20 1.00
21.00 1.21 1.86 0.90 0.30 0.64 1.04 1.40 0.20 1.00
21.30 0.99 1.57 0.87 0.29 0.53 0.85 1.35 0.20 1.00
22.00 0.77 1.29 0.85 0.26 0.43 0.70 1.30 0.20 1.00
22.30 0.63 1.06 0.83 0.25 0.34 0.58 1.00 0.20 1.00
23.00 0.48 0.83 0.82 0.23 0.23 0.52 0.70 0.20 1.00
23.30 0.38 0.66 0.81 0.21 0.21 0.47 0.35 0.20 1.00
INSPECTION AND
ACCEPTANCE OF
ITEMS e.g. pumpsets, CONSTRUCTORS
frame, enclosure, PRE-COMMISSIONING
control panels, pipes,
valves, fittings etc.
ACCEPTANCE
TESTING OF COMMISSIONINGisolations
ELECTRICAL ITEMS removed, water allowed to flow:
e.g. switchboard Complete instrument, set-up
SIGNED OFF BY PRE-COMMISSIONING: and cross check
CONSTRUCTOR Switchboard Cycle pumps under auto
Pumps/starters/protections controls
CUT-OVER to
Valves Finalise SCADA parameters SCADA
Alarms setup SIGNED-OFF BY WATER
Controls (RTU & PLC) setup AGENCY APPROVED BY
WATER
I/O confidence check AGENCY
Communications
telecommunications, telemetry,
alarms, etc.
DELIVERY Booster picture, alarms, sequence at
control centre.
HANDOVER TO
WATER AGENCY
Defects/ Non-
conformance RISK
ROADWORKS, reports (NCRs) ASSESSMENT HANDOVER
SITE closed out updated PRE-
RESTORATION COMMISSIONING PRACTICAL
completed CHECKLIST COMPLETION
OPERATIONAL
completed (Handover)
COMPLETION TRAINING and Certificate
Pumping system FAMILIARISATIO SIGNED OFF BY
functionally complete N completed WATER AGENCY
Functional access for SYSTEMS DEFECTS
maintenance truck and closed out
mobile generator WORK AS CONSTRUCTED
DRAWINGS and EQUIPMENT
Commissioning MANUALS finalised
completed, telemetry is
functional OPERATIONAL
Marked up drawings on DATABASE RECORDS
site updated
DOCUMENTS
Commissioning records COMPLETE
on site
CONTINGENCY PLAN and
Contingency plan marked OPERATIONS MANUAL CONTINGENCY
up and on site finalised PLAN tested. if
Operational completion required
certificate AS-BUILT NEEDS DEFECTS
SPECIFICATION (WAC LIABILITY
Supplement)
POST-
SIGNED OFF BY WATER COMMISSIONING GEOGRAPHIC
AGENCY TESTS (overflow, DATABASE updated by
system storage, COMMISSIONING Water Agency
noise) if required RECORDS finalised