Sludge Thickener Pump Head Calculation
Sludge Thickener Pump Head Calculation
Sludge Thickener Pump Head Calculation
SUCTION LINE
Pipe Loss:
Items DN Qty C Q hf
Pipe 200 16.000 LM 120 0.027 0.075 m
Pipe (Suction Header) 250 2.100 LM 120 0.053 0.012 m
Pipe 125 1.800 LM 120 0.027 0.084 m
Total Pipe Friction Loss 0.171 m
Fitting Loss:
Items DN Qty K V hv
22.50 Bend 200 1 Nos 0.045 0.849 0.002 m
Butterfly Valve 200 3 Nos 0.16 0.849 0.018 m
Line Flow Tee (200x80) 200 1 Nos 0.30 0.849 0.011 m
Branch Flow Tee (Equal) 200 1 Nos 0.75 1.698 0.110 m
Conc Taper (200x250) 200 1 Nos 0.25 1.698 0.037 m
Butterfly Valve 250 2 Nos 0.16 1.086 0.019 m
Branch Flow Tee (250x125) 250 1 Nos 0.75 1.086 0.045 m
Butterfly Valve 125 1 Nos 0.75 2.173 0.181 m
Total Fittings Friction Loss 0.422 m
DISCHARGE LINE
Pipe Head Loss:
Items DN Qty C Q hf
Pipe 100 2.5 LM 120 0.027 0.345 m
Pipe (Header) 200 0.68 LM 120 0.027 0.003 m
Pipe (Header) 200 3.1 LM 120 0.053 0.053 m
Total Pipe Friction Loss 0.401 m
Result:
H= 3.350 m
h f= 4.822 m
h V = 3.598 m
TDH= 11.770 m
Design TDH= 10.000 m
Net Available Head= -1.770 DESIGNED HEAD NOT OK
ER PUMP HEAD CALCULATION
UCTION LINE
Remarks
Q for 1 pump
Q for 2 pumps
Q for 1 pump
Remarks
v for 1 pump
v for 1 pump
v for 1 pump
v for 2 pumps
v for 2 pumps
v for 2 pumps
v for 2 pumps
v for 1 pump
SCHARGE LINE
Remarks
Q for 1 pump
Q for 1 pump
Q for 2 pumps
Remarks
v for 1 pump
v for 1 pump
v for 1 pump
v for 1 pump
v for 2 pumps
v for 2 pumps
v for 2 pumps
Remarks
Q for 2 pumps
Remarks
v for 2 pumps
v for 2 pumps
v for 2 pumps
v for 2 pumps
v for 2 pumps