BACKWARD PASS
activity ACTIVITY description Durati pred
previous activity
ES=largest EF o f
on in eces
LF=lowest LS of
days sor
FF=ESnext-EF
(D)
TF=LS-ES
EF=ES+D
LS=LF-D
prev
Early Ear Lat Lat To Fre
start ly e e tal e
fini sta fini flo flo
sh rt sh at at
Forward Backwar
pass d pass
1-2 A Ground beam excavation 1 start 0 1 0 1 0 0
2-3 B Fabrication and assembly of ground 2 A 1 3 1 3 0 0
beam reinforcement
2-4 C Fabrication and installation of ground 1 A 1 2 2 3 1 1
beam form work
2-5 D Fabrication and assembly of slab on fill 2 A 1 3 1 3 0 0
reinforcement
4-6 E Pouring of concrete delivered by transit 1 B,C, 3 4 3 4 0 0
mixers D
6-7 F 14 day curing 14 E 4 18 4 18 0
7-9 G Removal of formwork 1 F 18 19 23 24 5
2-8 H Fabrication of column and beam 3 A 1 4 21 24 20 20
formwork
2-11 I Fabrication of column and beam 3 A 1 4 21 24 20 20
reinforcement
7-10 J Scaffolding assembly 6 F 18 24 26 27 8
10-12 K installation of beam and column 2 J,H,I, 24 26 24 26 0
formwork G
12-13 L Pouring of concrete delivered by transit 1 K 26 27 26 27 0
mixers
13-14 M 14 day curing 14 L 27 41 27 41 0
14-15 N Removal of form and scaffold 2 M 41 43 41 43 0
7-15 O Delivery of steel, roofing and masonry 1 F 18 19 42 43 24
materials
15-19 P Steel truss fabrication and installation 7 O,N 43 50 50 57 7
19-18 Q Placing of corrugated GI sheet and 3 P 50 53 57 60 7
accessories
15-16 R Masonry works 8 N,O 43 51 43 51 0
16-17 S Window and door installation 4 R 51 55 51 55 0
17-18 T plastering 5 S 55 60 55 60 0
18-20 U Finishing works 7 T,Q 60 62 60 62 0