FURUKAWA Viaduct

on New Meishin Exp.


Bridge location
Overall plan view
.0m
For OSAKA L=1
, 475
pans
13 s
Ea
st 10
3.8m
L=47
sp
bo an
un s
d L=
36
con 9 sp ans 5m
tin an
uous s 9 sp
g irder m P1
L=3 1.2 m
15m L=32 R=700
We
st
bou
nd
P1
R=700m

For NAGOYA
Bridge specifications
Project : Furukawa Viaduct,The New Meishin Expressway
Structure : (9~13)spans continuous box girder
Total length : 1,475.0m
Span length : 36.0m (average)
Effective width : 15.0m (average)
Horizontal
alignment : Rmin=700m
Segment configurations
Cast-in-place concrete

1150 2400 1150


2600

4700
Plan Plan
4640 7000 4485 4640 7000 4485
2320

145 ~1032 3590 560 5000 565 3590 145 ~1032 2320 1490 3590 560 5000 560 3590 1335
Cross-section Cross-section

a)Standard segment b)Pier segment


Construction processes
STEP1 Fabrication and Erection STEP3 Cast-in-place slab

transversal tendon
transversal tendon
1S21.8
1S28.6

STEP2 Precast Panels STEP4 Surface


Tendons layout
34861
5800 2600 5200 5200 5200 10861

1 2 3

1-1 2-2 3-3

19φ15.2 n = 12
Full-scale span test
Segment fabrication
Stock yard in the precast concrete factory
Erection Outline
Cast-in-place Concrete Slab

Erection Girder

Precast Panels

Core Segments

Pier Segment
Span-by-span erection
Setting of PC panels
Construction of cast-in-place concrete slab