This document provides equipment usage details for a construction project to build internal roads and infrastructure for 354 residential plots in Shakhboot City. It lists 23 pieces of equipment such as dozers, graders, shovels, cranes, trucks and concrete mixers. For each equipment, it shows the planned number of units to be used each month from June 2017 through November 2018. The largest amounts of most equipment are scheduled between September 2017 and March 2018 during the peak construction period.
This document provides equipment usage details for a construction project to build internal roads and infrastructure for 354 residential plots in Shakhboot City. It lists 23 pieces of equipment such as dozers, graders, shovels, cranes, trucks and concrete mixers. For each equipment, it shows the planned number of units to be used each month from June 2017 through November 2018. The largest amounts of most equipment are scheduled between September 2017 and March 2018 during the peak construction period.
This document provides equipment usage details for a construction project to build internal roads and infrastructure for 354 residential plots in Shakhboot City. It lists 23 pieces of equipment such as dozers, graders, shovels, cranes, trucks and concrete mixers. For each equipment, it shows the planned number of units to be used each month from June 2017 through November 2018. The largest amounts of most equipment are scheduled between September 2017 and March 2018 during the peak construction period.