Indelec Survey Report - Lightning Protection
Indelec Survey Report - Lightning Protection
JE-2004 Building
We recommend to install two units of Prevectron S4.50 which each provide a protection
radius, based on the protection level, and height and specifications of the air terminal, in
order to protect buildings or surrounded areas. These Prevectron S4.50 shall be installed
at least 5 meters above the highest point of areas to be included in their coverage areas
to ensure a complete protection.
At this height, each Prevectron air terminal provides a protection radius of 68 meters.
The Prevectron units must be fixed on an elevation pole, which can be for example a
lighting pole or a dedicated pole. In every case, there should be a minimum distance of 2
meters between the air terminal and any other equipment.
In case of installation of the Prevectron unit on a building, this air terminal shall then be
connected to two down conductors fixed by the means of 3 fasteners per meter.
We strongly suggest to install on a Lightning Flash Counter (Ref. P8011) for checking and
maintenance purposes (allows periodic checking of the number of discharges) for each
single installation.
The base of the down conductor should be protected from accidental knocks and other
damage by means of 2 meter stainless-steel protection sheaths fixed to the building
with 3 fixings supplied.
Earth terminations
Each down conductor should be provided with its own earth termination system using a
triangle earth termination. The triangle termination is made of a set of three copper-
covered steel earth rods totaling a minimum length of 6 meters arranged in a
triangular fashion and separated from each other by a distance at least equal to their
driven depth and interconnected by a conductor identical to the down conductor.
An inspection housing should be installed on each earth termination, near the base of the
down conductor, in order to facilitate ground inspections. A test clamp should be
installed in this inspection housing so that the down conductor may be disconnected from
the earth termination system for regular checks of the earth termination resistance
value.