Structural Inspection Checklists
Structural Inspection Checklists
Structural Inspection Checklists
2 SITE OBSERVATIONS
Fender arrangement should should be as per
8 Approved drawing & project specification
Horizontal/Vertical position for fender should
9 be as per Approved drawing
Mooring system should be as per Approved
10 drawing & project specification
Racking piles for rigied mooring dolphin should be as per Approved
11
drawing
Concrete cup dimension for mooring should be
12 as per Approved drawing
Gang way dimension/materials should be
13 as per Approved drawing & project
specification
Anchor chain should be as per Approved
14
drawing
15 Pontoon/Finger connection should be as per Approved drawing
Bolt connection/grade/Dimension should be as per Approved drawing &
16
project specification
Jetties/Deck slab thickness/Beam/Connection should be as per
17
Approved drawing & project specification
18 Hand rail for Jetties should be as per Approved drawing
Shade details for jetty should be as per Approved drawing & project
19
specification
2 SITE OBSERVATIONS
8 Ponding (sixe & location) should be as per approved drawing.
1 DOCUMENTATION Y N Remark
1 Building Permit
2 Affection Plan
Demarcation Certificate and Bench Mark - Approval (from relevant
3
Authority/Business Unit)
4 Valid Consultant's License
Valid Contractor's License (Valid License of Nominated/Specialized Sub
5
Contractor)
6 Approved Drawings from CED
7 Shop Drawings approved by Consultant (based on A.D of CED)
8 Warranty by Shoring Contractor (after completion of Shoring Works)
Undertaking by Shoring Specialist approved by Consultant that shoring works
9
all lie within the plot limits.
10 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates (by 3rd Party & as per Code
11
Requirements)
12 Tendons Test Certificate (by 3rd Party & as per Code Requirements)
13 Stressing Certificate (by Specialized Sub Contractor & approved by Consultant)
14 CED Inspection Records (Activities as inspected by CED Engineers)
15 NOC from DEWA - Power
16 NOC from DEWA - Water
17 NOC from Telecommunication provider in the area
18 NOC from neighbor/RTA/BU (whenever shoring is outside plot limits)
19 Concrete Mix Design and Trail mix result Report
1 DOCUMENTATION Y N Remark
Site lab certificate by Trakhees
1 Inspection report for 0% of piling work
Test results of A preliminary pile should be verified by the Geotechnical
2
specialist and approved by CED
3 Inspection Report of 50% of Piling Works.
4 Building Permit
5 Affection Plan
Demarcation Certificate and Bench Mark - Approval (from relevant
6
Authority/Business Unit)
7 Valid Consultant's License
8 Valid License of Nominated/Specialized Sub Contractor
9 Approved Drawings from CED
10 Shop Drawings approved by Consultant (based on A.D of CED)
11 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates (by 3rd Party & as per Code
12
Requirements)
Records for Measurement of Verticality of Piles (by Sub Contractor & approved
13
by Consultant)
Betonies Test Records approved by Consultant (applicable to Cast In-Situ
14
Piling Works)
15 CED Inspection Records (Activities as inspected by CED Engineers)
16 NOC from DEWA - Power
1 DOCUMENTATION Y N Remark
17 NOC from DEWA - Water
18 NOC from Telecommunication provider in the area
19 NOC from neighbor (whenever encroachment is made)
20 For Precast Piles:
21 Strand Test Certificate (as per Code Requirements)
22 Stressing Certificate (by Specialized Sub Contractor & approved by Consultant)
2 SITE OBSERVATIONS Y N Remark
1 Pile Positions compared with Plans (Coordinates as approved from CED)
2 Length of Piles from Cut-off Level and in relation to Bench Mark
3 Pile Diameter
4 Pile Reinforcement: Main (Vertical bars - diameter and number)
5 Pile Reinforcement: Distribution (Ties - diameter and spacing)
6 Reinforcement Cover (to be as per A.D & Code Requirements)
7 Lap Length and location (to be as per A.D & Code Requirements)
8 For Precast Piles:
9 Length of Pile
10 Diameter of Pile
11 Diameter, spacing & number of Tendons
12 Damage to Piles (toe, head and Joint)
1 DOCUMENTATION Y N Remark
1 The shop Drawings to be matching with Approved Drawings of CED
The deviation of piles not more than the tolerance or approved by CED if it
2
more
3 Building Permit
4 Affection Plan
Demarcation Certificate and Bench Mark - Approval (from relevant
5
Authority/Business Unit)
6 Valid Consultant's License
Valid Contractor's License (Valid License of Nominated/Specialised Sub
7
Contractor)
8 Approved Drawings from CED
9 Shop Drawings approved by Consultant (based on A.D of CED)
10 Piles Test Records as per CED Regulations
11 Records for Compressive Strength of Concrete of all Piles
12 Records for Measured Deviation of Piles (approved by Consultant)
Records of Vibro Compaction / Soil Improvement Tests (based on the
13
recommendations of Soil Investigation Report)
14 Warranty from Specialist Contractor of Piles (before Foundation Works)
15 Compaction Test Results if applicable
16 CED Inspection Records (Activities as inspected by CED Engineers)
If the Depth of Raft ≥ 1.5 meter the Bottom Steel the 1st layer the
1
inspection done
Approved Method Statement for Casting of Concrete, approval from
2
Consultant if the Depth of Raft ≥ 1.0 meter:
3 Construction Joint in Foundations should be approved by CED
4 Approved Drawings from CED
5 Shop Drawings approved by Consultant (based on A.D of CED)
6 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates (by 3rd Party & as per Code
7
Requirements)
8 CED Inspection Records (Activities as inspected by CED Engineers)
9 NOC for Tower Crane Location (from relevant Authority/Business Unit)
10 Site lab certificate approved By Trakhees
2 SITE OBSERVATIONS Y N Remark
1 Correct thickness of Raft
Location of Columns and Walls (as per Grid Lines on A.D and to be marked on
2
blinding )
3 Dimensions of Columns and Walls
4 Thickness of Retaining Wall
If the Depth of Raft ≥ 1.5 meter the Bottom Steel the 1st layer the
1
inspection done
Approved Method Statement for Casting of Concrete, approval from
2
Consultant if the Depth of Raft ≥ 1.0 meter:
3 Construction Joint in Foundations should be approved by CED
4 Approved Drawings from CED
5 Shop Drawings approved by Consultant (based on A.D of CED)
6 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates (by 3rd Party & as per Code
7
Requirements)
8 CED Inspection Records (Activities as inspected by CED Engineers)
9 NOC for Tower Crane Location (from relevant Authority/Business Unit)
10 Site Lab certificate approve By Trakhees
2 SITE OBSERVATIONS Y N Remark
1 Correct thickness of Raft
2 Location of Columns and Walls (as shown on A.D)
3 Dimensions of Columns and Walls
4 Thickness of Retaining Wall
5 Correct Foundation Level in relation to Bench Mark (as per A.D of CED)
1 DOCUMENTATION Y N Remark
If the Depth of Raft ≥ 1.5 meter the Bottom Steel the 1st layer the
1
inspection done
Approved Method Statement for Casting of Concrete, approval from
2
Consultant if the Depth of Raft ≥ 1.0 meter
3 Construction Joint in Foundations should be approved by CED
4 Building Permit
5 Affection Plan
Demarcation Certificate and Bench Mark - Approval (from relevant
6
Authority/B.U)
7 Valid Consultant's License
8 Valid Contractor's License
9 Approved Drawings from CED
10 Shop Drawings Approved by Consultant (based on A.D of CED)
11 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
12
Requirements
13 CED Inspection Records (Activities as inspected by CED Engineers)
Confirmation of Bearing Capacity at actual level of Foundations by 3rd Party &
14
verified as per design regulations
Compaction Test Record for Sub grade Soil by 3rd Party & verified as per Soil
15
Report Requirements
Soil Improvement Test Records, If required by 3rd Party & verified as per Soil
16
Report Requirements
17 NOC from DEWA - Power
18 NOC from DEWA - Water
19 NOC from Telecommunication provider in the area
20 NOC from neighbor (whenever encroachment is made)
21 NOC for Tower Crane Location (from relevant Authority/Business Unit)
22 Site lab certificate approve by Trakhees
1 DOCUMENTATION Y N Remark
Site lab certificate by Trakhees
1 Retaining walls not required of inspection by CED if shoring is present.
Must be One side of formwork to be left open after installed the reinforcement in
2
order to enable inspection by CED.
3 Building Permit
4 Affection Plan
Demarcation Certificate and Bench Mark - Approval (from relevant
5
Authority/B.U)
6 Valid Consultant's License
7 Valid Contractor's License
8 Approved Drawings from CED
9 Shop Drawings approved by Consultant (based on A.D of CED)
10 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
11
Requirements
12 CED Inspection Records (Activities as inspected by CED Engineers)
Confirmation of Bearing Capacity at actual Foundation Level by 3rd Party &
13
verified as per Design Regulations
Compaction Test Record for Sub grade Soil by 3rd Party & verified as per Soil
14
Report Requirements
Soil Improvement Test Records, if required, by 3rd Party & verified as per Soil
15
Report Requirements
16 NOC from DEWA - Power
17 NOC from DEWA - Water
18 NOC from Telecommunication provider in the area
19 NOC from neighbor (whenever encroachment is made)
20 NOC for Tower Crane Location (from relevant Authority/ B.U)
1 DOCUMENTATION Y N Remark
1 Construction Joint in Foundations should be approved by CED
2 Building Permit
3 Affection Plan
Demarcation Certificate and Bench Mark - Approval (from relevant
4
Authority/B.U)
5 Valid Consultant's License
Valid Contractor's License (Valid License of Nominated/Specialized Sub
6
Contractor)
7 Approved Drawings from CED
8 Shop Drawings approved by Consultant (based on A.D of CED)
9 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
10
Requirements
11 CED Inspection Records (Activities as inspected by CED Engineers)
Confirmation of Bearing Capacity at actual Level of Foundation by 3rd Party &
12
verified as per Design Regulations
Compaction Test Record for Sub grade Soil by 3rd Party & verified as per Soil
13
Report Requirements
Soil Improvement Test Records, if required, by 3rd Party & verified as per Soil
14
Report Requirements
15 NOC from DEWA - Power
16 NOC from DEWA - Water
17 NOC from Telecommunication provider in the area
18 NOC from neighbor (whenever encroachment is made)
1 DOCUMENTATION Y N Remark
1 Retaining walls not required of inspection by CED if shoring is present
Must be One side of formwork to be left open after installed the reinforcement
2
in order to enable inspection by CED.
3 Approved Drawings from CED
4 Shop Drawings approved by Consultant (based on A.D of CED)
Affection Plan/Demarcation Certificate and Bench Mark - if required (from
5
relevant Authority/B.U)
6 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
7
Requirements
2 SITE OBSERVATIONS
1 Retaining Wall Dimensions (thickness and height) as per A.D
2 Location and detailing of Construction Joints
3 Location and detailing of Movement Joints
4 Location and detailing of Water Stoppers
5 Location and dimensions of Counter Walls (Counter fort Ret. Wall)
6 Reinforcement for Retaining Wall - Diameter and spacing (as per A.D)
7 Reinforcement for Counter Wall - Diameter and spacing (as per A.D)
8 Links in Wall as per approved drawings and according to Codes
9 Corner Details as per approved drawings
10 Correct Connection for Edge Walls with Slabs
Detailing of all reinforcement (to be according to ACI, BS) as per CED
11
Regulations
12 Reinforcement Cover to be as per A.D and according to Code Requirements
13 Lap Length and location to be as per A.D and according to Code Requirements
1 DOCUMENTATION Y N Remark
1 Building Permit
2 Approved Drawings from CED
3 Reinforcement Shop Drawings approved by Consultant (based on A.D of CED)
4 Concrete Mix Design approved by Consultant (in case of ramp on grade)
5 Steel Reinforcement Test Certificates by 3rd Party & as per Code Requirements
Steel Reinforcement Pull-Out Test Certificates by 3rd Party & as per Code
6
Requirements
7 Compressive Strength of Concrete Test Records for Walls and Columns
8 Scaffolding Certificate by Third Party
9 Scaffolding Shop Drawings approved by Consultant
Compaction Test Record for Sub grade Soil by 3rd Party & verified as per Soil
10
Report Requirements
2 SITE OBSERVATIONS
1 Clear Height and Width according to Approved Drawings
2 Scaffolding Executed as per Shop Drawings approved by Consultant
3 Thickness of Ramp Slab
4 Slope to be as per approved drawings of CED
5 Beams Dimensions as per approved drawings of CED
6 Main Reinforcement diameter and spacing as per A.D
7 Secondary Reinforcement (diameter and spacing as per A.D)
1 DOCUMENTATION Y N Remark
1 Building Permit
2 Valid Consultant's License
Valid Contractor's License (Valid License of Nominated/Specialized Sub
3
Contractor)
4 Approved Drawings from CED
5 Approved Drawings from EHS
6 Shop Drawings approved by Consultant (based on A.D of CED & EHS)
7 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
8
Requirements
9 CED Inspection Records (Activities as inspected by CED Engineers)
Compaction Test Record for Sub grade Soil by 3rd Party & verified as per Soil
10
Report Requirements
Soil Improvement Test Records, if required by 3rd Party & verified as per Soil
11
Report Requirements
12 Site lab certificate approved By Trakhees
2 SITE OBSERVATIONS
1 Observation of Setback distance (as per A.D of CED)
2 Correct Foundation Level in relation to Bench Mark (as per A.D of CED)
3 Correct Orientation of pool (as per A.D of CED)
4 Dimensions of Swimming Pool (as per A.D of CED)
5 Thickness of foundation & walls dimension (as per A.D of CED)
6 Reinforcement - Diameter and spacing (as per A.D)
7 Additional Reinforcement provided (as Indicated on A.D)
8 Walls Starter Bars - Diameter and spacing (as per A.D)
9 Correct Connection Details for Walls (as per A.D)
Detailing of all reinforcement (to be according to ACI, BS) as per CED
10
Regulations
11 Reinforcement Cover to be as per A.D and according to Code Requirements
12 Lap Length and location to be as per A.D and according to Code Requirements
13 Construction Joint location and detailing
14 Water Stopper location and detailing if applicable
1 DOCUMENTATION Y N Remark
1 If required any special requirements for applicable conditions
Pre-Cambering for Long Spans & Cantilever should be as
2
per approved drawings and according to Code Requirements
3 Is the Back Propping Refer to the code and site loading conditions
Affection Plan/Re-Demarcation Certificate -for ground floor level (from relevant
4
Authority/ B.U)
5 Approved Drawings from CED
6 Reinforcement Shop Drawings approved by Consultant (based on A.D of CED)
7 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
8
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party & as
9
per Code Requirements
Drawings for Transformers / Electrical Rooms approved by DEWA (openings in
10
particular)
11 CED Inspection Records (Activities as inspected by CED Engineers)
Certificate of Acceptable Tolerances in Vertical Members (approved by
12
Consultant)
Compressive Strength of Concrete Test Records for Walls and Columns (RCC
13
elements preceding the requested inspection)
14 Scaffolding Certificate by Third Party
15 Scaffolding Shop Drawings approved by Consultant
16 Block Test Certificate for Bearing Walls (by 3rd Party Independent Laboratories)
Structural Works Inspection for SOLID FLAT SLAB WITH & WITHOUT DROPS
Structural Works Inspection for SOLID FLAT SLAB WITH & WITHOUT DROPS
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer
Mobile No.
Name
Contractor Name e-mail
Accredited Engineer
Mobile No.
Name
Project Information
CED Permit/NOC Ref. No. Plot No.
1 DOCUMENTATION Y N Remark
Pre-Cambering for Long Spans & Cantilever should be as
1
per approved drawings and according to Code Requirements
2 Is the Back Propping Refer to the code and site loading conditions
Affection Plan/Re-Demarcation Certificate - for ground floor level (from
3
relevant Authority/B.U)
4 Approved Drawings from CED
Reinforcement Shop Drawings approved by Consultant (based on A.D of
5
CED)
6 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
7
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party & as
8
per Code Requirements
Drawings for Transformers / Electrical Rooms approved by DEWA (openings
9
in particular)
10 CED Inspection Records (Activities as inspected by CED Engineers)
Certificate of Acceptable Tolerances in Vertical Members (approved by
11
Consultant)
Compressive Strength of Concrete Test Records for Walls and Columns
12
(RCC elements preceding the requested inspection)
13 Scaffolding Certificate by Third Party
14 Scaffolding Shop Drawings approved by Consultant
Block Test Certificate for Bearing Walls (by 3rd Party Independent
15
Laboratories)
Structural Works Inspection for SOLID FLAT SLAB WITH & WITHOUT DROPS
Structural Works Inspection for SOLID FLAT SLAB WITH & WITHOUT DROPS
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer
Mobile No.
Name
Contractor Name e-mail
Accredited Engineer
Mobile No.
Name
Project Information
CED Permit/NOC Ref. No. Plot No.
1 DOCUMENTS Y N Remark
Pre-Cambering for Long Spans & Cantilever should be as
1
per approved drawings and according to Code Requirements
2 Is the Back Propping Refer to the code and site loading conditions
Affection Plan/Re-Demarcation Certificate -for ground floor level (from
3
relevant Authority/ B.U)
4 Approved Drawings from CED
Reinforcement Shop Drawings approved by Consultant (based on A.D of
5
CED)
6 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
7
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party &
8
as per Code Requirements
Drawings for Transformers / Electrical Rooms approved by DEWA
9
(openings in particular)
10 CED Inspection Records (Activities as inspected by CED Engineers)
Certificate of Acceptable Tolerances in Vertical Members (approved by
11
Consultant)
Compressive Strength of Concrete Test Records for Walls and Columns
12
(RCC elements preceding the requested inspection)
13 Scaffolding Certificate by Third Party
14 Scaffolding Shop Drawings approved by Consultant
Block Test Certificate for Bearing Walls (by 3rd Party Independent
15
Laboratories)
1 DOCUMENTATION Y N Remark
Pre-Cambering for Long Spans & Cantilever should be as
1
per approved drawings and according to Code Requirements
2 Is the Back Propping Refer to the code and site loading conditions
3 Affection Plan / Re-demarcation Certificate for Ground Floor Level
4 Approved Drawings from CED
5 Reinforcement Shop Drawings approved by Consultant (based on A.D of CED)
6 Concrete Mix Design and Trial mix Result Report
Steel Reinforcement Test Certificates by 3rd Party & as per Code
7
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party & as
8
per Code Requirements
Certificate of Acceptable Tolerances in Vertical Members (approved by
9
Consultant)
10 CED Inspection Records (Activities as inspected by CED Engineers)
Compressive Strength of Concrete Test Records for Walls and Columns (RCC
11
elements preceding the requested inspection)
12 Scaffolding Certificate by Third Party
13 Scaffolding Shop Drawings approved by Consultant
14 Method Statement approved by Consultant
2 SITE OBSERVATIONS Y N Remark
1 Beams Height according to approved drawings
2 Scaffolding executed as per Shop Drawings approved by Consultant
3 Beam Dimensions as per approved drawings
4 Beam connections to Supports as per approved drawings
5 Cantilever Projection Length as per approved drawings
1 DOCUMENTATION Y N Remark
1 Is the Back Propping Refer to the code and site loading conditions
2 Affection Plan / Re-demarcation Certificate for the Ground Floor Level
Valid Contractor's License for Structural Steel Fabrication Works
3
(Nominated/Specialized Sub Contractor)
4 Approved Drawings from CED
5 Steel Structure Shop Drawings approved by Consultant (based on A.D of CED)
6 Pull-out Test for Studs
7 Bolts and Studs Test Certificate
8 Welding Test Certificate
Concrete Mix Design approved Consultant. (Topping and Grouting for joints -
9
Design Regulations)
Steel Reinforcement Test Certificates by 3rd Party & as per Code
10
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party & as
11
per Code Requirements
Certificate of Acceptable Tolerances in Vertical Members (approved by
12
Consultant)
13 CED Inspection Records (Activities as inspected by CED Engineers)
Warranty from Specialist Sub Contractor/Supplier for Works Executed (for 10
14
years & before the BCC)
15 Materials Certificate from Specialist Company as per Code
DOCUMENTATION Y N Remark
1 Marine NOC if any condition
2 Demarcation Certificate
3 Approved drawing by CED
4 Valid Affection Plan
5 DM Approval letter for Consultant/Contractor Foreign Company
6 Site lab certificate
2 SITE OBSERVATIONS
1 Quay wall/Berth location as per Approved Drawings
2 Depth for quay wall/Berth in relation Bench mark to be as per Approved Drawings
3 Til-Road number/level should be as per Approved Drawing
4 Pile Reinforcement should be as per Approved Drawing
5 Diaphragm thickness should be as per Approved Drawing
6 Soldier pile Dimension should be as per Approved Drawing
Til-Road grade/diameter should be as per Approved Drawing & project
7
specification
8 Concrete Block dimension/Reinforcement should be as per Approved Drawing
9 Shop drawing approved by consultant (Based on AD from CED)
10 Concrete Block key details should be as per Approved Drawing
Arubble base foundation for concrete block wall should be as per Approved
11
Drawing
12 Anchor wall thickness/depth should be as per Approved Drawing
Joint between concrete blocks should be as per Approved Drawing & as per
13
project specification
Filling back face of wall should be as per Approved Drawing & project
14
specification
15 Quay wall/Berth/ anchor wall alignment should be as per Approved Drawing
1 DOCUMENTATION Y N Remark
1 Marine NOC if any condition
2 Demarcation Certificate
3 Approved drawing by CED
4 Valid Affection Plan
5 DM Approval letter for Consultant/Contractor Foreign Company
6 Site lab certificate
2 SITE OBSERVATIONS Y N Remark
1 Break water location should be as per Approved Drawing
2 Weight of armor unit/shape should be as per Approved Drawing
3 Thickness of armor layer/slope should be as per Approved Drawing
Weight of under layer rock/thickness should be as per Approved Drawing/Project
4
specification
5 Core structure should as per Approved Drawing
6 Crest Dimension/level should as per Approved Drawing
7 Toe protection should be as per Approved Drawing
8 Break water length should be as per Approved Drawing
9 Coping for break water should as per Approved Drawing
2 SITE OBSERVATIONS
17 Spacing of Soldier Piles
18 Pre-cast / wooden Panel size (fixing of Panels to be in parallel with excavation)
Diaphragm
19 Width and length of diaphragm as per AD
20 Reinforcement of Diaphragm as per AD
Sheet Piles
21 Check size, thickness and length
Restraining for Shoring
22 Anchor spacing, angle and numbers
23 Tendons size & numbers
24 Waling Beams, location, spacing and numbers
25 Anchorage Length of Tendons as per A.D of CED
26 Detailing according to Codes (ACI, BS) as per CED Regulations
Compressive Strength of Concrete Test Records for Walls and Columns (RCC
17
elements preceding the requested inspection)
18 Scaffolding Certificate by Third Party
19 Scaffolding Shop Drawings approved by Consultant
2 SITE OBSERVATIONS
1 Floor Height according to approved drawings
2 Scaffolding executed as per Shop Drawings approved by Consultant
3 Thickness of Slab as per approved drawings
4 Thickness of Slab as per approved drawings
5 Location of Openings as per approved drawings
6 Deep Beams & others beams dimensions as per approved drawings
7 Cantilever Projection Length as per approved drawings
8 Slab Duct size and length as per AD
9 PT profiles & spacing for slab ( in compliance with A.D)
10 Number of Tendons
11 PT positions should be marked on formwork
Opening size more than 600mm x 600 mm (approval from CED has to be
12
obtained prior to execution )
13 Low and High point locations (in compliance with A.D)
14 Coordination Between PT and MEP Services/Conduits
15 Grouting and venting pipes (as per A.D & Code Requirements)
16 Tendons to have smooth profiles and sharp deviations to be avoided.
17 Dead and Live End details are in compliance with A.D
Bar diameter for Chairs should not be less than 8mm (Chairs - for fixing Tendon
18
Duct to required profile)
19 Details of PT couplers are in compliance with A.D
20 Anti-bursting reinforcement (as per A.D)
Edge reinforcement for protection of unstressed areas around PT Tendons to
21
be as per A.D
22 PT Profiles & spacing for Beams are in compliance with A.D
23 Details of Reinforcement for Floor Pan Box (as per A.D)
Pour Strip location and size (as per A.D)
24
2 SITE OBSERVATIONS
25 Main Reinforcement (diameter and spacing as per A.D)
26 Secondary Reinforcement (diameter and spacing as per A.D)
27 Additional Reinforcement (diameter and spacing as per A.D)
28 Punching Shear Reinforcement (as per A.D)
29 Curtailment of reinforcement as per A.D
30 Cantilever Projection Reinforcement (as per A.D)
31 Anchorage length of reinforcement (as per A.D)
Reinforcement Around Openings - (no. of bars, diameter and spacing as per
32
A.D)
33 Slab & Beam connections to Supports. (as per A.D)
34 Pour Strip Reinforcement & location
35 Main Reinforcement for beams
36 Shear Reinforcement for beams (as per A.D)
37 Shrinkage Reinforcement for beams. (as per A.D)
38 Deep Transfer Beams Main and Secondary Reinforcement (as per A.D)
39 Side Reinforcement for Deep Beams as per approved drawings
40 Torsion Reinforcement as per approved drawings
Detailing of all reinforcement (to be according to ACI, BS) as per CED
41
Regulations.
42 Reinforcement Cover to be as per A.D and according to Code Requirements
43 Lap Length and location to be as per A.D and according to Code Requirements
44 Construction Joint location and detailing
All benching & channel shall be formed with concrete or other materials
8
specified @ drawing and project specifications.
Manhole wall thickness should be as per AD and should be smooth as
9
per project specifications.
Pipes entering / leaving manholes / chamber and other special structure
10
shall be as per AD
11 Road gullies location & details should be as per AD.
12 Connection pipe size between gull & manholes should be as per AD.
13 Back-drop should be as per AD.