Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Structural Inspection Checklists

Download as pdf or txt
Download as pdf or txt
You are on page 1of 57
At a glance
Powered by AI
The documents outline requirements and procedures for structural works inspections of marine works, anchor bolt settings, reinforced concrete, and pipes/manholes.

Documentation that must be submitted includes CED approval documents, plans, licenses, drawings, specifications, test reports, and utility NOCs.

Site observations include dimensions, materials, orientation, water depth, fender/mooring arrangements as per approved drawings.

CED-CP-006 CIVIL ENGINEERING Department CP-F-006aa

Structural Works Checklist for Marine Works


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Structural Works Inspection for Marine Works


Floating proverbs & structural inspection for pontoon (piers) & floating proverbs should be submitted for inspection
at four stages.
Before starting the work to check readiness in all aspects
After completed 50% of manufacturing for pontoons at yard.
After installing of 50% at site
At 100% final stage & after completed installing at site
1 DOCUMENTATION Y N Remark
1 CED NOC Approval
2 Affection Plan
Demarcation Certificate/Bench Mark (Approved from relevant
3
Authority/Business Unit)
4 Valid Consultant License.
Valid contractor License (Valid License of nominated specialist sub-
5
contractor).
6 Approved Drawing from CED.
7 Approved Concrete Mix drawing
8 CED inspection record.
9 NOC from DEWA for power & water.
10 NOC from Telecommunication provided in the area.
11 NOC from RTA
2 SITE OBSERVATIONS
1 Pontoon(pier)/Floating proverbs/Jetty/Moorings)
2 Pontoon/Finger dimension should be as per Approved Drawings
3 Pontoon/Finger Reinforcement should be as per Approved Drawings
Pontoon/Finger protective coating should be as per Approved Drawings
4
& project specification
Pontoon/Finger Orientation/Alignment should be as per Approved
5
Drawings
Pile prtective coating/cathoidc protection system should be as per
6
Approved drawing & project specification
Water depth alongside the berth (floating docks)
7 should be as per Approved drawing & project
specification
Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006aa

Structural Works Checklist for Marine Works


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS
Fender arrangement should should be as per
8 Approved drawing & project specification
Horizontal/Vertical position for fender should
9 be as per Approved drawing
Mooring system should be as per Approved
10 drawing & project specification
Racking piles for rigied mooring dolphin should be as per Approved
11
drawing
Concrete cup dimension for mooring should be
12 as per Approved drawing
Gang way dimension/materials should be
13 as per Approved drawing & project
specification
Anchor chain should be as per Approved
14
drawing
15 Pontoon/Finger connection should be as per Approved drawing
Bolt connection/grade/Dimension should be as per Approved drawing &
16
project specification
Jetties/Deck slab thickness/Beam/Connection should be as per
17
Approved drawing & project specification
18 Hand rail for Jetties should be as per Approved drawing
Shade details for jetty should be as per Approved drawing & project
19
specification

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006ab

Structural Works Checklist for Anchor Bolt Setting Plan


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Structural Works Inspection for Anchor Bolt Setting Plan


1 DOCUMENTATION Y N Remark
1 Affection Plan / Re-demarcation Certificate for Ground Floor Level
Valid Contractor's License for Structural Steel Fabrication Works
2
(Nominated/Specialized Sub Contractor)
3 Approved Drawings from CED
4 Steel Structure Shop Drawings approved by Consultant (based on A.D of CED)
5 Pull-out Test for Studs
6 Bolts and Studs Test Certificate
7 Welding Test Certificate
Concrete Mix Design approved Consultant. (Topping and Grouting for joints -
8
Design Regulations)
Steel Reinforcement Test Certificates by 3rd Party & as per Code
9
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party & as
10
per Code Requirements
Certificate of Acceptable Tolerances in Vertical Members (approved by
11
Consultant)
12 CED Inspection Records (Activities as inspected by CED Engineers)
Warranty from Specialist Sub Contractor/Supplier for Works Executed (for 10
13
years & before the BCC)
14 Materials Certificate from Specialist Company as per Code
2 SITE OBSERVATIONS
1 Bolt Diameter / Length Comply with A.D
2 Bolt to Bolt Dimension as per A.D
3 Bolts Install @ correct location / orientation as per A.D
4 Number of bolt @ each base as per A.D
5 Bolt Grade as per A.D
6 Distance from Bolts to edge concrete as per A.D
7 Bolt thread projection as per A.D
8 Concrete Base level as per A.D
9 Concrete Base reinforcement as per A.D
2 SITE OBSERVATIONS
10 Reinforcement size / detailing as per

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006ab

Structural Works Checklist for Anchor Bolt Setting Plan


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

11 Concrete cover as per A.D


12 Concrete shutter / formwork as per A.D
13 Beams size / reinforcement as per A.D

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006ac

Structural Works Checklist for Steel Structures Framing


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Structural Works Inspection for Steel Structures Framing


1 DOCUMENTATION Y N Remark
1 Affection Plan / Re-demarcation Certificate for Ground Floor Level
Valid Contractor's License for Structural Steel Fabrication Works
2
(Nominated/Specialized Sub Contractor)
3 Approved Drawings from CED
4 Steel Structure Shop Drawings approved by Consultant (based on A.D of CED)
5 Pull-out Test for Studs
6 Bolts and Studs Test Certificate
7 Welding Test Certificate
Concrete Mix Design approved Consultant. (Topping and Grouting for joints -
8
Design Regulations)
Steel Reinforcement Test Certificates by 3rd Party & as per Code
9
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party & as
10
per Code Requirements
Certificate of Acceptable Tolerances in Vertical Members (approved by
11
Consultant)
12 CED Inspection Records (Activities as inspected by CED Engineers)
Warranty from Specialist Sub Contractor/Supplier for Works Executed (for 10
13
years & before the BCC)
14 Materials Certificate from Specialist Company as per Code
2 SITE OBSERVATIONS
1 Fabrication & erection tolerance cimplied with National Standard
2 Main Frames Plumber / aligned as per A.D
Surfance defects in hot rolled / cold section in accordance with National
3
Standards
4 Location & orientation comply with A.D
5 Setback comply with A.D
Direct / gussected / pin connections comply with A.D / specification & National
6
Standard
7 base Plate size / thickness comply with A.D / Specification
2 SITE OBSERVATIONS
8 HSB Dimention / grade comply with A.D / Specification

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006ac

Structural Works Checklist for Steel Structures Framing


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

9 HSB / NB thread projection as oer Standard / Specification


10 Bolt center to center comply with A.D
11 Bolts correctly tightened
12 Columns / Rafters / Beams comply with A.D
13 Weilding type connection comply with A.D
14 Columns / Rafters / Beams Splices comply with A.D
15 Bracing / strut tube stayed cables comply with A.D
16 Purlins / Gint comply with A.D
17 Columns / Beams stiffeners comply with A.D
18 Nuts / washers comply with Specifications
19 Crane runway girder / dimension / installing comply with A.D / Specification

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006ad

Structural Works Checklist for Road Works


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Structural Works Inspection for Road Works


Floating proverbs & structural inspection for pontoon (piers) & floating proverbs should be submitted for inspection
at four stages.
Before starting the work to check readiness in all aspects
After completed 50% of manufacturing for pontoons at yard.
After installing of 50% at site
At 100% final stage & after completed installing at site
1 DOCUMENTATION Y N Remark
1 CED NOC Approval
2 Affection Plan
Demarcation Certificate/Bench Mark (Approved from relevant
3
Authority/Business Unit)
4 Valid Consultant License.
5 Valid contractor License (Valid License of nominated specialist sub-contractor).
6 Approved Drawing from CED.
7 Approved Concrete Mix drawing
8 CED inspection record.
9 NOC from DEWA for power & water.
10 NOC from Telecommunication provided in the area.
11 NOC from RTA
2 SITE OBSERVATIONS
Earthing work for (Formation, Sub-Grade & Sub Base) setting out plan,
1 Levelling and compaction should as per approved drawing as well as project
specification.
2 Asphalt road should be cleaned
3 Asphalt rolling compaction should be as per project specification.
Asphalt Road (Levelling, slopes, grading, curving & super elevation should be
4
as per approved drawing.
Kerb stone (fixing, hunching & expansion joint should be as per approved
5
drawings & specification as well.
6 Water Gutter location should be as per approved drawings.
water depth alongside the berth (floating docks) should be as per Approved
7 drawing & project specification

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006ad

Structural Works Checklist for Road Works


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS
8 Ponding (sixe & location) should be as per approved drawing.

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006ae

Structural Works Checklist for Pile Caps ( Without Raft )


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Structural Works Inspection for Pile Caps ( Without Raft )


- Depth of Pile Caps ≥ 1.5 meter: Two Inspections are required, one for Bottom Steel and the second after
completion of work
- Depth of Pile Caps ≥ 1.0 meter: Method Statement for Casting of Concrete, approval from Consultant required
1 DOCUMENTATION Y N Remark
Approved Drawings from CED Demarcation certificate with affection plan by
1
Trakhees
2 Shop Drawings approved by Consultant (based on A.D of CED)
3 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates (by 3rd Party & as per Code
4
Requirements)
5 CED Inspection Records (Activities as inspected by CED Engineers)
6 NOC for Tower Crane Location (from relevant Authority/Business Unit)
2 SITE OBSERVATIONS
1 Pile Cap Dimensions as per A.D
2 Location of Columns and Walls (to be marked and as per A.D )
3 Dimensions of Columns and Walls
4 Dimensions of Strap Beams
5 Correct Foundation Level in relation to Bench Mark (as per A.D of CED)
6 Reinforcement for Pile Caps - Diameter and spacing (as per A.D)
7 Additional Reinforcement provided (as Indicated on A.D)
8 Punching Shear Reinforcement around Columns and Walls (as per A.D)
9 Cover to Reinforcement on top of Piles (above the Pile Head Treatment)
10 Anti-Bursting Reinforcement - Diameter and spacing (as per A.D)
11 Strap Beams reinforcement & details. (as per A.D)
12 Columns and Walls Starter Bars - Diameter and details. (as per A.D)
13 Detailing of all reinforcement (according to ACI, BS) as per CED Regulations
14 Reinforcement Cover to be as per A.D and according to Code Requirements.
15 Lap Length and Location to be as per A.D and according to Code Requirements
16 Adequate support for concrete formwork.
Tower Crane Location as per A.D by CED (applicable only when it is located
17
within the structural element)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 1


CED-CP- 006 CIVIL ENGINEERING Department CP-F-006af

Structural Works Checklist for Break Water / Shore Revetment


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Structural Works Inspection for Break Water / Shore Revetment


SITE OBSERVATIONS
1 Break water location should be as per Approved Drawing
2 Weight of armour unit/shape should be as per Approved Drawing
3 Thickness of armour layer/slope should be as per Approved Drawing
Weight of under layer rock/thickness should be as per Approved
4
Drawing/Project specification
5 Core structure should as per Approved Drawing
6 Crest Dimension/level should as per Approved Drawing
7 Toe protection should be as per Approved Drawing
8 Break water length should be as per Approved Drawing
9 Coping for break water should as per Approved Drawing

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 1 of 1


CED-CP-006 CIVIL ENGINEERING Department CP-F-006ag

Structural Works Checklist for Precast Slab


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Structural Works Inspection for Precast Slab


- Pre-Cambering for Long Spans & Cantilever to be carried out as per approved drawings and according to Code
Requirements
- Back Propping is required as per Code and site loading conditions
1 DOCUMENTATION Y N Remark
1 Affection Plan / Re-demarcation Certificate for Ground Floor Level
2 Approved Drawings from CED
3 Reinforcement Shop Drawings approved by Consultant (based on A.D of CED)
4 Concrete Mix Design and Trial mix Result Report
Steel Reinforcement Test Certificates by 3rd Party & as per Code
5
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party & as
6
per Code Requirements
Certificate of Acceptable Tolerances in Vertical Members (approved by
7
Consultant)
8 CED Inspection Records (Activities as inspected by CED Engineers)
Compressive Strength of Concrete Test Records for Walls and Columns (RCC
9
elements preceding the requested inspection)
10 Scaffolding Certificate by Third Party
11 Scaffolding Shop Drawings approved by Consultant
12 Method Statement approved by Consultant
2 SITE OBSERVATIONS
1 Beams Height according to approved drawings
2 Scaffolding executed as per Shop Drawings approved by Consultant
3 Beam Dimensions as per approved drawings
4 Beam connections to Supports as per approved drawings
5 Cantilever Projection Length as per approved drawings
6 Bearing Strip Dimensions (as per A.D)
7 Main Reinforcement (diameter and spacing as per A.D)
8 Secondary Reinforcement (diameter and spacing as per A.D)
9 Additional Reinforcement (diameter and spacing as per A.D)
10 Curtailment of reinforcement as per A.D
11 Cantilever Projection Reinforcement (as per A.D)
2 SITE OBSERVATIONS

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006ag

Structural Works Checklist for Precast Slab


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

12 Shear Reinforcement for Beams (as per A.D)


13 Anchorage Length of reinforcement as per approved drawings
Bearing Strip Reinforcement to be as per approved drawings (number of bars,
14
diameter & spacing)
Steel Dowels for connections to be as per approved drawings and CED
15
Regulations
Detailing of all the reinforcement (to be according to ACI, BS) based on CED
16
Regulations
17 Reinforcement Cover to be as per A.D and according to Code Requirements
18 Lap Length and location to be as per A.D and according to Code Requirements
19 Construction Joint location and detailing

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006ah

Structural Works Checklist for Special Foundations


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Structural Works Inspection for Special Foundations


- Construction / Contraction and Movement Joint Location and Detailing as per Approved Drawings
1 DOCUMENTATION Y N Remark
1 Building Permit
2 Affection Plan
Demarcation Certificate and Bench Mark - Approval (from relevant
3
Authority/B.U)
4 Valid Consultant's License
Valid Contractor's License (Valid License of Nominated/Specialized Sub
5
Contractor)
6 Approved Drawings from CED
7 Shop Drawings approved by Consultant (based on A.D of CED)
8 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
9
Requirements
10 CED Inspection Records (Activities as inspected by CED Engineers)
Confirmation of Bearing Capacity at actual Level of Foundation by 3rd Party &
11
verified as per Design Regulations
Compaction Test Record for Sub grade Soil by 3rd Party & verified as per Soil
12
Report Requirements
Soil Improvement Test Records, if required, by 3rd Party & verified as per Soil
13
Report Requirements
14 NOC from DEWA - Power
15 NOC from DEWA - Water
16 NOC from Telecommunication provider in the area
17 NOC from neighbor (whenever encroachment is made)
2 SITE OBSERVATIONS
1 Observation of Setback distance (as per A.D of CED)
2 Correct Foundation Level in relation to Bench Mark (as per A.D of CED)
3 Correct Orientation of pool (as per A.D of CED)
4 Correct thickness of the raft .(as per A.D of CED)
5 Dimensions of Beams as per A.D of CED
6 Raft's Reinforcement - Diameter and spacing (as per A.D)
2 SITE OBSERVATIONS

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006ah

Structural Works Checklist for Special Foundations


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

7 Additional Reinforcement provided (as Indicated on A.D)


Beam Reinforcement (Main, Additional & Shear) (as per A.D - Diameter and
8
spacing)
9 Reinforcement Around Joints - Diameter and spacing (as per A.D)
10 Curtailment of Reinforcement - (as per A.D)
Detailing of all reinforcement (to be according to ACI, BS) as per CED
11
Regulations
12 Reinforcement Cover to be as per A.D and according to Code Requirements
13 Lap Length and location to be as per A.D and according to Code Requirements
14 Adequate Support for Concrete Formwork
15 Detailing of Joints (Movement, Contraction or Transverse Control) (as per A.D)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006c

Structural Works Inspection for Shoring WORKS


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
1 Building Permit
2 Affection Plan
Demarcation Certificate and Bench Mark - Approval (from relevant
3
Authority/Business Unit)
4 Valid Consultant's License
Valid Contractor's License (Valid License of Nominated/Specialized Sub
5
Contractor)
6 Approved Drawings from CED
7 Shop Drawings approved by Consultant (based on A.D of CED)
8 Warranty by Shoring Contractor (after completion of Shoring Works)
Undertaking by Shoring Specialist approved by Consultant that shoring works
9
all lie within the plot limits.
10 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates (by 3rd Party & as per Code
11
Requirements)
12 Tendons Test Certificate (by 3rd Party & as per Code Requirements)
13 Stressing Certificate (by Specialized Sub Contractor & approved by Consultant)
14 CED Inspection Records (Activities as inspected by CED Engineers)
15 NOC from DEWA - Power
16 NOC from DEWA - Water
17 NOC from Telecommunication provider in the area
18 NOC from neighbor/RTA/BU (whenever shoring is outside plot limits)
19 Concrete Mix Design and Trail mix result Report

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006c

Structural Works Inspection for Shoring WORKS


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS Y N Remark


1 Shoring Location as per A.D of CED
2 Depth/Length in relation to Bench Mark
3 Shoring Anchorage Length as per A.D (from Excavation Level)
Shoring Deviation within Allowable Limits (at the time of Final Inspection for
4
Shoring Works)
5 Contiguous/Secant Piles
6 Shoring Pile Diameter
7 Pile Reinforcement: Main (Vertical Bars - diameter and number)
8 Pile Reinforcement: Distribution (Ties - diameter and spacing)
9 Reinforcement Cover (to be as per A.D & Code Requirements)
10 Lap Length and Location (to be as per A.D & Code Requirements)
11 King Post Length and Reduced Levels
12 Soldier Piles
13 Size of Soldier Pile
14 Spacing of Soldier Piles
15 Pre-cast / wooden Panel size (fixing of Panels to be in parallel with excavation)
16 Diaphragm
17 Width and length of diaphragm as per AD
18 Reinforcement of Diaphragm as per AD
19 Sheet Piles
20 Check size, thickness and length
21 Restraining for Shoring
22 Anchor spacing, angle and numbers
23 Tendons size & numbers
24 Waling Beams, location, spacing and numbers
25 Anchorage Length of Tendons as per A.D of CED
26 Detailing according to Codes (ACI, BS) as per CED Regulations

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006d

Structural Works Inspection for PILING WORKS


Piling Works - Inspection for 3 Times
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
Site lab certificate by Trakhees
1 Inspection report for 0% of piling work
Test results of A preliminary pile should be verified by the Geotechnical
2
specialist and approved by CED
3 Inspection Report of 50% of Piling Works.
4 Building Permit
5 Affection Plan
Demarcation Certificate and Bench Mark - Approval (from relevant
6
Authority/Business Unit)
7 Valid Consultant's License
8 Valid License of Nominated/Specialized Sub Contractor
9 Approved Drawings from CED
10 Shop Drawings approved by Consultant (based on A.D of CED)
11 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates (by 3rd Party & as per Code
12
Requirements)
Records for Measurement of Verticality of Piles (by Sub Contractor & approved
13
by Consultant)
Betonies Test Records approved by Consultant (applicable to Cast In-Situ
14
Piling Works)
15 CED Inspection Records (Activities as inspected by CED Engineers)
16 NOC from DEWA - Power

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006d

Structural Works Inspection for PILING WORKS


Piling Works - Inspection for 3 Times
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
17 NOC from DEWA - Water
18 NOC from Telecommunication provider in the area
19 NOC from neighbor (whenever encroachment is made)
20 For Precast Piles:
21 Strand Test Certificate (as per Code Requirements)
22 Stressing Certificate (by Specialized Sub Contractor & approved by Consultant)
2 SITE OBSERVATIONS Y N Remark
1 Pile Positions compared with Plans (Coordinates as approved from CED)
2 Length of Piles from Cut-off Level and in relation to Bench Mark
3 Pile Diameter
4 Pile Reinforcement: Main (Vertical bars - diameter and number)
5 Pile Reinforcement: Distribution (Ties - diameter and spacing)
6 Reinforcement Cover (to be as per A.D & Code Requirements)
7 Lap Length and location (to be as per A.D & Code Requirements)
8 For Precast Piles:
9 Length of Pile
10 Diameter of Pile
11 Diameter, spacing & number of Tendons
12 Damage to Piles (toe, head and Joint)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006e

Structural Works Inspection for SETTING OUT FOR LAYOUT OF PILES


Inspection at Completion of Pile Head Treatment and Before Starting the
Reinforcement
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer
Mobile No.
Name
Contractor Name e-mail
Accredited Engineer
Mobile No.
Name
Project Information
CED Permit/NOC Ref.
Plot No.
No.

1 DOCUMENTATION Y N Remark
1 The shop Drawings to be matching with Approved Drawings of CED
The deviation of piles not more than the tolerance or approved by CED if it
2
more
3 Building Permit
4 Affection Plan
Demarcation Certificate and Bench Mark - Approval (from relevant
5
Authority/Business Unit)
6 Valid Consultant's License
Valid Contractor's License (Valid License of Nominated/Specialised Sub
7
Contractor)
8 Approved Drawings from CED
9 Shop Drawings approved by Consultant (based on A.D of CED)
10 Piles Test Records as per CED Regulations
11 Records for Compressive Strength of Concrete of all Piles
12 Records for Measured Deviation of Piles (approved by Consultant)
Records of Vibro Compaction / Soil Improvement Tests (based on the
13
recommendations of Soil Investigation Report)
14 Warranty from Specialist Contractor of Piles (before Foundation Works)
15 Compaction Test Results if applicable
16 CED Inspection Records (Activities as inspected by CED Engineers)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006e

Structural Works Inspection for SETTING OUT FOR LAYOUT OF PILES


Inspection at Completion of Pile Head Treatment and Before Starting the
Reinforcement
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer
Mobile No.
Name
Contractor Name e-mail
Accredited Engineer
Mobile No.
Name
Project Information
CED Permit/NOC Ref.
Plot No.
No.

2 SITE OBSERVATIONS Y N Remark


1 Observation of Setback distance (as shown on A.D of CED)
2 Locations of Piles compared with A.D of CED
3 Cut-off Level, in relation to Bench Mark (as per A.D of CED)
Reinforcement Projection length and numbers (Anchorage Length in the
4
Foundation)
5 Pile Caps dimensions and thickness
Formwork Levels as per A.D of CED (various depths of Raft, Levels, Drops and
6
sumps etc)
7 Dimensions of Strap Beams
8 Building Orientation

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006f

Structural Works Inspection for RAFT ON PILES


1 DOCUMENTATION Y N Remark
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

If the Depth of Raft ≥ 1.5 meter the Bottom Steel the 1st layer the
1
inspection done
Approved Method Statement for Casting of Concrete, approval from
2
Consultant if the Depth of Raft ≥ 1.0 meter:
3 Construction Joint in Foundations should be approved by CED
4 Approved Drawings from CED
5 Shop Drawings approved by Consultant (based on A.D of CED)
6 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates (by 3rd Party & as per Code
7
Requirements)
8 CED Inspection Records (Activities as inspected by CED Engineers)
9 NOC for Tower Crane Location (from relevant Authority/Business Unit)
10 Site lab certificate approved By Trakhees
2 SITE OBSERVATIONS Y N Remark
1 Correct thickness of Raft
Location of Columns and Walls (as per Grid Lines on A.D and to be marked on
2
blinding )
3 Dimensions of Columns and Walls
4 Thickness of Retaining Wall

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006f

Structural Works Inspection for RAFT ON PILES


1 DOCUMENTATION Y N Remark
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS Y N Remark


5 Correct Foundation Level in relation to Bench Mark (as per A.D of CED)
6 Raft Reinforcement - Diameter and spacing (as per A.D)
7 Additional Reinforcement provided (as Indicated on A.D)
8 Punching Shear Reinforcement around Columns and Walls (as per A.D)
9 Reinforcement Anchorage Length (as per A.D & as per Code)
10 Cover to Reinforcement on top of piles (above the Pile Head Treatment)
11 Anti Bursting Reinforcement - Diameter and spacing (as per A.D)
12 Columns and Walls Starter Bars - Diameter and spacing (as per A.D)
13 Reinforcement for Retaining Walls - Diameter and spacing (as per A.D)
14 Well Point location and reinforcement details (Dewatering Suction Pit)
15 Lap Length and location (to be as per A.D & Code Requirements)
Detailing of all reinforcement (to be according to ACI, BS) as per CED
16
Regulations
17 Reinforcement Cover (to be as per A.D & Code Requirements)
Location of Construction Joint & reinforcement details (to be as per A.D & Code
18
Requirements)
19 Water Stopper location and detailing if applicable (as per A.D)
Tower Crane Location as per CED A.D (applicable only when it is located within
20
the structural element)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006g

Structural Works Inspection for RAFT ON PILE CAPS


1 DOCUMENTATION Y N Remark
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

If the Depth of Raft ≥ 1.5 meter the Bottom Steel the 1st layer the
1
inspection done
Approved Method Statement for Casting of Concrete, approval from
2
Consultant if the Depth of Raft ≥ 1.0 meter:
3 Construction Joint in Foundations should be approved by CED
4 Approved Drawings from CED
5 Shop Drawings approved by Consultant (based on A.D of CED)
6 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates (by 3rd Party & as per Code
7
Requirements)
8 CED Inspection Records (Activities as inspected by CED Engineers)
9 NOC for Tower Crane Location (from relevant Authority/Business Unit)
10 Site Lab certificate approve By Trakhees
2 SITE OBSERVATIONS Y N Remark
1 Correct thickness of Raft
2 Location of Columns and Walls (as shown on A.D)
3 Dimensions of Columns and Walls
4 Thickness of Retaining Wall
5 Correct Foundation Level in relation to Bench Mark (as per A.D of CED)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006g

Structural Works Inspection for RAFT ON PILE CAPS


1 DOCUMENTATION Y N Remark
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS Y N Remark


6 Dimensions of Strap beams (as per A.D of CED)
7 Raft Reinforcement - Diameter and spacing (as per A.D)
8 Additional Reinforcement provided (as Indicated on A.D)
9 Punching Shear Reinforcement around Columns and Walls (as per A.D)
Main & Additional Reinforcement for Pile Caps - Diameter and spacing (as per
10
A.D)
11 Cover to Reinforcement on top of piles (above the Pile Head Treatment)
12 Anti-Bursting Reinforcement - Diameter and spacing (as per A.D)
13 Strap Beams Reinforcement - Diameter and spacing (as per A.D)
14 Columns and Walls Starter Bars - Diameter and spacing (as per A.D)
15 Reinforcement for Retaining Walls - Diameter and spacing (as per A.D)
16 Well Point location and reinforcement details (Dewatering Suction Pit)
17 Location of Construction Joint (as per A.D)
Detailing of all reinforcement (to be according to ACI, BS) as per CED
18
Regulations
19 Reinforcement Cover (to be as per A.D & Code Requirements)
20 Lap Length and location (to be as per A.D & Code Requirements)
21 Anchorage Length of Reinforcements (as per A.D)
22 Water Stopper location and detailing if applicable
Tower Crane Location as per CED A.D (applicable only when it is located within
23
the structural element)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006h

Structural Works Inspection for RAFT ON SOIL


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
If the Depth of Raft ≥ 1.5 meter the Bottom Steel the 1st layer the
1
inspection done
Approved Method Statement for Casting of Concrete, approval from
2
Consultant if the Depth of Raft ≥ 1.0 meter
3 Construction Joint in Foundations should be approved by CED
4 Building Permit
5 Affection Plan
Demarcation Certificate and Bench Mark - Approval (from relevant
6
Authority/B.U)
7 Valid Consultant's License
8 Valid Contractor's License
9 Approved Drawings from CED
10 Shop Drawings Approved by Consultant (based on A.D of CED)
11 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
12
Requirements
13 CED Inspection Records (Activities as inspected by CED Engineers)
Confirmation of Bearing Capacity at actual level of Foundations by 3rd Party &
14
verified as per design regulations
Compaction Test Record for Sub grade Soil by 3rd Party & verified as per Soil
15
Report Requirements
Soil Improvement Test Records, If required by 3rd Party & verified as per Soil
16
Report Requirements
17 NOC from DEWA - Power
18 NOC from DEWA - Water
19 NOC from Telecommunication provider in the area
20 NOC from neighbor (whenever encroachment is made)
21 NOC for Tower Crane Location (from relevant Authority/Business Unit)
22 Site lab certificate approve by Trakhees

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006h

Structural Works Inspection for RAFT ON SOIL


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS Y N Remark


1 Observation of Setback distance (as per A.D of CED)
2 Correct Foundation Level in relation to Bench Mark (as per A.D of CED)
3 Correct thickness of Raft
4 Correct Orientation of Structure
5 Dimensions of Strap Beams
6 Location of Columns and Walls (as per of A.D)
7 Dimensions of Columns and Walls
8 Thickness of Retaining Wall
9 Raft Reinforcement - Diameter and spacing (as per A.D)
10 Additional Reinforcement provided (as Indicated on A.D)
11 Punching Shear Reinforcement around Columns and Walls (as per A.D)
12 Strap Beams Reinforcement - Diameter and spacing (as per A.D)
13 Columns and Walls Starter Bars - Diameter and spacing (as per A.D)
14 Reinforcement for Retaining Walls - Diameter and spacing (as per A.D)
15 Connections between Walls
16 Well Point location and reinforcement details (Dewatering Suction Pit)
17 Construction Joint location & details .
Detailing of all reinforcement (to be according to ACI, BS) as per CED
18
Regulations

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006i

Structural Works Inspection for FOOTINGS - ALL TYPES


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
Site lab certificate by Trakhees
1 Retaining walls not required of inspection by CED if shoring is present.
Must be One side of formwork to be left open after installed the reinforcement in
2
order to enable inspection by CED.
3 Building Permit
4 Affection Plan
Demarcation Certificate and Bench Mark - Approval (from relevant
5
Authority/B.U)
6 Valid Consultant's License
7 Valid Contractor's License
8 Approved Drawings from CED
9 Shop Drawings approved by Consultant (based on A.D of CED)
10 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
11
Requirements
12 CED Inspection Records (Activities as inspected by CED Engineers)
Confirmation of Bearing Capacity at actual Foundation Level by 3rd Party &
13
verified as per Design Regulations
Compaction Test Record for Sub grade Soil by 3rd Party & verified as per Soil
14
Report Requirements
Soil Improvement Test Records, if required, by 3rd Party & verified as per Soil
15
Report Requirements
16 NOC from DEWA - Power
17 NOC from DEWA - Water
18 NOC from Telecommunication provider in the area
19 NOC from neighbor (whenever encroachment is made)
20 NOC for Tower Crane Location (from relevant Authority/ B.U)

2 SITE OBSERVATIONS Y N Remark


Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006i

Structural Works Inspection for FOOTINGS - ALL TYPES


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 Observation of Setback distance (as per A.D of CED)


2 Correct Foundation Level in relation to Bench Mark (as per A.D of CED)
3 Correct Orientation of Building
4 Dimensions of Footings as per A.D of CED
5 Dimensions of Strap Beams
6 Location of Columns and Walls as per A.D and to be marked
7 Dimensions of Columns and Walls
8 Footings Reinforcement - Diameter and spacing (as per A.D)
9 Additional Reinforcement provided (as Indicated on A.D)
10 Punching Shear Reinforcement around Columns and Walls (as per A.D)
11 Strap Beams Reinforcement - Diameter and spacing (as per A.D)
12 Columns and Walls Starter Bars - Diameter and spacing (as per A.D)
Detailing of all reinforcement (to be according to ACI, BS) as per CED
13
Regulations
14 Reinforcement Cover to be as per A.D and according to Code Requirements
15 Lap Length and location to be as per A.D and according to Code Requirements
16 Length of dowels for Columns & Walls (as per A.D)
17 Adequate Support for Concrete Formwork
Tower Crane Location and additional reinforcement as per A.D (applicable only
18
when located within the structural element)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006j

Structural Works Inspection for SPECIAL FOUNDATIONS


Structural Works Inspection - Silos, Machine Foundations & Storage Yard
Foundations
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
1 Construction Joint in Foundations should be approved by CED
2 Building Permit
3 Affection Plan
Demarcation Certificate and Bench Mark - Approval (from relevant
4
Authority/B.U)
5 Valid Consultant's License
Valid Contractor's License (Valid License of Nominated/Specialized Sub
6
Contractor)
7 Approved Drawings from CED
8 Shop Drawings approved by Consultant (based on A.D of CED)
9 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
10
Requirements
11 CED Inspection Records (Activities as inspected by CED Engineers)
Confirmation of Bearing Capacity at actual Level of Foundation by 3rd Party &
12
verified as per Design Regulations
Compaction Test Record for Sub grade Soil by 3rd Party & verified as per Soil
13
Report Requirements
Soil Improvement Test Records, if required, by 3rd Party & verified as per Soil
14
Report Requirements
15 NOC from DEWA - Power
16 NOC from DEWA - Water
17 NOC from Telecommunication provider in the area
18 NOC from neighbor (whenever encroachment is made)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006j

Structural Works Inspection for SPECIAL FOUNDATIONS


Structural Works Inspection - Silos, Machine Foundations & Storage Yard
Foundations
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS Y N Remark


1 Observation of Setback distance (as per A.D of CED)
2 Correct Foundation Level in relation to Bench Mark (as per A.D of CED)
3 Correct Orientation of Structure (as per A.D of CED)
4 Correct thickness of the raft .(as per A.D of CED)
5 Dimensions of Beams as per A.D of CED
6 Raft's Reinforcement - Diameter and spacing (as per A.D)
7 Additional Reinforcement provided (as Indicated on A.D)
Beam Reinforcement (Main, Additional & Shear) (as per A.D - Diameter and
8
spacing)
9 Reinforcement Around Joints - Diameter and spacing (as per A.D)
10 Curtailment of Reinforcement - (as per A.D)
Detailing of all reinforcement (to be according to ACI, BS) as per CED
11
Regulations
12 Reinforcement Cover to be as per A.D and according to Code Requirements
13 Lap Length and location to be as per A.D and according to Code Requirements
14 Adequate Support for Concrete Formwork
15 Detailing of Joints (Movement, Contraction or Transverse Control) (as per A.D)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006k

Structural Works Inspection for RETAINING WALLS


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
1 Retaining walls not required of inspection by CED if shoring is present
Must be One side of formwork to be left open after installed the reinforcement
2
in order to enable inspection by CED.
3 Approved Drawings from CED
4 Shop Drawings approved by Consultant (based on A.D of CED)
Affection Plan/Demarcation Certificate and Bench Mark - if required (from
5
relevant Authority/B.U)
6 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
7
Requirements
2 SITE OBSERVATIONS
1 Retaining Wall Dimensions (thickness and height) as per A.D
2 Location and detailing of Construction Joints
3 Location and detailing of Movement Joints
4 Location and detailing of Water Stoppers
5 Location and dimensions of Counter Walls (Counter fort Ret. Wall)
6 Reinforcement for Retaining Wall - Diameter and spacing (as per A.D)
7 Reinforcement for Counter Wall - Diameter and spacing (as per A.D)
8 Links in Wall as per approved drawings and according to Codes
9 Corner Details as per approved drawings
10 Correct Connection for Edge Walls with Slabs
Detailing of all reinforcement (to be according to ACI, BS) as per CED
11
Regulations
12 Reinforcement Cover to be as per A.D and according to Code Requirements
13 Lap Length and location to be as per A.D and according to Code Requirements

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 1


CED-CP-006 CIVIL ENGINEERING Department CP-F-006l

Structural Works Inspection for SUSPENDED RAMPS


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
1 Building Permit
2 Approved Drawings from CED
3 Reinforcement Shop Drawings approved by Consultant (based on A.D of CED)
4 Concrete Mix Design approved by Consultant (in case of ramp on grade)
5 Steel Reinforcement Test Certificates by 3rd Party & as per Code Requirements
Steel Reinforcement Pull-Out Test Certificates by 3rd Party & as per Code
6
Requirements
7 Compressive Strength of Concrete Test Records for Walls and Columns
8 Scaffolding Certificate by Third Party
9 Scaffolding Shop Drawings approved by Consultant
Compaction Test Record for Sub grade Soil by 3rd Party & verified as per Soil
10
Report Requirements
2 SITE OBSERVATIONS
1 Clear Height and Width according to Approved Drawings
2 Scaffolding Executed as per Shop Drawings approved by Consultant
3 Thickness of Ramp Slab
4 Slope to be as per approved drawings of CED
5 Beams Dimensions as per approved drawings of CED
6 Main Reinforcement diameter and spacing as per A.D
7 Secondary Reinforcement (diameter and spacing as per A.D)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006l

Structural Works Inspection for SUSPENDED RAMPS


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS Y N Remark


8 Additional Reinforcement (diameter and spacing as per A.D)
9 Curtailment of reinforcement as per A.D
10 Anchorage length of reinforcement as per A.D
11 Main Reinforcement for Beams (diameter and spacing as per A.D)
12 Additional Reinforcement for Beams (diameter and spacing as per A.D)
13 Shear Reinforcement for Beams (diameter and spacing as per A.D)
Detailing of all reinforcement (to be according to ACI, BS) as per CED
14
Regulations
15 Reinforcement Cover to be as per A.D and according to Code Requirements
16 Lap Length and location to be as per A.D and according to Code Requirements
17 Corbels Reinforcement (as per A.D)
18 Back Propping is required for Suspended Ramps

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006m

Structural Works Inspection for SWIMMING POOL


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
1 Building Permit
2 Valid Consultant's License
Valid Contractor's License (Valid License of Nominated/Specialized Sub
3
Contractor)
4 Approved Drawings from CED
5 Approved Drawings from EHS
6 Shop Drawings approved by Consultant (based on A.D of CED & EHS)
7 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
8
Requirements
9 CED Inspection Records (Activities as inspected by CED Engineers)
Compaction Test Record for Sub grade Soil by 3rd Party & verified as per Soil
10
Report Requirements
Soil Improvement Test Records, if required by 3rd Party & verified as per Soil
11
Report Requirements
12 Site lab certificate approved By Trakhees
2 SITE OBSERVATIONS
1 Observation of Setback distance (as per A.D of CED)
2 Correct Foundation Level in relation to Bench Mark (as per A.D of CED)
3 Correct Orientation of pool (as per A.D of CED)
4 Dimensions of Swimming Pool (as per A.D of CED)
5 Thickness of foundation & walls dimension (as per A.D of CED)
6 Reinforcement - Diameter and spacing (as per A.D)
7 Additional Reinforcement provided (as Indicated on A.D)
8 Walls Starter Bars - Diameter and spacing (as per A.D)
9 Correct Connection Details for Walls (as per A.D)
Detailing of all reinforcement (to be according to ACI, BS) as per CED
10
Regulations
11 Reinforcement Cover to be as per A.D and according to Code Requirements
12 Lap Length and location to be as per A.D and according to Code Requirements
13 Construction Joint location and detailing
14 Water Stopper location and detailing if applicable

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 1


CED-CP-006 CIVIL ENGINEERING Department CP-F-006n

Structural Works Inspection for RIBBED SLAB


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
1 If required any special requirements for applicable conditions
Pre-Cambering for Long Spans & Cantilever should be as
2
per approved drawings and according to Code Requirements
3 Is the Back Propping Refer to the code and site loading conditions
Affection Plan/Re-Demarcation Certificate -for ground floor level (from relevant
4
Authority/ B.U)
5 Approved Drawings from CED
6 Reinforcement Shop Drawings approved by Consultant (based on A.D of CED)
7 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
8
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party & as
9
per Code Requirements
Drawings for Transformers / Electrical Rooms approved by DEWA (openings in
10
particular)
11 CED Inspection Records (Activities as inspected by CED Engineers)
Certificate of Acceptable Tolerances in Vertical Members (approved by
12
Consultant)
Compressive Strength of Concrete Test Records for Walls and Columns (RCC
13
elements preceding the requested inspection)
14 Scaffolding Certificate by Third Party
15 Scaffolding Shop Drawings approved by Consultant
16 Block Test Certificate for Bearing Walls (by 3rd Party Independent Laboratories)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006n

Structural Works Inspection for RIBBED SLAB


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS Y N Remark


1 Floor Height according to approved drawings
2 Scaffolding executed as per Shop Drawings (approved by Consultant)
3 Size of Hourdi Block as per approved drawings
4 Thickness of Topping Concrete as per approved drawings
5 Location of openings as per approved drawings
6 Drop & hidden beams dimensions as per approved drawings
7 Main Reinforcement for Beams and Ribs (diameter and spacing as per A.D)
8 Additional Reinforcement (diameter and spacing as per A.D)
9 Curtailment of reinforcement as per A.D
10 Anchorage length of reinforcement (as per A.D)
11 Stirrups for Ribs and Beams (diameter and spacing as per A.D)
12 Top Steel Mesh (diameter and spacing as per A.D)
Reinforcement around openings - No. of bars (diameter and spacing as per
13
A.D)
14 Connections to Walls and Columns as per approved drawings
15 Drop and hidden beams Main & Secondary Reinforcement (as per A.D)
16 Shrinkage Reinforcement for Deep Beams (as per A.D)
17 Torsion Reinforcement as per approved drawings
18 Cantilever Projection Length and Reinforcement (as per A.D)
19 Detailing of all reinforcement (to be according to ACI, BS) as per CED Reg.
20 Reinforcement Cover to be as per A.D and according to Code Requirements
21 Lap Length and location to be as per A.D and according to Code Requirements
22 Construction Joint location and detailing

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006o

Structural Works Inspection for SOLID FLAT SLAB WITH & WITHOUT DROPS
Structural Works Inspection for SOLID FLAT SLAB WITH & WITHOUT DROPS
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer
Mobile No.
Name
Contractor Name e-mail
Accredited Engineer
Mobile No.
Name
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
Pre-Cambering for Long Spans & Cantilever should be as
1
per approved drawings and according to Code Requirements
2 Is the Back Propping Refer to the code and site loading conditions
Affection Plan/Re-Demarcation Certificate - for ground floor level (from
3
relevant Authority/B.U)
4 Approved Drawings from CED
Reinforcement Shop Drawings approved by Consultant (based on A.D of
5
CED)
6 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
7
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party & as
8
per Code Requirements
Drawings for Transformers / Electrical Rooms approved by DEWA (openings
9
in particular)
10 CED Inspection Records (Activities as inspected by CED Engineers)
Certificate of Acceptable Tolerances in Vertical Members (approved by
11
Consultant)
Compressive Strength of Concrete Test Records for Walls and Columns
12
(RCC elements preceding the requested inspection)
13 Scaffolding Certificate by Third Party
14 Scaffolding Shop Drawings approved by Consultant
Block Test Certificate for Bearing Walls (by 3rd Party Independent
15
Laboratories)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006o

Structural Works Inspection for SOLID FLAT SLAB WITH & WITHOUT DROPS
Structural Works Inspection for SOLID FLAT SLAB WITH & WITHOUT DROPS
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer
Mobile No.
Name
Contractor Name e-mail
Accredited Engineer
Mobile No.
Name
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS Y N Remark


1 Floor Height according to approved drawings
2 Scaffolding executed as per Shop Drawings approved by Consultant
3 Thickness of Slab as per approved drawings
4 Drop and Capital Dimensions as per approved drawings
5 Location of openings as per approved drawings
6 Beams dimensions as per approved drawings
7 Main Reinforcement (diameter and spacing as per A.D)
8 Secondary Reinforcement (diameter and spacing as per A.D)
9 Additional Reinforcement (diameter and spacing as per A.D)
10 Curtailment of reinforcement as per A.D
11 Anchorage length of reinforcement as per approved drawings and Code
Reinforcement around openings - No. of bars (diameter and spacing as per
12
A.D)
13 Slab and Beam connections to Supports as per approved drawings
14 Drop and Capital Reinforcement as per approved drawings
15 Punching Shear Reinforcement as per approved drawings
16 Cantilever Projection Length and Reinforcement (as per A.D)
Pour Strip Reinforcement - as per approved drawings (diameter and spacing
17
as per A.D)
18 Deep Transfer Beams Main and Secondary Reinforcement (as per A.D)
19 Shrinkage Reinforcement for Deep Beams as per approved drawings
20 Torsion Reinforcement as per approved drawings
21 Detailing of all reinforcement (to be according ACI, BS) as per CED Reg.
22 Reinforcement Cover to be as per A.D and according to Code Requirements
Lap Length and location to be as per A.D and according to Code
23
Requirements
24 Construction Joint location and detailing

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006p

Structural Works Inspection for SOLID SLAB WITH BEAMS


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTS Y N Remark
Pre-Cambering for Long Spans & Cantilever should be as
1
per approved drawings and according to Code Requirements
2 Is the Back Propping Refer to the code and site loading conditions
Affection Plan/Re-Demarcation Certificate -for ground floor level (from
3
relevant Authority/ B.U)
4 Approved Drawings from CED
Reinforcement Shop Drawings approved by Consultant (based on A.D of
5
CED)
6 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
7
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party &
8
as per Code Requirements
Drawings for Transformers / Electrical Rooms approved by DEWA
9
(openings in particular)
10 CED Inspection Records (Activities as inspected by CED Engineers)
Certificate of Acceptable Tolerances in Vertical Members (approved by
11
Consultant)
Compressive Strength of Concrete Test Records for Walls and Columns
12
(RCC elements preceding the requested inspection)
13 Scaffolding Certificate by Third Party
14 Scaffolding Shop Drawings approved by Consultant
Block Test Certificate for Bearing Walls (by 3rd Party Independent
15
Laboratories)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006p

Structural Works Inspection for SOLID SLAB WITH BEAMS


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS Y N Remark


1 Floor Height according to approved drawings
2 Scaffolding executed as per Shop Drawings approved by Consultant
3 Thickness of Slab as per approved drawings
4 Location of Openings as per approved drawings
5 Deep Beams & others beams dimensions as per approved drawings
6 Cantilever Projection Length as per approved drawings
7 Main Reinforcement (diameter and spacing as per A.D)
8 Secondary Reinforcement (diameter and spacing as per A.D)
9 Additional Reinforcement (diameter and spacing as per A.D)
10 Curtailment of reinforcement as per A.D
11 Anchorage length of reinforcement as per approved drawings
Reinforcement around openings - (no. of bars, diameter and spacing as per
12
A.D)
13 Cantilever Projection Reinforcement as per A.D
14 Slab & Beam connections to Supports as per approved drawings
15 Pour Strip Reinforcement & location
16 Main Reinforcement for beams (as per A.D)
17 Additional Reinforcement for beams (as per A.D)
18 Shear Reinforcement for beams (as per A.D)
19 Deep Transfer Beams Main and Secondary Reinforcement (as per A.D)
20 Side Reinforcement for Deep Beams as per approved drawings
21 Torsion Reinforcement as per approved drawings
22 Detailing of all reinforcement (to be according to ACI, BS) as per CED Reg.
Reinforcement Cover to be as per A.D and according to Code
23
Requirements
Lap Length and location to be as per A.D and according to Code
24
Requirements
25 Construction Joint location and detailing

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006q

Structural Works Inspection for CHECKLIST FOR INSITU BEAMS FOR


PRECAST SLAB
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
Pre-Cambering for Long Spans & Cantilever should be as
1
per approved drawings and according to Code Requirements
2 Is the Back Propping Refer to the code and site loading conditions
3 Affection Plan / Re-demarcation Certificate for Ground Floor Level
4 Approved Drawings from CED
5 Reinforcement Shop Drawings approved by Consultant (based on A.D of CED)
6 Concrete Mix Design and Trial mix Result Report
Steel Reinforcement Test Certificates by 3rd Party & as per Code
7
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party & as
8
per Code Requirements
Certificate of Acceptable Tolerances in Vertical Members (approved by
9
Consultant)
10 CED Inspection Records (Activities as inspected by CED Engineers)
Compressive Strength of Concrete Test Records for Walls and Columns (RCC
11
elements preceding the requested inspection)
12 Scaffolding Certificate by Third Party
13 Scaffolding Shop Drawings approved by Consultant
14 Method Statement approved by Consultant
2 SITE OBSERVATIONS Y N Remark
1 Beams Height according to approved drawings
2 Scaffolding executed as per Shop Drawings approved by Consultant
3 Beam Dimensions as per approved drawings
4 Beam connections to Supports as per approved drawings
5 Cantilever Projection Length as per approved drawings

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006q

Structural Works Inspection for CHECKLIST FOR INSITU BEAMS FOR


PRECAST SLAB
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS Y N Remark


6 Bearing Strip Dimensions (as per A.D)
7 Main Reinforcement (diameter and spacing as per A.D)
8 Secondary Reinforcement (diameter and spacing as per A.D)
9 Additional Reinforcement (diameter and spacing as per A.D)
10 Curtailment of reinforcement as per A.D
11 Cantilever Projection Reinforcement (as per A.D)
12 Shear Reinforcement for Beams (as per A.D)
13 Anchorage Length of reinforcement as per approved drawings
Bearing Strip Reinforcement to be as per approved drawings (number of bars,
14
diameter & spacing)
Steel Dowels for connections to be as per approved drawings and CED
15
Regulations
Detailing of all the reinforcement (to be according to ACI, BS) based on CED
16
Regulations
17 Reinforcement Cover to be as per A.D and according to Code Requirements
18 Lap Length and location to be as per A.D and according to Code Requirements
19 Construction Joint location and detailing

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006r

Structural Works Inspection Checklist for STEEL STRUCTURE FRAMING


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
1 Is the Back Propping Refer to the code and site loading conditions
2 Affection Plan / Re-demarcation Certificate for the Ground Floor Level
Valid Contractor's License for Structural Steel Fabrication Works
3
(Nominated/Specialized Sub Contractor)
4 Approved Drawings from CED
5 Steel Structure Shop Drawings approved by Consultant (based on A.D of CED)
6 Pull-out Test for Studs
7 Bolts and Studs Test Certificate
8 Welding Test Certificate
Concrete Mix Design approved Consultant. (Topping and Grouting for joints -
9
Design Regulations)
Steel Reinforcement Test Certificates by 3rd Party & as per Code
10
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party & as
11
per Code Requirements
Certificate of Acceptable Tolerances in Vertical Members (approved by
12
Consultant)
13 CED Inspection Records (Activities as inspected by CED Engineers)
Warranty from Specialist Sub Contractor/Supplier for Works Executed (for 10
14
years & before the BCC)
15 Materials Certificate from Specialist Company as per Code

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006r

Structural Works Inspection Checklist for STEEL STRUCTURE FRAMING


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS Y N Remark


1 Fabrication & erection tolerance complied with National Standard
2 Main Frames Plumber / aligned as per A.D
Surfance defects in hot rolled / cold section in accordance with National
3
Standards
4 Location & orientation comply with A.D
5 Setback comply with A.D
Direct/gussected/pin connections comply with A.D / specification & National
6
Standard
7 base Plate size / thickness comply with A.D / Specification
8 HSB Dimension/grade comply with A.D/Specification
9 HSB / NB thread projection as oer Standard / Specification
10 Bolt center to center comply with A.D
11 Bolts correctly tightened
12 Columns / Rafters / Beams comply with A.D
13 Wielding type connection comply with A.D
14 Columns/Rafters / Beams Splices comply with A.D
15 Bracing / strut tube stayed cables comply with A.D
16 Purlins/Gint comply with A.D
17 Columns / Beams stiffeners comply with A.D
18 Nuts / washers comply with Specifications
19 Crane runway girder / dimension / installing comply with A.D / Specification
20 Fabrication & erection tolerance complied with National Standard

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006s

Structural Works Inspection Checklist for QUAY WALL (Sea


wall/Berth/Anchor wall)
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

DOCUMENTATION Y N Remark
1 Marine NOC if any condition
2 Demarcation Certificate
3 Approved drawing by CED
4 Valid Affection Plan
5 DM Approval letter for Consultant/Contractor Foreign Company
6 Site lab certificate
2 SITE OBSERVATIONS
1 Quay wall/Berth location as per Approved Drawings
2 Depth for quay wall/Berth in relation Bench mark to be as per Approved Drawings
3 Til-Road number/level should be as per Approved Drawing
4 Pile Reinforcement should be as per Approved Drawing
5 Diaphragm thickness should be as per Approved Drawing
6 Soldier pile Dimension should be as per Approved Drawing
Til-Road grade/diameter should be as per Approved Drawing & project
7
specification
8 Concrete Block dimension/Reinforcement should be as per Approved Drawing
9 Shop drawing approved by consultant (Based on AD from CED)
10 Concrete Block key details should be as per Approved Drawing
Arubble base foundation for concrete block wall should be as per Approved
11
Drawing
12 Anchor wall thickness/depth should be as per Approved Drawing
Joint between concrete blocks should be as per Approved Drawing & as per
13
project specification
Filling back face of wall should be as per Approved Drawing & project
14
specification
15 Quay wall/Berth/ anchor wall alignment should be as per Approved Drawing

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 Jul 2016 Page 1 of 1


CED-CP-006 CIVIL ENGINEERING Department CP-F-006a

Structural Works for Break water/shore Revetment


Quay wall (Sea wall/Berth/Anchor wall)
Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

1 DOCUMENTATION Y N Remark
1 Marine NOC if any condition
2 Demarcation Certificate
3 Approved drawing by CED
4 Valid Affection Plan
5 DM Approval letter for Consultant/Contractor Foreign Company
6 Site lab certificate
2 SITE OBSERVATIONS Y N Remark
1 Break water location should be as per Approved Drawing
2 Weight of armor unit/shape should be as per Approved Drawing
3 Thickness of armor layer/slope should be as per Approved Drawing
Weight of under layer rock/thickness should be as per Approved Drawing/Project
4
specification
5 Core structure should as per Approved Drawing
6 Crest Dimension/level should as per Approved Drawing
7 Toe protection should be as per Approved Drawing
8 Break water length should be as per Approved Drawing
9 Coping for break water should as per Approved Drawing

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. Jul 2016 Page 1 of 1


CED-CP-006 CIVIL ENGINEERING Department CP-F-006v

Structural Works Checklist for Soil Improvement


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Structural Works Inspection for Soil Improvement


1 DOCUMENTATION Y N Remark
1 CED NOC Approval
2 Affection plan
Demarcation Certificate and bench Mark approval (relevant Authority / Business
3
unit
4 Valid Consultant letter
5 Valid Specialized Contractor license
6 CED approved Drawing
7 NOC DEWA Water/Power
8 NOC from Telecommunication provider in area
9 NOC from RTA/neighbor
2 SITE OBSERVATIONS
1 Stone vebro and creep pile spacing as per Approved Drawing
2 Ston / Vebro / Creep piles depth as per as per Approved Drawing
Check Trial spacing test Result (if Applicable) alone with Zero % stage
3
inspection
Check actual settlement beyond plot limit if has effect on infrastructure/utilities
4
during 50% Inspection
5 Shoring Location as per A.D of CED
6 Shoring Location as per A.D of CED
7 Depth/Length in relation to Bench Mark
8 Shoring Anchorage Length as per A.D (from Excavation Level)
Shoring Deviation within Allowable Limits (at the time of Final Inspection for
9
Shoring Works)
Contiguous/Secant Piles
10 Shoring Pile Diameter
11 Pile Reinforcement: Main (Vertical Bars - diameter and number)
12 Pile Reinforcement: Distribution (Ties - diameter and spacing)
13 Reinforcement Cover (to be as per A.D & Code Requirements)
14 Lap Length and Location (to be as per A.D & Code Requirements)
15 King Post Length and Reduced Levels
Soldier Piles
16 Size of Soldier Pile

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006v

Structural Works Checklist for Soil Improvement


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS
17 Spacing of Soldier Piles
18 Pre-cast / wooden Panel size (fixing of Panels to be in parallel with excavation)
Diaphragm
19 Width and length of diaphragm as per AD
20 Reinforcement of Diaphragm as per AD
Sheet Piles
21 Check size, thickness and length
Restraining for Shoring
22 Anchor spacing, angle and numbers
23 Tendons size & numbers
24 Waling Beams, location, spacing and numbers
25 Anchorage Length of Tendons as per A.D of CED
26 Detailing according to Codes (ACI, BS) as per CED Regulations

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006w

Structural Works Checklist for In-situ Beams For Precast Slab


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Structural Works Inspection In-situ Beams For Precast Slab


- Pre-Cambering for Long Spans & Cantilever to be carried out as per approved drawings and according to Code
Requirements
- Back Propping is required as per Code and site loading conditions
1 DOCUMENTATION Y N Remark
1 Affection Plan / Re-demarcation Certificate for Ground Floor Level
2 Approved Drawings from CED
3 Reinforcement Shop Drawings approved by Consultant (based on A.D of CED)
4 Concrete Mix Design and Trial mix Result Report
Steel Reinforcement Test Certificates by 3rd Party & as per Code
5
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party & as
6
per Code Requirements
Certificate of Acceptable Tolerances in Vertical Members (approved by
7
Consultant)
8 CED Inspection Records (Activities as inspected by CED Engineers)
Compressive Strength of Concrete Test Records for Walls and Columns (RCC
9
elements preceding the requested inspection)
10 Scaffolding Certificate by Third Party
11 Scaffolding Shop Drawings approved by Consultant
12 Method Statement approved by Consultant
2 SITE OBSERVATIONS
1 Beams Height according to approved drawings
2 Scaffolding executed as per Shop Drawings approved by Consultant
3 Beam Dimensions as per approved drawings
4 Beam connections to Supports as per approved drawings
5 Cantilever Projection Length as per approved drawings
6 Bearing Strip Dimensions (as per A.D)
7 Main Reinforcement (diameter and spacing as per A.D)
8 Secondary Reinforcement (diameter and spacing as per A.D)
9 Additional Reinforcement (diameter and spacing as per A.D)
10 Curtailment of reinforcement as per A.D
11 Cantilever Projection Reinforcement (as per A.D)
2 SITE OBSERVATIONS

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006w

Structural Works Checklist for In-situ Beams For Precast Slab


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

12 Shear Reinforcement for Beams (as per A.D)


13 Anchorage Length of reinforcement as per approved drawings
Bearing Strip Reinforcement to be as per approved drawings (number of bars,
14
diameter & spacing)
Steel Dowels for connections to be as per approved drawings and CED
15
Regulations
Detailing of all the reinforcement (to be according to ACI, BS) based on CED
16
Regulations
17 Reinforcement Cover to be as per A.D and according to Code Requirements
18 Lap Length and location to be as per A.D and according to Code Requirements
19 Construction Joint location and detailing

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006x

Structural Works Checklist for Steel Deck Slab


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Structural Works Inspection for Steel Deck Slab


- Back Propping is required as per Code and site loading conditions
1 DOCUMENTATION Y N Remark
1 Affection Plan / Re-demarcation Certificate for Ground Floor Level
Valid Contractor's License for Structural Steel Fabrication Works
2
(Nominated/Specialized Sub Contractor)
3 Approved Drawings from CED
Steel Structure Shop Drawings approved by Consultant (based on A.D
4
of CED)
5 Pull-out Test for Studs
6 Bolts and Studs Test Certificate
7 Welding Test Certificate
Concrete Mix Design approved Consultant. (Topping and Grouting for
8
joints - Design Regulations)
Steel Reinforcement Test Certificates by 3rd Party & as per Code
9
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party
10
& as per Code Requirements
Certificate of Acceptable Tolerances in Vertical Members (approved by
11
Consultant)
12 CED Inspection Records (Activities as inspected by CED Engineers)
Warranty from Specialist Sub Contractor/Supplier for Works Executed
13
(for 10 years & before the BCC)
14 Materials Certificate from Specialist Company as per Code
2 SITE OBSERVATIONS
1 Floor Height according to approved drawings
2 Corrugated Steel Sheet Thickness (as per A.D)
3 Shear Studs numbers and locations (as per A.D)
4 Steel Structural Beams dimensions (as per A.D)
5 Beams Connection to Columns (as per A.D)
6 Number of Bolts in Connection (as per A.D)
7 Bolts spacing (as per A.D)
8 Welding carried out as per approved drawings
2 SITE OBSERVATIONS
Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 1 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006x

Structural Works Checklist for Steel Deck Slab


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

9 Main Reinforcement (Topping Steel) as per AD in number, size and form


10 Splices for Steel Structure as per AD
11 Scaffolding executed as per Shop Drawings approved by Consultant
Detailing of all the Connections (to be according to AISC, BS) as per
12
CED Regulations
Detailing of all the Connections (to be according to AISC, BS) as per
13
CED Regulations
Detailing of all reinforcement (to be according to ACI, BS) as per CED
14
Regulations
Reinforcement Cover to be as per A.D and according to Code
15
Requirements
Lap Length and location to be as per A.D and according to Code
16
Requirements

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 2 of 2


CED-CP-006 CIVIL ENGINEERING Department CP-F-006y

Structural Works Checklist for Post Tension Slab


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Structural Works Inspection for Post Tension Slab


- Refer to special requirements for applicable conditions
- Pre-Cambering for Long Spans & Cantilevers to be carried out as per approved drawings and according to Code
Requirements
- Back Propping is required as per Code and site loading conditions
- Priority shall be given to PT System as and when there is a conflict with Services or other types of reinforcement
1 DOCUMENTATION Y N Remark
Affection Plan/Re-Demarcation Certificate for ground floor level (from relevant
1
Authority/B.U)
Valid Contractor's License for Post Tension Works (Nominated/Specialized Sub
2
Contractor)
3 Approved Drawings from CED
Reinforcement Shop Drawings & PT Shop Drawings (approval by Consultant as
4
per A.D of CED)
5 Concrete Mix Design approved by Consultant
Steel Reinforcement Test Certificates by 3rd Party & as per Code
6
Requirements
Steel Reinforcement Pull-Out Test Certificates - if required, by 3rd Party & as
7
per Code Requirements
Certificate of Confirmation by PT Sub Contractor for the work done (as per A.D
8
& Code Requirements)
Confirmation by Consultant for Final Stresses of preceding PT elements ( in
9
compliance with Design Regulations)
Certificate of Acceptable Tolerances in Vertical Members (approved by
10
Consultant)
Drawings for Transformers / Electrical Rooms approved by DEWA (Openings in
11
particular)
12 CED Inspection Records (Activities as inspected by CED Engineers)
13 Tendons Test Certificate (by 3rd Party & as per Code Requirements)
14 Materials Test Certificates for Anchors and Ducts (as per Code Requirements)
15 Compressive Strength for Grouting (as per A.D & Code Requirements)
Warranty from Specialist Sub Contractor of Post Tensioned Works (for 10 years
16
& before the B.C.C)

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 1 of 3


CED-CP-006 CIVIL ENGINEERING Department CP-F-006y

Structural Works Checklist for Post Tension Slab


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Compressive Strength of Concrete Test Records for Walls and Columns (RCC
17
elements preceding the requested inspection)
18 Scaffolding Certificate by Third Party
19 Scaffolding Shop Drawings approved by Consultant
2 SITE OBSERVATIONS
1 Floor Height according to approved drawings
2 Scaffolding executed as per Shop Drawings approved by Consultant
3 Thickness of Slab as per approved drawings
4 Thickness of Slab as per approved drawings
5 Location of Openings as per approved drawings
6 Deep Beams & others beams dimensions as per approved drawings
7 Cantilever Projection Length as per approved drawings
8 Slab Duct size and length as per AD
9 PT profiles & spacing for slab ( in compliance with A.D)
10 Number of Tendons
11 PT positions should be marked on formwork
Opening size more than 600mm x 600 mm (approval from CED has to be
12
obtained prior to execution )
13 Low and High point locations (in compliance with A.D)
14 Coordination Between PT and MEP Services/Conduits
15 Grouting and venting pipes (as per A.D & Code Requirements)
16 Tendons to have smooth profiles and sharp deviations to be avoided.
17 Dead and Live End details are in compliance with A.D
Bar diameter for Chairs should not be less than 8mm (Chairs - for fixing Tendon
18
Duct to required profile)
19 Details of PT couplers are in compliance with A.D
20 Anti-bursting reinforcement (as per A.D)
Edge reinforcement for protection of unstressed areas around PT Tendons to
21
be as per A.D
22 PT Profiles & spacing for Beams are in compliance with A.D
23 Details of Reinforcement for Floor Pan Box (as per A.D)
Pour Strip location and size (as per A.D)
24

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 2 of 3


CED-CP-006 CIVIL ENGINEERING Department CP-F-006y

Structural Works Checklist for Post Tension Slab


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

2 SITE OBSERVATIONS
25 Main Reinforcement (diameter and spacing as per A.D)
26 Secondary Reinforcement (diameter and spacing as per A.D)
27 Additional Reinforcement (diameter and spacing as per A.D)
28 Punching Shear Reinforcement (as per A.D)
29 Curtailment of reinforcement as per A.D
30 Cantilever Projection Reinforcement (as per A.D)
31 Anchorage length of reinforcement (as per A.D)
Reinforcement Around Openings - (no. of bars, diameter and spacing as per
32
A.D)
33 Slab & Beam connections to Supports. (as per A.D)
34 Pour Strip Reinforcement & location
35 Main Reinforcement for beams
36 Shear Reinforcement for beams (as per A.D)
37 Shrinkage Reinforcement for beams. (as per A.D)
38 Deep Transfer Beams Main and Secondary Reinforcement (as per A.D)
39 Side Reinforcement for Deep Beams as per approved drawings
40 Torsion Reinforcement as per approved drawings
Detailing of all reinforcement (to be according to ACI, BS) as per CED
41
Regulations.
42 Reinforcement Cover to be as per A.D and according to Code Requirements
43 Lap Length and location to be as per A.D and according to Code Requirements
44 Construction Joint location and detailing

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 3 of 3


CED-CP-005 CIVIL ENGINEERING Department CP-F-005z

Structural Works Checklist for Pipes & Manhole


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

Structural Works Inspection for Pipes & Manhole


1 DOCUMENTATION Y N Remark
1 CED NOC Approval
2 Affection Plan
Demarcation Certificate/Bench Mark (Approved from relevant
3
Authority/Business Unit)
4 Valid Consultant License.
Valid contractor License (Valid License of nominated specialist sub-
5
contractor).
6 Approved Drawing from CED.
7 Approved Concrete mix design from CED.
8 CED inspection record.
9 Shop drawing approved by consultant (Based on AD from CED)
10 Steel Reinforcement Test Certificate ( By Third Party)
11 Trial mix result approved by consultant.
In case shoring work is required / inspection should be submitted as per
12
shoring procedure inspection.
13 NOC from DEWA Power / Water.
14 NOC from Telecommunication provider in the area / empower
15 Pipe & Fitting factory test certificate approved by consultant.
2 SITE OBSERVATIONS
Pipes should be supplied and erected (installed) as well with all joint
1 rings, gaskets, washers, bolts, nuts and any other components
necessary for the complete installation as per AD & specification.
2 Supporting & anchoring arrangement for pipe should be as per AD.
3 Pipes alignment and connection should be as per AD.
Manholes & Chambers shape, size, dimensions, materials, as well as
4
respects to details should be as per AD.
5 Pipes invert level should be as per AD.
6 Manhole cover reduce level should be as per AD.
Manhole cover should be heavy duty type as per project specification.
7
2 SITE OBSERVATIONS

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 1 of 2


CED-CP-005 CIVIL ENGINEERING Department CP-F-005z

Structural Works Checklist for Pipes & Manhole


Submission Ref: …………………………..… Inspection Date: ………………………….
Applicant Information
Consultant Name e-mail
Accredited Engineer Name Mobile No.
Contractor Name e-mail
Accredited Engineer Name Mobile No.
Project Information
CED Permit/NOC Ref. No. Plot No.

All benching & channel shall be formed with concrete or other materials
8
specified @ drawing and project specifications.
Manhole wall thickness should be as per AD and should be smooth as
9
per project specifications.
Pipes entering / leaving manholes / chamber and other special structure
10
shall be as per AD
11 Road gullies location & details should be as per AD.
12 Connection pipe size between gull & manholes should be as per AD.
13 Back-drop should be as per AD.

Consultant Stamp & Signature Contractor Stamp & Signature

Rev. 00 August 2016 Page 2 of 2

You might also like