NETWORK OPTIMIZATION
MODELS: PERT-CPM
PART 2
1
2/23/2018
2
2/23/2018
Let:
i = expected time for activity i
i = time for activity i under maximum crashing
Mi = maximum possible reduction in time for activity
i due to crashing
Thus, per unit of time (e.g., per day), the crashing cost
K for each activity is given by
Ci Ci
Ki
Mi