DEWA eServices
Version: 1.0
Table of Contents
1. Legend..................................................................................................................... - 3 -
2. Manual Objectives .................................................................................................. - 4 -
3. Description .............................................................................................................. - 4 -
4. System Requirement ............................................................................................... - 4 -
5. How to Navigate? ................................................................................................... - 5 -
6. How to Register?..................................................................................................... - 5 -
7. Forget Password ...................................................................................................... - 8 -
8. How to Login? ...................................................................................................... - 10 -
9. Owner Registration ............................................................................................... - 11 -
10. Building NOC ....................................................................................................... - 13 -
11. LV Design Approval ............................................................................................. - 16 -
12. LV Shop Drawing Approval ................................................................................. - 19 -
13. Fit-out Application ................................................................................................ - 22 -
14. HV Design Approval ............................................................................................ - 25 -
15. HV Inspection ....................................................................................................... - 28 -
16. Application ............................................................................................................ - 31 -
17. LV Inspection........................................................................................................ - 33 -
18. Track your Application ......................................................................................... - 34 -
19. Make your payment (on-line) ............................................................................... - 35 -
20. Update Profile ....................................................................................................... - 35 -
21. Building NOC - Water .......................................................................................... - 37 -
22. Design Approval - Water ......................................................................... - 39 -
Cancel application.
Objective of this manual is to provide the hands on experience of the SAP transactions to the users. Based on
the DEWA eService business processes the transaction flow has been structured in this document as per
required business.
3. Description
DEWA eService is exclusively design for Consultant, Contractor and Govt Organization to apply and track the
application online. DEWA eService will covers the wide range of the Electricity and Water services offered by DEWA.
The services are:
Electricity Water
Building NOC Building NOC
Demolition NOC Demolition NOC
LV Design Approval Design Approval
LV Shop Drawing Approval Construction Drawing Approval
HV Design Approval Application
Application for Fit-Out Approval Application-Infrastructure (New)
HV Inspection On-line Estimate Payment
LV Inspection
Application
Application-Infrastructure (New)
On-line Estimate Payment
As the owner of our products you can get convenient access to Creation and tracking of application and account
information for certain services and performs select self-service transactions online.
4. System Requirement
To access the eService Website, we recommend your computer meets the following requirements:
Computer requirements
Your computer must have at least 1GB RAM, 100MB disk space, 133MHz, and Internet access.
Modem Requirements
The minimum speed requirement for a modem to access eService is 28.8Kbps, although we recommend using
56.6Kbps or higher speeds for optimal performance.
The following are known browsers or platforms that are not officially supported by eService:
¾ America Online®
¾ Netscape Navigator®
¾ Microsoft® Internet Explorer - lower than version 6.0
¾ Certain Sun Microsystems applications, such as, Hot Java Browser and StarOffice Browser
¾ Web TV
¾ Browsers for the blind (screen readers or braille-writers)
¾ Browsers that disable JavaScript
¾ Browsers that do not support JavaScript
¾ Other browsers, such as, Opera, Mozilla, IE-derivatives MSN Explorer & NeoPlanet, and any other
browser that supports HTML 4.0, CSS 1.0, and JavaScript 1.0 should be able to run eService. However,
these browsers are not officially supported platforms and therefore, results vary compared to those of
supported browsers and platforms.
5. How to Navigate?
DEWA eService is specially designed for Consultant, Contractor and Government Organization to serve his
customer with full satisfaction. Consultant, Contractor and Government Organization needs to be register with
DEWA for availing various services offered by DEWA.
To navigate you need to go to https://crm.dewa.gov.ae/
Availing Upon logging into the portal, please go to the eService tab. Select eService and you can directly
connected to the application.
6. How to Register?
Step 2: Select Application Category from Drop down list e.g. Consultant-Electrical, General etc.
Step 3: Enter all mandatory fields
Step 4: Enter Valid Trade License or Approved Letter
Step 5: Update the contact person Details
Step 8: Enter User ID and Password
Step 7: Upload required documents
Step 9: Submit application
Step 10: System will automatically send SMS & E-mail
Step 11: Submitted Application will undergo through approval process in DEWA
Step 12: Upon approval, system will automatically send Notification to consultant and contractor.
Any time if you forget your password, Password can be changed on-line
Prerequisite
Valid User ID and Password
Valid EID Card
Prerequisite
Valid User ID and Password
Registered Owner Master
Enrolled consultants (consultant – Electrical & Consultant – Gov) and contractors (Contractor- Electrical &
Contractor – Fit outs) are applying on-line for obtaining Drawing Approval through e-Services of DEWA. The
purpose of obtaining Drawing Approval for low voltage wiring installation is to carry out the electrical installation
work complying with DEWA regulation for electrical installation and to apply for connection for the projects.
LV design Approval is issued for consultant who had obtain DEWA Building NOC specifying requirement of
DEWA Substation within the consumer plot, LV Design Approval is also pre-requisite for Applying Shop Drawing
Approval for Such Projects. If requirement of DEWA substation is not specified in DEWA Building NOC, such
cases LV design approval is not mandatory for issuing LV shop drawing approval to the contractors.
Only electrical contractor can apply for LV shop drawing which is mandatory for all the projects.
LV Shop Drawing for Fit-out works is issued to fit-out contractors as well as electrical contractors after the above
LV shop drawing approval for the main project where ever applicable. Such case DEWA NOC is not mandatory
for submission of application.
LV design approval and LV Shop Drawing Approval Process are two independent processes however the
process is identical except for the documents.
Prerequisite
Valid User ID and Password
Registered Owner Master
Approved Building NOC
Simple Steps for LV Design Approval
Step 1: Download attached Sheet 1. Premise Details and 2. Material Request Form
Step 2: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search
Step 3: Select any of the Owner which you wish to create application.
Step 4: Select any of the Owner by pressing Owner Name
Step 5: Search Approved NOC by plot no or Electricity NOC
Step 7: Select Type of NOC No as per your wish to create LV Design Approval
Step 8: Select Type of application e.g. New or Revision
Step 7: Fill-up all mandatory information
Step 8: Attached all required document and downloaded file (Premise and Material)
Step 9: Press Submit Button
Step 10: System will automatically generate application number, the same can be refer any time
Enrolled consultants (consultant – Electrical & Consultant – Gov) and contractors (Contractor- Electrical &
Contractor – Fit outs) are applying on-line for obtaining Drawing Approval through e-Services of DEWA. The
purpose of obtaining Drawing Approval for low voltage wiring installation is to carry out the electrical installation
work complying with DEWA regulation for electrical installation and to apply for connection for the projects.
LV design Approval is issued for consultant who had obtain DEWA Building NOC specifying requirement of
DEWA Substation within the consumer plot, LV Design Approval is also pre-requisite for Applying Shop Drawing
Approval for Such Projects. If requirement of DEWA substation is not specified in DEWA Building NOC, such
cases LV design approval is not mandatory for issuing LV shop drawing approval to the contractors.
Only electrical contractor can apply for LV shop drawing which is mandatory for all the projects.
LV Shop Drawing for Fit-out works is issued to fit-out contractors as well as electrical contractors after the above
LV shop drawing approval for the main project where ever applicable. Such case DEWA NOC is not mandatory
for submission of application.
LV design approval and LV Shop Drawing Approval Process are two independent processes however the
process is identical except for the documents.
Prerequisite
Valid User ID and Password
Registered Owner Master
Approved Building NOC
Approved Design Approval (If Substation Required)
Simple Steps for LV Shop Drawing Approval
Step 1: Download attached Sheet 1. Premise Details and 2. Material Request Form
Step 2: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search
Step 3: Select any of the Owner which you wish to create application.
Step 4: Select any of the Owner by pressing Owner Name
Step 5: Search Approved NOC by plot no or Electricity NOC
Step 7: Select Type of NOC No as per your wish to create LV Shop Drawing Approval
Step 8: Select Type of application e.g. New or Revision
Step 7: Fill-up all mandatory information
Step 8: Attached all required document and downloaded file (Premise and Material)
Step 9: Press Submit Button
Step 10: System will automatically generate application number, the same can be refer any time
Enrolled consultants (consultant – Electrical & Consultant – Gov) and contractors (Contractor- Electrical &
Contractor – Fit outs) are applying on-line for obtaining Drawing Approval through e-Services of DEWA. The
purpose of obtaining Drawing Approval for low voltage wiring installation is to carry out the electrical installation
work complying with DEWA regulation for electrical installation and to apply for connection for the projects.
LV design Approval is issued for consultant who had obtain DEWA Building NOC specifying requirement of
DEWA Substation within the consumer plot, LV Design Approval is also pre-requisite for Applying Shop Drawing
Approval for Such Projects. If requirement of DEWA substation is not specified in DEWA Building NOC, such
cases LV design approval is not mandatory for issuing LV shop drawing approval to the contractors.
Only electrical contractor can apply for LV shop drawing which is mandatory for all the projects.
LV Shop Drawing for Fit-out works is issued to fit-out contractors as well as electrical contractors after the above
LV shop drawing approval for the main project where ever applicable. Such case DEWA NOC is not mandatory
for submission of application.
LV design approval and LV Shop Drawing Approval Process are two independent processes however the
process is identical except for the documents.
Prerequisite
Valid User ID and Password
Registered Owner Master
Approved Shop Drawing Approval
Simple Steps for Fit-Out Application
Step 1: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search
Step 2: Select any of the Owner which you wish to create application.
Step 3: Select any of the Owner by pressing Owner Name
Step 6: Select LV Shop Drawing No as per your wish to create Fit-Out Application
Step 8: Select Type of application e.g. New or Revision
Step 7: Fill-up all mandatory information
Step 8: Attached all required document and downloaded file (Premise and Material)
Step 9: Press Submit Button
Step 10: System will automatically generate application number, the same can be refer any time
Design Approval Consultant needs to be enrolled with DEWA through Enrollment Process. The pre-requisite for
Applying Design Approval is to have valid Building NOC.
Categories of Substation Design Approval submission can be.
New Approval
Revision Approval
Renewal after expiry
Up-rating
Shifting of Substation with additional load
Temporary Supply
RMU/ Control Room Approval (For 11/22 kV Dedicated Feeder)
Prerequisite
Valid User ID and Password
Registered Owner Master
Step 3: Select any of the Owner which you wish to create application.
Step 4: Select any of the Owner by pressing Owner Name
Step 5: Search Approved NOC by plot no or Electricity NOC
Step 6: Select Approved NOC by pressing NOC No
Step 7: Select Type of NOC No as per your wish to create HV Design Approval
Step 8: Select Type of application e.g. New, Revision, Renewal, RMU/Control Room, Up-rating, shifting with
additional load and Temporary Supply
Step 7: Fill-up all mandatory information
Releasing of power supply for new connection, substation room has to be approved by the HV Inspection unit
where ever substation is required. All this case related to the consultant of the project. Site Inspection for
substation room to be carried out by the HV inspection engineer once consultant requests for inspection. Once
the substation room is approved then it will go to the Est. & Job Order Section for further action.
Prerequisite
Valid User ID and Password
Registered Owner Master
Approved HV Design
Step 3: Select any of the Owner which you wish to create application.
Step 4: Select any of the Owner by pressing Owner Name
Step 5: Search Approved HV Design based on pre defined parameter
Step 6: Select Approved HV Design by pressing HV Design No
The Application for Supply of Electricity and Water, eServices will provide an on-line electronic service with an
automated business workflow on DEWA’s website. Contractor, Consultant or Govt Organization needs to enroll
with DEWA using Enrollment Process to have a valid user id and password. Consultant, Contractor and Govt
Org can submit the Application after obtaining the Building NOC and Design Approval from DEWA. Once DEWA
receives the application from the consultant, contractor or Govt Organization the Application team will check the
integrity of the applicant and application. Then they will forward it to estimate department for Estimation.
Prerequisite
Valid User ID and Password
Registered Owner Master
Approved LV Design and LV Shop Drawing for Electricity
Approved Design and Construction Supply for Water
Simple Steps for Application Approval
Step 1: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search
Step 2: Select Application Category e.g. Electricity, Water, Both or Infrastructure Services
Step 3: Select Connection type from drop down list e.g. Permanent, Additional Meter etc
17. LV Inspection
Releasing of power supply for new connection has to be approved by the LV Inspection unit for which the
concerned Electrical contractor of the project has to submit an inspection request. The Site inspection for the
inspection request is allocated to an inspection engineer. The Site is then inspected by the engineer and on
approval. The supply to the premise is released by the metering staff.
Prerequisite
Valid User ID and Password
Releasing of power supply for new connection has to be approved by the LV Inspection unit for which the
concerned Electrical contractor of the project has to submit an inspection request. The Site inspection for the
inspection request is allocated to an inspection engineer. The Site is then inspected by the engineer and on
approval. The supply to the premise is released by the metering staff.
Prerequisite
Valid User ID and Password
Registered Owner Master
Registered Application in DEWA
By default you will received all application which required Customer Action.
Various Parameters are available to search your application such by default you will receive all application which
required Customer Action.
DEWA is facilitating his support not only limited to application creation and tracking. You can also make estimate
payment online using Secure Payment Gateway.
DEWA is facilitating you to update your profile with latest information so that we can serve your better.
Prerequisite
Valid User ID and Password
Registered Owner Master
Prerequisite
Valid User ID and Password
Registered Owner Master
Prerequisite
Valid User ID and Password
Registered Owner Master
Step 3: Select any of the Owner which you wish to create application.
Step 4: Select any of the Owner by pressing Owner Name
Step 5: Search Approved NOC by plot no etc
Step 6: Select Approved NOC by pressing NOC No
Step 7: Select Type of NOC No as per your wish to create Design Application Waterl
Step 8: Select Type of application e.g. New, Revision
Step 7: Fill-up all mandatory information
Step 8: Attached all required document
Step 9: Press Submit Button
Step 10: System will automatically generate application number, the same can be refer any time