INFORMATION
General information
DESCRIPTION DIMENSIONS
SUBSTRUCTURES
Site preparation
Excavating
TO COLLECTION 107,820.00
Filling
Surface treatment
E10: MIXING/CASTING/CURING/IN-
SITU CONCRETE
TO COLLECTION 970,540.00
COLLECTION
Substructures
Page 1 107,820.00
Page 2 2,657,384.50
Page 3 970,540.00
FRAME
IN -SITU CONCRETE/LARGE
PRECAST CONCRETE
E10: MIXING/CASTING/CURRING/IN-
SITU CONCRETE
IN-SITU CONCRETE/LARGE
PRECAST CONCRETE
E10: MIXING/CASTING/CURRING
CONCRETE
TO COLLECTION 748,020.00
STRUCTURAL/CARCASSING
METAL/TIMBER
Roof trusses
C 50mm x 75mm Purlin 840 m 200.00 168,000.00
TO COLLECTION 1,795,000.00
COLLECTION
Page 6 748,020.00
Page 7 1,795,000.00
IN-SITU CONCRETE/LARGE
PRECAST CONCRETE
E10: MIXING/CASTING/CURING/IN-
SITU CONCRETE
EXTERNAL/INTERNAL WALLS
2,217,000.00
CARRIED TO SUMMARY
L10: WINDOWS
L20: DOORS/SHUTTERS
WALL FINISHES
SURFACE FINISHES
M20:
PLASTERED/RENDERED/ROUGH
CAST COATINGS
M40:
STONE/CONCRETE/QUARRY/CERAMI
CS TILLING/MOSAIC
TO COLLECTION 2,136,700.00
TO COLLECTION 674,550.00
COLLECTION
Page 11 2,136,700.00
Page 12 674,550.00
FLOOR FINISHES
M10:
SAND/CEMENT/CONCRETE/SCREED
S/TOPPINGS
CEILING FINISHES
SURFACE FINISHES
SERVICES INSTALLATIONS
Plumbing
Supply, assembly and fix the following
sanitary appliances and accessories
including all joints to cold water supply
SUMMARY
A SUBSTRUCTURE 3,735,744.50
B FRAME 514,480.00
C ROOF 2,543,020.00
E WINDOWS 563,140.00
F DOORS 594,900.00