Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

SATHISHUMAR MUTHUKUMAR (1001540196) Assignment-12 38.1. Solution

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

SATHISHUMAR MUTHUKUMAR (1001540196)

ASSIGNMENT-12
38.1. Solution:
Twc=38.6 min
E= 0.95
Rp= 50 units/hr
Tr=6 sec= 0.1 min
Eb=0.93
Tc= 60E/Rp= 60*0.95/50 = 1.14 min
Ts=Tc-Tr = 1.14-0.1 = 1.04 min
w= Minimum Integer ≥ Twc/ Ts Eb = 38.6/1.04*0.93 = 39.90 → 40 workers

38.2. Solution:
w=20
Twc= 28.4 min
Rp=36 units/hr
E= 0.96
Tr= 6sec= 0.1 min
Tc= 60E/Rp= 60*0.96/36 = 1.60 min
Ts=Tc-Tr =1.60-0.1= 1.50 min
w= Twc/ Ts Eb
Therefore Eb= Twc/ Tsw
= 28.4/1.50*20 = 0.9467
Eb= 94.67%
38.3. Solution:
Da= 80,000 units/yr
Sw= 5
Hsh= 7.5
Twc= 48 min
E= 0.97
Eb=0.93
Tr=8 sec= 0.13333 min
M=1.4
Rp= Da/50SwHsh = 80000/(50*5*7.5) = 42.6667 units/hr
Tc= 60E/Rp= 60*0.97/42.6667 = 1.364 min
Ts=Tc-Tr =1.36-0.13333= 1.2307 min
w= Minimum Integer ≥ Twc/ Ts Eb = 48/1.2307*0.93 =41.93 →42 workers
M=w/n
Therefore n=w/M = 42/1.4 = 30 workstations

38.8. Solution:
n=22
Tc=1.25 min
p=0.005
Td= 6 min
F= np= 22*0.005= 0.11
Tp=Tc + FTd = 1.25+(0.11*6) = 1.91 min
Rp=60/Tp= 60/1.91 = 31.41 units/hr
E=Tc/Tp= 1.25/1.91= 0.6545 =65.45%

You might also like