Specifications
To convert methanol by oxidation into
formaldehyde
Carbon steel
1.62m
10m3
4.86m
104.5m2
Thickness of reactor
Volume of silver catalyst
Weight of silver catalyst
Pressure drop in the reactor
Number of tubes
Length of tubes
Volume of tubes
Residence time achieved
9mm
4m3
3713.22kg
1.22kPa
107
6.09m
0.0435m3
8 minutes
3.9m/s
0.0635m
96.7oC
0
;
0
;
1
1:2
5640
3810
5640
= 11.43
3810
519.5
= 4.0960
K2 =antilog (4.0960) = 12474.5
XAF 1 RT : K2 CA dXA
0
K1 CA
K1 CA RT
1 : K2 CA RT
RT K1 CA
RT(1 RT : K2 CA )
CAO (1 XA )
(1 + A XA )
CH2O + H2O
2; 1.5
1.5
= 0.333
Also total molar flowrate components entering = 1281.5929kmol/hr
And PVo = nRT,
202.65
30518.35m3 x 1hr
hr x 60min
= 455.25m3/min
376.3100kmol x 1hr
hr x 60min
= 6.27kmol/min
Thus initial concentration of methanol: CAO =
Fm
Vo
6.27 1
min 455.253
= 0.0138kmol/m3
But =
XAF (1 RT : K2 CA )dXA
0
K1 CA
1
8.314 519.5
= 0.0002
Initial rate constant, K1 = 1.1657, final rate constant, K2 = 12474.5 conversion rate, XAF =
0.874
Therefore: = CAO
Since CA =
CAO (1; XA )
(1:0.333XA )
Solving integrally:
0.874 [0.0002( 1:0.333XA dXA
0.874 (1; )2
0.874
= 0
+
172.15
+
0
0
(1; XA )
(1; XA )
0.874 1
0.874 1
= 0.8578 (0.0002[ 0
+
0.333
] + 172.15(0.874))
0
(1; XA )
(1; XA )
0.874
+
0
0.333
0.874 (1;1: )
]
0
(1; XA )
+ 150.46)
= 0.8578(0.0002[-In(10.874)In (1)]
+0.333[
0.874 1
0.874 (1: )
0.333
]
0
0
(1; XA )
(1; XA )
+ 134.10)
0.874
XA
0.874
]+
0
150.46)
129.4kmol x kg.hr x m3
m3 x kmol x 950kg
0.1362 60
1
= 8.2 minutes
Hence the residence time achieved is 8.2 minutes
Weight of silver catalyst (W):
Also, =
CAO W
FAO
8.2 6.27
0.0138
= 3713.22
Weight of catalyst
3713.22kg
950kg/m3
= 4m3
Catalyst Dimensions:
Diameter of catalyst from rules of thumbs ranges from 2mm - 5mm
Hence diameter of silver catalyst chosen = 3mm
Voidage = 55% - 65%
Chosen Voidage = 60% = 0.6
Density of silver catalyst used = 950kg/m3
Volume of vessel, VV = ?
Volume of reactor vessel:
Voidage, (e) =
VV ; VC
VV
= 0.6
4
0.4
= 10m3
= 86917883.89W
A=
ULTM
86917883.89
2250/2 . 369.7
()
104.52
0.0508 6.09
= 107tubes
Pitch diameter:
For square pitches,
Pitch used = 1.25 x OD
= 1.25 x 0.0508m = 0.0635m
Bundle diameter:
1
Bundle diameter, DB = do x
N
( t )n1
K1
1
107
(
) 2.207
0.215
= 0.8469m
Bundle diameter clearance with bundle diameter of 0.8469m is 0.17m from
bundle diameter clearance against bundle diameter charts
but =
Also, PV = nRT =
PM =
(density)
= RT
=
PM
RT
= 1.25kg/m3
Assumptions:
Viscosity of fluid, = 0.02cP = 0.00002N.s/m2
Length of tube, L = 6.09m
Diameter of tube, D = 2in = 0.0508m
Voidage, e = 0.6
x D2
4
4 x 10
3
x D2 3
4
= 3.142 x D3
3
D = 4.244
= 1.62m
Hence length of reactor, L = 3 x 1.62m
= 4.86m
Area of reactor (Ar):
Ar =
x D2
4
3.142 (1.62)2
4
= 2.06m2
10.0771kg x m3
10.0771 m/s
2.58
= 3.9m/s
Pressure drop in the reactor:
Using the Ergun equation:
150(1;)2 ( )
1.75(1;)(( )2 )
+
3 2
3
1.22kPa x 14.7psi
101.325kPa
= 0.18psi
Tube Dimensions:
Assumptions:
Outer diameter of tube = 2in = 0.0508m
Length of tube chosen = 20ft = 6.09m
Therefore volume of tube, Vt =
x d2 x L
4
= 0.0435m3
Log Mean Temperature Difference:
LMTD =
; ; (;)
ln(
)
185;343 ; (160;150)
185150
ln(343150)
168
1.7073
= 96.7oC
P1 D1
2f;P1
= 5.10mm
Adding corrosion allowance of 30% for 15years:
Thickness of the vessel = 5.10 + (0.3 x 15)
= 9.6mm
THANK YOU