Purpose: This purpose of the Go/No-Go Checkpoint – End of Analysis is to decide if the project should proceed to the
Design stage. In order to make this determination, the Delivery Manager (DM) should compile information below and then
setup a Go / No Go meeting with the Delivery Director to review the results. Based on the information gathered, a
recommendation will be made as to whether or not the project is still viable and should proceed. The DM and Delivery Director
may seek the Executive Director’s approval for the recommendation. Once completed and approved (email approval is fine),
this document must be filed in PPM.
Delivery Health
Are there any reasons why this project should not proceed to
9. the next SDLC stage? If so, identify. Yes No
Estimate History
At the end of the Analysis stage, the Project Estimate History in PPM should be updated, exported to Excel and embedded / attached to this
document:
<<Provide rationale for decision from both a Delivery Health and Estimate History perspectives. Significant risks (Delivery Health) or
variances (Estimate History) are recommended to be documented in Decision Document format. >>
PREPARED BY
Delivery Manager
REVIEWED / APPROVED BY
Delivery Director
(Print name) (signature) (date)