Electrical Checklist
Electrical Checklist
Electrical Checklist
__________________________________________________
1. General:
a. The above systems and components integral to this equipment are complete and
ready for Functional Performance Tests. The Prefunctional Checklist items are
complete and have been checked off only by parties having direct knowledge of the
event, as indicted below, respective to each responsible contractor. This
Prefunctional Checklist is submitted for approval and is subject to the attached list of
outstanding items not completed successfully. Submit a Deficiency Form upon
completion of any outstanding or deficient items. None of the outstanding items
preclude safe and reliable functional tests being performed.
c. This Prefunctional Checklist does not take the place of the manufacturer’s
recommended checkout and Start-up procedures or report.
3. Equipment Verification:
4. Installation Checks:
5. Operational Checks:
a. These checks supplement the manufacturer’s list. This is not the Functional
Performance Test.
a. All field-installed temperature sensors, pressure sensors, meters, and gages, and all
actuators and valves on this piece of equipment shall be calibrated. Sensors installed
in the unit at the factory with calibration certification provided are not required to be
field calibrated.
b. All test instruments have had a certified calibration within the last 12-months: Y / N
Contractors attest that the above items have been verified and meet the requirements of the
Contract Documents except as noted on the attached Deficiency form.
Signature:
Title:
Date:
Signature:
Title:
Date:
Signature:
Title:
Date:
Signature:
Title:
Date:
Signature:
Title:
Date:
Components Included:
___ Prime Mover, ___ Generator, ___ Fuel System, ___Cooling System, ___Battery System,
___ Exhaust System, ___ ATS, ___ UPS
1. General:
a. The above systems and components integral to this equipment are complete and
ready for Functional Performance Tests. The Prefunctional Checklist items are
complete and have been checked off only by parties having direct knowledge of the
event, as indicted below, respective to each responsible contractor. This
Prefunctional Checklist is submitted for approval and is subject to the attached list of
outstanding items not completed successfully. Submit a Deficiency Form upon
completion of any outstanding or deficient items. None of the outstanding items
preclude safe and reliable functional tests being performed.
c. This Prefunctional Checklist does not take the place of the manufacturer’s
recommended checkout and Start-up procedures or report.
3. Equipment Verification:
4. Installation Checks:
5. Operational Checks:
f. These checks supplement the manufacturer’s list. This is not the Functional
Performance Test.
g. All field-installed temperature sensors, pressure sensors, meters, and gages, and all
actuators and valves on this piece of equipment shall be calibrated. Sensors installed
in the unit at the factory with calibration certification provided are not required to be
field calibrated.
h. All test instruments have had a certified calibration within the last 12-months: Y / N
3. All sensors are calibrated within required tolerances ___ YES ___ NO
Contractors attest that the above items have been verified and meet the requirements of the
Contract Documents except as noted on the attached Deficiency form.
Signature:
Title:
Date:
Signature:
Title:
Date:
Signature:
Title:
Date:
Signature:
Title:
Date:
Signature:
Title:
Date: