Contract Dashboard
Escondida Water Supply
Internal Field Coating
18
12
16
52.27%
7
10 14
5.73%
12
0.48% 8
3.10% 3
10.74% 12 10
6
8
12.41%
15.27% 6
4 11
7
6
0.48% 8
3.10% 3
10.74% 12 10
6
8
12.41%
15.27% 6
4 11
7
6 4
2
INCENTIVE
2
1
Code 1 Code 2 Code 3 Code 4 0
RFIs
0
FCDs NCRs
0
Open
Code 5 IFR IFI Open Cl os ed Corn's
Operation
Operation ; 33.33% Operation ; 33.33%
Quality; 22.33%
Quality; 22.22% Quality; 22.33%
Safety; 33.33%
Safety; 33.33%
Safety; 33.33%
Operation Safety Qua l i ty Incetive Unobtai n Operation Safety Qual i ty Incetive Unobtai n
lient Use Only
act Dashboard
dida Water Supply
al Field Coating
NOTES
USD 4,500
1.400
USD 2,000
0.600
USD 1,500
11 3
0.400
Ratio
USD 2,500 0.800
USD 2,000
0.600
USD 1,500
11 3
0.400
USD 1,000
0.200
4 USD 500
USD 0 0.000
Open Cl os ed
Work Inci dents Nea r Mi s s es Reported
Corn's CNN Cum $
Trai ni ng Ses s ions Ki l ometers Driven
obtain;
Cumulative
Operation ; 33.33%
Safety; 33.33%
Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jun-16 Jul-16 Jul-16 Jul-16 Jul-16 Aug-16 Aug-16 Aug-16 Aug-16 Aug-16 Sep-16 Sep-16 Sep-16 Sep-16 Oct-16 Oct-16
Plan 0 0 0 7 7 7 7 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 63 63 63 63 63 63 63 63 63 63
Cumulative Plan 0 0 0 7 14 21 28 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 98 161 224 287 350 413 476 539 602 665
Cumulative Forecast 2490 2553 2616 2679 2742 2805 2868 2931 2994 3057 3120 3183 3246 3309 3372 3435 3498 3561 3624 3687
Actual 3 3 4 3 7 5 16 13 106 157 119 100 119 175 208 149 132 139 188 200
Cumulative Actual 3 6 10 13 20 25 41 54 160 317 436 520 639 814 1022 1171 1303 1442 1630 1830
Cumulative Plan% 0% 0% 0% 1% 2% 3% 4% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 15% 24% 34% 43% 53% 62% 72% 81% 91% 100%
Cumulative Forecast% 68% 69% 71% 73% 74% 76% 78% 79% 81% 83% 85% 86% 88% 90% 91% 93% 95% 97% 98% 100%
Cumulative Actual% 0% 1% 2% 2% 3% 4% 6% 8% 24% 48% 66% 78% 96% 122% 154% 176% 196% 217% 245% 50%
Hours FTE
28-Aug 107.5 3
4-Sep 110 3
11-Sep 102.5 3
18-Sep 122 3
25-Sep 145 4
2-Oct 127.75 3
9-Oct 288 7
16-Oct 205 5 ep 14
23-Oct 630 16
30-Oct 516.75 13
S 4-Sep 11-Sep 18-Sep 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec 1-Jan 8-Jan 15-Jan
107.5 110 102.5 122 145 127.75 288 205 630 516.75 6360 9420 4760 4000 4760 7000 8320 5960 5280 5560 7520
3 3 3 3 4 3 7 5 16 13 106 157 119 100 119 175 208 149 132 139 188
8 11 15 18 25 30 46 59 165 322 441 541 660 835 1043 1192 1324 1463 1651
Man Power
250 100%
90%
200 80%
70%
150 60%
Incramental Man Power
50%
100 40%
30%
50 20%
10%
0 0%
4 14 4 4 - 15 5 5 5
y-1
5 - 15 15 5 5 15 5 5 - 16 -1 6 6
p-1 Oc
t- v-1 c-1
Jan Feb
-1 r-1 r-1
Jun Jul
- g-1 p-1 Oc
t- v-1 c-1
Jan Feb
r-1
Se No De Ma Ap Ma Au Se No De Ma
Direct
Indirect Field
Indirect PMT
Expatriate
National
For Client Use Only
Quality Dashboard
Escondia Water Supply
Internal Field Coating
2-
25870-114-HC3-NXPJ-00054
Project Number: 3-
20-Sep-15
Date:
DATE
40,000 1,200
Weekly Production 0.9
Plan Accumulated
1,092
1,080
0.8
35,000
814
0.6
800
25,000
% Require Repair
714
Column D
0.5 Li nea r (Col umn D)
663
637 Column G
Li nea r (Col umn G)
20,000 589 600
JOINTS
573
0.4
527
507
491
15,000 0.3
422
399 397
400
353
320 0.2
299
10,000
259249
225
210
0.1
181 200
5,000
89 99
72 0
7 9 1 3 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 4 6
21 221 222 222 222 222 223 223 223 223 223 224 224 224 224 224 225 225 225 225 225 226 226 226 226 226 227 227 227
42 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 310158
- -
-
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 Date
JOINT COATED
200
180
160
140
120
JOINT COATED
100
80
60
40
20
0
7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2
21 221 221 222 222 222 222 222 222 222 222 222 222 223 223 223 223 223 223 223 223 223 223 224 224 224 224 224 224 224 224 224 224 225 225 225 225 225 225 225 225 225 225 226 226 226 226 226 226 226 226 226 226 227 227 227 227 227 227 227 227 227 227 228 228 228
42 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
DATE
20-Sep-15
Uncapped pipe ends
Date:
STT- 21 Day Rolling Average Inspection Results LINE COATED SAW- 21 Day Rolling Average Inspection Results
(LINE A AND B FROM KM 0 TO KM 22) (LINE B FROM KM 0 TO 145 LINE A FROM KM 0 TO KM 22)
90 1 90 1
0.9 80 0.9
80
0.8 0.8
70 70
20 20
0.2 0.2
10 0.1 10 0.1
0 0
0 0
Back End Line B CRC 21 Day Rolling Average Inspection Results ISSUES BY SPREAD LIQUID
(LINE B FROM KM22 TO KM 145) 100%
90 1
90%
80 0.9
80%
0.8
70
70%
0.7 Column U
60 60%
Column V
0.6 Column W
50 Column X
50%
Column Y
0.5 Linear (Column Y)
40 40%
0.4
30 30%
0.3
20%
20
0.2
10%
10 0.1
0%
Puerto Colos o Tunel Colos o Km18 a 164
0 0 2 3 6
REPAIR CAUSES LIQUID HOLIDAY CAUSES LIQUID SINGLE JOINTS QUALITY PERFORMANCE
100%
INSCRUSTA
ORANGEOTHER;
TIONS;
PEEL; 0.11%
0.17%
4.23% Cut-back
Cratering;
(over 0.49%
size); 0.37% 90%
DFT FAIL; 2.40% Undercut (weld); 11.84%
Feathering (porous); 16.97%
80%
70%
60%
50%
%
Other; 31.99%
40%
20%
0%
1602 1031
Front End LINE B CRC 21 Day Rolling Average Inspection Results (LINE B FROM KM145 TO KM 178) Front End LINE A CRC 21 Day Rolling Average Inspection Results (LINE A FROM KM 22 TO KM 178)
90 1 90 1
80 0.9 80 0.9
0.8 0.8
70 70
0.7 0.7
60 Column AA 60 Column AM
Column AB Column AN
0.6 0.6
Column AC Column AO
50 50 Column AP
Column AD
0.5 Column AE 0.5 Column AQ
Linear (Column AE) 40 Linear (Column AQ)
40
0.4 0.4
30 30
0.3 0.3
20 20
0.2 0.2
10 10 0.1
0.1
0 0 0 0
Total Incentive U$ Dollar $ 1,000,000
Weekly SEPTEMBER Weekly
Requested Obtain Factor Amount Total Incentive
Operation 90% 90% 100% $ 83,333.33 83,333
Incetive
Safety 2.8 0 100% $ 83,333.33 83,333 Unobtain;
Quality Backlog 20% 0% 11.11%
0% $ 55,555.56 - Operation
Quality Other 10% 0%
33.33%
166,667
Quality; 22.22%
Monthly
CUMULATIVE
Requested Obtain Factor Amount Total Incentive
Operation 90% 0% 0% $ 83,333.33 -
Safety 2.8 0 100% $ 83,333.33 83,333
Quality Backlog 20% 0% Safety; 33.33%
0% $ 55,555.56 -
Quality Other 10% 0%
83,333
Operation Safety Qual i ty I
Weekly Weekly
Operation
Safety
100%
100%
33%
33%
Mont
Quality 67% 22%
Incetive Unobtain 33% 11% Incetive
Unobtain;
11.00%
Monthly Monthly
Operation 100% 33%
Quality; 22.33%
Safety 100% 33%
Quality 67% 22%
Incetive Unobtain 33% 11%
Cumulative Cumulative
Operation 17% 6%
Safety; 3
Safety 17% 6%
Quality 11% 4%
Incetive Unobtain 5.500% 2% Operation Safety
Cum
11.00
22.33%
Operation Safe
Operation Safe
ICM RAW ICM Other
Weekly 1-Sep 8 2 10
tal Incentive 2-Sep 8 2 10
3-Sep 8 2 10
Incetive
Unobtain; 4-Sep 8 2 10
11.11% 5-Sep 8 2 10
Operation ; 6-Sep 8 2 10
33.33%
Quality; 22.22% 7-Sep 8 2 10
8-Sep 8 2 10
9-Sep 8 2 10
tal Incentive 10-Sep 8 2 10
11-Sep 8 2 10
12-Sep 8 2 10
Safety; 33.33% 13-Sep 8 2 10
14-Sep 8 2 10
Operation Safety Qual i ty Incetive Unobta i n 15-Sep 8 2 10
16-Sep 8 2 10
17-Sep 8 2 10
18-Sep 8 2 10
Monthly 19-Sep
20-Sep
8
8
2
2
10
10
21-Sep 8 2 10
Incetive 22-Sep 8 2 10
Unobtain;
11.00% 23-Sep 8 2 10
Operation ; 24-Sep 8 2 10
33.33% 25-Sep 8 2 10
Quality; 22.33%
26-Sep 8 2 10
27-Sep 7 2 9
28-Sep 6 2 8
29-Sep 8 2 10
30-Sep 8 2 10
297
Safety; 33.33%
Cumulative
11.00%
33.33%
22.33%
33.33%
2-
25870-114-HC3-NXPJ-00054
Project Number: 3-
#VALUE!
Date:
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
Ra ck Dobl e Junta Porta l Tunel a km18 Si ngl e Km18 a 164 Ti e Ins Tubo 42" Km164 a Res ervori o Pi pe Res evori o
Pi pe Doubl e
1.00 4.00 6.00 7.00 9.00 11.00
100.00%
2.30%
97.70%
PTR Status
PTR RFIs FCDs NCRs
Open 1 0 6
Closed 12 7 3
Total 13 7 9
CHANGE ORDERS
Change Orders Corn's CNN Cum $ I Validate
Open 11 7 USD 4,813,795 USD 4,818,235
Closed 4 3 USD 2,710,881 USD 1,710,881
15 10 USD 7,524,676 USD 6,529,116
s
informado para revison Solo Información Total
IFR IFI
45 64 419
10.7% 15.3%
Total
7
22
29
Total
USD 4,818,235
USD 1,710,881
USD 6,529,116
Activity ID Activity Name Original Duration N° Joint
Baseline_United Rev 1 771 95439
Baseline_United Rev 1 771 95439
250,000
200,000
150,000
100,000
50,000
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45
rs
100.00%
80.00%
60.00%
40.00%
20.00%
0.00%
-20.00%
Ta rget Actua l
28-Dec-14 04-Jan-15 11-Jan-15 18-Jan-15 25-Jan-15 1-Feb-15 8-Feb-15 15-Feb-15
21639 24818 27813 30344 33671 39300 44928 50718
265 1193 1936 2216 3113 4112 5111 6111
7
0.278
46
0.183
399217
1.495
87
0.339
1
0
266,924.00
Project
KPI HSEC
Current Week Results Results To Date
1.600
0 7 Work Incidents 1.400
0.03 0.305 Work Incident Ratio/ 10000 Man-hour 1.200
0 46 Near Misses Reported 1.000
-0.007 0.176 Near Miss Ratio/1000 Man-hours
Ratio
0.800
8,237.00 407454 Kilometers Driven
0.600
0.000 1.495 Km Driven/Man-Hour
0.400
1.000 88 Training Sessions
0.200
-0.009 0.330 Training Session/ 1000 Man-Hours
0 1 HSEC Audits 0.000
0.800
0.600
0.400
0.200
0.000
Work Inci dents Near Mi s ses Reported
Tra i ni ng Sess i ons Ki l ometers Dri ven
Total General
de juntas Start Finish
EWS 10/24/2014 2/25/2016
DJR 14042 10/24/2014 6/30/2015
Coloso Port 83 11/1/2014 2/28/2015
Coloso Tunnel 267 11/15/2014 5/15/2015
KM-2 to La Negra 1668 1/2/2015 7/31/2015
KM-18 to KM 164 11800 2/1/2015 9/20/2015
KM-164 to KM 178 1413 7/31/2015 10/22/2015
Special Crossings 1020 11/1/2014 7/31/2015
Tie-In 600 2/15/2015 9/30/2015
Reservoir 2837 10/22/2015 2/25/2016
33,730
Total
36003.76 0.936846596
33730
90%
35,000
80%
30,000
70%
% Requiring Repear
25,000
60%
JOINTS
20,000 50%
40%
15,000
30%
10,000
20%
5,000
10%
- 0%
19-Oct-14 19-Dec-14 19-Feb-15 19-Apr-15 19-Jun-15 19-Aug-15 19-Oct-15 19-Dec-15 19-Feb-16
90%
80%
70%
% Requiring Repear
60%
50%
40%
30%
20%
10%
0%
19-Dec-15 19-Feb-16
i ri ng Repear
1 PROGRESS
SPREAD DETAIL COATED INSPECTED RELEASED
1b PROGRESS FBE
SPREAD.SPREADDETAIL COATED INSPECTED RELEASED
1c PROGRESS LIQUID
SPREAD.SPREADDETAIL COATED INSPECTED RELEASED
Require
Repair
108
0
0
4
84
0
0
196
Require
Repair
0
98
0
0
100
0
0
0
0
0
Produccion Semana Actual
Require
RELEASED Spread Area Productions Inspected
Repair
5744 129 1 Rack Doble Junta 0 0
48 0 2 Puerto Coloso 0 0
93 98 3 Tunel Coloso 1 0
1234 4 4 Portal Tunel a km18 Single Pipe 46 12
4 0 5 Portal Tunel a km18 Double Pipe 0 0
5767 139 6 Km18 a 164 531 497
94 0 7 Tie Ins Tubo 42" -1 -1
21 0 8 Cruces Especiales 2 2
880 3 9 Km164 a Reservorio Pipe Double 0 3
0 10 Km164 a Reservorio Pipe Single 0 0
19 0 11 Resevorio 13 15
13904 373 TOTAL 592
Require
RELEASED Repair
21 0
0 0
0 0
12 0
0 0
452 0
-1 0
2 0
5 0
0 0
15 0
506 0
LAG TIME BY SPREAD
Expr1 DETAIL 3M 206N STD 3M LIQUID EPOXY 323
1 Rack Doble Junta 7
2 Puerto Coloso 21 2
3 Tunel Coloso 27 7
4 Portal Tunel a km18 Single Pipe 16 2
5 Portal Tunel a km18 Double Pipe 2
6 Km18 a 164 16 17
7 Tie Ins Tubo 42" 4
8 Cruces Especiales 3
9 Km164 a Reservorio Pipe Double 10
11 Resevorio 3
21 DAYS ROLLING 25 15
WEEKLY PRODUCTION_RELEASED
DETAIL COATED <> NOT RELEASE
Rack Doble Junta 2 1
Puerto Coloso 0 0
Tunel Coloso 0 0
Portal Tunel a km18 Sing 44 43
Portal Tunel a km18 Dou 0 0
Km18 a 164 600 529 6
Tie Ins Tubo 42" 1
Cruces Especiales 0 0
Km164 a Reservorio Pip 0 0
Km164 a Reservorio Pip 0 0
Resevorio 6 6
TOTAL 653 579 6
TOTAL PRODUCTION_RELEASED
SPREAD DETAIL COATED <>
1 Rack Doble Junta 5856 95
2 Puerto Coloso 48
3 Tunel Coloso 182
4 Portal Tunel a km18 Single Pipe 1267 61
5 Portal Tunel a km18 Double Pipe 4
6 Km18 a 164 7091 940
7 Tie Ins Tubo 42" 93 2
8 Cruces Especiales 23
9 Km164 a Reservorio Pipe Double 823 26
10 Km164 a Reservorio Pipe Single 0 0
11 Resevorio 40 6
12 TOTAL 15427 1130
LIQUID EPOXY 323
RELEASED
1
65
1
68
NOT RELEASE RELEASED
104 5657
48
98 84
4 1202
4
175 5976
91
23
1 796
34
382 13915
PLAN REAL ANTERIOR SEMANA
Rack Doble Junta 14042 5765 5744 21
Puerto Coloso 83 48 48 0
Tunel Coloso 267 94 93 1
Portal Tunel a km18 Single Pipe 668 1246 1234 12
Portal Tunel a km18 Double Pipe 1000 4 4 0
Km18 a 164 11800 6219 5767 452
Tie Ins Tubo 42" 600 93 94 -1
Cruces Especiales 1020 23 21 2
Km164 a Reservorio Pipe Double 538 885 880 5
Km164 a Reservorio Pipe Single 875 0 0
Resevorio 2837 34 19 15
Total 33730 14411 7912 507
B
35000
30000
25000
20000
15000 14042
118
10000
5765
5000
83 48 267 94 6681246 1000 4
0
a o o e e
nt os os Pi
p
Pi
p 1
Ju l ol a
e Co lC le le 18
bl rto e ng ub
Do n Si Km
Pu
e
Tu Do
ck 18 18
Ra km km
a a
n el el
Tu n
l l Tu
rta rta
Po Po
Base Line v/s Real
33730
14411
11800
Bas e Pl a n
6219 Real
2837
6681246 1000 4 600 93 102023 538885 875 34
e e 4 " s le e0 io l
Pi
p
Pi
p 16 42 a le b n gl or To
ta
e e a bo ci ou Si ev
n gl bl 18 Tu pe e
D
p e Re
s
u Km Es
Si Do In
s
Pi
p Pi
8
18 e es ri o
Ti uc ri o vo
km Cr rvo e r
la s e s
e Re Re
un a 4
a
lT 4 16
16
Km Km
Lost Time Log EWS - IFC
1
336 15 86 3 598
FBE FAILURES
SPREAD DETAIL BUBBLES MELTING ORANGE PEELFISURES INSCRUTATIO
1 Rack Doble Junta 194 8 68 3 457
2 Puerto Coloso 0 0 0 0 2
3 Tunel Coloso 0 0 0 0 5
4 Portal Tunel a k 16 1 1 0 13
5 Portal Tunel a k 0 0 0 0 1
6 Km18 a 164 108 1 7 0 113
7 Tie Ins Tubo 42" 4 4 0 0 3
8 Cruces Especiale 0 0 0 0 0
9 Km164 a Reservo 14 1 10 0 4
10 Km164 a Reservorio Pipe Single
11 Resevorio 0 0 0 0 0
543 154 4426
0
HISTORICAL HOLIDAY CAUSES FBE
HOLIDAY CAUSE Total de Último 1 2 3 4
Cratering 92 22 7
Cut-back (over si 359 6 2 2 6
Excess penetrati 17 12
Feathering (poro 497 247 43
Grit 55 11 1 15
Inscrustation 99 16 1 21
Lack of Fusion (w 1177 990 2 70
Other 527 101 1 2 198
Undercut (weld) 695 352 22 6 92
Weld Porosity 47 40 1
Weld Porosity Ot 25 3 6
Weld spatter 36 4 12
6 7 8 9
45 2 16
339 4
5
136 7 64
27 1
49 2 10
94 14 4 3
171 1 53
205 13 1 4
3 3
16
19 1
0 0 2 0
LIQUID FAILURES
SPREAD DETAIL BUBBLES MELTING ORANGE PEELFISURES
1 Rack Doble Junta 0 0 0 0
2 Puerto Coloso 0 0 0 0
3 Tunel Coloso 0 0 0 0
4 Portal Tunel a km18 Single Pipe 0 0 0 0
5 Portal Tunel a km18 Double Pipe
6 Km18 a 164 0 0 2 0
7 Tie Ins Tubo 42"
8 Cruces Especiales
9 Km164 a Reservorio Pipe Double 0 0 0 0
10 Km164 a Reservorio Pipe Single
11 Resevorio
3 74 42 1628
0 0 1
0 HISTORICAL HOLIDAY CAUSES LIQUID
0 HOLIDAY CAU Total de Últ 1 2 3
2 Cratering 4 1
0 Cut-back (over 3 1 2
3 Feathering (po 139 4 6
74 Inscrustation 257 1
42 Lack of Fusion 57 7 37
1628 Other 262 1 4
Undercut (wel 97 59
Weld Porosity 9
Weld spatter 48
4 6
3
8 121
256
5 8
9 248
7 31
9
48
HISTORICAL PERFORMNCE BY SPREAD
SPREAD DETAIL Total de Últ <> CLEAN NOT CLEAN
1 Rack Doble Ju 6712 173 3852 2687
2 Puerto Coloso 70 17 53
3 Tunel Coloso 468 2 126 340
4 Portal Tunel a 1945 61 1073 811
5 Portal Tunel 4 3 1
6 Km18 a 164 9607 949 5325 3333
7 Tie Ins Tubo 4 107 2 54 51
8 Cruces Especi 33 24 9
9 Km164 a Reser 1129 26 795 308
10 Km164 a Reser 0 0
11 Resevorio 48 7 41
0 16 5
1 3 10 71 1
0 0
0 0
0 0
PERATOR MISTAKES
SumaDeCut-bac
SumaDeExcess
SumaDeFeathe
SumaDeLack SumaDeUnderc
of SumaDeWeld SumaDeWeld
P SumaDeWeld
P spatter
2 4 1
7 7 1 1
umaDeWeld spatter