Irc 24 2010 1 PDF
Irc 24 2010 1 PDF
Irc 24 2010 1 PDF
2. 504.4(b) For rolled steel joists and plate girders Replace “plate girders” by “uniform depth plate
girders”
(Page 36)
3. 504.6.2(a) Beams and plate girders upto and including Substitute the following for the existing:
4.
(Page 37)
507.5.1.2
(Page 63)
C
35 m span need not be cambered
6. 509.3.1 In simply supported beams with intermediate Substitute the following for the existing:
lateral restraints against lateral torsional
Para 2 “In simply supported beams with intermediate
buckling the effective length for lateral
lateral restraints against lateral torsional
(Pages 86 & 87) torsional buckling to be used in Clause
buckling, the effective length for lateral torsional
509.2.2.1, LLT, shall be taken as the length of
buckling, LLT to be used in Clause 509.2.2.1
the relevant segment in between the lateral
shall be taken as the length of the relevant
restraints. The effective length shall be
segment in between the lateral restraints. In
equal to 1.2 times the length of the relevant
case of intermediate partial lateral restraints, the
segment in between the lateral restraints.
effective length LLT shall be taken as equal to
1.2 times the length of the relevant segment in
between the partial lateral restraints.
8. 509.5.1 Panel B is designed without utilizing tension Substitute the following for the existing:
filed action as given in Clause 509.4.2.2(a)
Fig.7 Note 2 “Panel B is designed using simple post-critical
method as given in Clause 509.4.2.2(a)”
(Page 95)
9. 514.4.5 Erection scheme of the bridge shall be Substitute the following for the existing:
checked to ensure the adequacy of the
(Page 170) “All components of the bridge structure shall
affected components of the bridge structure
10. 514.5.9
(Page 171)
erection.
C
and safety of the bridge at all stages of
be checked against temporary forces, to which
these will be subjected to during various stages
of erection, to ensure safety during erection”.
The method of erection, as also the drawing Substitute the following for the existing:
of the temporary work and the use of erection
equipment, shall be subject to the approval
by the Engineer.
“The Engineer shall approve the procedure of
erection, drawings of temporary works and use
of erection equipment, prior to commencement
of erection”.
IR