US 1
Building Strong
Damage
after Ike
Building Strong
Building Strong
Dune Fill, Fencing,
The Concept Plantings,
Crossovers and
Beach
Walkways
Nourishment
PolyUrea
Protective
Coating
Geotextile Tube
Core
Scour Tube
Scour Apron
Building Strong
ALT 4. CLAY BORROW AREA
ROUTE TO GRAND ISLE
CLAY BORROW
AREA
46 MILES
GRAND ISLE
Building Strong
Damage
After Ike
Building Strong
Sand filled geotextile tubes
VS
Clay filled geotextile burrittos
Building Strong
Field Trip with Mayor,
Consultants, Industrial Fabrics, and
Engineers to Galveston
Building Strong
Building Strong
The Concept
Building Strong
Proposed
Design
Building Strong
Inside a
Geo-textile
Tube
Building Strong
Grade area
Create swell that
is the width of
Tube plus apron
Controls large
volume of water
to prevent
localized erosion
Building Strong
Unroll apron
Fill anchor tube
Overlap second
apron and fill
anchor tube
Stretch apron
so its free of
wrinkles
Building Strong
Unroll Geotube
Connect discharge line from
the dredge
Fill Geotube while monitoring
fill
Adjust alignment as
necessary before fill is
complete
Building Strong
Building Strong
Building Strong
Building Strong
January 2011 Field
Visit
Building Strong
January 2011 Field
Visit
Building Strong
January 2011 Field
Visit
Building Strong
January 2011 Field
Visit
Building Strong
January 2011 Field
Visit
Building Strong