Project Title : KOLEJ VOKASIONAL SP2

Building : BENGKEL SENI KULINARI 1

MAIN SUMMARY

ITEM DESCRIPTION QTY UNIT REMARKS

WBLFF

1 PAD FOOTING

a) Exc. n.e 1.50m depth 886 m3


b) 50mm thk Lean concrete 572 m2
c) VRC grade 30 413 m3
d) Formwork 601 m2
e) Reinforcement
- Y12 2,055 kg
- Y10 (link) 235 kg

2 COLUMN STUMP

a) VRC grade 30 8 m3
b) Formwork 74 m2
c) Reinforcement
- Y32 90 kg
- Y25 150 kg
- Y16 18 kg
- Y12 293 kg
- R12 5 kg
- R10 151 kg

3 GROUND BEAM
a) Excavation n.e 1.5m depth 40 m3
b) 50mm thk lean concrete 64 m2
c) VRC Grade 30 37 m3
d) Formwork 361 m2
e) Reinforcement
- T25 1,405 kg
- T20 1,214 kg
- T16 440 kg
- T12 589 kg
- R10 (link) 1,263 kg

4 GROUND SLAB
a) Exc oversite n.e 350mm depth 570 m2
b) 50mm thk sand screed 570 m2
c) DPM 570 m2
d) 150mm thk VRC grade 30 86 m3
e) BRC A8 627 m2
Project Title : KOLEJ VOKASIONAL SP2

Building : BENGKEL SENI KULINARI 1

MAIN SUMMARY (cont'd)


FRAME

1. COLUMN

a) VRC grade 30 10 m3
b) Formwork 134 m2
c) Reinforcement
- T16 102 kg
- T12 345 kg
- R10 (link) 617 kg

2. STIFFENER
a) VRC grade 30 0.32 m3
b) Formwork 9 m2
c) Reinforcement
- T12 56 kg
- R6 (link) 11 kg

3. ROOF BEAM
a) VRC grade 30 102 m3
b) Formwork 461 m2
c) Reinforcement
- T16 - kg
- T12 1,583 kg
- R10 (link) 4,923 kg

4. ROOF TRUSSES

TRUSS B
a) 100 x 50 x 4mm thk x 11.75kg/m RHS 609 kg
b) 50 x 50 x 4mm thk x 6.71kg/m SHS - vertical strut 43 kg
c) 50 x 50 x 4mm thk x 6.71kg/m SHS - diagonal strut 122 kg
d) 100mm x 100mm x 10mm ms plate welded with
1 no 20mm dia. Anchorage bolts & nuts 12 no
e) 100mm x 200mm x 10mm ms plate welded with
1 no 20mm dia. Anchorage bolts & nuts 2 no
f) 150mm x 200mm x 10mm ms plate welded with
1 no 20mm dia. Anchorage bolts & nuts 4 no

TRUSS C
a) 100 x 50 x 4mm thk x 11.75kg/m RHS 3,043 kg
b) 50 x 50 x 4mm thk x 6.71kg/m SHS - vertical strut 213 kg
c) 50 x 50 x 4mm thk x 6.71kg/m SHS - diagonal strut 609 kg
d) 100mm x 100mm x 10mm ms plate welded with
1 no 20mm dia. Anchorage bolts & nuts 80 no
e) 150mm x 200mm x 10mm ms plate welded with
1 no 20mm dia. Anchorage bolts & nuts 20 no
Project Title : KOLEJ VOKASIONAL SP2

Building : BENGKEL SENI KULINARI 1

MAIN SUMMARY (cont'd)


TRUSS D
a) 100 x 50 x 4mm thk x 11.75kg/m RHS 1,055 kg
b) 50 x 50 x 4mm thk x 6.71kg/m SHS - vertical strut 64 kg
c) 50 x 50 x 4mm thk x 6.71kg/m SHS - diagonal strut 183 kg
d) 100mm x 100mm x 10mm ms plate welded with
1 no 20mm dia. Anchorage bolts & nuts 30 no
e) 100mm x 200mm x 10mm ms plate welded with
1 no 20mm dia. Anchorage bolts & nuts 3 no
f) 150mm x 200mm x 10mm ms plate welded with
1 no 20mm dia. Anchorage bolts & nuts 6 no

TRUSS A
a) 50 x 50 x 3mm thk x 9.23kg/m SHS 194 kg
b) 50 x 50 x 3mm thk x 9.23kg/m SHS - vertical strut 18 kg
c) 50 x 50 x 4mm thk x 6.71kg/m SHS - diagonal strut 46 kg
d) 150mm x 200mm x 10mm ms plate welded with
1 no 20mm dia. Anchorage bolts & nuts 20 no

- 12mm dia sag rod - 1100mm long 203 m

- 125mm x 50mm x 20mm x 2.3mm thk x 3.25kg/m


purlin 1,825 kg

Note : Kulinari 1 ada 1 blok


add 10% 627.0
PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA)
BERSERTA LAIN-LAIN KEMUDAHAN DI ATAS SEBAHAGIAN LOT 19, PEKAN SINTOK, DAERAH KUBANG PASU
BUILDING: BENGKEL SENI KULINARI 1
DRG. NO. :
ELEMENT: WORK BELOW LOWEST FLOOR FINISH
ITEM : PAD FOOTING

Info :
Lean Concrete : 0.050 m
Hardcore : 0.000 m

No. Pile Col. Total Exc. Exc. Depth Area Formwork Formwork Concrete G30
Location Grid Cap Length Width Depth Stump Depth (m) <4.00m (LC/HC) (m) (m²) (m³)
(m³) (m²)

P2 29 1.50 1.50 0.55 0.95 1.55 101.14 65.25 174.00 95.70 35.89

P3 4 2.50 2.50 0.65 0.85 1.55 38.75 25.00 40.00 26.00 16.25

P4 50 3.00 3.00 0.75 0.75 1.55 697.50 450.00 600.00 450.00 337.50

P5 2 3.50 3.50 0.75 0.75 1.55 37.98 24.50 28.00 21.00 18.38

P6 1 2.00 3.50 0.75 0.75 1.55 10.85 7.00 11.00 8.25 5.25

TOTAL 86 886.21 571.75 853.00 600.95 413.26

TOTAL NO. OF PILE CAPS= Reinforcement Qty = 52897.6 kg (ratio 128)

No of pile

PAD FOOTING Page 5


Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By : ZAI
BERSERTA LAIN-LAIN KEMUDAHAN DI ATAS SEBAHAGIAN LOT 19, PEKAN SINTOK, DAERAH KUBANG PASU
Building Title : WORK BELOW LOWEST FLOOR FINISH Drwg No : UUM/JPP/DS/CS/ST/RC/03
Element : PAD FOOTING Date : 12/01/2018
Item : :

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 Y10 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

Bar b
a c

depth
width

Stirrup

F2

B1 T 16 0.550 2 2.000 1 - 3.100 0.080 2 - - 0.160 0.040 4 0.160 3.100 21 1 29 - - - 1,887.900 - - - -


B2 T 16 0.550 2 2.000 1 3.100 0.080 2 - - 0.160 0.040 4 0.160 3.100 21 1 29 - - - 1,887.900 - - - -
T1 T 16 0.550 2 2.000 1 3.100 0.384 2 - - 0.768 0.040 4 0.160 3.708 21 1 29 - - - 2,258.172 - - - -
T2 T 16 0.550 2 2.000 1 3.100 0.384 2 - - 0.768 0.040 4 0.160 3.708 21 1 29 - - - 2,258.172 - - - -

F3
B1 T 16 0.650 2 2.500 1 3.800 0.080 2 - - 0.160 0.040 4 0.160 3.800 26 1 4 - - - 395.200 - - - -
B2 T 16 0.650 2 2.500 1 3.800 0.080 2 - - 0.160 0.040 4 0.160 3.800 26 1 4 - - - 395.200 - - - -
T1 T 16 0.650 2 2.500 1 3.800 0.384 2 - - 0.768 0.040 4 0.160 4.408 26 1 4 - - - 458.432 - - - -
T2 T 16 0.650 2 2.500 1 3.800 0.384 2 - - 0.768 0.040 4 0.160 4.408 26 1 4 - - - 458.432 - - - -

F4
B1 T 20 0.750 2 3.000 1 4.500 0.100 2 - - 0.200 0.040 2 0.080 4.620 25 1 50 - - 5,775.000 - - - - -
B2 T 20 0.750 2 3.000 1 4.500 0.100 2 - - 0.200 0.040 2 0.080 4.620 25 1 50 - - 5,775.000 - - - - -
T1 T 20 0.750 2 3.000 1 4.500 0.480 2 - - 0.960 0.040 4 0.160 5.300 25 1 50 - - 6,625.000 - - - - -
T2 T 20 0.750 2 3.000 1 4.500 0.480 2 - - 0.960 0.040 4 0.160 5.300 25 1 50 - - 6,625.000 - - - - -
F5
B1 T 20 0.750 2 3.500 1 5.000 0.040 2 - - 0.080 0.040 2 0.080 5.000 25 1 2 - - 250.000 - - - - -
B2 T 20 0.750 2 3.500 1 5.000 0.100 2 - - 0.200 0.040 2 0.080 5.120 25 1 2 - - 256.000 - - - - -
T1 T 20 0.750 2 3.500 1 5.000 0.480 2 - - 0.960 0.040 4 0.160 5.800 25 1 2 - - 290.000 - - - - -
T2 T 20 0.750 2 3.500 1 5.000 0.480 2 - - 0.960 0.040 4 0.160 5.800 25 1 2 - - 290.000 - - - - -

F6
B1 T 20 0.750 2 2.000 1 3.500 0.100 2 - - 0.200 0.040 2 0.080 3.620 17 1 1 - - 61.540 - - - - -
B2 T 20 0.750 2 3.500 1 5.000 0.100 2 - - 0.200 0.040 2 0.080 5.120 29 1 1 - - 148.480 - - - - -
T1 T 20 0.750 2 2.000 1 3.500 0.480 2 - - 0.960 0.040 4 0.160 4.300 17 1 1 - - 73.100 - - - - -
T2 T 20 0.750 2 3.500 1 5.000 0.480 2 - - 0.960 0.040 4 0.160 5.800 29 1 1 - - 168.200 - - - - -

factor 6.313 3.853 2.466 1.578 0.888 0.617 0.617 0.222


TOTAL/m - - 26,337.320 9,999.408 - - - -
TOTAL/KG - - 64,947.83 15,779.07 - - - -
rounded total/KG - - 64,948 15,779 - - - -

PAD FOOTING - reinf (2) Page 6 of 37


Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By : ZAI
Building Title : BENGKEL SENI KULINARI 1 Drwg No :
Element : WORK BELOW LOWEST FLOOR FINISH Date : 12/01/2018
Item : PAD FOOTING :

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 Y10 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

Bar b
a c

depth
width

Stirrup

P1

B1 T 12 0.200 1 1.250 1 0.210 1 1.660 0.060 2 - - 0.120 0.040 2 0.080 1.700 8 1 12 - - - - 163.200 - - -
B2 T 12 0.210 1 1.250 1 0.210 1 1.670 0.060 2 - - 0.120 0.040 2 0.080 1.710 8 1 12 - - - - 164.160 - - -
T1 T 10 1.250 2 1.250 2 - - 5.000 0.240 1 - - 0.240 0.040 8 0.320 4.920 1 1 12 - - - - - 59.040 - -
T2 T 10 1.250 2 1.250 2 - - 5.000 0.240 1 - - 0.240 0.040 8 0.320 4.920 1 1 12 - - - - - 59.040 - -
L T 10 1.250 2 1.250 2 - - 5.000 0.240 1 - - 0.240 0.040 8 0.320 4.920 1 1 12 - - - - - 59.040 - -
P2
B1 T 12 0.210 1 1.800 1 0.210 1 2.220 0.060 2 - - 0.120 0.040 2 0.080 2.260 13 1 14 - - - - 411.320 - - -
B2 T 12 0.210 1 1.800 1 0.210 1 2.220 0.060 2 - - 0.120 0.040 2 0.080 2.260 13 1 14 - - - - 411.320 - - -
L T 10 1.800 2 1.800 2 - - 7.200 0.240 1 - - 0.240 0.040 8 0.320 7.120 1 1 14 - - - - - 99.680 - -

P3
B1 T 12 0.210 1 2.000 1 0.210 1 2.420 0.060 2 - - 0.120 0.040 2 0.080 2.460 14 1 2 - - - - 68.880 - - -
B2 T 12 0.210 1 2.000 1 0.210 1 2.420 0.060 2 - - 0.120 0.040 2 0.080 2.460 14 1 2 - - - - 68.880 - - -
L T 10 2.000 2 2.000 2 - - 8.000 0.240 1 - - 0.240 0.040 8 0.320 7.920 1 1 2 - - - - - 15.840 - -

P4
B1 T 12 0.210 1 2.350 1 0.210 1 2.770 0.060 2 - - 0.120 0.040 2 0.080 2.810 17 1 2 - - - - 95.540 - - -
B2 T 12 0.210 1 2.350 1 0.210 1 2.770 0.060 2 - - 0.120 0.040 2 0.080 2.810 17 1 2 - - - - 95.540 - - -
L T 10 2.350 2 2.350 2 - - 9.400 0.240 1 - - 0.240 0.040 8 0.320 9.320 1 1 2 - - - - - 18.640 - -

P5
B1 T 12 0.210 1 2.800 1 0.210 1 3.220 0.060 2 - - 0.120 0.040 2 0.080 3.260 20 1 3 - - - - 195.600 - - -
B2 T 12 0.210 1 2.800 1 0.210 1 3.220 0.060 2 - - 0.120 0.040 2 0.080 3.260 20 1 3 - - - - 195.600 - - -
L T 10 2.800 2 2.800 2 - - 11.200 0.240 1 - - 0.240 0.040 8 0.320 11.120 1 1 3 - - - - - 33.360 - -

P6
B1 T 12 0.260 1 2.850 1 0.260 1 3.370 0.060 2 - - 0.120 0.040 2 0.080 3.410 20 1 2 - - - - 136.400 - - -
B2 T 12 0.210 1 2.850 1 0.210 1 3.270 0.060 2 - - 0.120 0.040 2 0.080 3.310 20 1 2 - - - - 132.400 - - -
L T 10 2.850 2 2.850 2 - - 11.400 0.240 1 - - 0.240 0.040 8 0.320 11.320 1 1 2 - - - - - 22.640 - -

P7
B1 T 12 0.260 1 3.300 1 0.260 1 3.820 0.060 2 - - 0.120 0.040 2 0.080 3.860 23 1 1 - - - - 88.780 - - -
B2 T 12 0.210 1 3.300 1 0.210 1 3.720 0.060 2 - - 0.120 0.040 2 0.080 3.760 23 1 1 - - - - 86.480 - - -
L T 10 3.300 2 3.300 2 - - 13.200 0.240 1 - - 0.240 0.040 8 0.320 13.120 1 1 1 - - - - - 13.120 - -

PAD FOOTING - reinf Page 7 of 37


Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By : ZAI
Building Title : BENGKEL SENI KULINARI 1 Drwg No :
Element : WORK BELOW LOWEST FLOOR FINISH Date : 12/01/2018
Item : PAD FOOTING :

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 Y10 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

factor 6.313 3.853 2.466 1.578 0.888 0.617 0.617 0.222


TOTAL/m - - - - 2,314.100 380.400 - -
TOTAL/KG - - - - 2,054.92 234.71 - -
rounded total/KG - - - - 2,055 235 - -

PAD FOOTING - reinf Page 8 of 37


PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA)

BUILDING: BENGKEL SENI KULINARI 1


DRG. NO. :
ELEMENT: WORK BELOW LOWEST FLOOR FINISH
ITEM : COLUMN STUMP

Info :
Lean Concrete : 0.050 m
Hardcore : 0.000 m

Column Stump
Location Depth
No of Length Width Formwork Concrete
Pad Footing Column Grid Member C. Stump (m²) G30(m³)
Exc. Footing

F2 C1 2 1.50 0.30 1.45 0.55 0.85 6.12 0.77


F4 C1 16 1.50 0.30 1.45 0.75 0.70 40.32 5.04
F5 C1 2 1.50 0.30 1.45 0.75 0.65 4.68 0.59

F2 C2 5 1.50 0.23 1.45 0.55 0.85 14.71 1.47

C5 4 0.15 0.15 1.45 0.25 1.15 2.76 0.10

C6 8 0.15 0.15 1.45 0.25 1.15 5.52 0.21

TOTAL 37 74.11 8.17

Column Stump Page 9


Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By : ZAI
Building Title : BENGKEL SENI KULINARI 1 Drwg No :
Element : COLUMN STUMP Date : 12/11/2018

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 R12 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

Bar b
a c

depth
width

Stirrup

C1
T T 12 0.300 1 2.365 1 - - 2.665 - - - - - - - - 2.665 4 1 19 - - - - 202.540 - - -
L R 10 0.300 2 0.300 2 - - 1.200 0.240 1 - - 0.240 0.040 8 0.320 1.120 1 8 19 - - - - - - 170.240 -

C2
T T 25 0.300 1 2.950 1 - - 3.250 - - - - - - - - 3.250 4 1 3 - 39.000 - - - - - -
L R 10 0.300 2 0.300 2 - - 1.200 0.240 1 - - 0.240 0.025 4 0.100 1.340 1 4 3 - - - - - - 16.080 -

C3
T T 32 0.300 1 3.265 1 - - 3.565 - - - - - - - - 3.565 4 1 1 14.260 - - - - - - -
L R 12 0.300 2 0.300 2 - - 1.200 0.288 1 - - 0.288 0.025 4 0.100 1.388 1 4 1 - - - - - 5.552 - -

C4
T T 16 0.300 1 2.545 1 - - 2.845 - - - - - - - - 2.845 4 1 1 - - - 11.380 - - - -
L R 10 0.300 2 0.300 2 - - 1.200 0.240 1 - - 0.240 0.025 4 0.100 1.340 1 6 1 - - - - - - 8.040 -

C5
T T 12 0.300 1 2.365 1 - - 2.665 - - - - - - - - 2.665 4 1 4 - - - - 42.640 - - -
L R 10 0.150 2 0.150 2 - - 0.600 0.240 1 - - 0.240 0.040 8 0.320 0.520 1 8 4 - - - - - - 16.640 -

C6
T T 12 0.300 1 2.365 1 - - 2.665 - - - - - - - - 2.665 4 1 8 - - - - 85.280 - - -
L R 10 0.150 2 0.150 2 - - 0.600 0.240 1 - - 0.240 0.040 8 0.320 0.520 1 8 8 - - - - - - 33.280 -

factor 6.313 3.853 2.466 1.578 0.888 0.888 0.617 0.222


TOTAL/m 14.260 39.000 - 11.380 330.460 5.552 244.280 -
TOTAL/KG 90.02 150.27 - 17.96 293.45 4.93 150.72 -
rounded total/KG 90 150 - 18 293 5 151 -

COLUMN STUMP -REINF Page 10 of 37


PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA)

BUILDING: BENGKEL SENI KULINARI 1


DRG. NO. :
ELEMENT: WORK BELOW LOWEST FLOOR FINISH
ITEM : GROUND BEAM

Info :
Lean Concrete : 0.050 m
Hardcore : 0.000 m

Length Depth Excavation


(m³)
Lean
Type of Beam No of Grid Width Concrete Formwork Concrete
Beam Exc ne (m²) (m²) G30 (m³)
Gross Net Gross Beam DEPTH 1.50m
depth

.
GB1 1 B/1-10 39.000 39.000 0.225 0.600 0.600 0.650 5.704 8.775 46.800 5.265

GB2 & GB4 2 B1/4-7 9.000 9.000 0.150 0.600 0.600 0.650 1.755 2.700 21.600 1.620

GB3 1 C/1-10 39.000 39.000 0.225 0.600 0.600 0.650 5.704 8.775 46.800 5.265

GB5 1 C2/4-5 3.000 3.000 0.150 0.600 0.600 0.650 0.293 0.450 3.600 0.270

GB6 1 D/1-10 39.000 39.000 0.225 0.600 0.600 0.650 5.704 8.775 46.800 5.265

GB7 & GB8 1 E/4A-6A 6.000 6.000 0.150 0.450 0.450 0.500 0.450 0.900 5.400 0.405

GB9, GB10,GB11 8 1/A-B 2.000 2.000 0.150 0.450 0.450 0.500 1.200 2.400 14.400 1.080
GB14, GB18, GB19, 8 1/B-D 12.000 12.000 0.225 0.600 0.600 0.650 14.040 21.600 115.200 12.960
GB20, GB21

GB12 1 4/B-D 6.000 6.000 0.150 0.600 0.600 0.650 0.585 0.900 7.200 0.540

GB13, GB17 2 4A/D-F 4.000 4.000 0.150 0.450 0.450 0.500 0.600 1.200 7.200 0.540

GB15 1 6/B-B1 4.500 4.500 0.150 0.600 0.600 0.650 0.439 0.675 5.400 0.405

Ground Beam Page 11


PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA)

BUILDING: BENGKEL SENI KULINARI 1


DRG. NO. :
ELEMENT: WORK BELOW LOWEST FLOOR FINISH
ITEM : GROUND BEAM

Info :
Lean Concrete : 0.050 m
Hardcore : 0.000 m

Length Depth Excavation


(m³)
Lean
Type of Beam No of Grid Width Concrete Formwork Concrete
Beam Exc ne (m²) (m²) G30 (m³)
Gross Net Gross Beam DEPTH 1.50m
depth

GB16 1 6/C1-D 4.500 4.500 0.150 0.600 0.600 0.650 0.439 0.675 5.400 0.405

GB22 1 A/1-10 39.000 39.000 0.150 0.450 0.450 0.500 2.925 5.850 35.100 2.633

TOTAL 39.84 63.68 360.90 36.65

Ground Beam Page 12


Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By : ZAI
Building Title : BENGKEL SENI KULINARI 1 Drwg No :
Element : GROUND BEAM Date : 12/1/2018

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 R12 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

Bar b
a c

depth
width
Stirrup

GB1
T1 T 12 0.160 1 5.170 1 - - 5.330 0.060 1 - - 0.060 - - - 5.390 2 1 1 - - - - 10.780 - - -
T2 T 20 - - 3.300 1 - - 3.300 - - - - - - - - 3.300 2 3 1 - - 19.800 - - - - -
T3 T 12 - - 4.100 1 - - 4.100 - - - - - - - - 4.100 2 4 1 - - - - 32.800 - - -
T4 T 20 - - 3.300 1 - - 3.300 - - - - - - - - 3.300 3 1 1 - - 9.900 - - - - -
T5 T 12 - - 3.300 1 - - 3.300 - - - - - - - - 3.300 4 1 1 - - - - 13.200 - - -
T6 T 16 - - 3.700 1 - - 3.700 - - - - - - - - 3.700 2 1 1 - - - 7.400 - - - -
T7 T 12 - - 4.470 1 0.160 1 4.630 0.060 1 - - 0.060 - - - 4.690 2 1 1 - - - - 9.380 - - -
B1 T 20 0.200 1 5.970 1 - - 6.170 - - - - - - - - 6.170 2 1 1 - - 12.340 - - - - -
B2 T 16 - - 7.600 1 - - 7.600 - - - - - - - - 7.600 2 1 1 - - - 15.200 - - - -
B3 T 20 - - 6.650 1 - - 6.650 - - - - - - - - 6.650 2 1 1 - - 13.300 - - - - -
B4 T 20 - - 6.500 1 - - 6.500 - - - - - - - - 6.500 2 1 1 - - 13.000 - - - - -
B5 T 12 - - 3.500 1 - - 3.500 - - - - - - - - 3.500 2 1 1 - - - - 7.000 - - -
B6 T 16 - - 6.650 1 - - 6.650 - - - - - - - - 6.650 2 1 1 - - - 13.300 - - - -
B7 T 20 - - 5.970 1 0.200 1 6.170 - - - - - - - - 6.170 2 1 1 - - 12.340 - - - - -
L R 10 0.225 2 0.600 2 - - 1.650 0.240 1 - - 0.240 0.050 8 0.400 1.490 1 156 1 - - - - - - 232.440 -

GB2, GB4
T1 T 25 0.320 1 9.120 1 0.320 1 9.760 0.125 2 - - 0.250 - - - 10.010 2 1 2 - 40.040 - - - - - -
B1 T 12 0.160 1 2.920 1 - - 3.080 0.060 1 - - 0.060 - - - 3.140 2 1 2 - - - - 12.560 - - -
B2 T 12 - - 4.500 1 - - 4.500 - - - - - - - - 4.500 2 1 2 - - - - 18.000 - - -
B3 T 25 - - 6.680 1 0.340 1 7.020 0.125 1 - - 0.125 - - - 7.145 2 1 2 - 28.580 - - - - - -
L R 10 0.150 2 0.600 2 - - 1.500 0.240 1 - - 0.240 0.050 8 0.400 1.340 1 41 2 - - - - - - 109.880 -

GB5
T1 T 12 0.160 1 3.120 1 0.160 1 3.440 0.060 2 - - 0.120 - - - 3.560 2 1 1 - - - - 7.120 - - -
B1 T 12 0.160 1 3.120 1 0.160 1 3.440 0.060 2 - - 0.120 - - - 3.560 2 1 1 - - - - 7.120 - - -
L R 10 0.150 2 0.600 2 - - 1.500 0.240 1 - - 0.240 0.050 8 0.400 1.340 1 13 1 - - - - - - 17.420 -

GB3
T1 T 12 0.160 1 5.170 1 - - 5.330 0.060 1 - - 0.060 - - - 5.390 2 1 1 - - - - 10.780 - - -
T2 T 25 - - 3.300 1 - - 3.300 - - - - - - - - 3.300 3 3 1 - 29.700 - - - - - -
T3 T 16 - - 4.500 1 - - 4.500 - - - - - - - - 4.500 2 2 1 - - - 18.000 - - - -
T4 T 12 - - 4.100 1 - - 4.100 - - - - - - - - 4.100 2 2 1 - - - - 16.400 - - -
T5 T 20 - - 3.300 1 - - 3.300 - - - - - - - - 3.300 3 1 1 - - 9.900 - - - - -
T6 T 16 - - 3.300 1 - - 3.300 - - - - - - - - 3.300 2 1 1 - - - 6.600 - - - -
T7 T 20 - - 3.300 1 - - 3.300 - - - - - - - - 3.300 2 1 1 - - 6.600 - - - - -
T8 T 12 - - 4.470 1 0.160 1 4.630 0.060 1 - - 0.060 - - - 4.690 2 1 1 - - - - 9.380 - - -
B1 T 25 0.320 1 6.920 1 - - 7.240 0.125 1 - - 0.125 - - - 7.365 3 1 1 - 22.095 - - - - - -
B2 T 16 - - 5.700 1 - - 5.700 - - - - - - - - 5.700 2 1 1 - - - 11.400 - - - -
B3 T 16 - - 4.500 1 - - 4.500 - - - - - - - - 4.500 2 1 1 - - - 9.000 - - - -
B4 T 25 - - 7.600 1 - - 7.600 - - - - - - - - 7.600 2 1 1 - 15.200 - - - - - -
B5 T 25 - - 4.300 1 - - 4.300 - - - - - - - - 4.300 1 1 1 - 4.300 - - - - - -
B6 T 16 - - 5.700 1 - - 5.700 - - - - - - - - 5.700 2 1 1 - - - 11.400 - - - -
B7 T 12 - - 3.500 1 - - 3.500 - - - - - - - - 3.500 2 1 1 - - - - 7.000 - - -
B8 T 20 - - 7.550 1 - - 7.550 - - - - - - - - 7.550 2 1 1 - - 15.100 - - - - -

GROUND BEAM - reinf Page 13 of 37


Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By : ZAI
Building Title : BENGKEL SENI KULINARI 1 Drwg No :
Element : GROUND BEAM Date : 12/1/2018

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 R12 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

B9 T 25 - - 4.600 1 - - 4.600 - - - - - - - - 4.600 2 1 1 - 9.200 - - - - - -


B10 T 25 - - 6.000 1 0.340 1 6.340 - - - - - - - - 6.340 2 1 1 - 12.680 - - - - - -
L R 10 0.225 2 0.600 2 - - 1.650 0.240 1 - - 0.240 0.050 8 0.400 1.490 1 176 1 - - - - - - 262.240 -

GB7
T1 T 16 0.200 1 6.080 1 0.200 1 6.480 0.080 2 - - 0.160 - - - 6.640 2 1 1 - - - 13.280 - - - -
B1 T 25 0.360 1 6.040 1 0.360 1 6.760 0.125 2 - - 0.250 - - - 7.010 2 1 1 - 14.020 - - - - - -
B2 T 12 - - 4.800 1 - - 4.800 - - - - - - - - 4.800 2 1 1 - - - - 9.600 - - -
L R 10 0.150 2 0.450 2 - - 1.200 0.240 1 - - 0.240 0.050 8 0.400 1.040 1 33 1 - - - - - - 34.320 -

GB8
T1 T 12 0.180 1 6.080 1 0.180 1 6.440 0.060 2 - - 0.120 - - - 6.560 2 1 1 - - - - 13.120 - - -
B1 T 25 0.360 1 6.040 1 0.360 1 6.760 0.125 2 - - 0.250 - - - 7.010 2 1 1 - 14.020 - - - - - -
L R 10 0.150 2 0.450 2 - - 1.200 0.240 1 - - 0.240 0.050 8 0.400 1.040 1 25 1 - - - - - - 26.000 -

GB6
T1 T 12 0.160 1 5.170 1 - - 5.330 0.060 1 - - 0.060 - - - 5.390 2 1 1 - - - - 10.780 - - -
T2 T 20 - - 3.300 1 - - 3.300 - - - - - - - - 3.300 2 5 1 - - 33.000 - - - - -
T3 T 12 - - 4.100 1 - - 4.100 - - - - - - - - 4.100 2 4 1 - - - - 32.800 - - -
T4 T 16 - - 3.900 1 - - 3.900 - - - - - - - - 3.900 2 1 1 - - - 7.800 - - - -
T5 T 12 - - 2.837 1 0.160 1 2.997 0.060 1 - - 0.060 - - - 3.057 2 1 1 - - - - 6.114 - - -
B1 T 20 0.200 1 5.970 1 - - 6.170 0.100 1 - - 0.100 - - - 6.270 2 1 1 - - 12.540 - - - - -
B2 T 16 - - 7.600 1 - - 7.600 - - - - - - - - 7.600 2 1 1 - - - 15.200 - - - -
B3 T 20 - - 5.700 1 - - 5.700 - - - - - - - - 5.700 2 1 1 - - 11.400 - - - - -
B4 T 16 - - 5.700 1 - - 5.700 - - - - - - - - 5.700 4 1 1 - - - 22.800 - - - -
B5 T 12 - - 4.300 1 - - 4.300 - - - - - - - - 4.300 2 1 1 - - - - 8.600 - - -
B6 T 16 - - 6.650 1 - - 6.650 - - - - - - - - 6.650 2 1 1 - - - 13.300 - - - -
B7 T 20 - - 3.667 1 0.200 1 3.867 0.100 1 - - 0.100 - - - 3.967 2 1 1 - - 7.934 - - - - -
L R 10 0.225 2 0.600 2 - - 1.650 0.240 1 - - 0.240 0.050 8 0.400 1.490 1 156 1 - - - - - - 232.440 -

GB9
T1 T 16 0.280 1 3.000 1 - 1 3.280 0.080 1 - - 0.080 - - - 3.360 2 1 1 - - - 6.720 - - - -
T2 T 12 0.120 1 5.160 1 - 1 5.280 0.060 1 - - 0.060 - - - 5.340 2 1 1 - - - - 10.680 - - -
T3 T 20 - - 3.300 1 - 1 3.300 - - - - - - - - 3.300 2 1 1 - - 6.600 - - - - -
T4 T 20 - - 2.200 1 - 1 2.200 - - - - - - - - 2.200 1 1 1 - - 2.200 - - - - -
T5 T 12 - - 5.100 1 0.120 1 5.220 0.060 1 - - 0.060 - - - 5.280 2 1 1 - - - - 10.560 - - -
B1 T 12 0.160 1 2.060 1 0.300 1 2.520 0.060 2 - - 0.120 - - - 2.640 2 1 1 - - - - 5.280 - - -
B2 T 20 0.200 1 7.050 1 - 1 7.250 0.100 1 - - 0.100 - - - 7.350 2 1 1 - - 14.700 - - - - -
B3 T 20 - - 6.000 1 0.200 1 6.200 0.100 1 - - 0.100 - - - 6.300 2 1 1 - - 12.600 - - - - -
L R 10 0.150 2 0.450 2 - - 1.200 0.240 1 - - 0.240 0.050 8 0.400 1.040 1 8 1 - - - - - - 8.320 -
L R 10 0.225 2 0.600 2 - - 1.650 0.240 1 - - 0.240 0.050 8 0.400 1.490 1 48 1 - - - - - - 71.520 -

GB10, GB19, GB20


T1 T 20 0.280 1 3.000 1 - 1 3.280 0.100 1 - - 0.100 - - - 3.380 2 1 3 - - 20.280 - - - - -
T2 T 20 0.540 1 1.760 1 - 1 2.300 0.100 1 - - 0.100 - - - 2.400 2 1 3 - - 14.400 - - - - -
T3 T 12 - - 4.100 1 - 1 4.100 - - - - - - - - 4.100 2 1 3 - - - - 24.600 - - -

GROUND BEAM - reinf Page 14 of 37


Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By : ZAI
Building Title : BENGKEL SENI KULINARI 1 Drwg No :
Element : GROUND BEAM Date : 12/1/2018

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 R12 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

T4 T 25 - - 3.300 1 - 1 3.300 - - - - - - - - 3.300 2 1 3 - 19.800 - - - - - -


T5 T 25 - - 2.200 1 - 1 2.200 - - - - - - - - 2.200 1 1 3 - 6.600 - - - - - -
T5 T 12 - - 5.100 1 0.120 1 5.220 0.060 1 - - 0.060 - - - 5.280 2 1 3 - - - - 31.680 - - -
B1 T 12 0.160 1 2.060 1 0.300 1 2.520 0.060 2 - - 0.120 - - - 2.640 2 1 3 - - - - 15.840 - - -
B2 T 20 0.200 1 7.050 1 - 1 7.250 0.100 1 - - 0.100 - - - 7.350 2 1 3 - - 44.100 - - - - -
B3 T 20 - - 4.300 1 - - 4.300 - - - - - - - - 4.300 1 1 3 - - 12.900 - - - - -
B4 T 25 - - 5.850 1 0.300 1 6.150 0.125 1 - - 0.125 - - - 6.275 2 1 3 - 37.650 - - - - - -
B5 T 25 - - 4.600 1 - - 4.600 - - - - - - - - 4.600 1 1 3 - 13.800 - - - - - -
L R 10 0.150 2 0.450 2 - - 1.200 0.240 1 - - 0.240 0.050 8 0.400 1.040 1 8 3 - - - - - - 24.960 -
L R 10 0.225 2 0.600 2 - - 1.650 0.240 1 - - 0.240 0.050 8 0.400 1.490 1 58 3 - - - - - - 259.260 -

GB11, GB18, GB20


T1 T 20 0.280 1 3.000 1 - 1 3.280 0.100 1 - - 0.100 - - - 3.380 2 1 2 - - 13.520 - - - - -
T2 T 20 0.540 1 1.760 1 - 1 2.300 0.100 1 - - 0.100 - - - 2.400 2 1 2 - - 9.600 - - - - -
T3 T 12 - - 4.100 1 - 1 4.100 - - - - - - - - 4.100 2 1 2 - - - - 16.400 - - -
T4 T 25 - - 3.300 1 - 1 3.300 - - - - - - - - 3.300 2 1 2 - 13.200 - - - - - -
T5 T 12 - - 5.200 1 0.120 1 5.320 0.060 1 - - 0.060 - - - 5.380 2 1 2 - - - - 21.520 - - -
B1 T 12 0.160 1 2.060 1 0.300 1 2.520 0.060 2 - - 0.120 - - - 2.640 2 1 2 - - - - 10.560 - - -
B2 T 20 0.200 1 7.050 1 - 1 7.250 0.100 1 - - 0.100 - - - 7.350 2 1 2 - - 29.400 - - - - -
B4 T 20 - - 5.850 1 0.300 1 6.150 0.100 1 - - 0.100 - - - 6.250 2 1 2 - - 25.000 - - - - -
B5 T 20 - - 4.600 1 - - 4.600 - - - - - - - - 4.600 1 1 2 - - 9.200 - - - - -
L R 10 0.150 2 0.450 2 - - 1.200 0.240 1 - - 0.240 0.050 8 0.400 1.040 1 8 2 - - - - - - 16.640 -
L R 10 0.225 2 0.600 2 - - 1.650 0.240 1 - - 0.240 0.050 8 0.400 1.490 1 51 2 - - - - - - 151.980 -

GB12
T1 T 12 0.160 1 1.700 1 - 1 1.860 0.060 1 - - 0.060 - - - 1.920 2 1 1 - - - - 3.840 - - -
T2 T 16 - - 4.600 1 - 1 4.600 0.080 1 - - 0.080 - - - 4.680 2 1 1 - - - 9.360 - - - -
T3 T 25 - - 3.220 1 - 1 3.220 - - - - - - - - 3.220 2 1 1 - 6.440 - - - - - -
T4 T 16 - - 4.350 1 - 1 4.350 - - - - - - - - 4.350 2 1 1 - - - 8.700 - - - -
T5 T 12 - - 1.700 1 0.160 1 1.860 0.060 1 - - 0.060 - - - 1.920 2 1 1 - - - - 3.840 - - -
B1 T 25 0.340 1 7.150 1 - - 7.490 0.125 1 - - 0.125 - - - 7.615 2 1 1 - 15.230 - - - - - -
B4 T 25 - - 5.850 1 0.340 1 6.190 0.125 1 - - 0.125 - - - 6.315 2 1 1 - 12.630 - - - - - -
L R 10 0.150 2 0.600 2 - - 1.500 0.240 1 - - 0.240 0.050 8 0.400 1.340 1 48 1 - - - - - - 64.320 -

GB14
T1 T 20 0.280 1 3.000 1 - 1 3.280 0.100 1 - - 0.100 - - - 3.380 2 1 1 - - 6.760 - - - - -
T2 T 20 0.540 1 1.760 1 - 1 2.300 0.100 1 - - 0.100 - - - 2.400 2 1 1 - - 4.800 - - - - -
T3 T 12 - - 4.100 1 - 1 4.100 - - - - - - - - 4.100 2 1 1 - - - - 8.200 - - -
T4 T 25 - - 3.300 1 - 1 3.300 - - - - - - - - 3.300 3 1 1 - 9.900 - - - - - -
T5 T 12 - - 5.200 1 0.120 1 5.320 0.060 1 - - 0.060 - - - 5.380 2 1 1 - - - - 10.760 - - -
B1 T 12 0.160 1 2.060 1 0.300 1 2.520 0.060 2 - - 0.120 - - - 2.640 2 1 1 - - - - 5.280 - - -
B2 T 20 0.200 1 7.050 1 - 1 7.250 0.100 1 - - 0.100 - - - 7.350 2 1 1 - - 14.700 - - - - -
B4 T 20 - - 5.850 1 0.300 1 6.150 0.100 1 - - 0.100 - - - 6.250 2 1 1 - - 12.500 - - - - -
B5 T 20 - - 4.600 1 - - 4.600 - - - - - - - - 4.600 1 1 1 - - 4.600 - - - - -
L R 10 0.150 2 0.450 2 - - 1.200 0.240 1 - - 0.240 0.050 8 0.400 1.040 1 8 1 - - - - - - 8.320 -
L R 10 0.225 2 0.600 2 - - 1.650 0.240 1 - - 0.240 0.050 8 0.400 1.490 1 62 1 - - - - - - 92.380 -

GB15
T1 T 12 0.160 1 4.580 1 0.160 1 4.900 0.060 2 - - 0.120 - - - 5.020 2 1 1 - - - - 10.040 - - -
B1 T 25 0.340 1 4.580 1 0.340 1 5.260 0.125 2 - - 0.250 - - - 5.510 2 1 1 - 11.020 - - - - - -

GROUND BEAM - reinf Page 15 of 37


Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By : ZAI
Building Title : BENGKEL SENI KULINARI 1 Drwg No :
Element : GROUND BEAM Date : 12/1/2018

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 R12 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

L R 10 0.150 2 0.600 2 - - 1.500 0.240 1 - - 0.240 0.050 8 0.400 1.340 1 19 1 - - - - - - 25.460 -

GB16
T1 T 12 0.160 1 4.580 1 0.160 1 4.900 0.060 2 - - 0.120 - - - 5.020 2 1 1 - - - - 10.040 - - -
B1 T 25 0.360 1 4.580 1 0.360 1 5.300 0.125 2 - - 0.250 - - - 5.550 2 1 1 - 11.100 - - - - - -
L R 10 0.150 2 0.600 2 - - 1.500 0.240 1 - - 0.240 0.050 8 0.400 1.340 1 19 1 - - - - - - 25.460 -

GB13, GB17
T1 T 12 0.160 1 4.160 1 0.160 1 4.480 0.060 2 - - 0.120 - - - 4.600 2 1 2 - - - - 18.400 - - -
T2 T 12 0.300 1 2.100 1 0.300 1 2.700 0.060 2 - - 0.120 - - - 2.820 2 1 2 - - - - 11.280 - - -
B1 T 12 0.160 1 2.120 1 0.420 1 2.700 0.060 2 - - 0.120 - - - 2.820 2 1 2 - - - - 11.280 - - -
B2 T 20 0.200 1 3.000 1 0.300 1 3.500 0.100 2 - - 0.200 - - - 3.700 2 1 2 - - 14.800 - - - - -
L R 10 0.150 2 0.450 2 - - 1.200 0.240 1 - - 0.240 0.050 8 0.400 1.040 1 18 2 - - - - - - 37.440 -

GB21
T1 T 16 0.280 1 3.000 1 - 1 3.280 0.080 1 - - 0.080 - - - 3.360 2 1 1 - - - 6.720 - - - -
T2 T 16 0.540 1 1.760 1 - 1 2.300 0.080 1 - - 0.080 - - - 2.380 2 1 1 - - - 4.760 - - - -
T3 T 12 - - 4.100 1 - 1 4.100 - - - - - - - - 4.100 2 1 1 - - - - 8.200 - - -
T4 T 20 - - 3.300 1 - 1 3.300 - - - - - - - - 3.300 2 1 1 - - 6.600 - - - - -
T5 T 12 - - 5.200 1 0.120 1 5.320 0.060 1 - - 0.060 - - - 5.380 2 1 1 - - - - 10.760 - - -
B1 T 12 0.160 1 2.060 1 0.300 1 2.520 0.060 2 - - 0.120 - - - 2.640 2 1 1 - - - - 5.280 - - -
B2 T 16 0.200 1 7.050 1 - 1 7.250 0.080 1 - - 0.080 - - - 7.330 2 1 1 - - - 14.660 - - - -
B4 T 20 - - 5.850 1 0.200 1 6.050 0.100 1 - - 0.100 - - - 6.150 2 1 1 - - 12.300 - - - - -
L R 10 0.150 2 0.450 2 - - 1.200 0.240 1 - - 0.240 0.050 8 0.400 1.040 1 8 1 - - - - - - 8.320 -
L R 10 0.225 2 0.600 2 - - 1.650 0.240 1 - - 0.240 0.050 8 0.400 1.490 1 48 1 - - - - - - 71.520 -

GB22
T1 T 12 0.160 1 4.465 1 - 1 4.625 0.060 1 - - 0.060 - - - 4.685 2 1 1 - - - - 9.370 - - -
T2 T 16 - - 3.150 1 - 1 3.150 - - - - - - - - 3.150 2 4 1 - - - 25.200 - - - -
T3 T 12 - - 4.250 1 - 1 4.250 - - - - - - - - 4.250 2 3 1 - - - - 25.500 - - -
T4 T 12 - - 9.700 1 - 1 9.700 - - - - - - - - 9.700 2 1 1 - - - - 19.400 - - -
T5 T 12 - - 5.200 1 0.160 1 5.360 0.060 1 - - 0.060 - - - 5.420 2 1 1 - - - - 10.840 - - -
B1 T 16 0.200 1 6.000 1 - - 6.200 0.080 1 - - 0.080 - - - 6.280 2 1 1 - - - 12.560 - - - -
B2 T 12 - - 7.150 1 - 1 7.150 0.060 1 - - 0.060 - - - 7.210 2 1 1 - - - - 14.420 - - -
B3 T 12 - - 6.500 1 - - 6.500 - - - - - - - - 6.500 2 1 1 - - - - 13.000 - - -
B4 T 12 - - 9.500 1 - - 9.500 - - - - - - - - 9.500 2 1 1 - - - - 19.000 - - -
B5 T 12 - - 6.500 1 - - 6.500 - - - - - - - - 6.500 2 1 1 - - - - 13.000 - - -
B6 T 16 - - 6.000 1 0.200 1 6.200 - - - - - - - - 6.200 2 1 1 - - - 12.400 - - - -
L R 10 0.150 2 0.450 2 - - 1.200 0.240 1 - - 0.240 0.050 8 0.400 1.040 1 163 1 - - - - - - 169.520 -

GROUND BEAM - reinf Page 16 of 37


Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By : ZAI
Building Title : BENGKEL SENI KULINARI 1 Drwg No :
Element : GROUND BEAM Date : 12/1/2018

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 R12 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

factor 6.313 3.853 2.466 1.578 0.888 0.888 0.617 0.222


TOTAL/m - 347.205 468.714 265.760 631.384 - 1,950.160 -
TOTAL/KG - 1,337.82 1,155.85 419.37 560.67 - 1,203.25 -
rounded total/KG - 1,338 1,156 419 561 - 1,203 -
add 5% 1,404.90 1,213.80 439.95 589.05 - 1,263.15 -

GROUND BEAM - reinf Page 17 of 37


PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVER
BLOCK: BENGKEL SENI KULINARI 1
ELEMEN: GROUND FLOOR

DIMENSION QUANTITY
ITEM L W NO CONC F/W EDGE
(m2) (m)
(LxWxD/HxNO) 125mm high

Exc. Not exceeding 350mm


150mm thk hardcore
50mm thk sand screed with DPM

150mm thk non- suspended

1-10/A-D 39.00 14.00 1 546.00 114.00

4A-6A/D-F 6.00 4.00 1 24.00 114.00

TOTAL 570.00 228.00


M3 85.5

GROUND FLOOR
NYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA)

#REF!

GROUND FLOOR
PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UT
BLOCK: BENGKEL SENI KULINARI 1
DRG. NO.:
ELEMEN: FRAME - COLUMN

DIMENSION QUANTITY
ITEM LOCATION L W D/H NO CONC F/W
(m3) (m2)
(LxWxD/HxNO) (Girth xLx NO)

GROUND TO ROOF

C1 0.30 0.30 4.30 19 7.35 98.04

C2 0.30 0.30 4.30 3 1.16 15.48

C3 0.30 0.30 4.30 1 0.39 5.16

C4 0.30 0.30 4.30 1 0.39 5.16

C5 0.15 0.15 4.30 4 0.39 10.32

TOTAL 9.68 134.16

Page 20 of 1
GUNA (UNIVERSITI UTARA MALAYSIA)

Page 21 of 1
Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By :
Building Title : BENGKEL SENI KULINARI 1 Drwg No :
Element : FRAME - COLUMN Date :

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 R12 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

Bar b
a c

depth
width
Stirrup

GROUND TO ROOF

C1
T T 12 - - 3.900 1 0.150 1 4.050 - - - - - - - - 4.050 4 1 19 - - - - 307.800 - - -
L R 10 0.300 2 0.300 2 - - 1.200 0.240 1 - - 0.240 0.025 8 0.200 1.240 1 32 19 - - - - - - 753.920 -

C2
T T 16 - - 3.900 1 0.150 1 4.050 - - - - - - - - 4.050 4 1 3 - - - 48.600 - - - -
L R 10 0.300 2 0.300 2 - - 1.200 0.240 1 - - 0.240 0.025 8 0.200 1.240 1 23 3 - - - - - - 85.560 -

C3
T T 16 - - 3.900 1 0.150 1 4.050 - - - - - - - - 4.050 4 1 1 - - - 16.200 - - - -
L R 10 0.300 2 0.300 2 - - 1.200 0.240 1 - - 0.240 0.025 8 0.200 1.240 1 32 1 - - - - - - 39.680 -

C4
T T 12 - - 3.900 1 0.150 1 4.050 - - - - - - - - 4.050 4 1 1 - - - - 16.200 - - -
L R 10 0.300 2 0.300 2 - - 1.200 0.240 1 - - 0.240 0.025 8 0.200 1.240 1 32 1 - - - - - - 39.680 -

C5
T T 12 - - 3.900 1 0.150 1 4.050 - - - - - - - - 4.050 4 1 4 - - - - 64.800 - - -
L R 10 0.150 2 0.150 2 - - 0.600 0.240 1 - - 0.240 0.025 8 0.200 0.640 1 32 4 - - - - - - 81.920 -

factor 6.313 3.853 2.466 1.578 0.888 0.888 0.617 0.222


TOTAL/m - - - 64.800 388.800 - 1,000.760 -
TOTAL/KG - - - 102.25 345.25 - 617.47 -
rounded total/KG - - - 102 345 - 617 -

COLUMN -REINF Page 22 of 37


PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UT
BLOCK: BENGKEL SENI KULINARI 1
DRG. NO.:
ELEMEN: FRAME - STIFFENER

DIMENSION QUANTITY
ITEM LOCATION L W D/H NO CONC F/W
(m3) (m2)
(LxWxD/HxNO) (Girth xLx NO)

CX 0.15 0.15 1.80 8 0.32 8.66

TOTAL 0.32 8.66

Page 23 of 1
GUNA (UNIVERSITI UTARA MALAYSIA)

Page 24 of 1
Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By :
Building Title : BENGKEL SENI KULINARI 1 Drwg No :
Element : FRAME - STIFFENER Date :

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 R12 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

Bar b
a c

depth
width
Stirrup

CX
T T 12 - - 1.804 1 0.150 1 1.954 - - - - - - - - 1.954 4 1 8 - - - - 62.528 - - -
L R 6 0.150 2 0.150 2 - - 0.600 0.144 1 - - 0.144 0.025 8 0.200 0.544 1 11 8 - - - - - - - 47.872

factor 6.313 3.853 2.466 1.578 0.888 0.888 0.617 0.222


TOTAL/m - - - - 62.528 - - 47.872
TOTAL/KG - - - - 55.52 - - 10.63
rounded total/KG - - - - 56 - - 11

STIFFENER -REINF Page 25 of 37


PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA)
BERSERTA LAIN-LAIN KEMUDAHAN DI ATAS SENAHAGIAN LOT 5064, SINTOK, KEDAH DARULAMAN.
BLOCK: DEWAN SERBAGUNA
DRG. NO.: UUM/JPP/DS/CS/ST/RC/09
ELEMEN: FRAME - UPPER ROOF BEAM

DIMENSION QUANTITY
ITEM LOCATION L W D/H NO CONC F/W
(m3) (m2)
(LxWxD/HxNO) (Girth xLx NO)

ROOFPLAN

URB1 P/4-10 17.990 0.60 0.75 1 8.10 37.78


URB2 L-P/3-5&9-11 17.500 0.60 0.75 2 15.75 73.50

URB4 K-L/2-3&11-12 2.500 0.60 1.50 2 4.50 18.00


URB4 J-L/2-3&11-12 5.000 0.60 3.65 2 21.90 79.00

URB5 G-K/2-4&10-12 9.000 0.60 1.50 2 16.20 64.80


URB6 F-H/3-6&8-11 6.300 0.60 1.50 2 11.34 45.36

URB7 G/6-8 12.500 0.20 1.50 1 3.75 40.00


URB8 F/6-8 12.040 0.60 1.50 1 10.84 43.34

URB10 6/E-G&8/E-G 4.000 0.45 0.60 2 2.16 13.20

URB11 7/D-G 4.700 0.45 0.60 1 1.27 7.76

URB12 (a) L6-L5&L3-L2 2.500 0.45 0.60 4 2.70 16.50


R2-R3&R4-R5

URB12 (b) L5-L4&R3-R4 3.000 0.45 0.60 2 1.62 9.90


URB13 K-L/1-3&11-13 2.500 0.30 1.00 2 1.50 11.50

TOTAL 101.62 460.64

Page 26 of 1
PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA)
BERSERTA LAIN-LAIN KEMUDAHAN DI ATAS SENAHAGIAN LOT 5064, SINTOK, KEDAH DARULAMAN.
BLOCK: DEWAN SERBAGUNA
DRWG. NO.: UUM/JPP/DS/CS/ST/RC/09
ELEMENT: FRAME - UPPER ROOF BEAM

DIMENSION QUANTITY
ITEM LOCATION L W D/H NO CONC F/W
(m3) (m2)
(LxWxD/HxNO) (Girth xLx NO)

ROOFPLAN

URB9 1-13/D-L 60.000 0.20 0.60 1 7.20 14.40

TOTAL
Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By : Ainaa
Building Title : DEWAN SERBAGUNA Drwg No : UUM/JPP/DS/CS/ST/RC/09
Element : ROOF BEAM Date :

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 Y10 R12 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

Bar b
a c

depth
width
Stirrup

URB1
T1 T 25 0.700 1 8.250 1 - - 8.950 0.125 1 - - 0.125 - - - 9.075 6 1 1 - 54.450 - - - - - - -
T2 T 25 - - 4.000 1 - - 4.000 - - - - - - - - 4.000 3 1 1 - 12.000 - - - - - - -
T3 T 25 - - 4.150 1 - - 4.150 - - - - - - - - 4.150 6 1 1 - 24.900 - - - - - - -
T4 T 25 - - 4.050 1 - - 4.050 - - - - - - - - 4.050 3 1 1 - 12.150 - - - - - - -
T5 T 25 - - 8.425 1 0.700 1 9.125 0.125 1 - - 0.125 - - - 9.250 6 1 1 - 55.500 - - - - - - -
T6 T 12 0.300 1 6.650 1 - - 6.950 0.060 1 - - 0.060 - - - 7.010 4 1 1 - - - - 28.040 - - - -
T7 T 12 - - 12.700 1 0.300 1 13.000 0.060 1 0.540 1 0.600 - - - 13.600 4 1 1 - - - - 54.400 - - - -
B1 T 25 0.350 1 7.800 1 - - 8.150 0.125 1 - - 0.125 - - - 8.275 6 1 1 - 49.650 - - - - - - -
B2 T 25 - - 11.900 1 0.350 1 12.250 0.125 1 - - 0.125 - - - 12.375 6 1 1 - 74.250 - - - - - - -
L R 10 0.400 2 0.750 2 - - 2.300 0.240 1 - - 0.240 0.040 8 0.320 2.220 2 84 1 - - - - - - - 372.960 -

URB2
T1 T 25 0.700 1 9.500 1 - - 10.200 0.125 1 - - 0.125 - - - 10.325 6 1 2 - 123.900 - - - - - -
T2 T 25 - - 6.300 1 - - 6.300 - - - - - - - - 6.300 2 1 2 - 25.200 - - - - - -
T3 T 25 - - 9.850 1 0.350 1 10.200 0.125 1 - - 0.125 - - - 10.325 6 1 2 - 123.900 - - - - - - -
T4 T 12 0.300 1 6.750 1 - - 7.050 0.060 1 - - 0.060 - - - 7.110 4 1 2 - - - - 56.880 - - - -
T5 T 12 - - 12.350 1 0.300 1 12.650 0.060 1 0.540 1 0.600 - - - 13.250 4 1 2 - - - - 106.000 - - - -
B1 T 25 0.350 1 7.800 1 - - 8.150 0.125 1 - - 0.125 - - - 8.275 6 1 2 - 99.300 - - - - - - -
B2 T 25 - - 11.350 1 0.350 1 11.700 0.125 1 - - 0.125 - - - 11.825 6 1 2 - 141.900 - - - - - - -
L R 10 0.600 2 0.750 2 - - 2.700 0.240 1 - - 0.240 0.040 8 0.320 2.620 2 108 2 - - - - - - - 1,131.840 -
-
-
URB4 -
T1 T 25 - - 7.650 1 1.000 1 8.650 0.125 1 - - 0.125 - - - 8.775 6 1 2 - 105.300 - - - - - -
T2 T 12 - - 8.650 1 - - 8.650 - - - - - - - - 8.650 28 1 2 - - - - 484.400 - - -
T3 T 25 2.750 1 4.600 1 - - 7.350 0.125 1 - - 0.125 - - - 7.475 6 1 2 - 89.700 - - - - - - -
T4 T 12 0.400 1 4.150 1 - - 4.550 0.060 1 - - 0.060 - - - 4.610 28 1 2 - - - - 258.160 - - - -
B1 T 25 0.950 1 8.300 1 0.950 1 10.200 0.125 2 - - 0.250 - - - 10.450 6 1 2 - 125.400 - - - - - - -
L R 10 0.600 2 1.500 2 - - 4.200 0.240 1 - - 0.240 0.040 8 0.320 4.120 3 49 2 - - - - - - - 1,211.280 -
-
-
URB5 -
T1 T 25 - - 3.000 1 - - 3.000 - - - - - - - - 3.000 6 1 2 - 36.000 - - - - - -
T2 T 25 - - 4.100 1 - - 4.100 - - - - - - - - 4.100 6 1 2 - 49.200 - - - - - -
T3 T 25 - - 3.000 1 - - 3.000 - - - - - - - - 3.000 6 1 2 - 36.000 - - - - - - -
T4 T 25 - - 4.100 1 - - 4.100 - - - - - - - - 4.100 6 1 2 - 49.200 - - - - - - -
T5 T 12 - - 5.700 1 - - 5.700 - - - - - - - - 5.700 10 1 2 - - - - 114.000 - - - -
B1 T 25 0.950 1 10.100 1 0.950 1 12.000 0.125 2 - - 0.250 - - - 12.250 6 1 2 - 147.000 - - - - - - -
L R 10 0.600 2 1.500 2 - - 4.200 0.240 1 - - 0.240 0.040 8 0.320 4.120 3 58 2 - - - - - - - 1,433.760 -
-
-
URB5,URB6,URB8 (MIRROR)
T1 T 12 - - 19.650 1 - - 19.650 - - - - - - - - 19.650 10 1 2 - - - - 393.000 - - -

UPPER ROOF BEAM - reinf Page 28 of 37


Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By : Ainaa
Building Title : DEWAN SERBAGUNA Drwg No : UUM/JPP/DS/CS/ST/RC/09
Element : ROOF BEAM Date :

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 Y10 R12 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

URB6
T1 T 25 - - 3.000 1 - 1 3.000 - - - - - - - - 3.000 6 1 2 - 36.000 - - - - - -
T2 T 25 - - 6.200 1 - 1 6.200 - - - - - - - - 6.200 6 1 2 - 74.400 - - - - - -
B1 T 25 0.950 1 7.400 1 0.950 1 9.300 0.125 2 - - 0.250 - - - 9.550 6 1 2 - 114.600 - - - - - - -
L R 10 0.600 2 1.500 2 - - 4.200 0.240 1 - - 0.240 0.040 8 0.320 4.120 3 42 2 - - - - - - - 1,038.240 -
-
-
URB8
T1 T 25 - - 8.100 1 - - 8.100 - - - - - - - - 8.100 6 1 1 - 48.600 - - - - - -
T2 T 25 - - 4.500 2 - - 9.000 - - - - - - - - 9.000 9 1 1 - 81.000 - - - - - -
T3 T 25 - - 4.500 2 - - 9.000 - - - - - - - - 9.000 6 1 1 - 54.000 - - - - - - -
B1 T 25 0.950 1 12.250 1 0.950 1 14.150 0.125 2 1.125 1 1.375 - - - 15.525 9 1 1 - 139.725 - - - - - - -
B2 T 25 - - 9.550 1 - 1 9.550 - - - - - - - - 9.550 6 1 1 - 57.300 - - - - - - -
L R 10 0.600 2 1.500 2 - - 4.200 0.240 1 - - 0.240 0.040 8 0.320 4.120 3 75 1 - - - - - - - 927.000 -
-
-
URB7
T1 T 25 0.900 1 12.300 1 0.900 1 14.100 0.125 2 1.125 1 1.375 - - - 15.475 2 1 1 - 30.950 - - - - - -
T2 T 10 - - 12.050 1 - - 12.050 - - 0.450 1 0.450 - - - 12.500 6 1 1 - - - - - - - -
B1 T 25 0.450 1 12.225 1 0.450 1 13.125 0.125 2 1.125 1 1.375 - - - 14.500 2 1 1 - 29.000 - - - - - - -
B2 T 25 - - 9.550 1 - - 9.550 - - - - - - - - 9.550 2 1 1 - 19.100 - - - 75.000 - - -
L R 10 0.200 2 1.000 2 - - 2.400 0.240 1 - - 0.240 0.040 8 0.320 2.320 1 57 1 - - - - - - - 132.240 -
-
-
URB9 (CURVED BEAM) (MIRROR)
T1 T 20 0.525 1 7.000 1 - - 7.525 0.100 1 - - 0.100 0.040 1 0.040 7.585 2 1 2 - - 30.340 - - - - -
T2 T 20 - - 5.950 1 - - 5.950 - - - - - - - - 5.950 2 1 2 - - 23.800 - - - - -
T3 T 20 - - 6.050 1 - - 6.050 - - - - - - - - 6.050 2 1 2 - - 24.200 - - - - - -
T4 T 20 - - 8.750 1 - - 8.750 - - - - - - - - 8.750 2 1 2 - - 35.000 - - - - - -
T5 T 20 - - 5.550 1 - - 5.550 - - - - - - - - 5.550 2 1 2 - - 22.200 - - - - - -
T6 T 12 - - 5.550 1 - - 5.550 - - - - - - - - 5.550 4 1 2 - - - - 44.400 - - - -
T7 T 12 - - 6.200 1 - - 6.200 - - - - - - - - 6.200 4 1 2 - - - - 49.600 - - - -
T8 T 12 - - 6.250 1 - - 6.250 - - - - - - - - 6.250 4 1 2 - - - - 50.000 - - - -
T9 T 12 - - 8.950 1 - - 8.950 - - - - - - - - 8.950 4 1 2 - - - - 71.600 - - - -
T10 T 12 - - 5.750 1 - - 5.750 - - - - - - - - 5.750 4 1 2 - - - - 46.000 - - - -
B1 T 20 0.500 1 5.400 1 - - 5.900 0.100 1 - - 0.100 - - - 6.000 2 1 2 - - 24.000 - - - - - -
B2 T 20 - - 5.950 1 - - 5.950 - - - - - - - - 5.950 2 1 2 - - 23.800 - - - - - -
B3 T 20 - - 6.050 1 - - 6.050 - - - - - - - - 6.050 2 1 2 - - 24.200 - - - - - -
B4 T 20 - - 8.750 1 - - 8.750 - - - - - - - - 8.750 2 1 2 - - 35.000 - - - - - -
B5 T 20 - - 5.550 1 - - 5.550 - - - - - - - - 5.550 2 1 2 - - 22.200 - - - - - -
L R 10 0.200 2 0.600 2 - - 1.600 0.240 1 - - 0.240 0.040 8 0.320 1.520 2 168 2 - - - - - - - 1,021.440 -
-
-
URB10
T1 T 25 0.600 1 4.150 1 0.500 1 5.250 0.125 2 - - 0.250 - - - 5.500 7 1 2 - 77.000 - - - - - -
T2 T 25 - - 4.000 1 - - 4.000 - - - - - - - - 4.000 2 1 2 - 16.000 - - - - - -
B1 T 25 0.500 1 4.050 1 1.000 1 5.550 0.125 2 - - 0.250 - - - 5.800 4 1 2 - 46.400 - - - - - - -
L1 R 10 0.300 2 0.600 2 - - 1.800 0.240 1 - - 0.240 0.040 8 0.320 1.720 2 4 2 - - - - - - - 27.520 -
L2 R 10 0.300 2 0.600 2 - - 1.800 0.240 1 - - 0.240 0.040 8 0.320 1.720 2 7 2 - - - - - - - 48.160 -
-

UPPER ROOF BEAM - reinf Page 29 of 37


Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA) Prepared By : Ainaa
Building Title : DEWAN SERBAGUNA Drwg No : UUM/JPP/DS/CS/ST/RC/09
Element : ROOF BEAM Date :

Dimension Add Less Nett No. of No.of No. of Y32 Y25 Y20 Y16 Y12 Y10 R12 R10 R6
Item Types
a no. b no. c no. Total Bend No. Lap No. Total Cover No. Total Length Bar Link Beam

-
URB11
T1 T 25 0.600 1 4.800 1 0.500 1 5.900 0.125 2 - - 0.250 - - - 6.150 7 1 1 - 43.050 - - - - - -
T2 T 25 - - 4.650 1 - - 4.650 - - - - - - - - 4.650 4 1 1 - 18.600 - - - - - -
B1 T 20 0.500 1 4.750 1 1.000 1 6.250 0.100 2 - - 0.200 - - - 6.450 4 1 1 - - 25.800 - - - - - -
L1 R 10 0.300 2 0.600 2 - - 1.800 0.240 1 - - 0.240 0.040 8 0.320 1.720 2 9 1 - - - - - - - 30.960 -
L2 R 10 0.300 2 0.600 2 - - 1.800 0.240 1 - - 0.240 0.040 8 0.320 1.720 2 23 1 - - - - - - - 79.120 -
-

URB12 (a)
T1 T 25 2.000 1 2.150 1 0.500 1 4.650 0.125 2 - - 0.250 - - - 4.900 7 1 4 - 137.200 - - - - - -
B1 T 20 0.500 1 2.050 1 1.000 1 3.550 0.100 2 - - 0.200 - - - 3.750 4 1 4 - - 60.000 - - - - -
L R 10 0.300 2 0.600 2 - - 1.800 0.240 1 - - 0.240 0.040 8 0.320 1.720 2 17 4 - - - - - - - 233.920 -
-
-
URB12 (b)
T1 T 25 2.000 1 2.650 1 0.500 1 5.150 0.125 2 - - 0.250 - - - 5.400 7 1 2 - 75.600 - - - - - -
B1 T 20 0.500 1 2.550 1 1.000 1 4.050 0.100 2 - - 0.200 - - - 4.250 4 1 2 - - 34.000 - - - - -
L R 10 0.300 2 0.600 2 - - 1.800 0.240 1 - - 0.240 0.040 8 0.320 1.720 2 22 2 - - - - - - - 151.360 -
-
-
URB13
T1 T 25 2.000 1 2.300 1 0.650 1 4.950 0.125 2 - - 0.250 - - - 5.200 4 1 2 - 41.600 - - - - - -
T2 T 12 - - 2.150 1 - - 2.150 - - - - - - - - 2.150 6 1 2 - - - - 25.800 - - -
B1 T 20 0.500 1 2.200 1 0.550 1 3.250 0.100 2 - - 0.200 - - - 3.450 4 1 2 - - 27.600 - - - - - -
L R 10 0.200 2 1.000 2 - - 2.400 0.240 1 - - 0.240 0.040 8 0.320 2.320 2 15 2 - - - - - - - 139.200 -
-
-
factor 6.313 3.853 2.466 1.578 0.888 0.617 0.888 0.617 0.222
TOTAL/m - 2,575.025 412.140 - 1,782.280 75.000 - 7,979.000 -
TOTAL/KG - 9,921.89 1,016.34 - 1,582.66 46.28 - 4,923.04 -
rounded total/KG - 9,922 1,016 - 1,583 46 - 4,923 -

UPPER ROOF BEAM - reinf Page 30 of 37


Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA M
Building Title : DEWAN SERBAGUNA
Element : ROOF STRUCTURE

location length width No. total


(m) (m)

TRUSS B

100 x 50 x 4mm THK x


11.75KG/M RHS

BOTTOM 12.00 2 24.00

TOP 13.90 2 27.80

sub-total / m 51.80
kg/m 11.75
total / kg 608.65

TRUSS B

50 x 50 x 4mm x 6.71KG/M SHS

VERTICAL STRUT 0.16 2 0.32


0.38 2 0.76
0.64 2 1.28
0.88 2 1.76
1.12 2 2.24

sub-total / m 6.36
kg/m 6.71
total / kg 42.68

TRUSS B

50 x 50 x 4mm x 6.71KG/M SHS

DIAGONAL STRUT 1.34 2 2.68


1.70 2 3.40
1.82 2 3.64
2.04 2 4.08
2.18 2 4.36

sub-total / m 18.16
kg/m 6.71
total / kg 121.85

TRUSS B
Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA M
Building Title : DEWAN SERBAGUNA
Element : ROOF STRUCTURE

location length width No. total


(m) (m)

100mm x 100mm x 10mm MS


PLATE
WELDED WITH 1 NO 20MM DIA.
ANCHORAGE
BOLT & NUT

DETAIL'C' 6 2 12

total / NO 12

TRUSS B

150mm x 200mm x 10mm MS


PLATE
WELDED WITH 1 NO 20MM DIA.
ANCHORAGE
BOLT & NUT

SECTION X-X 1 2 2

total / NO 2

TRUSS B

150mm x 200mm x 10mm MS


PLATE
WELDED WITH 1 NO 20MM DIA.
ANCHORAGE
BOLT & NUT

SECTION Y-Y 2 2 4

total / NO 4

TRUSS C

100 x 50 x 4mm THK x


11.75KG/M RHS

BOTTOM 12.00 10 120.00

TOP 13.90 10 139.00

sub-total / m 259.00
kg/m 11.75
total / kg 3,043.25

TRUSS C
Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA M
Building Title : DEWAN SERBAGUNA
Element : ROOF STRUCTURE

location length width No. total


(m) (m)
50 x 50 x 4mm x 6.71KG/M SHS

VERTICAL STRUT 0.16 10 1.60


0.38 10 3.80
0.64 10 6.40
0.88 10 8.80
1.12 10 11.20

sub-total / m 31.80
kg/m 6.71
total / kg 213.38

TRUSS C

50 x 50 x 4mm x 6.71KG/M SHS

DIAGONAL STRUT 1.34 10 13.40


1.70 10 17.00
1.82 10 18.20
2.04 10 20.40
2.18 10 21.80

sub-total / m 90.80
kg/m 6.71
total / kg 609.27

TRUSS C

150mm x 100mm x 10mm MS


PLATE
WELDED WITH 1 NO 20MM DIA.
ANCHORAGE
BOLT & NUT

DETAIL'C' 8 10 80

total / NO 80

TRUSS C
Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA M
Building Title : DEWAN SERBAGUNA
Element : ROOF STRUCTURE

location length width No. total


(m) (m)
150mm x 200mm x 10mm MS
PLATE
WELDED WITH 1 NO 20MM DIA.
ANCHORAGE
BOLT & NUT

SECTION Y-Y 2 10 20

total / NO 20

TRUSS D

100 x 50 x 4mm THK x


11.75KG/M RHS

BOTTOM 12.00 3 36.00

TOP 17.93 3 53.79

sub-total / m 89.79
kg/m 11.75
total / kg 1,055.03

TRUSS D

50 x 50 x 4mm x 6.71KG/M SHS

VERTICAL STRUT 0.16 3 0.48


0.38 3 1.14
0.64 3 1.92
0.88 3 2.64
1.12 3 3.36

sub-total / m 9.54
kg/m 6.71
total / kg 64.01

TRUSS D
Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA M
Building Title : DEWAN SERBAGUNA
Element : ROOF STRUCTURE

location length width No. total


(m) (m)
50 x 50 x 4mm x 6.71KG/M SHS

DIAGONAL STRUT 1.34 3 4.02


1.70 3 5.10
1.82 3 5.46
2.04 3 6.12
2.18 3 6.54

sub-total / m 27.24
kg/m 6.71
total / kg 182.78
TRUSS D

150mm x 100mm x 10mm MS


PLATE
WELDED WITH 1 NO 20MM DIA.
ANCHORAGE
BOLT & NUT

DETAIL'C' 10 3 30

total / NO 30

TRUSS D

150mm x 200mm x 10mm MS


PLATE
WELDED WITH 1 NO 20MM DIA.
ANCHORAGE
BOLT & NUT

SECTION X-X 1 3 3

total / NO 3

TRUSS D

150mm x 200mm x 10mm MS


PLATE
WELDED WITH 1 NO 20MM DIA.
ANCHORAGE
BOLT & NUT

SECTION Y-Y 2 3 6

total / NO 6

TRUSS A
Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA M
Building Title : DEWAN SERBAGUNA
Element : ROOF STRUCTURE

location length width No. total


(m) (m)
50 x 50 x 3mm THK x 9.23KG/M
SHS

BOTTOM 2.00 5 10.00

TOP 2.21 5 11.05

sub-total / m 21.05
kg/m 9.23
total / kg 194.29
TRUSS A

50 x 50 x 3mm THK x 9.23KG/M


SHS

VERTICAL STRUT 0.40 5 2.00

sub-total / m 2.00
kg/m 9.23
total / kg 18.46

TRUSS A

50 x 50 x 3mm THK x 9.23KG/M


SHS

DIAGONAL STRUT 1.00 5 5.00

sub-total / m 5.00
kg/m 9.23
total / kg 46.15

TRUSS A

150mm x 100mm x 10mm MS


PLATE
WELDED WITH 1 NO 20MM DIA.
ANCHORAGE
BOLT & NUT

SECTION Z-Z 4 5 20

total / NO 20

60.3mm dia x 2.77mm thk x


3.93kg/m CHS bracing 12.00 8 96.00
Project Title : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA M
Building Title : DEWAN SERBAGUNA
Element : ROOF STRUCTURE

location length width No. total


(m) (m)

sub-total / m 96.00
kg/m 3.93
total / kg 377.28

12mm dia sag rod - 1100mm long

13.90 12 166.80
17.93 2 35.86
total /m 202.66
125mm x 50mm x 20mm x 2.3mm
thk x 3.25kg/m purlin
40.80 13 530.40
7.80 4 31.20

sub-total / m 561.60
kg/m 3.25
total / kg 1,825.20