ELECTRICAL SPECIFICATIONS
Generator shall have its neutral solidly connected to the system earth through the
transfer switch. No local system earthing means shall be used as it would create
a multiple earthing of the neutral which may cause stray currents. Alternatively the
Contractor may use a local earthing of the neutral if he uses an overlapping
neutral transfer contact in the automatic transfer switch.
The generator set earthing shall be separate from the general earthing of the
building.
Annuniciator shall be flush mounting unit. The face of the front panel shall
incorporate nine lamps, an audible alarm. A toggle switch marked NORMAL and
OFF, and a lamp test push-button switch. The printed circuits internal wiring,
terminal block and battery voltage sensors shall be accessible on removing the
front panel.
1- Generating Power
2- Failed to Start
3- Low Lube Oil Pressure
4- Excessive Water Temperature
5- Engine Over Speed
6- Low Fuel Supply
7- Low Battery Voltage
8- High Battery Voltage
9- Low Water Jacket Temperature
Annunciator panel shall operate on DC source taken from the batteries of the
generator it-self.
Audible Alarm shall sound for the above status except for 1, 7 & 8.
ELECTRICAL SPECIFICATIONS
All equipments which form part of the diesel generating plant shall be visually
inspected for damage and checked against the manufacturer
catalogues/drawings and schedule, for the following:
The set shall be run continuously for 8 hours test run at rated load followed by
110 percent of rated load of a period of one hour.
Every 15 minutes for the first hour and every hour thereafter, the following
parameters shall be recorded
ELECTRICAL SPECIFICATIONS
5- Cooling air medium flow
6- Alternator cooling air inlet and outlet temperatures.
Resistive load shall be applied and switched ON and OFF in STEPS, with the
diesel generator running at rated speed and generating rated voltage.
1- Remove all external wiring between the plant and load bank/test panels.
The operation of interlocks and interconnections with all external equipment and
controls to be connected on site, shall be simulated as part of these tests.
Local controls, alarms and shutdown functions associated with the generator set
installation shall be simulated and demonstrated on site. These tests shall
include, but not limited to the following:
2. load Data
- nominal voltage
- nominal current frequency
- steady state voltage tolerance
Addendum no-3 17 of 188 FEBRUARY 2016