10069A-9-3PS-EBB3-00001
Tipo doc. Codice EmittenteTeamcenter Ente Emittente Edizione in lingua Derivato da Rev.
doc. type teamcenter issuer code issued by language derived from rev.
00 FIRST ISSUE
Accepted by: Bruzzone
Ansaldo Energia s.p.a. si riserva tutti i diritti su questo documento che non può essere riprodotto neppure parzialmente senza la sua autorizzazione scritta
Ansaldo Energia s.p.a. reserves all rights on this document that can not be reproduced in any part without its written consent
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 2 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
SUMMARY
1. SCOPE .................................................................................................................................... 4
2. FAT/SAT PROCEDURE FOR IPB ........................................................................................... 4
2.1. Procedure for visual and dimensional inspection during FAT ............................................... 4
2.2. Procedure for inspection of painting and galvanization ......................................................... 5
2.3. Procedure for testing the pressurization cubicle ................................................................... 5
2.4. Procedure for electrical testing ............................................................................................. 6
3. FAT/SAT PROCEDURE FOR PT CUBICLE AND NEUTRAL GROUNDING CUBICLE ........... 7
3.1. Instructions IT P 04: Dielectric voltage test on auxiliary and operating circuits of MV
switchboards ................................................................................................................................. 7
3.1.1. Scope .............................................................................................................................. 7
3.1.2. Range of applicability ...................................................................................................... 7
3.1.3. Reference to standards ................................................................................................... 8
3.1.4. Instruments ..................................................................................................................... 8
3.1.5. Working formalities .......................................................................................................... 8
3.1.6. Test report ....................................................................................................................... 9
3.2. Instructions IT P 05: Industrial frequency voltage test on main circuits of MV
switchboards ............................................................................................................................... 10
3.2.1. Scope ............................................................................................................................ 10
3.2.2. Range of applicability .................................................................................................... 10
3.2.3. Reference to standards ................................................................................................. 10
3.2.4. Instruments ................................................................................................................... 10
3.2.5. working formalities ......................................................................................................... 11
3.2.6. Test report ..................................................................................................................... 14
3.2.7. Dielectric test on the main circuit on site ........................................................................ 14
3.3. Instructions IT P 06: Resistance measure on main circuits of MV switchboards ................. 14
3.3.1. Scope ............................................................................................................................ 14
3.3.2. Range of applicability .................................................................................................... 14
3.3.3. Reference to standards ................................................................................................. 15
3.3.4. Instruments ................................................................................................................... 15
3.3.5. Working formalities ........................................................................................................ 15
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 3 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
0553 F1BAAU670 0 4 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
1. SCOPE
Scope of this document is to provide a detailed list of inspections and tests, together with the
relevant procedures, applicable to the Factory Acceptance Tests (FAT) and Site Acceptance Tests
(SAT) of Isolated Phase Busducts and related accessories.
Dimensions of IPB and related accessories shall be verified to check their compliance with general
layout drawing and detailed (workshop) drawings. The workshop drawings are internal and
confidential but they will be available to inspectors during the FAT. For site inspection, the
compliance of installation with applicable drawings shall be verified all through the process, a final
inspection only could be too late to apply corrective actions if necessary.
For each IPB element and accessory all main dimensions are verified during the construction, e.g.:
length, diameter, position of insulators, supporting collars and flanges. Flanges and holes for
bolted connections are verified as regards holes diameter, holes distance and/or drilling pattern. In
general the correct matching with the coupled element shall be checked. For all others
components and accessories the relevant dimensions and drilling shall be checked. During the
shop test & inspection, the dimensions shall be verified on sample basis.
Reference markings and numbers matching with bill of materials are also checked.
Reference standard is UNI ISO 2768 Part 1, acceptance criteria are the following:
Coupling flanges
± 0,5 mm for holes diameters
± 1,0 mm for holes distances
± 4,0 mm for lengths
0553 F1BAAU670 0 5 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
The positive result is registered on the inspection report, in case of unfavourable result the
necessary countermeasures shall be taken.
The colour of IPB enclosure shall be visually compared with the colour card, the visual aspect shall
be also checked but it is important to remark that the coating is provided for identification and
aesthetical purposes only (not protective) and a paint touch up will be performed at site after
completion of installation: any small defect will be removed at site.
For the measurement of thickness of painting and galvanization, first of all a calibration of
instrument (Elcometer STD model 345 FN1 or Phynix Surfix model FN21) shall be carried out on a
bare surface of the same base metal: select the correct type of base metal (ferrous or non-ferrous
as applicable) then set the reading to zero after putting the probe on the bare metal.
Choose the calibration foil having a thickness equal to or similar to the required film thickness, and
use it to check the reading on bare metal, calibrate again to the foil thickness if necessary.
Finally, use the probe on the specimen and read the thickness of paint or galvanization in different
samples widely dispersed on the specimen.
0553 F1BAAU670 0 6 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
If the overpressure does not reach the upper limit of 20 mbar within 10 minutes, the solenoid valve
is closed by a time switch and the low pressure status is highlighted by red light and by low
pressure signal. In order to avoid any accidental excessive overpressure, the pressurization
system is equipped with a safety valve (glycerine valve) calibrated to open the circuit at 30 mbar.
The high pressure signal is also given by a manometer to terminal blocks for remote alarm.
- The functional testing of control system, after successful check of wiring and piping as
per relevant drawings and diagrams, includes:
- check that air flow starts when overpressure is below 5 mbar ± 20%
- check that air flow stops when overpressure reaches 20 mbar ± 20%
- check that high pressure alarm switches on when overpressure exceeds 30 mbar (this
test can be performed in factory using an air receiver and shall not be repeated on site)
- check that low pressure alarm switches after 10 minutes of air flow without reaching the
required overpressure value of 20 mbar
- check of operation without air leakage from pneumatic circuit
The arrangement of power frequency withstand voltage test shall comply with the following circuit
diagram:
I circuit breaker
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 7 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
R regulator
T step-up transformer
V voltmeter
O object under test, disconnected from any other equipment
In case of site testing, the procedure is the same but the test voltage to be applied is 80% of
nominal value, i.e. 30.8 kV, as per IEC 62271-200 clause 7.105.
In case of insufficient power of HV test set for site testing on the fully assembled IPB, DC testing
could be performed after agreement between Purchaser and Manufacturer.
3.1. Instructions IT P 04: Dielectric voltage test on auxiliary and operating circuits of MV
switchboards
3.1.1. Scope
It describes all the activity relating to the tests and to final checks and quality control before
shipping, in order to assure that every supplied product and installation comply to the requested
technical specifications.
This instruction describes the execution of "Dielectric voltage test on auxiliary and operating
circuits of MV switchboards".
0553 F1BAAU670 0 8 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
- the test must be carried out by skilled people with proper instruction training and
informed on safety procedure.
3.1.4. Instruments
The following instruments are used:
- Instruments for verification of dielectric properties up to 5KV.
For more detail, see the list of testing instruments present in Quality Test Responsabile office; the
identification code of the used instrument is, usually, write also on the test report of the equipment
tested.
0553 F1BAAU670 0 9 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
which the application of the test voltage would cause the flow of a current, shall be disconnected.
These apparatus shall be disconnected at one of their terminals unless they are not designed to
withstand the test voltage, in which case all terminals may be disconnected.
IMPORTANT NOTES:
Normally, the test voltage of motors and other devices used in the auxiliary and control circuits
shall be the same as the test voltage of those circuits. If such apparatus has already been tested in
accordance with the appropriate specification, it may be disconnected for these tests.
Current transformer secondaries may be short-circuited and disconnected from earth. Voltage
transformer secondaries may be open.
Voltage-limiting devices, if any, shall be disconnected.
During the test an instruments for verification of dielectric properties up to 5KV is used. The test
voltage at the moment of application shall not exceed 50% of the full value.
It shall then be increased steadily within a few seconds to this full value maintained for 1 min. The
a.c. power sources shall have sufficient power to maintain the test voltage irrespective of any
leakage currents.
The test voltage shall have a practically sinusoidal waveform and a frequency between 45 and 62
Hz.
Anti-interference capacitors installed between live and exposed conductive parts shall not be
disconnected and shall be capable of withstanding the test voltage.
For the test:
- either all switching shall be closed, or
- the test voltage shall be supplied successively to all parts of the circuit..
The auxiliary and control circuits of switchgear and controlgear shall be considered to have passed
the tests if no disruptive discharge occurs during each test.
0553 F1BAAU670 0 10 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
3.2.4. Instruments
The following instruments are used:
- Test bench with variable voltage feeder up to 80KV
For more detail, see the list of testing instruments present in Quality Test Responsabile office; the
identification code of the used instrument is, usually, write also on the test report of the equipment
tested.
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 11 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
On the main circuit of the MV switchboards the industrial frequency testing voltage is applied for 1
minute in accordance with Table 1:
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 12 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
TABLE 1
Rated insulation Industrial frequency test voltage a.c.
voltage Ui (r.m.s.) (KV)
(r.m.s.) (KV) Between earth and phases On the insulating distance
(KV) (KV)
3,6 10 12
7,2 20 23
12 28 32
17,5 38 45
24 50 60
36 70 80
52 95 110
72,5 140 160
CEI EN 62271-1 / IEC 62271-1
During the test a bench for verification of industrial frequency properties up to 80KV is used. The
test is considered to have been passed if there is no puncture or flash-over.
0553 F1BAAU670 0 13 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
Voltage transformers, power transformers or fuses may be replaced by replicas reproducing the
same configuration of the high-voltage connections. Overvoltage protective devices may be
disconnected or removed.
TABLE 2
Distance between Peak voltage Service voltage Primary voltage Rated current
the two ball of the (KV) (KV) (V) (A)
spark-gap
(cm.)
0,5 16,8 11,9 56,6 16
1 31,7 22,4 106,6 21
1,5 45,5 32,2 153,3 28,5
2 59 41,8 199 41
2,4 70 49 203 52
3 85 60 286 72
3,3 99 70,2
CEI standard 42-11 / IEC 60052
c. Increase the voltage on the primary of the transformer up to have a spark between
the two balls; verify the voltage on the primary of the transformer (V1) on the
voltmeter in the bench;
d. Connect the switchboard to the secondary terminal of the step up transformer, in
place of the spark-gap;
e. Repeat the same procedure as in c) point up to V1;
f. This full value shall be maintained for 1 min.
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 14 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
NOTE 1: The reduction of the test voltage is motivated by the safety margin in the rated test
voltage values, which takes ageing, wear and other normal deterioration into account, and by the
statistical nature of the flashover voltage.
0553 F1BAAU670 0 15 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
- the test must be carried out by skilled people with proper instruction training and
informed on safety procedure.
3.3.4. Instruments
The following instruments are used:
- Instrument for the measurement of the resistance of the main circuit.
For more detail, see the list of testing instruments present in Quality Test Responsabile office; the
identification code of the used instrument is, usually, write also on the test report of the equipment
tested.
The measure shall be performed in a.c. voltage, by measuring voltage (V) or resistance (Ohm) ,
among the terminals of each pole.
The testing conditions have to be the nearest to those of reference during the type test.
The test apparatus shall have an environment temperature and the current shall be, during the test
between 50A and the thermic rated current.
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 16 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
The test is considered to have been passed if the resistance measure is no more than 1,2 Ru (with
Ru = resistance measured before verification of temperature-rise limits).
If the type tests of resistance measure and of verification of temperature-rise limits haven't been
performed, the routine test shall be performed to verify the resistance of the main circuits, without
any reference.
Sometime the Client provide to the inspector the measures and reference to compare the routine
to the type test.
3.4.4. Instruments
The following instruments are used:
- Insulation measuring device at a voltage of at least 500V (MEGGER).
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 17 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
For more detail, see the list of testing instruments present in Quality Test Responsabile office; the
identification code of the used instrument is, usually, write also on the test report of the equipment
tested.
TABLE 1
Rated insulation Rated insulation Minimum value to be
voltage Ui (V) voltage to earth Uo (V) measured for the insulation
resistance (KOhm)
Ui = 110 Uo = 64 Ri > 64
Ui = 230 Uo = 133 Ri > 133
Ui = 400 Uo = 230 Ri > 230
Ui = 690 Uo = 400 Ri > 400
0553 F1BAAU670 0 18 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
3.5. Instructions IT P 08: Operation tests with switchboard under voltage (LV)
3.5.1. Scope
It describes all the activity relating to the tests and to final fulfilment before shipping, in order to
assure that every supplied product and installation comply to the requested technical
specifications. This instruction describes the execution of "Operation tests with switchboard under
voltage (LV)".
3.5.4. Instruments
The following instruments are used:
- Test bench with variable voltage feeder
- Test bench with variable voltage feeder a.c.
- Test bench with variable voltage feeder d.c. .
For more detail, see the list of testing instruments present in Quality Test Responsabile office; the
identification code of the used instrument is, usually, write also on the test report of the equipment
tested.
0553 F1BAAU670 0 19 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
This test is carried out by feeding with rated voltage the auxiliary circuits of each cubicle and then
all the switchboard (LV switchboards and auxiliary circuits of MV switchboards).
The inspector, before starting this phase, operates a visual control on the wiring diagram in order
to find out possible project errors which could cause damages during the testing phase.
This control will help the inspector in the better knowing of the general operation of the equipment.
With the test bench in operation it is possible to check:
- the correct wiring of the switchboard in accordance with the diagrams;
- the operation of the electrical components of the switchboard such as: relays, metering,
measurement instruments, switches, pushbottons, signallers, etc.
- setting of electrical components
The test is considered satisfactory if no abnormalies occurs in comparison with the operating
required and described in the technical specifications.
Operations sequence
Electrical and mechanical interlocks and all the other control devices with a defined operation
sequence must be tested five times without interruptions in scheduled working conditions and for
the auxiliary circuits with the heaviest working parameters.
During the test no regulation can be done.
The test is considered satisfactory if auxiliary devices have properly operated, if they are, after the
tests, in good working conditions and if the operational strain remain the same before and after the
tests.
In case of sequence repeat, for example during FAT test, the number of operation to do can be
reduced to 1.
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 20 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
ENEL LV93
Painting Specification
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 21 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
3.6.4. Instruments
The instruments used for the following tests are described in the single paragraphs explaining the
working formalities of the test.
A special cure must be placed in the control of those dimensional measures most important for the
compartments coupling (in the workshop or to the plant).
Painting checks
The checks on painting refer to the internal procedure CASAGRANDE (ISOP 08.10 o ENEL
DY991), or, if present, to the Client Painting Specification.
During the final testing only some aspects of the painting are verified, as a most accurate control
takes place at the reception of the goods or through the painting certificate of the supplier. Painting
is made by external supplier.
The painting characteristics definitions, for the components for the job involved, is made through a
table (ISOP 06.21), for internal use of CASAGRANDE ELETTROCOSTRUZIONI S.P.A., or directly
on the Purchase Order to the supplaier, where are specified some or all the followings:
- paint color;
- quantity of the pieces of the set;
- commercial reference;
- type of finishing characteristics;
- particolar prescription.
0553 F1BAAU670 0 22 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
This verification is similar to that at the reception of the goods, so that only the 5% of the
switchboards are verified. Indications about the methodology of the verification are defined on the
technical instruction " ISOP 06.02". The result is positive if all the measure are up to the minimum
required value.
- IRREGULARITY: the inspector shall verify eventual irregularity in the painting surfaces
and correct it.
Special finish
The special finish listed below are normally done by external supplier.
During the final checks only some aspects are verified, as a control take place at the reception of
the goods or at the supplier premise or through supplier report / certificate:
- cold galvanizing: check of the minimum thickness, of the uniform distribution, and of
- eventual irregularities (standard UNI EN ISO 2081);
- hot galvanizing: check of the minimum thickness, of the uniform distribution, and of
eventual irregularities;
- epoxy resination: check of the uniform distribution, and of eventual irregularities;
- bars treatment (silvering, nicheling..) : check of the uniform distribution in the contact
zones.
0553 F1BAAU670 0 23 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
It shall be verified:
- conductors numeration, colour and cross section in compliance with the prescriptions
of the wiring diagrams or operating drawings;
- conductors correct positioning in compliance to the identification and to the wiring
diagram;
- easy accessibility to conductors.
For some kind of panels equipping ENEL (Italian National Electrical Company) substation up to
380kV it is possible to use a machine "Sistema prova cablaggi KTX 40" (D 003), capable to effect
only resistive measures.
The system uses a personal computer; it is possible to prepare a program for each kind of
equipment to test. The result of the test is printed on a ticket.
Must be checked conformity to the standards and to the project documents in according also to the
client specification.
Each assembly shall be provided with one or more plates, marked in a durable manner and located
in a place such that they are visible and legible when the assembly is installed.
The following information shall be given on the nameplates of MV and LV switchboards:
- manufacturer's name or trade mark;
- CE marking for LV switchboard, if applicable;
- type designation or identification number or other means of identification making it
possible to obtain relevant information from the manufacturer, as follow:
- job number.
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 24 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
Only for MV switchboards, the following information shall be given on the nameplate:
- rated voltage;
- rated insulation voltage;
- rated frequency;
- rated current;
- short time withstand current (1 sec.).
- construction year
- designation and/or classification IAC
0553 F1BAAU670 0 25 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
- when removable or withdrawable parts are equipped with metal supporting surfaces,
these surfaces are considered sufficient for ensuring continuity of protective circuits
provided that the pressure exerted on them is sufficiently high;
- for lids, doors, cover plates and the like, the usual metal screwed connections and
metal hinges are considered sufficient to ensure continuity provided that no electrical
equipment is attached to them. If apparatus with a voltage exceeding the limits of extra- low
voltage are attached to lids, doors, cover plates, etc., steps shall be taken to ensure
continuity of the protection circuits. It is recommended that these parts be fitted with a
carefully attached protective conductor whose cross-sectional area depends on the
maximum cross-section of the supply lead to the equipment attached. An equivalent
electrical connection especially designed for this purpose (sliding contact, hinges
protected against corrosion) shall also be considered satisfactory;
- when the enclosure of an assembly is used as a part of the protection circuit, the cross-
sectional area of this enclosure shall be at least electrically equivalent to the minimum
cross-sectional area specified in Table 1
- the protective circuit shall be interrupted only after the live conductors have been
interrupted and continuity shall be established before the live conductors are reconnected;
- in principle protective circuits within an assembly shall not include a disconnecting
device (switch, disconnector, etc.). The only means permitted in the run of protective
conductors shall be links which are removable by means of a tool and accessible only to
authorized personnel.
Continuity of protective circuits shall be ensured also in case of parts connected with metal painted
parts. In the connection zone it shall be necessary to remove the layer of varnish.
IMPORTANT: in general, it shall be verified that the different exposed conductive parts of the
assembly are effectively connected to the protective circuit.
A measurement may be carried out to verify that the resistance between the terminal for the
incoming protective conductor and the relevant exposed conductive part of the assembly is
sufficiently low.
The cross-sectional area of the protective conductor shall be not less than the appropriate value
shown in Table 1:
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 26 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
TABLE 1
Cross-sectional area of phase Minimum cross-sectional area
conductors of the corresponding
S protective conductor
(mmq.) Sp
(mmq.)
S < 16 S
16 < S < 35 16
S > 35 S/2
These values are valid only if the protective conductor is made of the same metal as the phase
conductors. If this is not so, the cross-sectional area of the protective conductor is to be
determined in a manner which produces a conductance equivalent to that which results from the
application of Table 1.
Degree of protection
The degree of protection provided by any assembly against contact with live parts, ingress of solid
foreign bodies and liquid is indicated by the designation IP according to IEC 60529
The degree of protection must be verified with a visual inspection.
It is indicated by the designation IP and by two characteristic numerals:
- the first characteristic numeral represents "the protection against contact and protection
against ingress of solid foreign bodies";
- the second characteristic numeral represents "the protection against harmful ingress of
water";
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 27 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
TABLE 2
1st Characteristic numeral 2nd Characteristic numeral
(CEI 70-1; IEC529) (CEI 70-1; IEC529)
IP TESTS IP TESTS
No protection No protection
0 0
Protection against solid bodies Protection against the vertical falling
1 greater than 50 mm. 1 of drops of water
Protection against solid bodies Protection against the vertical falling
2 greater than 12 mm. 2 of drops of water (max inclination
15°)
Protection against solid bodies Protection against the vertical falling
3 greater than 2,5 mm. 3 of drops of water (max inclination
60°)
Protection against solid bodies Protection against sprays of water
4 greater than 1 mm. 4
Protection against dust (no harmful Protection against jets of water from
5 deposit) 5 all directions
Total protection against dust Protection against projection of
6 6 waters similar to marina swells
All the tests shall be carried out in conformity to the mechanical and electrical drawings, taking into
account creepage and clearance distances for each apparatus.
If necessary, these clearances and creepage distances shall be verified by measurement.
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 28 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
If the assembly contains withdrawable parts, it is necessary to verify that both in the test position, if
any, and in the disconnected position, the clearances and creepage
distances are complied with.
0553 F1BAAU670 0 29 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
Main reason of the segragation is to allow operation, maintenance, inspection or other operations
in the maximum safety also with the service continuity of the network.
See table below:
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 30 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
DIN 267
3.7.4. Instruments
The instruments used for the following tests are described in the single paragraphs explaining the
working formalities of the test.
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 31 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
0553 F1BAAU670 0 32 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
3.7.7. Annex
See table SCH 19
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 33 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
0553 F1BAAU670 0 34 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
The tightening torque for the fixing and connection of Copper bars, with Cold galvanized steel
bolts, must be reduced of 15% with reference to the Resistance category 8,8: see Table 2.
The tightening torque for the fixing and connection of Copper bars, with Stainless steel bolts, must
be reduced of 25% with reference to the Table 1 Resistance category 8,8; the same values must
be applied for the threaded connection elements used in the cubicle assembling and for the MV
support insulator fixing: see Table 3.
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no. rev. page of
0553 F1BAAU670 0 35 35
WEST DAMIETTA Power Project Phase II
Converting existing Simple Cycle to PGESCo No. Classe di Riservatezza 2
confidential class
Combined Cycle 10069A-CP-106
The tightening torque for the fixing and connection of Aluminium bars, with Stainless steel bolts,
must be reduced of 45% with reference to the Table 1 Resistance category 8,8: see Table 4.
Furthermore, for this last kind of bars, these value must be considered together with plate washer
of big diameter (type UNI 6593), or with plastic washer (type DIN 2093), which allow a more
uniform distribution of the connection pressure; the bolts are self locked type.
The tightening torque for the fixing and connection of Copper bars, with Stainless steel bolts on
bushing and post insulators with brass insert, must be according to the Table 5.
Nominal Tightening torque
Bolt MA (N·m) 1 kg·m =
section
9.81 N·m
M4 -
M5 -
M6 9,8
M8 19,6
M10 29,4
M12 39,2
M14 -
M16 68,7
M18 -
M20 117,7
Table 5
Tightening torque tolerance +-10%
(Table are derived from the technical characteristic of the bolts and nuts used, considering the
attrition coefficent of the material coupled).