Rts Using+excel
Rts Using+excel
Selected Units are always exceed peak calculation. For example, a 3 TR fan coil unit will be
selected to deliver a capacity of 2.7 TR as the lower standard size (2.5 TR) cannot be selected
FCU-1
FCU-3 1000 1400
FCU-6 cfm 2.5 TR cfm
1000 cfm 3.5 TR
FCU-05
2.5 TR
FCU-06’ 1600 cfm FCU-2
1200 cfm 4 TR FCU-4
1000 cfm
3 TR 800 cfm
2.5 TR
2 TR
FCU-07
1600 cfm Units
4 TR
Distribution
1200 cfm-3 TR
FCU-08
FCU-11
1600 cfm
4 TR
1600 cfm
4 TR
FCU-11 39
1600 cfm
4 TR TR
3.5
2.5 2.5 TR
TR
TR
3 TR 2.5
4 TR 2 TR
TR
13.5
2 TR 22 TR; N
TR; +
W 2 TR 15 TR; S
3-TR
4 TR 4 TR
4 TR
Total Cooling Load Required: 26.69 TR
as Per Dubai Municipality Calculator
for the hall space as One Zone
TOTAL LOAD BTU/HR CFM
without Treated FA
Total Grand Load 320,312 Supply Air 13680
Total
259,928 Return Air 12712
Sensible Heat
Total
60,384 Out Door Air 968
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
26.69 49.61 2.12 1.64
40
35
30
25
20
15
10
0
Total Selected Load Total Design Load/RM Total Design Load TDL-with Treated FA Max. TR for Given Flow
Given
• Total Calculated Cooling load for each Office individually
indicates that the peak load is 28.9 TR (2.735 Ltr/sec). While
Calculated Load for the hall area is: 26.69 TR (2.526 Ltr/sec)
TR Equipment has been selected In order to deliver the
proper sensible and latent load of all spaces. Due to
standardization of cooling equipment such as fan coils, it is
not possible to exactly match the cooling capacity of space
with the nominal capacity of the equipment. For example, a 3
TR fan coil unit will be selected to deliver a capacity of 2.7 TR
as the lower standard size (2.5 TR) cannot be selected.
Therefore, the total nominal capacity of the equipment used
is 39 TR (3.69 Ltr/sec).
West Zone
BTU/HR CFM
TOTAL LOAD without Treated FA
Total Grand Load 172,918 Supply Air 7946
Total
150,967 Return Air 7573
Sensible Heat
Total
21,951 Out Door Air 373
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
14.41 91.83 4.22 0.606
Total Cooling Load Required: 6.08 TR
as Per Dubai Municipality Calculator
Considering that Fresh Air Supply is: 15’C
North Zone
BTU/HR CFM
TOTAL LOAD with Treated FA
Total Grand Load 72,998 Supply Air 3549
Total
67,440 Return Air 3549
Sensible Heat
Total
5,559 Out Door Air
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
6.08 28.27 1.37 0.256
North Zone
BTU/HR CFM
TOTAL LOAD without Treated FA
Total Grand Load 121,419 Supply Air 4806
Total
91,314 Return Air 4295
Sensible Heat
Total
30,104 Out Door Air 511
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
10.12 47.02 1.86 0.426
Total Cooling Load Required: 4.56 TR
as Per Dubai Municipality Calculator
Considering that Fresh Air Supply is: 15’C
South Zone
BTU/HR CFM
TOTAL LOAD with Treated FA
Total Grand Load 54,723 Supply Air 2655
Total
50,438 Return Air 2655
Sensible Heat
Total
4,285 Out Door Air
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
4.56 27.49 1.33 0.192
South Zone
BTU/HR CFM
TOTAL LOAD without Treated FA
Total Grand Load 92,047 Supply Air 3623
Total
68,842 Return Air 3229
Sensible Heat
Total
23,205 Out Door Air 394
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
7.67 46.24 1.82 0.323
TRIMEX Orientation
3.5
2.5 2.5 TR
TR
TR
3 TR 2.5
4 TR 2 TR
2 TR TR
+
2 TR
3-TR
When
4 TR 4 TR Distribute
4 TR the Cooling
Load for
Zones
Office can be divided in to 3 Zones
40
35
30
25
20
15
10
0
Total Total Design Total Design TDL-with Max. TR for West Zone West Zone North Zone North Zone South Zone South Zone
Selected Load/RM Load Treated FA Given Flow with T.FA without T.FA with T.FA without T.FA with T.FA without T.FA
Load
Given
• West Zone needs 11.47 TR (1.36 Ltr/sec) at its peak around
4:00 P.M. (Assuming units are working at full capacity).
• While North Zone needs 6.08 TR (0.575 Ltr/sec) at its peak
(Knowing that north zone had the least heat load).
• While South Zone needs 4.56 TR (0.432 Ltr/sec) at its peak
around 12:00 P.M. (Knowing that north zone had the least
heat load).
• It is true that the total required Flow at Peaks (2.09 Ltr/sec) is
still exceeding the maximum given flow of (1.462 Ltr/sec)
Okay
Peak of Heat Load
• Design & selection
of A/C system
depends on Peak
the Peak.
• Peak is at Hour
16:00 (4:00 P.M.)
Time 4 8 12 16 20 24
What do we mean by Diversity ?
Since the sun rays are not
direct on all the building
orientation at the same
time: The Peak can’t
happen at all zones at
the same time
Conclusion: That S
More Okay
• To higher Delta-T of flowing chilled water at TriMex Offices,
we design our piping system to connect both Supply & Return
in Common headers to divert the limited chilled water to
where it needs more.
• Selected FCUs are design for DC-Delta-T of 16’, by cycle the
water more than 10 times facing air, also by creating more coil
resisterant.
• Utilizing the benefits of eDPCV (Electronic Pressure
Differential Control Valve) will slow the water velocity to allow
crossed air to absorbe maximum cooling with least amount of
water.
More Reduction of HL
Fact:
CONDUCTION How heat is transferred
86% RADIATION
7%
100 % of Sun
Heat 7%
Load
CONVECTION
Existing Glass Showing Reflecting Film at
50% of the Glass
Using BTU/ft2 Meter
Electronic Pressure Differential Control Valve
Which Side
has the
Film??????
We Advice to Use
More Reflecting Films
Possible to use
Reflecting Film
that are Clear with
Maximum Light
Penetration While
Reflecting Max.
Heat
Best Film
Most
Challenging
Side
39
TR
More Accurate Calculation Methods:
For
more
Load
Analysis
& divide
for
more
zones
Without any load for Fresh Air, since Building
provide Fully Treated Fresh Air & Exhaust
Total Cooling
Load: 16.8 TR
Min
1.8 cfm/ft2
Summary:
https://www.facebook.com/groups/780970768708352/
www.alsadarah.net
https://www.linkedin.com/in/juma-yousef-j-saleh-
%D8%AC%D9%85%D8%B9%D8%A9-%D9%8A%D9%88%D8%B3%D9%81-
%D8%AC%D9%85%D8%B9%D8%A9-%D8%B5%D8%A7%D9%84%D8%AD-
9941b049/