Roadworks Rates

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Portal RATOL & Rates PreMo

CAWANGAN KONTRAK DAN UKUR BAHAN 03.09.2018

Work Item Unit Overall Average (RM)


ROADS, HARDSTANDING, FOOTPATHS AND no. Location Range (RM) Average (RM) RM 3300.00
PAVINGS
D 1500.00 - 6900.00 3300.00
ROADS, HARDSTANDING, FOOTPATHS AND
PAVINGS
ROAD WORKS
Core Test
Obtain core sample by approved method and carry out
all tests as works proceed or on completion of the
roadworks as specified.

1/2
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 03.09.2018

Nota Catatan
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

u.p: En Husnan Husin


Tel: 03-26161111
Email: husnan@jkr.gov.my

2/2

You might also like