PROPOSED LANDSCAPE DESIGN AT KITAR LARIS, ASIQS,

BUKIT CHERAKAH, PUNCAK ALAM.

: BILL NO. 1 : SOFTSCAPE

Prepared by: PUTERI NAJWA BINTI MOHAMMAD ESA


Matric no. 2022659694
Bill of quantities (Softscape)

NOMINATED SUB-CONTRACT FOR – SOFT LANDSCAPING WORKS FOR LANDSCAPE DESIGN AT KITAR
LARIS, ASIQS, BUKIT CHERAKAH, PUNCAK ALAM,

Bill of Quantities 1-Softscape


Rate
NO. Description Unit Qty Amount (RM)
(RM)
B1 SOFTSCAPE
1 SITE CLEARANCE
1.1 The contarctor shall be deemed to have visited and examined the site area and its
surrounding area to obtain to himself necessary information as to risks, L/S 1
contigencies and all circumtances influencing and effecting work.

2 HOLE EXCAVATION (PROVASIONAL QUANTITIES)


2.1 Rate quotes to include cost to supply of labour, equiption, tools, machinery and
others deem necessary to execute the works as stipulated in contract.
Trees : 1.0 m length X 1.0 m width X 1.0 m depth nos 59 100 5,900.00
Shrubs : 0.5 m length X 0.5 m width X 0.5 m depth nos 2127 55 116,985.00
3 SOIL MIXTURES (PROVISIONAL QUANTITIES)

3.1 Rate to include supply all labour, tools, transportation, hoisting, etc and supply of
soil mix to fill excavated hole/pit and ran to height of 4"above the surroundings
for plant materials including trees, shrubs, groundcovers and turfing. (To check
site conditions prior to estimates)
i) Soil mix backfilling for trees m² 15 37 555.00
iii) Soil mix backfilling for shrubs m² 100 37 3,700.00

4 STAKING (PROVISIONAL QUANTITIES)


4.1 Rate to include supply of labor, transportation, tools, machinery
staking woods, rubber protection, ties etc for following plant size:
i) Trunk dia 3.0" and above - 'H' Stake nos 90 7 630.00
ii) Trunk dia 3.0" and below- 3 stakes nos 60 7 420.00
5 MULCHING
5.1 To supply and lay 50mm thk. Coconut fibre onto the trees, palms and shrubs area
nos 50 2 100.00

6 SUBSOIL DRAINAGE

6.1 Subsoil Drainage (Provisional quantities)


100mm dia approved corrugated and perforated PE pipe "Ribfle" or approved
equivalent as sub soil drainage laid to fall and including one layer of geotextile nos 300 9 2,700.00
membrance wrapped around,backfill with and 50mm thk. sand on top of pipe.
TO COLLECTION 132,140.00

[1/1/3]
Bill of Quantities (Softscape)

NOMINATED SUB-CONTRACT FOR – SOFT LANDSCAPING WORKS FOR LANDSCAPE DESIGN AT KITAR
LARIS, ASIQS, BUKIT CHERAKAH, PUNCAK ALAM,

Bill of Quantities 1-Softscape


Qty Rate Amount
NO. Description Unit
(RM) (RM)
B2 SOFTSCAPE
7 PLANTING (PROVISIONAL QUANTITIES)
Rate to include cost for supply of labor, supervision, tools, machinery
transportation, hoisting, mulching and others deem necessary for the execution of
the works.

7.1 TREES
Parkia speciosa
a nos 13 150 1,950.00
Petai

Khaya Senegalensis
b Senegal khaya nos 13 200 2,600.00

Mangifera indica
c Mangga nos 3 150 450.00

Mimusops elengi
d nos 10 150 1,500.00
Cherry
Terminalia mantaly
e nos 11 200 2,200.00
Madagascar almond
Hopea odorata
f nos 9 200 1,800.00
Chengal pasir

7.2 SHRUBS

a Petunia hybrida
Petunia nos 315 12 3,780.00

Tagetes erecta
b nos 186 12 2,232.00
Aztec marigold

Calathea lutea
c nos 517 17 8,789.00
Cigar plant

Duranta erecta
d Kachang puteh nos 299 12 3,588.00

Pandanus pygmaeus
e Small screwpine nos 434 10 4,340.00

f Crinum asiaticum
nos 376 12 4,512.00
Spider lily
TO COLLECTION 37,741.00
[2/1/3]
Bill of quantities (Softscape)

NOMINATED SUB-CONTRACT FOR – SOFT LANDSCAPING WORKS FOR LANDSCAPE DESIGN AT KITAR
LARIS, ASIQS, BUKIT CHERAKAH, PUNCAK ALAM,

Bill of Quantities 1-Softscape


Rate
NO. Description Unit Qty Amount (RM)
(RM)
B3 SOFTSCAPE
PLANTING (PROVISIONAL QUANTITIES)
Rate to include cost for supply of labor, supervision, tools, machinery
transportation, hoisting, mulching and others deem necessary for the execution of
the works.

7.3 AQUATIC PLANT


Nelumbo nucifera
a nos 24 19 456.00
Lotus

7.4 TURF GRASS


Axonopus compressus
b Cow grass m² 1172 1 1,172.00

TO COLLECTION 1,628.00

[3/1/3]
Bill of quantities (Softscape)

NOMINATED SUB-CONTRACT FOR – SOFT LANDSCAPING WORKS FOR LANDSCAPE DESIGN AT KITAR
LARIS, ASIQS, BUKIT CHERAKAH, PUNCAK ALAM,

Bill of Quantities 1-Softscape


Rate
NO. Description Unit Qty Amount (RM)
(RM)
B4 MAINTANANCE WORK
To carry out proper maintanance works which include watering, fertilizing,
pruning, soil loosening, site clearing, pest control and other maintanance works
and procedures as follows :-
7.5 WATERING
Watering all plant materials with moderate quantiity of water 2 times daily as TRIP 2186 80 174,880.00
following :-
Morning
Afternoon

7.6 WEEDING
Weed all planting areas areas using proper method and material twice a week and
m² 2186 0.15 327.90
also when necessary

7.7 PEST-CONTROL
Do inspection of all plant materials and locate any disease plant and do pest
control using suitable method based on plant disease. It need to be done twice a m² 2186 0.15 327.90
month and when necessary

7.8 PRUNING
The amount of pruning works shall be follow the necessary limit of plants itself.
m² 2186 0.3 655.80
It should be done twice a week and when necessary

7.9 FERTILIZING

The amount of fertilizing should follow N:P:K ratio and done by once a week m² 2186 0.15 327.90

8 CLEANING
All waste materials shall be continuously removed and all precautions need to beb
taken to avoid any damaged t existing structure. It need to be done three times a month 3 500 1,500.00
week and when necessary.
TO COLLECTION 178,019.50

[4/1/3]
Bill of quantities (Softscape)

NOMINATED SUB-CONTRACT FOR – SOFT LANDSCAPING WORKS FOR LANDSCAPE DESIGN AT KITAR
LARIS, ASIQS, BUKIT CHERAKAH, PUNCAK ALAM,

Bill of Quantities 1-Softscape


Rate
NO. Description Unit Qty Amount (RM)
(RM)
COLLECTION

B1 Page No. 1/1/3 132,140.00

B2 Page No. 2/1/3 37,741.00

B3 Page No. 3/1/3 1,628.00

B3 Page No. 4/1/3 178,019.50

TOTAL CARRIED FORWARD TO FINAL SUMMARY 349,528.50

[5/1/3]