Cable Meggering

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12
At a glance
Powered by AI
The documents provided are inspection reports for various electrical equipment installation and testing activities.

The reports cover inspections of lighting fixture installation, switchgear installation, UPS charger installation, cable tray installation, cabling work, earth pit installation and earth resistance testing.

Each inspection item lists the description, inspection status, remarks. Details like contractor name, project owner, location, references are also provided.

ESSAR OIL AND GAS EXPLORATION AND

PRODUCTION LTD
INSPECTION REPORT : LIGHTING FIXTURE INSTALLATION

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

Fixtures Installed
Sl No Description Inspection status
Type Quantity
1 Installation of light fixtures
2 Installation of Swicthes / Sockets
3 Installation of LDB & Dressing of Cables inside DB.
4 Earthing of light fixtures & DBs
5 Operation of light fixture with lighting DB
Installation and functioning of exhaust fan & ceiling
6
fans.
7 Installation of Fixtures on light pole
8 Installation of FLP Junction Box.
9 Earthing of pole, light fixture & Junction boxes

10 Operation of External lighting fixtures with lighting DB

REMARKS : - ______________________________________________________________________________
______________________________________________________________________________

NAME

SIGNATURE

DATE

FOR CONTRACTOR EOGEPL


ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : SWITCHGEAR INSTALLATION

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

Sl. No Description Inspection status Remarks

1 Permanent installation & allingment of panel

2 Input / Output cable glanding & termination

3 Panel interconnections

4 Earthing of Panels

5 All bolted connection tightness

6 Termination of cable and wiring continuity.

Megger check of incoming and out going cables and


7
panel as a whole
8 Check of all accessaries for proper functioning.

REMARKS : - ______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

NAME

SIGNATURE

DATE

FOR CONTRACTOR EOGEPL


ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : UPS CHARGER INSTALLATION

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

Sl. No Description Inspection status Remarks

1 Alignment and fixing of Charger / Inverter

2 Cable glanding and Termination

3 Inter panel connection and wiring

4 Cleaning of panel

5 Earthing of panel

6 Megger check

REMARKS : - ______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

NAME

SIGNATURE
DATE
FOR CONTRACTOR EOGEPL
ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : CABLE TRAY INSTALLATION

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

Sl.No Description Inspection status Remarks

1 Welding and Alignment of tray supports.

2 Painting of suppoprts.

3 Installation of cable tray / Covers

4 Earthing of cable trays / Covers.

REMARKS : - ______________________________________________________________________________

______________________________________________________________________________

NAME

SIGNATURE

DATE
FOR CONTRACTOR EOGEPL
ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : CABLING REPORT

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EOGEPL/VAD/QAC/FM – 001-1A

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

CABLES
DEPTH OF DRESSING /
CABLE BRICKS TAGGING / MARKER ON
SR.NO FROM TO CABLE SAND
CABLE AND
TAG NO. COVERING OF CABLES
TRENCH BEDDING ALONG ROUTE

REMARKS : - ______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

NAME

SIGNATURE

DATE

FOR CONTRACTOR EOGEPL


nch layout Drawing

REMARKS

EPL
ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : INSTALLATION OF EARTH PIT

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA :
DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

Sl.No Description Inspection status Remarks

1 Depth of Earth Pit

2 Positioning of Earth Electrode

3 Filling of Salt & Coal/ Back fill Compound

4 Laying of Earth Grid

5 Dimensions of earth strip - Cu / GI

6 Welding of earth strip

7 Earth resistance of earth electrode and grid.

8 Watering arrengement

REMARKS : - _________________________________________________________________________________________
______________________________________________________________________________

NAME
SIGNATURE
DATE
FOR CONTRACTOR EOGEPL
ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : EARTHING RESISTANCE REPORT

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

EARTH RESISTANCE REMARKS


EARTH PIT
SL.NO AREA / LOCATION WITHOUT
NO. WITH GRID
GRID

REMARKS : - _________________________________________________________________________________________
______________________________________________________________________________

NAME

SIGNATURE

DATE
FOR CONTRACTOR EOGEPL
ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : EARTHING RESISTANCE REPORT

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

EARTHING STRIP LAYED SIZE OF CONDUCTOR Cu LENGTH OF


SL.NO REMARKS
FROM TO / GI / PVC WIRE STRIP

REMARKS : - _________________________________________________________________________________________
______________________________________________________________________________

NAME
SIGNATURE
DATE
FOR CONTRACTOR EOGEPL
ESSAR OIL AND GAS EXPLORATION AND PRODUCTION LTD
INSPECTION REPORT : CABLE MEGGERING REPORT

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EOGEPL/VAD/QAC/FM – 001-1B

STATION : REPORT NO:

LOCATION / AREA : DATE :

No of cores x INSULATION RESISTANCE IN M.OHMS.


TYPE / CONTINUITY
SR.NO CABLE TAG NO. Size of cable
Voltage RY YB BR RN YN BN RE YE BE NE TEST
Cu/Al

REMARKS : - ______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

NAME
SIGNATURE
DATE
For CONTRACTOR EOGEPL