Welljet Lateral Jetting
Welljet Lateral Jetting
Welljet Lateral Jetting
Through
New and Proven Technologies
A Subsidiary Of
• Reservoir Modeling
• Reservoir Simulation
• Geologic Modeling
Oil & Gas wells up to 8000 ft. depth with riser. Wells at depth of 8,000-16,000 ft.
will require an injector head.
16,000 ft.+ Evaluation
Casing size: ranging from 4.5”-9 5/8”.
Casing grade: J55, N80 and P110. Well deviation: no more than 35°
deviation of well-bore.
Well must have good casing cementation.
PROCESS - STAGE 1
• • Using
Using5/8”
5/8”coil
coiltubing,
tubing,run
runmud
mudmotor
motorwith
withflex
flexshaft
shaft
and
andmilling
millingbit
bitinto
intohole.
hole.
• • Mill
Millhole
holethrough
throughcasing
casingat
attarget
targetazimuth.
azimuth. Typical
Typical
time
timefor
formilling
millingisis40
40minutes
minuteswith
withconfirmation
confirmationring
ring
on
onbit.
bit.
•Run in hole 100M (300 Ft.) flexible hose with jet nozzle
attached to 5/8” coiled tubing.
BHA
•Jet Stays in
formation placemilled hole out into formation
through
with ability to jet laterals up to 100M (300ft.)
•Once desired length of lateral has been reached,
back jetting slowly at high pressure to make bigger
channel.
THE LATERAL JETTING PROCESS
PLEASE VIEW
The lateral hole created will improve the flow channel, and increase the
migration efficiency deep into formation.
Bottom
Hole
Standard Assembly
Nozzles Placed On
Used for Production
Certain Tubing
Formations
Centralizers
Diverter
Shoe
Nozzles
STANDARD NOZZLE
Nozzle rotates at 18,000 Revolutions Per Minute which is 300 Revolutions Per
Second.
Develops up to 15,000 psi at formation!!
Harmonically Balanced Nozzle allow for straight laterals.
New Technology – Only rotating nozzle in the world used in lateral jetting!
TESTING ROCK
Old Style Nozzle New Rotating Nozzle Rotating Nozzle Exits in less
than 1 minute.
EXIT HOLE
LEADING IN NEW TECHNOLOGY
INCLUDING FIRST EVER ROTATING NOZZLE APPLICATION
PLEASE VIEW
So with use of new rotating nozzle and our new FF01 chemical we can increase
flow channel to well bore with no damaging of formation like conventional
perforating will do.
SIMULATION ARGENTINA WELL
CONDUCTED BY UNIVERSITY OF KS
PUBLISHED
Sandstone ChileRESULTS
1 8.2 BOPD 51 522%
Sandstone Kazakhstan 20 410 BOPD 1161 183%
Published results by
Tethys Petroleum of
a 5 well project in
Uzbekistan.
Tracking of Laterals
HighPressure Unit - More horsepower at the nozzle
up to 15,000 PSI
Innovative Chemicals, green, safe and
environmentally friendly Earthborn-Kerui
UltraSeries FF-01 to enhance production through
new and improved chemical technologies.
Down-HoleChemistry Consultant to maximize
hydrocarbon delivery.
ACHILLES CERTIFIED
Welljet is proud to
be
RePro-Certified