Gudang 9x9
Gudang 9x9
Gudang 9x9
A UPAH
1 Upah Pekerja
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 2 3 4
1 Pekerja OH 72,600.00
2 Tukang OH 93,500.00
3 Tukang Batu OH 93,500.00
4 Tukang Kayu OH 82,500.00
5 Kepala Tukang OH 99,000.00
6 Tukang Las OH 93,500.00
7 Tukang Besi OH 93,500.00
8 Tukang Pelitur OH 93,500.00
9 Tukang Cat OH 93,500.00
10 Kepala Tukang OH 90,000.00
11 Mandor OH 105,100.00
12 Tukang Pipa PVC OH 82,500.00
13 Tukang Pipa Besi OH 82,500.00
14 Tukang Listrik OH 82,500.00
15 Kepala Tukang OH 99,000.00
17 Tukang Alluminium OH 93,500.00
18 Kepala Tukang Alluminium OH 99,000.00
2 Bahan Atap
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 3 4
1 Nok Spandek T= 0.3 mm m' 33,500.00
2 Spandek 0,30 mm lebar 70 cm m' 46,200.00
3 Spandek 0,35 mm lebar 70 cm m' 49,500.00
4 Spandek 0.40 mm lebar 70 cm m' 92,950.00
5 Spandek 0.45 mm lebar 70 cm m' 99,000.00
6 Trimdek 0,25 mm m' 35,200.00
7 Trimdek 0,30 mm m' 41,250.00
8 Trimdek 0,35 mm m' 47,850.00
3 Bahan Kayu
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 3 4
1 Papan Kayu Klas I m3 20,564,000.00
2 Papan Kayu Klas II m3 15,578,800.00
3 Papan Kayu Klas III m3 5,608,400.00
4 Balok Kayu Klas I m3 19,940,800.00
5 Balok Kayu Klas II m3 14,955,600.00
6 Balok Kayu Klas III m3 4,985,200.00
7 Dolken / Perancah Dia 8-10 - 4 M batang 10,000.00
8 Papan kayu bekisting m3 5,608,400.00
9 Balok kayu bekisting m3 5,608,400.00
10 Lumbersering Kls I m2 484,500.00
11 Lumbersering Kls II m2 423,500.00
12 Kayu papan 3/20 kls II m2 14,955,600.00
13 Kayu usuk 5/7 bekisting m3 4,985,200.00
14 Kayu usuk 5/7 Kls II m3 19,940,800.00
15 Kayu reng 2/3 cm kls II m3 4,985,200.00
16 Kayu lis plapond m' 13,750.00
17 Penjaga jarak bekisting/spacer batang -
4 Bahan Bambu
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 3 4
1 Bambu (dia.12,5 cm, P - 6 m) batang 25,000.00
2 Bambu (dia.10 cm, P- 6 m) batang 21,800.00
3 Bambu (dia.7 cm, P- 6 m) batang 18,700.00
4 Bambu (dia.10 cm, P- 4 m) batang 10,000.00
5 Bedek kulitan m2 45,500.00
6 Bedek biasa m2 43,700.00
7 Bedek pagar m2 35,500.00
8 Bilik bambu m2 37,400.00
9 bedek 1/2 kulitan m2 42,900.00
5 Bahan Cetak
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 2 3 4
1 Box culvert 30 x 30 x 120 buah 671,000.00
2 Box culvert 50 x 50 x 120 buah 1,391,500.00
3 Box culvert 80 x80 x 120 buah 2,117,500.00
4 Buis Beton 1/2 linkaran Dia. 20 Cm x 80 cm bh 41,800.00
5 Buis Beton 1/2 linkaran dia.20 cm x 100 cm bh 48,400.00
6 Buis Beton 1/2 linkaran Dia. 30 Cm x 100 cm bh 52,800.00
7 Buis Beton1/2 linkaran Dia. 40 Cm x 100 cm bh 71,500.00
8 Buis Beton 1/2 linkaran Dia. 50 Cm x 100 cm bh 94,600.00
9 Buis Beton 1/2 linkaran Dia. 60 Cm x 100 cm bh 124,300.00
10 Bataco 10 x 20 x 40 Cm. buah 2,970.00
11 Buis beton dia.30 x 50 cm buah 44,000.00
12 Buis beton dia 40 x 50 cm buah 60,500.00
13 Buis beton dia 60 cm x 50 cm buah 77,000.00
14 Buis beton dia 80 x 50 cm buah 93,500.00
15 Buis beton dia 10 x100 cm buah 62,700.00
16 Buis beton dia 20 x 100 buah 71,500.00
17 Buis beton dia 30 x 100 buah 85,800.00
18 Buis beton dia 40 x 100 buah 104,400.00
19 Buis beton dia 60 x 100 buah 132,000.00
20 Buis beton 80 x100 cm buah 172,700.00
21 Buis beton (sigaran) 40 x 40 x 100 buah 146,300.00
22 Buis beton(sigaran)30 x 45 x 100 buah 146,300.00
23 Buis beton(sigaran) 30 x 55 x 100 buah 169,400.00
24 grass block tebal 6 cm m2 132,000.00
25 grass block tebal 8 cm m2 148,500.00
26 Kansteen 20x20x40 cm bh 44,000.00
27 Kansteen 15x30x50 cm bh 49,500.00
28 Lubang Angin Bata 10 x 20 cm bh 8,800.00
29 Lubang Angin Bata 20 x 20 cm bh 9,900.00
30 Lubang Angin Bata 30 x 30 cm bh 11,000.00
31 Lubang Angin beton 20 x 20 cm bh 11,000.00
32 Lubang Angin beton 20 x 30 cm bh 16,500.00
33 Lubang Angin Palimanan 20 x 20 cm bh 33,000.00
34 Lubang Angin Palimanan 30 x 30 cm bh 44,000.00
35 Panel Beton Bertulang 240 x 40x5 cm lembar 126,500.00
36 Panel Beton Bertulang 240 x 50x5 cm lembar 139,700.00
37 Tiang Panel beton bertulang m' 115,500.00
38 Paving Block Type bata 20 x10 cm tebal 6 cm ( K 100) M2 77,000.00
39 Paving Block Type segi tiga berlian tebal 6 cm ( K 100) M2 77,000.00
40 Paving Block Type kotak 20 x20 cm tebal 6 cm ( K 100) M2 77,000.00
41 Paving Block Type segi enam 18 x18 cm tebal 6 cm ( K 100) M2 77,000.00
42 Paving Block Type bata 20 x10 cm tebal 6 cm ( K 200) M2 93,500.00
43 Paving Block Type segi tiga berlian tebal 6 cm ( K 200) M2 93,500.00
44 Paving Block Type kotak 20 x20 cm tebal 6 cm ( K 200) M2 93,500.00
45 Paving Block Type segi enam 18 x18 cm tebal 6 cm ( K 200) M2 93,500.00
46 Paving Block Type bata 20 x10 cm tebal 6 cm ( K 300) M2 110,000.00
47 Paving Block Type segi tiga berlian tebal 6 cm ( K 300) M2 110,000.00
48 Paving Block Type kotak 20 x20 cm tebal 6 cm ( K 300) M2 110,000.00
49 Paving Block Type segi enam 18 x18 cm tebal 6 cm ( K 300) M2 110,000.00
50 Paving Block Type bata 20 x10 cm tebal 8 cm ( K 100) M2 84,150.00
51 Paving Block Type kotak 20 x20 cm tebal 8 cm ( K 100) M2 84,150.00
52 Paving Block Type segi enam 18 x18 cm tebal 8 cm ( K 100) M2 84,150.00
53 Paving Block Type bata 20 x10 cm tebal 8 cm ( K 200) M2 99,000.00
54 Paving Block Type kotak 20 x20 cm tebal 8 cm ( K 200) M2 100,000.00
55 Paving Block Type segi enam 18 x18 cm tebal 8 cm ( K 200) M2 100,000.00
56 Paving Block Type bata 20 x10 cm tebal 8 cm ( K 300) M2 100,000.00
57 Paving Block Type kotak 20 x20 cm tebal 8 cm ( K 300) M2 118,000.00
#REF! Plat penutup Beton Dia 1m bh 80,000.00
6 Bahan Lantai
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 2 3 4
1 Batu Candi m2 159,500.00
2 Batu Candi Garis m2 213,000.00
3 Batu Granit ( Kerikil Sikat ) kg 12,650.00
4 Batu Hias bh 2,420.00
5 Batu Marino m2 151,800.00
6 Batu Paras m2 203,500.00
7 Batu Traso ( Kerikil Sikat ) kg 229,900.00
8 Granit Tile 40 x 40 m2 265,000.00
9 Granit 30 x 60 m2 253,000.00
10 Granit 60 x 60 m2 285,000.00
11 Karpet m2 103,840.00
12 Keramik Dinding 20 x 20 bh 1,980.00
13 Keramik Dinding 20 x 25 m2 3,781.25
14 Keramik Dinding 25 x 40 bh 7,700.00
15 Keramik Lantai KW I 30x30 m2 60,500.00
16 Keramik Lantai KW I 40x40 m2 12,941.18
17 Keramik Lantai KW I 60x60 m2 110,000.00
18 Keramik Lantai 30x30 m2 60,500.00
19 Keramik Lantai KW II 40x40 bh 11,945.70
20 Keramik Lantai KW II 60x60 m2 104,500.00
21 Keramik Artistik 10/20 m2 167,750.00
22 Keramik Artistik 5/20 m2 320,000.00
23 Marmer100 x 100 cm m2 322,000.00
24 Mozaik 30/30 m2 37,400.00
25 Parquet m2 144,100.00
26 Plint keramik artistik 10/10 m2 280,500.00
27 Plint keramik artistik 10/20 m2 168,300.00
28 Plint keramik 10/30 m2 15,500.00
29 Plint Geranittle 10/40 m2 35,000.00
30 Plint keramik artistik 5/20 m2 119,900.00
31 Plint ubin abu-abu 15/20 m2 31,900.00
32 Plint ubin abu-abu 10/40 m2 47,300.00
33 Plint ubin abu-abu 15/30 m2 31,900.00
34 Plint ubin granit 10/30 m2 210,100.00
35 Plint ubin granit 10/40 m2 210,100.00
36 Plint ubin teralux kerang 10/30 m2 227,700.00
37 Plint ubin teralux kerang 10/40 m2 226,600.00
38 Plint ubin teralux marmer 10/30 m2 297,000.00
39 Plint ubin teralux marmer 10/40 m2 323,400.00
40 Plint ubin teralux marmer 10/60 m2 270,600.00
41 Plint ubin teraso 10/30 m2 67,100.00
42 Plint ubin teraso 10/40 m2 57,100.00
43 Plint ubin warna 10/20 m2 56,100.00
44 Plint ubin warna 10/30 m2 55,000.00
45 Plint ubin warna 10/40 m2 27,500.00
46 Porselin 10/20 m2 72,600.00
47 Porselin 11/11 m2 72,600.00
48 Porselin 20/20 m2 77,000.00
49 Roster bali m2 278,300.00
50 Tegel abu-abu 20/20 cm m2 47,300.00
51 Tegel teraso klas 1 30/30 m2 58,300.00
52 Tegel teraso klas 2 30/30 m2 56,100.00
53 Tegel wapel 20/20 cm m2 49,500.00
54 Tegel warna 20/20 cm m2 49,500.00
55 Tegel warna wapel 20/20 cm m2 47,300.00
56 teraso cor m2 755,700.00
57 Ubin abu-abu 20/20 m2 47,300.00
58 Ubin abu-abu 30/30 m2 47,300.00
59 Ubin abu-abu 40/40 m2 47,300.00
60 Ubin granit 30/30 m2 210,100.00
61 Ubin granit 40/40 m2 210,100.00
62 Ubin keramik 10/33 m2 79,200.00
63 Ubin keramik 20/20 m2 68,200.00
64 Ubin keramik 30/30 m2 68,200.00
65 Ubin keramik 33/33 m2 47,300.00
66 Ubin keramik 40/40 m2 71,500.00
67 Ubin keramik aristik 10/10 m2 88,000.00
68 Ubin keramik aristik10/20 m2 44,000.00
69 Ubin teralux kerang 30/30 m2 226,600.00
70 Ubin teralux kerang 40/40 m2 226,600.00
71 Ubin teralux marmer 30/30 m2 244,200.00
72 Ubin teralux marmer 40/40 m2 244,200.00
73 Ubin teralux marmer 60/60 m2 244,200.00
74 Ubin teraso 30/30 m2 67,100.00
75 Ubin teraso 40/40 m2 67,100.00
76 Ubin warna 20/20 m2 55,000.00
77 Ubin warna 30/30 m2 55,000.00
78 Ubin warna 40/40 m2 55,000.00
79 Undlayer/rubber corrugated m2 112,200.00
80 Vinly 30/30 m2 119,900.00
81 Vinly karet 30/30 m2 222,200.00
82 Wallpaper m2 38,500.00
1 Marmer palimanan
2 10 x 20 m2 156,200
3 15 x 30 m2 167,200
4 20 x 20 m2 167,200
5 20 x 30 m2 167,200
6 30 x 30 m2 190,300
7 30 x 40 m2 201,300
8
9 Marmerta
10 40 x 60 m2 390,500
11 20 x 40 m2 212,300
12 30 x 30 m2 290,400
13 40 x 40 m2 334,400
14
15 Marmer tengger
16 30 x 30 m2 267,300
17 40 x 60 m2 323,400
18 40 x 40 m2 301,400
19
20 Marmer batik
21 30 x 30 m2 212,300
22 40 x 40 m2 245,300
23 60 x 60 m2 334,400
24
25 Marmer lampung
26 30 x 30 m2 323,400
27 40 x 40 m2 376,200
28 60 x 60 m2 579,700
29 Marmer Bandung
30 15 x 30 m2 245,300
31 20 x 30 m2 267,300
32 30 x 30 m2 434,500
33 40 x 40 m2 443,500
34 40 x 60 m2 462,000
35 60 x 60 m2 475,200
36 Ornamen Lampu Motif Rumahan ( Batu Palimanan ) Tinggi 65 cm m2
37 Batu Palimanan m2
7 Bahan Besi
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 3 4
1 Akustik Ukuran 30x30 cm Lembar 19,250.00
2 Akustik Ukuran 30x60 cm Lembar 37,950.00
3 Akustik Ukuran 60x120 cm Lembar 149,600.00
4 Angkur Dack bh 6,380.00
5 Baut Mour bh 9,350.00
6 Besi Angkur dia 8mm kg 13,000.00
7 Besi beton polos kg 13,000.00
8 Besi Beton Ulir kg 14,000.00
9 Besi Beugel/ Baut Kuda-kuda bh 30,800.00
10 Besi Kuningan kg 145,200.00
11 Besi Pelat kg 18,300.00
12 Besi Frofil kg 18,300.00
13 Besi Pipa kg 18,300.00
14 Besi Profil Bleck Still kg 39,600.00
15 Besi Siku 30 x 30 x 3 mm kg 18,300.00
16 Besi Siku 50 x 50 x 5 mm kg 18,300.00
17 Besi Siku 50 x 50 x 6 mm kg 18,300.00
18 Besi Siku 60 x 60 x 6 mm kg 18,300.00
19 Besi Siku 70 x 70 x 7 mm kg 18,300.00
15 Besi Strip 30 x 3 mm kg 20,350.00
16 Besi Ulir Pintu Air dia 2" - Dia 2,5" kg 589,050.00
26 Roda pintu sorong bh 250,000.00
27 Roda pintu sorong gantung bh 200,000.00
17 Begel Komplit kg 42,900.00
18 Besi Tempa m2 300,000.00
19 Baut mata Bor untk Trimdeck bh 1,540.00
20 CSP 10-16 x 16 HGS bh 1,430.00
21 CTEKS 12 - 14 X 45 HGS bh 1,650.00
22 Jaring Kawat Baja dilas kg 1,430.00
23 Kawat Berduri kg 28,600.00
24 Kawat Beronjong 3 mm kg 33,550.00
25 Kawat Beronjong 4 mm kg 33,550.00
26 Kawat Harmonika Gas ( HG) m2 22,000.00
27 Kawat Ikat Beton kg 22,000.00
28 Kawat Las kg 37,400.00
29 Kawat Nayamuk Alumunium m2 44,000.00
30 Kawat Nayamuk Plastik m2 27,500.00
31 Klip- Lok MTEKS 10-16 x WHF bh 770.00
32 Kontra Mur dia 12 bh 47,190.00
33 Nok Zingkalum T=0,35 mm m' 143,000.00
34 Paku 1 cm - 3 cm kg 15,000.00
35 Paku 4 cm - 6 cm kg 15,000.00
36 Paku 5 cm - 10 cm kg 15,000.00
37 Paku 7 cm - 12 cm kg 15,000.00
38 Paku Asbes kg 27,500.00
39 Paku Eternit kg 27,500.00
40 Paku Kait kotak 27,500.00
41 Paku Skrup10 cm kg 11,000.00
42 Paku Skrup 5 cm kg 11,000.00
43 Paku Skrup bh 700.00
44 Paku Seng kg 27,500.00
45 Paku Sumbat kg 20,350.00
46 Paku Tahan Karat kg 27,500.00
47 Paku Triplek kg 22,000.00
48 Plat Strip Klem talang 4 mm kg 31,460.00
49 Besi Strip tebal 5 mm bh 12,000.00
50 Skrup Fixer bh 18,150.00
51 Skrup / Piles 1,5 cm kotak 11,000.00
52 Skrup / Piles 2 cm kotak 11,000.00
53 Topspan C75 Hi-Ten Tebal 0,6 TCT m2 12,650.00
54 Zilcalume C75 Hi-Ten Tebal 0,6 TCT m2 12,650.00
55 Zilcalume C75 Hi-Ten Tebal 0,8 TCT m2 16,500.00
56 Zilcalume C75 Hi-Ten Tebal 1,05 TCT m2 165,000.00
57 Zingkalum 0,30 mm Color L. 0.75 m m2 90,200.00
58 Zingkalum 0,35 mm Color L. 0.75 m m2 93,500.00
59 Zingkalum 0,40 mm Color L. 0.75 m m2 110,000.00
60 Zingkalum 0,45 mm Color L. 0.75 m m2 121,000.00
63 Kusen Alluminium m' 70,000.00
64 Rangka Jendela Alluminium m' 65,000.00
65 Rangka Pintu Alluminium m' 65,000.00
66 Kusen & Pintu PVC Toilet m' 70,000.00
67 Baut D 16 mm bh 160.00
68 Baut D 20 mm bh 200.00
69 Angkar Baut D 22 mm P= 40 cm bh 8,000.00
70 Angkar Baut D 24 mm P= 40 Cm bh 15,000.00
71 Triktang Dia 12 Panjang 8" bh 15,000.00
73 Rolling door aluminium m2 370,000.00
74 Profil aluminium m 41,666.67
75 Sealant Khusus tube 35,000.00
76 Aluminium Strip m 25,000.00
77 Profil kaca m 8,000.00
78 Rangka Metal m' 5,000.00
79 Hollow 40.40.2 mm kg 18,300.00
80 Tulisan Aladin T= 20 Cm Tebal 2 cm bh 80,000.00
81 Pisar Scerw Viles 2 cm bh 150.00
8 Bahan Langit-langit
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 3 4
1 Eternit 100 x 100 Cm lembar 27,500.00
2 Triplek 120x240x 2 mm lembar 57,750.00
3 Triplek 120x240x 3 mm lembar 50,000.00
4 Triplek 120x240x 6 mm lembar 93,500.00
5 Triplek 120x240x 4 mm lembar 90,000.00
6 Triplek 120x240x 9 mm lembar 120,000.00
7 Triplek 120x240x 12 mm lembar 192,500.00
8 Triplek 120x240x 18 mm lembar 291,500.00
9 Triplek lapis alluminium lembar 88,000.00
10 Calsiboard 120 x 240 x 3 mm lembar 94,050.00
11 Calsiboard 120 x 240 x 6 mm lembar 115,500.00
12 Gypsum board 120 x 240 x 9 mm lembar 80,000.00
13 Teakwoods 120x240x2 mm lembar 211,200.00
14 Teakwoods 120x240x3 mm lembar 88,000.00
16 Teak block 120x240x6 mm lembar 104,500.00
17 Teak block 120x240x9 mm lembar 179,300.00
18 Teak block 120x240x12 mm lembar 258,500.00
19 Teak block 120x240x18 mm lembar 297,000.00
#REF! List Gypsum M' 34,100.00
#REF! List Gypsum Profil 10 cm M' 34,100.00
#REF! List Gypsum Profil 5 cm M' 8,500.00
#REF! List Kayu M' 34,100.00
#REF! GRC (6 mm) lembar 171,600.00
#REF! GRC (9 mm) lembar 213,400.00
#REF! GRC (12 mm) lembar 246,400.00
#REF! Lem Kayu kg 44,000.00
#REF! Rangka Plafon Metal Furing m2 45,000.00
9 Bahan Pipa
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 3 4
Pipa GI Medium A
1 Pipa GI Ø 20 mm ( 0,7874 inc ) m' 40,400.00
2 Pipa GI Ø 25 mm ( 0,98425 inc ) m' 46,200.00
3 Pipa GI Ø 32 mm ( 1,25984 inc ) m' 58,300.00
4 Pipa GI Ø 40 mm ( 1,5748 inc ) m' 73,700.00
5 Pipa GI Ø 50 mm ( 1,9685 inc ) m' 93,500.00
6 Pipa GI Ø 63 mm ( 2,48031 inc ) m' 121,000.00
7 Pipa GI Ø 75 mm ( 2,952776 inc ) m' 145,200.00
8 Pipa GI Ø 90 mm ( 3,54331 inc ) m' 234,300.00
9 Pipa GI Ø 110 mm ( 4,33071 inc ) m' 295,900.00
10 Pipa GI Ø 160 mm ( 6,29921 inc ) m' 442,200.00
Pipa GI Medium B
1 Pipa GI Ø 20 mm ( 0,7874 inc ) m' 37,400.00
2 Pipa GI Ø 25 mm ( 0,98425 inc ) m' 52,800.00
3 Pipa GI Ø 32 mm ( 1,25984 inc ) m' 55,000.00
4 Pipa GI Ø 40 mm ( 1,5748 inc ) m' 66,000.00
5 Pipa GI Ø 50 mm ( 1,9685 inc ) m' 81,400.00
6 Pipa GI Ø 63 mm ( 2,48031 inc ) m' 104,500.00
7 Pipa GI Ø 75 mm ( 2,952776 inc ) m' 115,500.00
8 Pipa GI Ø 90 mm ( 3,54331 inc ) m' 196,900.00
9 Pipa GI Ø 110 mm ( 4,33071 inc ) m' 254,100.00
10 Pipa GI Ø 160 mm ( 6,29921 inc ) m' 398,200.00
Pipa PVC SC S 10
1 Pipa Ø 20 mm ( 0,7874 inc ) m' 4,000.00
2 Pipa Ø 25 mm ( 0,98425 inc ) m' 6,000.00
3 Pipa Ø 32 mm ( 1,25984 inc ) m' 10,000.00
4 Pipa Ø 40 mm ( 1,5748 inc ) m' 15,000.00
5 Pipa Ø 50 mm ( 1,9685 inc ) m' 24,000.00
6 Pipa Ø 63 mm ( 2,48031 inc ) m' 36,000.00
7 Pipa Ø 75 mm ( 2,952776 inc ) m' 52,000.00
8 Pipa Ø 90 mm ( 3,54331 inc ) m' 74,000.00
9 Pipa Ø 110 mm ( 4,33071 inc ) m' 112,000.00
10 Pipa Ø 160 mm ( 6,29921 inc ) m' 236,000.00
Pipa PVC RRJ S 10
1 Pipa Ø 63 mm ( 2,48031 inc ) m' 40,000.00
2 Pipa Ø 75 mm ( 2,952776 inc ) m' 56,000.00
3 Pipa Ø 90 mm ( 3,54331 inc ) m' 79,000.00
4 Pipa Ø 110 mm ( 4,33071 inc ) m' 117,000.00
5 Pipa Ø 160 mm ( 6,29921 inc ) m' 245,000.00
10 Bahan Kaca
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 3 4
1 Kaca Polos 3 mm m2 106,800.00
2 Kaca Polos 5 mm m2 133,400.00
3 Kaca Polos 10 mm m2 262,000.00
4 Kaca Riben Tebal 3 mm m2 102,700.00
5 Kaca Riben Tebal 5 mm m2 170,900.00
6 Kaca Riben 10 mm m2 291,000.00
7 Kaca Riben 12 mm m2 327,400.00
8 Kaca Buram 3 mm m2 138,300.00
9 Kaca Buram 5 mm m2 196,500.00
10 Kaca wire glass 8 mm m2 218,300.00
11 Kaca wire glass 5 mm m2 218,300.00
12 Kaca Buram Bermotif 3 mm m2 225,700.00
13 Kaca Buram Bermotif 5 mm m2 218,300.00
14 Kaca Cermin 5 mm m2 109,200.00
15 Glass Block buah 36,500.00
16 Kerangka Nako 5 mm m2 103,200.00
17 Kerangka Es 3 mm m2 109,200.00
11 Bahan Finishing
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 2 3 4
1 Amplas kayu Lbr 4,600.00
2 Plamir Kayu kg 29,400.00
3 Spiriyus Liter 16,400.00
4 Minyak cat Liter 12,200.00
5 Residu Liter 17,900.00
6 Teak Oil Liter 41,800.00
7 Melamin lembar 93,800.00
8 Alumunium Pintu kamar madi lembar 127,400.00
9 Meni besi kg 33,300.00
10 Meni Kayu kg 28,900.00
11 Cat kayu Mutu Menengah kg 61,200.00
12 Cat kayu mutu tinggi kg 91,700.00
13 Cat Tembok mutu menengah kg 67,900.00
14 Cat Tembok mutu tinggi kg/kaleng 114,900.00
15 Cat dasar kayu kg 35,700.00
16 Cat Besi kg 39,400.00
17 Cat Genteng kg 71,400.00
18 Kuas kg 11,500.00
19 Plamir kayu liter 23,000.00
20 Plamir tembok kg 11,100.00
21 tepung Gypsum Kg 21,500.00
22 Teer liter 7,900.00
23 Politur liter 65,100.00
23 Cat marka jalan ocalats Kg 95,600.00
24 Minyak cat liter 47,900.00
25 Aqua proof Kg 65,100.00
26 Cat marka jalan biasa Kg 77,800.00
27 Cairan pengupas cat Kg 231,300.00
28 Cairan pengeras cat ( Hardner) Kg 213,100.00
29 Roll cat buah 14,400.00
30 Kape buah 7,200.00
31 Sikat baja buah 20,100.00
32 Vernis liter 43,700.00
33 Willerood F kg 28,600.00
34 Soda Api kg 35,700.00
35 Seal tipe kg 5,000.00
36 Minyak begisting Liter 6,400.00
12 Bahan Pengunci
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 3 4
1 Kunci pintu mutu menengah buah 126,700.00
2 Kunci pintu mutu tinggi buah 356,900.00
3 Yale kecil buah 69,200.00
4 Yale besar buah 124,700.00
5 Kuda terbang kecil buah 71,000.00
6 Kuda terbang besar buah 88,300.00
7 Royal stel 59,200.00
8 Haag angin besar stel 8,100.00
9 Haag angin kecil stel 6,500.00
10 Grendel besar buah 14,800.00
11 Grendel Kecil buah 11,400.00
12 Engsel Nyilon ps 16,600.00
13 Engsel Biasa ps 11,200.00
14 Expagnolet buah 67,200.00
15 Kunci Tanam Biasa buah 109,200.00
16 Kunci Tanam Biasa Mutu Menengah buah 181,900.00
17 Kunci Tanam Antik buah 291,000.00
18 Kunci Silender buah 51,000.00
19 Kunci Slot buah 80,200.00
20 Door Holder buah 43,800.00
21 Door Closer buah 218,300.00
22 Door Stop buah 55,400.00
13 Bahan Sanitaire
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 3 4
1 Kloset Duduk Keramik buah 3,113,300.00
2 Kloset Jongkok Teraso buah 87,100.00
3 Kloset Jongkok Porselin buah 203,800.00
4 Wastapel buah 1,945,900.00
5 Urinior Porselin (Kualitas N0.1) buah 227,200.00
6 Saringan Air Besi Stainless buah 267,000.00
7 Saringan Air Plastik buah 19,700.00
8 Bak cuci piring teraso buah 305,100.00
9 Bak cuci Staenless Steel buah 371,100.00
10 Bak cuci piring Logam buah 454,200.00
11 Septictank Kapasitas 1 m³ buah 4,851,600.00
12 Septictank Kapasitas 2 m³ buah 6,421,100.00
13 Bak Fiberglass 0,3 m³ buah 937,000.00
14 Bak Fiberglass 1,00 m³ buah 392,900.00
15 Bak mandi plastik kap 0,5 m³ buah 454,200.00
16 Bak mandi porselin buah 436,500.00
17 Kran Air Dia. 1/2 " buah 19,800.00
18 Kran Air Dia. 3/4 " buah 21,900.00
19 Floor Drain buah 21,900.00
20 Seal Tape buah 3,800.00
21 Tangki Air Fiberglass 1000 Lt. Vertikal buah 6,135,700.00
22 Tangki Air Fiberglass 2000 Lt. Vertikal buah 9,274,900.00
23 Tangki Air Fiberglass 3000 Lt. Vertikal buah 12,271,400.00
24 Tangki Air Fiberglass 4000 Lt. Vertikal buah 17,693,500.00
25 Tangki Air Fiberglass 5000 Lt. Vertikal buah 24,542,700.00
26 Tangki Air Fiberglass 3000 Lt. Horizontal Buah 34,958,900.00
27 Tangki Air Fiberglass 4000 Lt. Horizontal Buah 49,227,800.00
28 Tangki Air Fiberglass 5000 Lt. Horizontal Buah 58,359,900.00
29 Tangki Air Fiberglass 6000 Lt. Horizontal Buah 67,420,700.00
30 Sumur Pompa Tangan Terpasang Buah 1,600,300.00
15 Bahan Listrik
BESARAN
NO. URAIAN SATUAN
P. Lombok
1 3 4
1 Stop Kontak Tanam buah 32,000.00
2 Stop Kontak Luar buah 16,500.00
3 Saklar ganda buah 22,000.00
4 Saklar tunggal buah 16,500.00
5 Box Skring 1 Grup buah 346,500.00
6 Box Skring 2 Grup buah 452,100.00
7 Box Skring 3 Grup buah 555,500.00
8 Box MCB 6 A buah 50,000.00
9 Box MCB 4 A buah 45,000.00
16 Bahan Tambahan
NO. URAIAN SATUAN HARGA (Rp)
1 3 4
1 Axytilin Botol 475,900.00
2 Bentonite zak 353,500.00
3 Flux Oil liter 4,600.00
4 Kayu Bakar mᶟ 204,000.00
5 Minyak Begisting liter 17,000.00
6 Oxigen botol 238,000.00
7 Sambungan Rumah 1" set 2,379,300.00
8 Sambungan Rumah 1/2" set 1,223,700.00
9 Sambungan Rumah 3/4" set 1,699,500.00
10 Wall Paper m² 56,700.00
11 Floor Hardener kg 20,400.00
12 Ramset buah 17,000.00
13 Sealant tube 22,700.00
14 Venitions Blinds dan Vertical blinds (tirai) m² 170,000.00
15 Minyak Rem Liter 60,500.00
16 Modifir Liter 5,060.00
17 Oline SAE 140 Liter 44,000.00
18 Solar liter 6,200.00
19 Cetakan Huruf Bahan Vynil m2 25,000.00
20 Palam Ekor Tupai dia 10 T=1,5 Bt bh 250,000.00
21 Minyak bekisting liter 5,000.00
22 Alat Bantu set 50,000.00
23 Sewa Alat hari 375,000.00
24 Sewa Alat batu jam 50,000.00
25 Lubang Kontrol bh 25,000.00
24 Penjaga jarak bekisting / m' 8,000.00
25 Aqua Froof liter 60,000.00
17 Harga Bahan Pengairan
NO. URAIAN SATUAN HARGA (Rp)
1 3 4
1 pintu air lebar b=50 cm
b = 50 cm, h = 50 cm,H = 70 cm,T = 130 cm buah 5,850,000.00
b = 50 cm, h = 50 cm,H = 80 cm,T = 140 cm buah 6,110,000.00
b = 50 cm,h =50 cm,H = 90 cm,T =150 cm buah 6,240,000.00
2 pintu air lebar b = 80 cm
b= 80 cm,h = 80 cm,H = 150,T = 230 cm buah 9,625,000.00
b = 80 cm,h = 80 cm H = 160 cm,T = 2290 cm buah 11,450,000.00
b = 80 cm,h = 80 cm H = 240 cm,T = 320 cm buah 12,300,000.00
b = 80 cm,h = 80 cm H = 300 cm,T = 380 cm buah 15,250,000.00
b = 80 cm,h = 80 cm H = 400 cm,T = 480 cm buah 17,340,000.00
b = 80 cm,h = 80 cm H = 500 cm,T = 580 cm buah 20,700,000.00
b = 80 cm,h = 80 cm H = 600 cm,T = 680 cm buah 22,500,000.00
3 pintu air lebar b = 100 cm
b = 100 cm,h = 120 cm,H =200 cm,T = 320 cm buah 23,000,000.00
b = 100 cm,h = 120 cm,H =300 cm,T = 420 cm buah 24,100,000.00
b = 100 cm,h = 120 cm,H =400 cm,T = 520 cm buah 26,000,000.00
b = 100 cm,h = 120 cm,H =500 cm,T = 620 cm buah 26,500,000.00
b = 100 cm,h = 120 cm,H =580 cm,T = 700 cm buah 26,700,000.00
4 pintu air lebar b = 150 cm
b = 150 cm,h = 200 cm,H = 300 cm,T = 500 cm buah 47,320,000.00
b = 150 cm,h = 200 cm,H = 400 cm,T = 600 cm buah 51,800,000.00
b = 150 cm,h = 200 cm,H = 500 cm,T = 700 cm buah 25,100,000.00
b = 150 cm,h = 200 cm,H = 600 cm,T = 800 cm buah 57,800,000.00
b = 150 cm,h = 200 cm,H = 700 cm,T = 900 cm buah 61,200,000.00
b = 150 cm,h = 200 cm,H = 800 cm,T = 500 cm buah 63,000,000.00
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KETERANGAN
5
KETERANGAN
5
Konsultan Perencana
CV. JAGAD GEMA YASA CONSULTAN
YULIANA BUDI PERMATA SARI, ST.
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan : Penyusunan Dokumen Perencanaan Pengembangan Kawasan Usaha Garam Rakyat Kabupaten Lombok
Barat
Lokasi : Dusun Bengkang, Desa Buwun Mas, Kec. Sekotong
Kabupaten : Lombok Barat
Tahun Anggaran : 2018
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 72,600.00 7,260.00
Tukang Kayu L.02 OH 0.1000 82,500.00 8,250.00
Kepala Tukang L.03 OH 0.0100 99,000.00 990.00
Mandor L.04 OH 0.0050 105,100.00 525.50
Jumlah Harga Tenaga 17,025.50
B BAHAN
Kayu usuk 5/7 bekisting m3 0.0012 4,985,200.00 5,982.24
Paku 1 cm - 3 cm kg 0.0200 15,000.00 300.00
Papan kayu bekisting m3 0.0070 5,608,400.00 39,258.80
Jumlah Harga Bahan 45,541.04
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 72,600.00 7,260.00
Tukang Kayu L.02 OH 0.1000 82,500.00 8,250.00
Kepala Tukang L.03 OH 0.0100 99,000.00 990.00
Mandor L.04 OH 0.0050 105,100.00 525.50
Jumlah Harga Tenaga 17,025.50
B BAHAN
Balok Kayu Klas III M3 0.0120 4,985,200.00 59,822.40
Paku 7 cm - 12 cm Kg 0.0200 15,000.00 300.00
Triplek 120x240x 6 mm Lembar 0.0070 93,500.00 654.50
Cetakan Huruf Bahan Vynil m2 1.0000 25,000.00 25,000.00
Jumlah Harga Bahan 85,776.90
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 13.3340 72,600.00 968,048.40
Mandor L.04 OH 0.6660 105,100.00 69,996.60
Jumlah Harga Tenaga
B BAHAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.6670 72,600.00 484,024.20
Mandor L.04 OH 0.3330 105,100.00 34,998.30
Jumlah Harga Tenaga
B BAHAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 72,600.00 54,450.00
Mandor L.04 OH 0.0250 105,100.00 2,627.50
Jumlah Harga Tenaga 57,077.50
B BAHAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 72,600.00 65,340.00
Mandor L.04 OH 0.0450 105,100.00 4,729.50
Jumlah Harga Tenaga 70,069.50
B BAHAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 72,600.00 36,300.00
Mandor L.04 OH 0.0500 105,100.00 5,255.00
Jumlah Harga Tenaga 41,555.00
B BAHAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 72,600.00 36,300.00
Mandor L.04 OH 0.0500 105,100.00 5,255.00
Jumlah Harga Tenaga 41,555.00
B BAHAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 72,600.00 21,780.00
Mandor L.04 OH 0.0100 105,100.00 1,051.00
Jumlah Harga Tenaga 22,831.00
B BAHAN
Pasir urug m3 1.2000 149,600.00 179,520.00
Jumlah Harga Bahan 179,520.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 72,600.00 10,890.00
Mandor L.04 OH 0.0150 105,100.00 1,576.50
Jumlah Harga Tenaga
B BAHAN
Ijuk m3 6.0000 - -
Jumlah Harga Bahan
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 72,600.00 18,150.00
Mandor L.04 OH 0.0250 105,100.00 2,627.50
Jumlah Harga Tenaga 20,777.50
B BAHAN
Tanah urug biasa m3 1.2000 118,400.00 142,080.00
Jumlah Harga Bahan 142,080.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 72,600.00 108,900.00
Tukang Batu L.02 OH 0.7500 93,500.00 70,125.00
Kepala Tukang L.03 OH 0.0750 99,000.00 7,425.00
Mandor L.04 OH 0.0750 105,100.00 7,882.50
Jumlah Harga Tenaga 194,332.50
B BAHAN
Batu Belah m3 1.2000 187,000.00 224,400.00
Semen Portland kg 163.0000 1,758.00 286,554.00
Pasir Pasang m3 0.5200 168,300.00 87,516.00
Jumlah Harga Bahan 598,470.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 72,600.00 108,900.00
Tukang Batu L.02 OH 0.7500 93,500.00 70,125.00
Kepala Tukang L.03 OH 0.0750 99,000.00 7,425.00
Mandor L.04 OH 0.0750 105,100.00 7,882.50
Jumlah Harga Tenaga 194,332.50
B BAHAN
Batu Belah m3 1.2000 187,000.00 224,400.00
Semen Portland kg 136.000 1,758.00 239,088.00
Pasir Pasang m3 0.5440 168,300.00 91,555.20
Jumlah Harga Bahan 555,043.20
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 779,443.20
E Overhead & Profit 10% (10% x D) 77,944.32
F Harga Satuan Pekerjaan (D+E) 857,387.52
A.3.2.1.9. Pemasangan 1 m³ batu kosong (aanstamping)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7800 72,600.00 56,628.00
Tukang Batu L.02 OH 0.3900 93,500.00 36,465.00
Kepala Tukang L.03 OH 0.0390 99,000.00 3,861.00
Mandor L.04 OH 0.0390 105,100.00 4,098.90
Jumlah Harga Tenaga 101,052.90
B BAHAN
Batu Belah m3 1.2000 187,000.00 224,400.00
Pasir Urug m3 0.4320 149,600.00 64,627.20
Jumlah Harga Bahan 289,027.20
C PERALATAN
A.4.1.1.1. Membuat 1 m³ beton mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 72,600.00 119,790.00
Tukang Batu L.02 OH 0.2750 93,500.00 25,712.50
Kepala Tukang L.03 OH 0.0280 99,000.00 2,772.00
Mandor L.04 OH 0.0830 105,100.00 8,723.30
Jumlah Harga Tenaga 156,997.80
B BAHAN
Semen Portland kg 247.0000 1,758.00 434,226.00
Pasir Beton (PB) M3 0.6207 187,000.00 116,073.57
Kerikil beton M3 0.7400 187,000.00 138,380.00
Air. liter 215.0000 290.00 62,350.00
Jumlah Harga Bahan 751,029.57
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 72,600.00 87,120.00
Tukang Batu L.02 OH 0.2000 93,500.00 18,700.00
Kepala Tukang L.03 OH 0.0200 99,000.00 1,980.00
Mandor L.04 OH 0.0600 105,100.00 6,306.00
Jumlah Harga Tenaga
B BAHAN
Semen Portland kg 230.0000 1,758.00 404,340.00
Pasir Beton (PB) kg 0.6615 187,000.00 123,697.04
Kerikil beton m3 0.7607 187,000.00 142,258.52
Air liter 200.0000 475,900.00 95,180,000.00
Jumlah Harga Bahan
C PERALATAN
A.4.1.1.5. Membuat 1 m³ beton mutu f'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 72,600.00 119,790.00
Tukang Batu L.02 OH 0.2750 93,500.00 25,712.50
Mandor L.04 OH 0.0830 105,100.00 8,723.30
Jumlah Harga Tenaga 154,225.80
B BAHAN
Semen Portland kg 326.0000 1,758.00 573,108.00
Pasir Beton (PB) M3 0.6207 187,000.00 116,073.57
Kerikil beton M3 0.7400 187,000.00 138,380.00
Air. liter 215.0000 290.00 62,350.00
Jumlah Harga Bahan 889,911.57
C PERALATAN
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 1,044,137.37
E Overhead & Profit 10% (10% x D) 104,413.74
F Harga Satuan Pekerjaan (D+E) 1,148,551.11
A.4.1.1.7. Membuat 1 m³ beton mutu f'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 72,600.00 119,790.00
Tukang Batu L.02 OH 0.2750 93,500.00 25,712.50
Kepala Tukang L.03 OH 0.0280 99,000.00 2,772.00
Mandor L.04 OH 0.0830 105,100.00 8,723.30
Jumlah Harga Tenaga 156,997.80
B BAHAN
Semen Portland kg 371.0000 1,758.00 652,218.00
Pasir Beton (PB) kg 0.4986 187,000.00 93,232.86
Kerikil beton kg 0.78 187,000.00 145,028.89
Air. liter 215.0000 290.00 62,350.00
Jumlah Harga Bahan 952,829.75
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 1,109,827.55
E Overhead & Profit 10% (10% x D) 110,982.75
F Harga Satuan Pekerjaan (D+E) 1,220,810.30
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0070 72,600.00 508.20
Tukang Besi L.02 OH 0.0070 93,500.00 654.50
Kepala Tukang L.03 OH 0.0007 99,000.00 69.30
Mandor L.04 OH 0.0004 105,100.00 42.04
Jumlah Harga Tenaga 1,274.04
B BAHAN
Besi beton Ulir kg 1.0500 14,000.00 14,700.00
Kawat Ikat Beton kg 0.0150 22,000.00 330.00
Jumlah Harga Bahan 15,030.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 16,304.04
E Overhead & Profit 10% (10% x D) 1,630.40
F Harga Satuan Pekerjaan (D+E) 17,934.44
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0070 72,600.00 508.20
Tukang Besi L.02 OH 0.0070 93,500.00 654.50
Kepala Tukang L.03 OH 0.0007 99,000.00 69.30
Mandor L.04 OH 0.0004 105,100.00 42.04
Jumlah Harga Tenaga 1,274.04
B BAHAN
Besi beton polos kg 1.0500 13,000.00 13,650.00
Kawat Ikat Beton kg 0.0150 22,000.00 330.00
Jumlah Harga Bahan 13,980.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 15,254.04
E Overhead & Profit 10% (10% x D) 1,525.40
F Harga Satuan Pekerjaan (D+E) 16,779.44
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 72,600.00 37,752.00
Tukang Kayu L.02 OH 0.2600 82,500.00 21,450.00
Kepala Tukang L.03 OH 0.0260 99,000.00 2,574.00
Mandor L.04 OH 0.0260 105,100.00 2,732.60
Jumlah Harga Tenaga 64,508.60
B BAHAN
Papan Kayu Klas III m3 0.0200 5,608,400.00 112,168.00
Paku 5 cm - 10 cm kg 0.3000 15,000.00 4,500.00
Minyak bekisting liter 0.1000 5,000.00 500.00
Jumlah Harga Bahan 117,168.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 72,600.00 37,752.00
Tukang Kayu L.02 OH 0.2600 82,500.00 21,450.00
Kepala Tukang L.03 OH 0.0260 99,000.00 2,574.00
Mandor L.04 OH 0.0260 105,100.00 2,732.60
Jumlah Harga Tenaga 64,508.60
B BAHAN
Papan Kayu Klas III m3 0.0450 5,608,400.00 252,378.00
Paku 5 cm - 10 cm kg 0.3000 15,000.00 4,500.00
Minyak bekisting liter - - -
Jumlah Harga Bahan 256,878.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 321,386.60
E Overhead & Profit 10% (10% x D) 32,138.66
F Harga Satuan Pekerjaan (D+E) 353,525.26
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 72,600.00 47,916.00
Tukang Kayu L.02 OH 0.3300 82,500.00 27,225.00
Kepala Tukang L.03 OH 0.0330 99,000.00 3,267.00
Mandor L.04 OH 0.0330 105,100.00 3,468.30
Jumlah Harga Tenaga 81,876.30
B BAHAN
Papan Kayu Klas III m3 0.0400 5,608,400.00 224,336.00
Paku 5 cm - 10 cm kg 0.4000 15,000.00 6,000.00
Minyak bekisting liter - 5,000.00 -
Balok Kayu Klas II m3 0.0150 14,955,600.00 224,334.00
Triplek 120x240x 9 mm lembar 0.3500 120,000.00 42,000.00
Bambu (dia.10 cm, P- 4 m) batang 2.0000 10,000.00 20,000.00
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 72,600.00 47,916.00
Tukang Kayu L.02 OH 0.3300 82,500.00 27,225.00
Kepala Tukang L.03 OH 0.0330 99,000.00 3,267.00
Mandor L.04 OH 0.0330 105,100.00 3,468.30
Jumlah Harga Tenaga 81,876.30
B BAHAN
Papan Kayu Klas III m3 0.0400 5,608,400.00 224,336.00
Paku 5 cm - 10 cm kg 0.4000 15,000.00 6,000.00
Minyak bekisting liter - 5,000.00 -
Balok Kayu Klas II m3 0.0180 14,955,600.00 269,200.80
Triplek 120x240x 9 mm lembar 0.3500 120,000.00 42,000.00
Bambu (dia.10 cm, P- 4 m) batang 2.0000 10,000.00 20,000.00
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 72,600.00 47,916.00
Tukang Kayu L.02 OH 0.3300 82,500.00 27,225.00
Kepala Tukang L.03 OH 0.0330 99,000.00 3,267.00
Mandor L.04 OH 0.0330 105,100.00 3,468.30
Jumlah Harga Tenaga 81,876.30
B BAHAN
Papan Kayu Klas III m3 0.0400 5,608,400.00 224,336.00
Paku 5 cm - 10 cm kg 0.4000 15,000.00 6,000.00
Minyak bekisting liter - 5,000.00 -
Balok Kayu Klas II m3 0.0150 14,955,600.00 224,334.00
Triplek 120x240x 9 mm lembar 0.3500 120,000.00 42,000.00
Bambu (dia.10 cm, P- 4 m) batang 6.0000 10,000.00 60,000.00
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 72,600.00 47,916.00
Tukang Kayu L.02 OH 0.3300 82,500.00 27,225.00
Kepala Tukang L.03 OH 0.0330 99,000.00 3,267.00
Mandor L.04 OH 0.0330 105,100.00 3,468.30
Jumlah Harga Tenaga
B BAHAN
Papan Kayu Klas III m3 0.0300 5,608,400.00 168,252.00
Paku 5 cm - 10 cm kg 0.4000 15,000.00 6,000.00
Minyak bekisting liter 0.2000 5,000.00 1,000.00
Balok Kayu Klas II m3 0.0200 14,955,600.00 299,112.00
Triplek 120x240x 9 mm lembar 0.3500 120,000.00 42,000.00
Bambu (dia.10 cm, P- 4 m) batang 3.0000 10,000.00 30,000.00
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 72,600.00 47,916.00
Tukang Kayu L.02 OH 0.3300 82,500.00 27,225.00
Kepala Tukang L.03 OH 0.0330 99,000.00 3,267.00
Mandor L.04 OH 0.0330 105,100.00 3,468.30
Jumlah Harga Tenaga 81,876.30
B BAHAN
Papan Kayu Klas III m3 0.0300 5,608,400.00 168,252.00
Paku 5 cm - 10 cm kg 0.2000 15,000.00 3,000.00
Minyak bekisting liter 0.1500 5,000.00 750.00
Balok Kayu Klas II m3 0.0150 14,955,600.00 224,334.00
Triplek 120x240x 9 mm lembar 0.1750 120,000.00 21,000.00
Bambu (dia.10 cm, P- 4 m) batang 2.0000 10,000.00 20,000.00
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 72,600.00 10,890.00
Tukang Kayu L.02 OH 0.0500 82,500.00 4,125.00
Kepala Tukang L.03 OH 0.0050 99,000.00 495.00
Mandor L.04 OH 0.0080 105,100.00 840.80
Jumlah Harga Tenaga 16,350.80
B BAHAN
Papan kayu bekisting m3 0.0264 5,608,400.00 148,061.76
Paku 5 cm - 10 cm kg 0.6000 15,000.00 9,000.00
Bambu (dia.10 cm, P- 4 m) batang 0.5000 10,000.00 5,000.00
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.3000 72,600.00 384,780.00
Tukang Batu L.02 OH 0.2750 93,500.00 25,712.50
Tukang Kayu L.02 OH 1.3000 82,500.00 107,250.00
Tukang Besi L.02 OH 1.0500 93,500.00 98,175.00
Kepala Tukang L.03 OH 0.2620 99,000.00 25,938.00
Mandor L.04 OH 0.2650 105,100.00 27,851.50
Jumlah Harga Tenaga 669,707.00
B BAHAN
Papan Kayu Klas III m3 0.2000 5,608,400.00 1,121,680.00
Paku 5 cm - 10 cm kg 1.5000 15,000.00 22,500.00
Minyak bekisting liter 0.4000 5,000.00 2,000.00
Besi beton polos kg 157.5000 13,000.00 2,047,500.00
Kawat Ikat Beton kg 2.2500 22,000.00 49,500.00
Semen Portland kg 336.0000 1,758.00 590,688.00
Pasir Beton (PB) m3 0.5400 187,000.00 100,980.00
Batu pecah 2-3 cm m3 0.8100 348,200.00 282,042.00
Jumlah Harga Bahan 4,216,890.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.6500 72,600.00 410,190.00
Tukang Batu L.02 OH 0.2750 93,500.00 25,712.50
Tukang Kayu L.02 OH 1.5600 82,500.00 128,700.00
Tukang Besi L.02 OH 1.4000 93,500.00 130,900.00
Kepala Tukang L.03 OH 0.3230 99,000.00 31,977.00
Mandor L.04 OH 0.2830 105,100.00 29,743.30
Jumlah Harga Tenaga 757,222.80
B BAHAN
Papan Kayu Klas III m3 0.2700 2,500,000.00 675,000.00
Paku 5 cm - 10 cm kg 2.0000 15,000.00 30,000.00
Minyak bekisting liter 0.6000 10,000.00 6,000.00
Besi beton polos kg 210.0000 13,000.00 2,730,000.00
Kawat Ikat Beton kg 3.0000 20,000.00 60,000.00
Semen Portland kg 336.0000 1,360.00 456,960.00
Pasir Beton (PB) m3 0.5400 200,000.00 108,000.00
Batu pecah 2-3 cm m3 0.8100 375,000.00 303,750.00
Jumlah Harga Bahan 4,369,710.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 7.0500 72,600.00 511,830.00
Tukang Batu L.02 OH 0.2750 93,500.00 25,712.50
Tukang Kayu L.02 OH 1.6500 82,500.00 136,125.00
Tukang Besi L.02 OH 2.1000 93,500.00 196,350.00
Kepala Tukang L.03 OH 0.4030 99,000.00 39,897.00
Mandor L.04 OH 0.3530 105,100.00 37,100.30
Jumlah Harga Tenaga 947,014.80
B BAHAN
Papan Kayu Klas III m3 0.4000 5,608,400.00 2,243,360.00
Paku 5 cm - 10 cm kg 4.0000 15,000.00 60,000.00
Minyak bekisting liter 2.0000 5,000.00 10,000.00
Besi beton polos kg 315.0000 13,000.00 4,095,000.00
Kawat Ikat Beton kg 4.5000 22,000.00 99,000.00
Semen Portland kg 336.0000 1,758.00 590,688.00
Pasir Beton (PB) m3 0.5400 187,000.00 100,980.00
Batu pecah 2-3 cm m3 0.8100 348,200.00 282,042.00
Balok Kayu Klas II m3 0.1500 14,955,600.00 2,243,340.00
Triplek 120x240x 9 mm lembar 3.5000 120,000.00 420,000.00
Bambu (dia.10 cm, P- 4 m) batang 20.0000 10,000.00 200,000.00
Jumlah Harga Bahan 10,344,410.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.3500 72,600.00 461,010.00
Tukang Batu L.02 OH 0.2750 93,500.00 25,712.50
Tukang Kayu L.02 OH 1.6500 82,500.00 136,125.00
Tukang Besi L.02 OH 1.4000 93,500.00 130,900.00
Kepala Tukang L.03 OH 0.3330 99,000.00 32,967.00
Mandor L.04 OH 0.3180 105,100.00 33,421.80
Jumlah Harga Tenaga 820,136.30
B BAHAN
Papan Kayu Klas III m3 0.3200 5,608,400.00 1,794,688.00
Paku 5 cm - 10 cm kg 3.2000 15,000.00 48,000.00
Minyak bekisting liter 1.6000 5,000.00 8,000.00
Besi beton polos kg 210.0000 13,000.00 2,730,000.00
Kawat Ikat Beton kg 3.0000 22,000.00 66,000.00
Semen Portland kg 336.0000 1,758.00 590,688.00
Pasir Beton (PB) m3 0.5400 187,000.00 100,980.00
Batu pecah 2-3 cm m3 0.8100 348,200.00 282,042.00
Balok Kayu Klas II m3 0.1400 14,955,600.00 2,093,784.00
Triplek 120x240x 9 mm lembar 2.8000 120,000.00 336,000.00
Bambu (dia.10 cm, P- 4 m) batang 16.0000 10,000.00 160,000.00
Jumlah Harga Bahan 8,210,182.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 9,030,318.30
E Overhead & Profit 10% (10% x D) 903,031.83
F Harga Satuan Pekerjaan (D+E) 9,933,350.13
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.3000 72,600.00 384,780.00
Tukang Batu L.02 OH 0.2750 93,500.00 25,712.50
Tukang Kayu L.02 OH 1.3000 82,500.00 107,250.00
Tukang Besi L.02 OH 1.0500 93,500.00 98,175.00
Kepala Tukang L.03 OH 0.2650 99,000.00 26,235.00
Mandor L.04 OH 0.2650 105,100.00 27,851.50
Jumlah Harga Tenaga 670,004.00
B BAHAN
Papan Kayu Klas III m3 0.3200 5,608,400.00 1,794,688.00
Paku 5 cm - 10 cm kg 3.2000 15,000.00 48,000.00
Minyak bekisting liter 1.6000 5,000.00 8,000.00
Besi beton polos kg 157.5000 13,000.00 2,047,500.00
Kawat Ikat Beton kg 2.2500 22,000.00 49,500.00
Semen Portland kg 336.0000 1,758.00 590,688.00
Pasir Beton (PB) m3 0.5400 187,000.00 100,980.00
Batu pecah 2-3 cm m3 0.8100 348,200.00 282,042.00
Balok Kayu Klas II m3 0.1200 14,955,600.00 1,794,672.00
Triplek 120x240x 9 mm lembar 2.8000 120,000.00 336,000.00
Bambu (dia.10 cm, P- 4 m) batang 32.0000 10,000.00 320,000.00
Jumlah Harga Bahan 7,372,070.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 8,042,074.00
E Overhead & Profit 10% (10% x D) 804,207.40
F Harga Satuan Pekerjaan (D+E) 8,846,281.40
A.4.1.1.33Membuat 1 m³ dinding beton bertulang (150 kg besi + bekisting)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.3000 72,600.00 384,780.00
Tukang Batu L.02 OH 0.2750 93,500.00 25,712.50
Tukang Kayu L.02 OH 1.3000 82,500.00 107,250.00
Tukang Besi L.02 OH 1.0500 93,500.00 98,175.00
Kepala Tukang L.03 OH 0.2650 99,000.00 26,235.00
Mandor L.04 OH 0.2650 105,100.00 27,851.50
Jumlah Harga Tenaga 670,004.00
B BAHAN
Papan Kayu Klas III m3 0.2400 5,608,400.00 1,346,016.00
Paku 5 cm - 10 cm kg 3.2000 15,000.00 48,000.00
Minyak bekisting liter 1.6000 5,000.00 8,000.00
Besi beton polos kg 157.5000 13,000.00 2,047,500.00
Kawat Ikat Beton kg 2.2500 22,000.00 49,500.00
Semen Portland kg 336.0000 1,758.00 590,688.00
Pasir Beton (PB) m3 0.5400 187,000.00 100,980.00
Batu pecah 2-3 cm m3 0.8100 348,200.00 282,042.00
Balok Kayu Klas II m3 0.1600 14,955,600.00 2,392,896.00
Triplek 120x240x 9 mm lembar 2.8000 120,000.00 336,000.00
Bambu (dia.10 cm, P- 4 m) batang 24.0000 10,000.00 240,000.00
Jumlah Harga Bahan 7,441,622.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 8,111,626.00
E Overhead & Profit 10% (10% x D) 811,162.60
F Harga Satuan Pekerjaan (D+E) 8,922,788.60
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.6500 72,600.00 410,190.00
Tukang Batu L.02 OH 0.2750 93,500.00 25,712.50
Tukang Kayu L.02 OH 1.5600 82,500.00 128,700.00
Tukang Besi L.02 OH 1.4000 93,500.00 130,900.00
Kepala Tukang L.03 OH 0.3230 99,000.00 31,977.00
Mandor L.04 OH 0.2830 105,100.00 29,743.30
Jumlah Harga Tenaga 757,222.80
B BAHAN
Papan Kayu Klas III m3 0.2500 5,608,400.00 1,402,100.00
Paku 5 cm - 10 cm kg 3.0000 15,000.00 45,000.00
Minyak bekisting liter 1.2000 5,000.00 6,000.00
Besi beton polos kg 210.0000 13,000.00 2,730,000.00
Kawat Ikat Beton kg 3.0000 22,000.00 66,000.00
Semen Portland kg 336.0000 1,758.00 590,688.00
Pasir Beton (PB) m3 0.5400 187,000.00 100,980.00
Batu pecah 2-3 cm m3 0.8100 348,200.00 282,042.00
Balok Kayu Klas II m3 0.1050 14,955,600.00 1,570,338.00
Triplek 120x240x 9 mm lembar 2.5000 120,000.00 300,000.00
Bambu (dia.10 cm, P- 4 m) batang 14.0000 10,000.00 140,000.00
Jumlah Harga Bahan 7,233,148.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 7,990,370.80
E Overhead & Profit 10% (10% x D) 799,037.08
F Harga Satuan Pekerjaan (D+E) 8,789,407.88
A.4.1.1.35Membuat 1 m¹ kolom praktis beton bertulang (11 x 11) cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1800 72,600.00 13,068.00
Tukang Batu L.02 OH 0.0200 93,500.00 1,870.00
Tukang Kayu L.02 OH 0.0200 82,500.00 1,650.00
Tukang Besi L.02 OH 0.0200 93,500.00 1,870.00
Kepala Tukang L.03 OH 0.0060 99,000.00 594.00
Mandor L.04 OH 0.0090 105,100.00 945.90
Jumlah Harga Tenaga 19,997.90
B BAHAN
Papan Kayu Klas III m3 0.0020 5,608,400.00 11,216.80
Paku 5 cm - 10 cm kg 0.0100 15,000.00 150.00
Minyak bekisting liter - 5,000.00 -
Besi beton polos kg 3.0000 13,000.00 39,000.00
Kawat Ikat Beton kg 0.4500 22,000.00 9,900.00
Semen Portland kg 4.0000 1,758.00 7,032.00
Pasir Beton (PB) m3 0.0060 187,000.00 1,122.00
Batu pecah 2-3 cm m3 0.0090 348,200.00 3,133.80
Jumlah Harga Bahan 71,554.60
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2970 72,600.00 21,562.20
Tukang Batu L.02 OH 0.0330 93,500.00 3,085.50
Tukang Kayu L.02 OH 0.0330 82,500.00 2,722.50
Tukang Besi L.02 OH 0.0330 93,500.00 3,085.50
Kepala Tukang L.03 OH 0.0100 99,000.00 990.00
Mandor L.04 OH 0.0150 105,100.00 1,576.50
Jumlah Harga Tenaga 33,022.20
B BAHAN
Papan Kayu Klas III m3 0.0030 5,608,400.00 16,825.20
Paku 5 cm - 10 cm kg 0.0200 15,000.00 300.00
Minyak bekisting liter 5,000.00 -
Besi beton polos kg 3.6000 13,000.00 46,800.00
Kawat Ikat Beton kg 0.0500 22,000.00 1,100.00
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 72,600.00 4,356.00
Tukang Las L.03 OH 0.0600 93,500.00 5,610.00
Kepala Tukang L.03 OH 0.0060 99,000.00 594.00
Mandor L.04 OH 0.0030 105,100.00 315.30
Jumlah Harga Tenaga 10,875.30
B BAHAN
Besi Frofil kg 1.1500 18,300.00 21,045.00
Jumlah Harga Bahan 21,045.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 31,920.30
E Overhead & Profit 10% (10% x D) 3,192.03
F Harga Satuan Pekerjaan (D+E) 35,112.33
A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 72,600.00 4,356.00
Tukang Las L.03 OH 0.0600 93,500.00 5,610.00
Kepala Tukang L.03 OH 0.0060 99,000.00 594.00
Mandor L.04 OH 0.0030 105,100.00 315.30
Jumlah Harga Tenaga
B BAHAN
Besi Baja IWF kg 1.1500 18,300.00 21,045.00
Jumlah Harga Bahan
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 72,600.00 4,356.00
Tukang Las L.03 OH 0.0600 93,500.00 5,610.00
Kepala Tukang L.03 OH 0.0060 99,000.00 594.00
Mandor L.04 OH 0.0030 105,100.00 315.30
Jumlah Harga Tenaga 10,875.30
B BAHAN
Besi beton polos kg 1.1500 13,000.00 14,950.00
Jumlah Harga Bahan 14,950.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 72,600.00 7,260.00
Tukang Las L.03 OH 0.1000 93,500.00 9,350.00
Kepala Tukang L.03 OH 0.0010 99,000.00 99.00
Mandor L.04 OH 0.0050 105,100.00 525.50
Jumlah Harga Tenaga 17,234.50
B BAHAN
Solar liter 1.0000 6,200.00 6,200.00
Minyak Pelumas liter 0.1000 13,000.00 1,300.00
Jumlah Harga Bahan 7,500.00
C PERALATAN
Sewa Alat jam 0.8000 375,000.00 300,000.00
Jumlah Harga Peralatan 300,000.00
D Jumlah (A+B+C) 324,734.50
E Overhead & Profit 10% (10% x D) 32,473.45
F Harga Satuan Pekerjaan (D+E) 357,207.95
Harga Persatu Kg F/100 3,572.08
A.4.2.1.4. Pembuatan 1 m² pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0500 72,600.00 76,230.00
Tukang Las L.03 OH 1.0500 93,500.00 98,175.00
Kepala Tukang L.03 OH 0.1050 99,000.00 10,395.00
Mandor L.04 OH 0.0520 105,100.00 5,465.20
Jumlah Harga Tenaga 190,265.20
B BAHAN
Besi Siku L 30.30.3 kg 15.0000 18,300.00 274,500.00
Besi Plat Baja kg 32.8000 18,300.00 600,240.00
Kawat Las kg 0.0500 37,400.00 1,870.00
Jumlah Harga Bahan 876,610.00
C PERALATAN
A.4.2.1.4. Pemasangan 1 unit pintu sorong uk. = 4 x 4 ( dua daun pintu ) lengkap dengan accesoreis
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5250 72,600.00 38,115.00
Tukang Las L.03 OH 0.5250 93,500.00 49,087.50
Kepala Tukang L.03 OH 0.0525 99,000.00 5,197.50
Mandor L.04 OH 0.0260 105,100.00 2,732.60
Jumlah Harga Tenaga 95,132.60
B BAHAN
Pintu besi plat baja tebal 2 mm A.4.2.1.4.
m2 22.5000 1,173,562.72 26,405,161.20
rangkap, rangka baja siku
Besi WF 125 kg 132.0000 18,300.00 2,415,600.00
Besi Siku 70.70.7 kg 26.8741 18,300.00 491,795.12
Roda pintu sorong bh 4.0000 250,000.00 1,000,000.00
Roda pintu sorong gantung bh 4.0000 200,000.00 800,000.00
Kawat Las kg 0.0500 37,400.00 1,870.00
Jumlah Harga Bahan 31,114,426.32
C PERALATAN
Sewa Alat jam 0.8000 375,000.00 300,000.00
Jumlah Harga Peralatan 300,000.00
D Jumlah (A+B+C) 31,509,558.92
E Overhead & Profit 10% (10% x D) 3,150,955.89
F Harga Satuan Pekerjaan (D+E) 34,660,514.81
A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0400 72,600.00 2,904.00
Tukang Besi L.03 OH 0.0200 93,500.00 1,870.00
Kepala Tukang L.03 OH 0.0020 99,000.00 198.00
Mandor L.04 OH 0.0020 105,100.00 210.20
Jumlah Harga Tenaga 5,182.20
B BAHAN
Kawat Las kg 0.0040 37,400.00 149.60
Solar liter 0.3000 6,200.00 1,860.00
Minyak Pelumas liter 0.0400 13,000.00 520.00
Jumlah Harga Bahan 2,529.60
C PERALATAN
Sewa Alat batu jam 0.1700 50,000.00 8,500.00
Jumlah Harga Peralatan 8,500.00
D Jumlah (A+B+C) 16,211.80
E Overhead & Profit 10% (10% x D) 1,621.18
F Harga Satuan Pekerjaan (D+E) 17,832.98
Harga Perstu Cm F/10 1,783.30
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 72,600.00 726.00
Tukang las L.03 OH 0.0100 93,500.00 935.00
Kepala tukang L.03 OH 0.0010 99,000.00 99.00
Mandor L.04 OH - 105,100.00 -
Jumlah Harga Tenaga 1,760.00
B BAHAN
Baut D 16 mm kg 1.0000 160.00 160.00
Jumlah Harga Bahan 160.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 1,920.00
E Overhead & Profit 10% (10% x D) 192.00
F Harga Satuan Pekerjaan (D+E) 2,112.00
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 72,600.00 726.00
Tukang las L.03 OH 0.0100 93,500.00 935.00
Kepala tukang L.03 OH 0.0010 99,000.00 99.00
Mandor L.04 OH - 105,100.00 -
Jumlah Harga Tenaga 1,760.00
B BAHAN
Baut D 20 mm kg 1.0000 200.00 200.00
Jumlah Harga Bahan 200.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 72,600.00 726.00
Tukang las L.03 OH 0.0100 93,500.00 935.00
Kepala tukang L.03 OH 0.0010 99,000.00 99.00
Mandor L.04 OH - 105,100.00 -
Jumlah Harga Tenaga 1,760.00
B BAHAN
Angkar Baut D 22 mm P= 40 cm kg 1.0000 8,000.00 8,000.00
Jumlah Harga Bahan 8,000.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 72,600.00 726.00
Tukang las L.03 OH 0.0100 93,500.00 935.00
Kepala tukang L.03 OH 0.0010 99,000.00 99.00
Mandor L.04 OH - 105,100.00 -
Jumlah Harga Tenaga 1,760.00
B BAHAN
Baut D 24 mm kg 1.0000 9,350.00 9,350.00
Jumlah Harga Bahan 9,350.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 72,600.00 72,600.00
Tukang Alluminium L.03 OH 1.0000 93,500.00 93,500.00
Kepala Tukang L.03 OH 0.1000 99,000.00 9,900.00
Mandor L.04 OH 0.0500 105,100.00 5,255.00
Jumlah Harga Tenaga 181,255.00
B BAHAN
Rolling door aluminium m² 1.0000 370,000.00 370,000.00
Jumlah Harga Bahan 370,000.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0430 72,600.00 3,121.80
Tukang Alluminium L.03 OH 0.0430 93,500.00 4,020.50
Kepala Tukang L.03 OH 0.0043 99,000.00 425.70
Mandor L.04 OH 0.0021 105,100.00 220.71
Jumlah Harga Tenaga 7,788.71
B BAHAN
Profil aluminium m 1.1000 41,666.67 45,833.33
Skrup Fixer buah 2.0000 18,150.00 36,300.00
Sealant Khusus tube 0.0600 35,000.00 2,100.00
Jumlah Harga Bahan 84,233.33
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0850 72,600.00 6,171.00
Tukang Alluminium L.03 OH 0.0850 93,500.00 7,947.50
Kepala Tukang L.03 OH 0.0085 99,000.00 841.50
Mandor L.04 OH 0.0042 105,100.00 441.42
Jumlah Harga Tenaga 15,401.42
B BAHAN
Pintu aluminium m 4.4000 - -
Alluminium Strip m 14.6000 49,000.00 715,400.00
Jumlah Harga Bahan 715,400.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 730,801.42
E Overhead & Profit 10% (10% x D) 73,080.14
F Harga Satuan Pekerjaan (D+E) 803,881.56
A.4.2.1.20Pemasagan 1 m² rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 72,600.00 18,150.00
Tukang Besi L.02 OH 0.2500 93,500.00 23,375.00
Kepala Tukang L.03 OH 0.0250 99,000.00 2,475.00
Mandor L.04 OH 0.0130 105,100.00 1,366.30
Jumlah Harga Tenaga 45,366.30
B BAHAN
Rangka Metal m¹ 3.5000 5,000.00 17,500.00
Hollow 40.40.2 mm 1.6715 18,300.00 30,588.45
Assesoris Ls 100 % x 500.00 1,750.00
Pisar Scerw Viles 2 cm 20.0000 150.00 3,000.00
Jumlah Harga Bahan 52,838.45
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0430 72,600.00 3,121.80
Tukang Alluminium L.03 OH 0.0430 93,500.00 4,020.50
Kepala Tukang L.03 OH 0.0043 99,000.00 425.70
Mandor L.04 OH 0.0020 105,100.00 210.20
Jumlah Harga Tenaga 7,778.20
B BAHAN
Rolling door aluminium m² 1.1000 370,000.00 407,000.00
Skrup Fixer buah 2.0000 18,150.00 36,300.00
Sealant Khusus Tube 0.0600 35,000.00 2,100.00
Jumlah Harga Bahan 445,400.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.8500 72,600.00 61,710.00
Tukang Alluminium L.03 OH 0.8500 93,500.00 79,475.00
Kepala Tukang L.03 OH 0.0085 99,000.00 841.50
Mandor L.04 OH 0.0042 105,100.00 441.42
Jumlah Harga Tenaga 142,467.92
B BAHAN
Profil aluminium m² 4.4000 41,666.67 183,333.33
Aluminium Strip buah 14.6000 25,000.00 365,000.00
Jumlah Harga Bahan 548,333.33
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.8500 72,600.00 61,710.00
Tukang Alluminium L.03 OH 0.8500 93,500.00 79,475.00
Kepala Tukang L.03 OH 0.0090 99,000.00 891.00
Mandor L.04 OH 0.0050 105,100.00 525.50
Jumlah Harga Tenaga 142,601.50
B BAHAN
Pintu aluminium m 4.4000 - -
Profil kaca m 4.4000 8,000.00 35,200.00
Sealant Khusus buah 14.6000 35,000.00 511,000.00
Jumlah Harga Bahan 546,200.00
C PERALATAN
A.4.2.1.21Pemasagan 1 m² rangka Metal puring, Ukuran (2/4 & 4/4) modul 60 x 60 cm,
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 72,600.00 25,410.00
Tukang Besi L.02 OH 0.3500 93,500.00 32,725.00
Kepala Tukang L.03 OH 0.0350 99,000.00 3,465.00
Mandor L.04 OH 0.0180 105,100.00 1,891.80
Jumlah Harga Tenaga 63,491.80
B BAHAN
Rangka Plafon Metal Furing m¹ 1.0000 45,000.00 45,000.00
Jumlah Harga Bahan 45,000.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH - 72,600.00 -
Tukang Besi L.02 OH 0.3500 93,500.00 32,725.00
Kepala Tukang L.03 OH - 99,000.00 -
Mandor L.04 OH - 105,100.00 -
Jumlah Harga Tenaga 32,725.00
B BAHAN
Tulisan Aladin T= 20 Cm Tebal 2 cm bh 1.0000 80,000.00 80,000.00
Pisar Scerw Viles 2 cm bh 2.0000 150.00 300.00
Jumlah Harga Bahan 80,300.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 72,600.00 43,560.00
Tukang Batu L.02 OH 0.2000 93,500.00 18,700.00
Kepala Tukang L.03 OH 0.0200 99,000.00 1,980.00
Mandor L.04 OH 0.0300 105,100.00 3,153.00
Jumlah Harga Tenaga 67,393.00
B BAHAN
Bata merah kelas 1 m3 140.0000 800.00 112,000.00
Semen Portland kg 32.9500 1,758.00 57,926.10
Pasir Pasang m3 0.0910 168,300.00 15,315.30
Jumlah Harga Bahan 185,241.40
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 72,600.00 43,560.00
Tukang Batu L.02 OH 0.2000 93,500.00 18,700.00
Kepala Tukang L.03 OH 0.0200 99,000.00 1,980.00
Mandor L.04 OH 0.0300 105,100.00 3,153.00
Jumlah Harga Tenaga 67,393.00
B BAHAN
Bata merah kelas 1 m3 140.0000 800.00 112,000.00
Semen Portland kg 22.2000 1,758.00 39,027.60
Pasir Pasang m3 0.1020 168,300.00 17,166.60
Jumlah Harga Bahan 168,194.20
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 72,600.00 21,780.00
Tukang Batu L.02 OH 0.1000 93,500.00 9,350.00
Kepala Tukang L.03 OH 0.0100 99,000.00 990.00
Mandor L.04 OH 0.0150 105,100.00 1,576.50
Jumlah Harga Tenaga 33,696.50
B BAHAN
Bata merah kelas 1 buah 70.0000 800.00 56,000.00
Semen Portland kg 14.370 1,758.00 25,262.46
Pasir Pasang m3 0.045 168,300.00 7,573.50
Jumlah Harga Bahan 88,835.96
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 72,600.00 21,780.00
Tukang Batu L.02 OH 0.1000 93,500.00 9,350.00
Kepala Tukang L.03 OH 0.0100 99,000.00 990.00
Mandor L.04 OH 0.0150 105,100.00 1,576.50
Jumlah Harga Tenaga 33,696.50
B BAHAN
Bata merah kelas 1 buah 70.0000 800.00 56,000.00
Semen Portland kg 9.6800 1,758.00 17,017.44
Pasir Pasang m3 0.0450 168,300.00 7,573.50
Jumlah Harga Bahan 80,590.94
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 72,600.00 21,780.00
Tukang Batu L.02 OH 0.1000 93,500.00 9,350.00
Kepala Tukang L.03 OH 0.0100 99,000.00 990.00
Mandor L.04 OH 0.0150 105,100.00 1,576.50
Jumlah Harga Tenaga 33,696.50
B BAHAN
Lubang Angin beton 20 x 30 cm m3 17.0000 16,500.00 280,500.00
Semen Portland kg 11.0000 1,758.00 19,338.00
Pasir Pasang m3 0.0350 168,300.00 5,890.50
Jumlah Harga Bahan 305,728.50
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 72,600.00 21,780.00
Tukang Batu L.03 OH 0.1500 93,500.00 14,025.00
Kepala Tukang L.03 OH 0.0150 99,000.00 1,485.00
Mandor L.04 OH 0.0150 105,100.00 1,576.50
Jumlah Harga Tenaga 38,866.50
B BAHAN
Semen Portland kg 7.7760 1,758.00 13,670.21
Pasir Pasang m3 0.0230 168,300.00 3,870.90
Jumlah Harga Bahan 17,541.11
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 56,407.61
E Overhead & Profit 10% (10% x D) 5,640.76
F Harga Satuan Pekerjaan (D+E) 62,048.37
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 72,600.00 21,780.00
Tukang Batu L.03 OH 0.1500 93,500.00 14,025.00
Kepala Tukang L.03 OH 0.0150 99,000.00 1,485.00
Mandor L.04 OH 0.0150 105,100.00 1,576.50
Jumlah Harga Tenaga 38,866.50
B BAHAN
Semen Portland kg 5.1840 1,758.00 9,113.47
Pasir Pasang m3 0.0260 168,300.00 4,375.80
Jumlah Harga Bahan 13,489.27
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 52,355.77
E Overhead & Profit 10% (10% x D) 5,235.58
F Harga Satuan Pekerjaan (D+E) 57,591.35
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 72,600.00 5,808.00
Tukang Batu L.03 OH 0.4000 93,500.00 37,400.00
Kepala Tukang L.03 OH 0.0400 99,000.00 3,960.00
Mandor L.04 OH 0.0040 105,100.00 420.40
Jumlah Harga Tenaga 47,588.40
B BAHAN
Semen Portland kg 0.5000 1,758.00 879.00
Pasir Pasang m3 0.0130 168,300.00 2,187.90
Jumlah Harga Bahan 3,066.90
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3300 72,600.00 23,958.00
Tukang Batu L.03 OH 0.1000 93,500.00 9,350.00
Kepala Tukang L.03 OH 0.0100 99,000.00 990.00
Mandor L.04 OH 0.0150 105,100.00 1,576.50
Jumlah Harga Tenaga 35,874.50
B BAHAN
Semen Portland kg 4.3200 1,758.00 7,594.56
Pasir Pasang kg 0.0060 168,300.00 1,009.80
Jumlah Harga Bahan 44,478.86
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 72,600.00 10,890.00
Tukang Batu L.03 OH 0.0750 93,500.00 7,012.50
Kepala Tukang L.03 OH 0.0080 99,000.00 792.00
Mandor L.04 OH 0.0080 105,100.00 840.80
Jumlah Harga Tenaga 19,535.30
B BAHAN
Semen Portland kg 3.1080 1,758.00 5,463.86
Jumlah Harga Bahan 5,463.86
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 72,600.00 21,780.00
Tukang Batu L.03 OH 0.1500 93,500.00 14,025.00
Kepala Tukang L.03 OH 0.0150 99,000.00 1,485.00
Mandor L.04 OH 0.0150 105,100.00 1,576.50
Jumlah Harga Tenaga 38,866.50
B BAHAN
Semen Portland kg 6.3400 1,758.00 11,145.72
Pasir Pasang m3 0.0120 168,300.00 2,019.60
Jumlah Harga Bahan 13,165.32
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 52,031.82
E Overhead & Profit 10% (10% x D) 5,203.18
F Harga Satuan Pekerjaan (D+E) 57,235.00
A.4.4.2.27Pemasangan 1 m² acian
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 72,600.00 14,520.00
Tukang Batu L.03 OH 0.1000 93,500.00 9,350.00
Kepala Tukang L.03 OH 0.0100 99,000.00 990.00
Mandor L.04 OH 0.0100 105,100.00 1,051.00
Jumlah Harga Tenaga 25,911.00
B BAHAN
Semen Portland kg 3.2500 1,758.00 5,713.50
Jumlah Harga Bahan 5,713.50
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 31,624.50
E Overhead & Profit 10% (10% x D) 3,162.45
F Harga Satuan Pekerjaan (D+E) 34,786.95
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500
Tukang Batu L.02 OH 0.1250
Kepala Tukang L.03 OH 0.0130
Mandor L.04 OH 0.0130
Jumlah Harga Tenaga
B BAHAN
Ubin Abu-abu buah 6.6300
Semen Portland kg 9.8000
Pasir Pasang m3 0.0450
Jumlah Harga Bahan
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 72,600.00 18,150.00
Tukang Batu L.02 OH 0.1250 93,500.00 11,687.50
Kepala Tukang L.03 OH 0.0130 99,000.00 1,287.00
Mandor L.04 OH 0.0130 105,100.00 1,366.30
Jumlah Harga Tenaga 32,490.80
B BAHAN
Keramik Lantai KW II 40x40 buah 6.6300 11,945.70 79,200.00
Semen Portland kg 9.8000 1,758.00 17,228.40
Semen Warna kg 0.1625 15,600.00 2,535.00
Pasir Pasang m3 0.0450 168,300.00 7,573.50
Jumlah Harga Bahan 106,536.90
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 139,027.70
E Overhead & Profit 10% (10% x D) 13,902.77
F Harga Satuan Pekerjaan (D+E) 152,930.47
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 72,600.00 3,630.00
Tukang Kayu L.02 OH 0.0500 82,500.00 4,125.00
Kepala Tukang L.03 OH 0.0050 99,000.00 495.00
Mandor L.04 OH 0.0030 105,100.00 315.30
Jumlah Harga Tenaga 8,565.30
B BAHAN
List Gypsum Profil 5 cm m' 1.0500 8,500.00 8,925.00
Paku Eternit kg 0.1100 27,500.00 3,025.00
Jumlah Harga Bahan 11,950.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 72,600.00 3,630.00
Tukang Kayu L.02 OH 0.0500 82,500.00 4,125.00
Kepala Tukang L.03 OH 0.0050 99,000.00 495.00
Mandor L.04 OH 0.0030 105,100.00 315.30
Jumlah Harga Tenaga 8,565.30
B BAHAN
Kayu lis plapond m 1.0500 13,750.00 14,437.50
Paku Eternit kg 0.1100 27,500.00 3,025.00
Jumlah Harga Bahan 17,462.50
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 72,600.00 8,712.00
Tukang Besi L.03 OH 0.0600 93,500.00 5,610.00
Kepala Tukang L.11 OH 0.0060 99,000.00 594.00
Mandor L.15 OH 0.0060 105,100.00 630.60
Jumlah Harga Tenaga 15,546.60
B BAHAN
Spandek 0,30 mm lebar 70 cm m' 1.5000 46,200.00 69,300.00
Screw Spandek 7 cm kg 5.0000 700.00 3,500.00
Jumlah Harga Bahan 72,800.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 72,600.00 10,890.00
Tukang Besi L.03 OH 0.0700 93,500.00 6,545.00
Kepala Tukang L.11 OH 0.0070 99,000.00 693.00
Mandor L.15 OH 0.0070 105,100.00 735.70
Jumlah Harga Tenaga 18,863.70
B BAHAN
Nok Spandek T= 0.3 mm m' 1.0500 33,500.00 35,175.00
Screw Spandek 7 cm buah 5.0000 700.00 3,500.00
Jumlah Harga Bahan 38,675.00
C PERALATAN
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 57,538.70
E Overhead & Profit 10% (10% x D) 5,753.87
F Harga Satuan Pekerjaan (D+E) 63,292.57
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 72,600.00 14,520.00
Tukang Besi L.03 OH 0.2000 93,500.00 18,700.00
Kepala Tukang L.11 OH 0.0200 99,000.00 1,980.00
Mandor L.15 OH 0.0010 105,100.00 105.10
Jumlah Harga Tenaga 35,305.10
B BAHAN
Nok Spandek T= 0.3 mm m' 1.0500 33,500.00 35,175.00
Perlengkapan 35 % harga pipa 0.3500 11,725.00 4,103.75
Jumlah Harga Bahan 39,278.75
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.0000 72,600.00 435,600.00
Tukang Kayu L.03 OH 18.0000 82,500.00 1,485,000.00
Kepala Tukang L.03 OH 1.8000 99,000.00 178,200.00
Mandor L.04 OH 0.3000 105,100.00 31,530.00
Jumlah Harga Tenaga 2,130,330.00
B BAHAN
Balok Kayu Klas II m³ 1.2000 14,955,600.00 17,946,720.00
Paku 7 cm - 12 cm kg 1.2500 15,000.00 18,750.00
Lem Kayu kg 1.0000 44,000.00 44,000.00
Jumlah Harga Bahan 18,009,470.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 72,600.00 72,600.00
Tukang Kayu L.03 OH 3.0000 82,500.00 247,500.00
Kepala Tukang L.03 OH 0.3000 99,000.00 29,700.00
Mandor L.04 OH 0.0500 105,100.00 5,255.00
Jumlah Harga Tenaga 355,055.00
B BAHAN
Balok Kayu Klas II m³ 0.0400 14,955,600.00 598,224.00
Lem Kayu kg 0.5000 44,000.00 22,000.00
Jumlah Harga Bahan 620,224.00
C PERALATAN
A.4.6.1.13Pemasangan 1 m³ konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 72,600.00 290,400.00
Tukang Kayu L.03 OH 12.0000 82,500.00 990,000.00
Kepala Tukang L.03 OH 1.2000 99,000.00 118,800.00
Mandor L.04 OH 0.2000 105,100.00 21,020.00
Jumlah Harga Tenaga 1,420,220.00
B BAHAN
Balok Kayu Klas II m3 1.1000 14,955,600.00 16,451,160.00
Besi Strip tebal 5 mm kg 15.0000 12,000.00 180,000.00
Paku 7 cm - 12 cm kg 5.6000 15,000.00 84,000.00
Jumlah Harga Bahan 16,715,160.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 72,600.00 1,452.00
Tukang Cat L.02 OH 0.2000 93,500.00 18,700.00
Kepala Tukang L.03 OH 0.0200 99,000.00 1,980.00
Mandor L.04 OH 0.0025 105,100.00 262.75
Jumlah Harga Tenaga 22,394.75
B BAHAN
Meni Besi kg 0.1000 33,300.00 3,330.00
Kuas buah 0.0100 11,500.00 115.00
Jumlah Harga Bahan 3,445.00
C PERALATAN
A.4.7.1.21Pengecatan 1 m² permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 72,600.00 29,040.00
Tukang Cat L.02 OH 0.7000 93,500.00 65,450.00
Kepala Tukang L.03 OH 0.0700 99,000.00 6,930.00
Mandor L.04 OH 0.0200 105,100.00 2,102.00
Jumlah Harga Tenaga 103,522.00
B BAHAN
Cat Genteng kg 0.3000 71,400.00 21,420.00
Meni Besi liter 0.0100 33,300.00 333.00
Jumlah Harga Bahan 21,753.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 72,600.00 1,452.00
Tukang Cat L.02 OH 0.2000 93,500.00 18,700.00
Kepala Tukang L.03 OH 0.0200 99,000.00 1,980.00
Mandor L.04 OH 0.0025 105,100.00 262.75
Jumlah Harga Tenaga 22,394.75
B BAHAN
Cat Besi kg 0.1000 39,400.00 3,940.00
Kuas liter 0.0100 11,500.00 115.00
Jumlah Harga Bahan 4,055.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 72,600.00 2,613.60
Tukang Batu L.02 0.0600 93,500.00 5,610.00
Kepala Tukang L.03 0.0060 99,000.00 594.00
Mandor L.04 OH 0.0020 105,100.00 210.20
Jumlah Harga Tenaga 9,027.80
B BAHAN
Pipa PVC AW Ø 1/2" m 1.2000 7,500.00 9,000.00
Perlengkapan % 35.0000 2,625.00 2,625.00
Jumlah Harga Bahan 11,625.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 72,600.00 2,613.60
Tukang Batu L.02 OH 0.0600 93,500.00 5,610.00
Kepala Tukang L.03 OH 0.0060 99,000.00 594.00
Mandor L.04 OH 0.0020 105,100.00 210.20
Jumlah Harga Tenaga 9,027.80
B BAHAN
Pipa PVC AW Ø 3/4" m' 1.2000 10,000.00 12,000.00
Perlengkapan % 35.0000 3,500.00 3,500.00
Jumlah Harga Bahan 15,500.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 72,600.00 2,613.60
Tukang Batu L.02 0.0600 93,500.00 5,610.00
Kepala Tukang L.03 0.0060 99,000.00 594.00
Mandor L.04 OH 0.0020 105,100.00 210.20
Jumlah Harga Tenaga 9,027.80
B BAHAN
Pipa PVC AW Ø 1" m 1.2000 13,000.00 15,600.00
Perlengkapan % 35.0000 4,550.00 4,550.00
Jumlah Harga Bahan
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 72,600.00 3,920.40
Tukang Batu L.02 OH 0.0900 93,500.00 8,415.00
Kepala Tukang L.03 OH 0.0090 99,000.00 891.00
Mandor L.04 OH 0.0030 105,100.00 315.30
Jumlah Harga Tenaga 13,541.70
B BAHAN
Pipa PVC AW Ø 2" m' 1.2000 25,000.00 30,000.00
Perlengkapan % 35.0000 8,750.00 8,750.00
Jumlah Harga Bahan 38,750.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 72,600.00 5,880.60
Tukang Batu L.02 OH 0.1350 93,500.00 12,622.50
Kepala Tukang L.03 OH 0.0135 99,000.00 1,336.50
Mandor L.04 OH 0.0040 105,100.00 420.40
Jumlah Harga Tenaga 20,260.00
B BAHAN
Pipa PVC AW Ø 3" m' 1.2000 43,000.00 51,600.00
Perlengkapan % 35.0000 15,050.00 15,050.00
Jumlah Harga Bahan 66,650.00
C PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 72,600.00 5,880.60
Tukang Batu L.02 OH 0.1350 93,500.00 12,622.50
Kepala Tukang L.03 OH 0.0135 99,000.00 1,336.50
Mandor L.04 OH 0.0040 105,100.00 420.40
Jumlah Harga Tenaga 20,260.00
B BAHAN
Pipa PVC AW Ø 4" m 1.2000 67,500.00 81,000.00
Perlengkapan % 35.0000 23,625.00 23,625.00
Jumlah Harga Bahan 104,625.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 124,885.00
E Overhead & Profit 10% (10% x D) 12,488.50
F Harga Satuan Pekerjaan (D+E) 137,373.50
A.5.1.1.32 1 bh PEKERJAAN MEMASANG AIR BERSIH
A.5.1.1.32. 1 M¹ PAS. BUIS BETON 1/2 Ø 30CM
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Tenaga
1 Pekerja L.01 OH 0.0810 72,600.00 5,880.60
2 Tukang Batu L.02 OH 0.1350 93,500.00 12,622.50
3 Kepala Tukang L.03 OH 0.0135 99,000.00 1,336.50
4 Mandor L.04 OH 0.0040 105,100.00 420.40
Jumlah Tenaga Kerja 20,260.00
B Bahan
1 Buis Beton 1/2 linkaran Dia. 30 Cm x 100 BH 1.0000 52,800.00 52,800.00
2 Bata merah kelas 1 BH - 800.00 -
52,800.00
C Peralatan
Dimensi Panjang Diameter Tulangan Berat Tulangan Per-Meter Jrk begel Panjang Jumlah Tulangan
NO. JENIS BETON bxh Per - m3 Pokok Ekstra Begel Pokok Ekstra Begel Rata@ Begel / bh Pokok Ekstra
(CM) (M) (MM) (MM) (MM) (KG/M) (KG/M) (KG/M) (CM) (M) (BH) (BH)
SLOOF
1 Sloof 15/20 15.0 x 20 33.33 10 - 6 0.616 0.000 0.222 14 0.52 4.00 -
1 Sloof 15/30 Kios 15.0 x 30.00 22.22 12.00 0.00 8.00 0.89 0.00 0.39 16.30 0.73 5.00 0.00
1 Sloof 20/30 (los) 20.0 x 30.00 16.67 13.00 0.00 8.00 1.04 0.00 0.39 16.30 0.83 6.00 0.00
Dimensi Panjang Diameter Tulangan Berat Tulangan Per-Meter Jrk begel Panjang Jumlah Tulangan
NO. JENIS BETON bxh Per - m3 Pokok Ekstra Begel Pokok Ekstra Begel Rata@ Begel / bh Pokok Ekstra
(CM) (M) (MM) (MM) (MM) (KG/M) (KG/M) (KG/M) (CM) (M) (BH) (BH)
KOLOM
1 Kolom (20/25) 20 x 25 20.00 12.0000 - 8.0000 0.886 0.000 0.394 13.75 0.72 6.0000 -
1 Kolom 25/35 (Bencingah) 25 x 35 11.43 13.0000 - 8.0000 1.040 0.000 0.394 13.63 1.03 8.0000 -
1 Kolom 25/40 (los) 25 x 40 10.00 16.0000 16.00 8.0000 1.576 1.576 0.394 13.75 1.14 6.0000 2.00
Dimensi Panjang Diameter Tulangan Berat Tulangan Per-Meter Jrk begel Panjang Jumlah Tulangan
NO. JENIS BETON bxh Per - m3 Pokok Ekstra Begel Pokok Ekstra Begel Rata@ Begel / bh Pokok Ekstra
(CM) (M) (MM) (MM) (MM) (KG/M) (KG/M) (KG/M) (CM) (M) (BH) (BH)
BALOK
1 Balok Gantung 10/25 10 x 25 40.00 13.00 - 6.0000 1.040 0.000 0.222 13.75 0.52 4.00 -
2 Balok dack 15/30 15 x 30 22.22 13.00 - 6.0000 1.040 0.000 0.222 12.26 0.73 4.00 -
3 Balok dack 15/30 15 x 30 22.22 13.00 - 6.0000 1.040 0.000 0.222 12.26 0.73 4.00 -
4 Balok dack 15/35 15 x 35 19.05 13.00 - 6.0000 1.040 0.000 0.222 12.00 0.83 7.00 -
Dimensi Panjang Diameter Arah X Diameter Arah Y Berat Tul. X Berat Tul. Y
No. Jenis Beton b x l x h Per - m3 Pokok Bagi Pokok Bagi Pokok Bagi Pokok Bagi
(CM) (M3) (MM) (MM) (MM) (MM) (KG/M) (KG/M) (KG/M) (KG/M)
PELAT
1 Pelat Deker T = 8 100 x 100 x 8.00 12.50 8.00 8.00 0.39 0.39
1 Pelat Topian dan T = 8 100 x 100 x 7.00 14.29 8.00 8.00 0.39 0.39
1 Pelat Meja Beton dan T = 10 100 x 100 x 8.00 12.50 8.00 8.00 0.39 0.39
ETON
ERJAAN
Jarak Tulangan Panjang Tul X Panjang Tul Y Jumlah tulangan Berat Tul. X Berat Tul. Y Kebutuhan
Pokok Bagi Pokok Bagi Pokok Bagi Pokok Bagi Pokok Bagi Pokok Bagi Tulangan Beton Begisting Bekisting
(CM) (CM) (CM) (CM) (CM) (CM) (BH) (BH) (KG) (KG) (KG) (KG) (KG)/M3 (M3) Perancah (M2)
7.666667
umlah Tulangan Berat Total Tulangan Kebutuhan
Begel Pokok Ekstra Begel Tulangan Beton Begisting
(BH) (KG) (KG) (KG) (KG) (M3) (M2)
Jarak Tulangan Panjang Tul X Panjang Tul Y Jumlah tulangan Berat Tul. X Berat Tul. Y Kebutuhan
Pokok Bagi Pokok Bagi Pokok Bagi Pokok Bagi Pokok Bagi Pokok Bagi Tulangan Beton Begisting Begisting
(CM) (CM) (CM) (CM) (CM) (CM) (BH) (BH) (KG) (KG) (KG) (KG) (KG)/M3 (M3) (M3) (M2)
###
100 100 100 100 7.00 7.00 2.76 2.758 89.6324 12.5000
###
100 100 100 100 7.00 7.00 2.76 2.758 102.4370 14.2857
100 100 100 100 7.00 7.00 2.76 2.758 89.6324 12.5000
1
***** PERHITUNGAN VOLUME PEKERJAAN *****
Oleh : MUHAMMAD AKUP, ST
DATA UMUM :
I. PEKERJAAN PENDAHULUAN
1. Pembersihan Lokasi = 304.29
2. Pengukuran dan Bouplank = 76.00 m'
3. Papan nama proyek = Ls
II. PEKERJAAN TANAH DAN PASIR
5 Akibat Rolak
Lebar pasangan (b) Tinggi pasangan (h) Panjang pasangan (L)
0.04 m' 0.00 m' 96.00 m'
Volume 3.40426752 m3
1 Pasangan BATU KALI Saluran Posisi Atas Luar dan dalam ( Bidang 1 )
Lebar pasangan (b) Tinggi pasangan (h) Panjang pasangan (L)
0.35 m' 0.5 m' 146.40 m'
Volume 23.790 m3 Lebar Puncak (c)
0.30 m'
2 Pasangan BATU KALI Saluran Posisi Bawah Luar dan dalam ( Bidang 2 )
Lebar pasangan (b) Tinggi pasangan (h) Panjang pasangan (L)
0.35 m' 0.4 m' 146.40 m'
Volume 40.992 m3
1. Pasangan ROLLAG
Lebar pasangan (b) Tinggi pasangan (h) Panjang pasangan (L)
2 Beton Sloof 20 / 30
Lebar Sloof (b) Tinggi Sloof (h) Panjang Sloof (L)
0.20 m' 0.30 m' 60.00 m'
Volume 3.6 m3
2 Pelat Deker T = 10
34.91 m2 0.00 m'
Volume 0 m3
V. PEKERJAAN PLESTERAN
1 Plesteran Tangga
Lebar Tinggi Panjang
0.00 m' 0.20 m' 80.84 m'
Luas Plesteran 80.84 m2
4 Peleteran Kolom
Keliling Tinggi Jumlah
1.41 m' 0.58 m' 10.00 sisi
Luas Plesteran 8.178 m2
5 Peleteran Saluran
Keliling luar Tinggi Luasan
0.00 m' 0.76 m' 14.00 sisi
Luas Plesteran 14.00 m2
Total Siaran
Berat
No ELMEN
kg/m'
1 WF 200.100.5,5.8 21.30
2 WF 150.75.5.7 14.00
3 WF = 300. 150.6,5.9 0.00
3 Pipa Baja Diamer 6" ( T=4.5 mm ) 17.80
4 Pipa Baja Diamer 3" ( T=2.3 mm ) 4.14
5 Pipa Baja Dim 2" ( T=2.3 mm ) Tegak 2.82
6 Pipa Baja Dim 1" ( T=2.3 mm ) 1.41
7 Holo Kotak 100.50.2,3 5.14
8 Gording CNP 100.50.20. 2,3 4.96
9 CNP 200.75.20.3.2 9.27
10 Jumlah Kolom baja 10.00
Kebutuhan Pelat
Elemen Berat Jumlah Panjang Tot. Panjang
No kg/m' (bh) (m) (m)
PEKERJAAN PENGELASAN
1. BAJA
Elemen Jumlah Panjang Tot. Panjang
No berat (bh) (m) (m)
13 Pipa Gride 2 inc Btg tegak dan miring - 228 0.16 36.252
15 Pipa Gride 2 inc Btg tegak dan miring Ata - 132 0.16 20.988
Total
Kebutuhan Baut
No Elemen Jenis Baut Jum Baut Elemen
1 Plat Landas 24 8 10.00
Kebutuhan Baut
No Elemen Jenis Baut Jum Baut Elemen
2 Sambungan Kolom 20 12 10.00
Kebutuhan Baut
No Elemen Jenis Baut Jum Baut Elemen
1 1/2 Kuda, Jurai 16 8 6
2 Pertemuan Kuda-kuda 16 8 2
TOTAL SATUAN
134.05 m2
170.24 m2
304.29 m2
72.00 m2
50.80 m2
80.84 m2
67.36 m2
10.00 m2
72.00 m2
76.80 m2
74.40 m2
= 21.60
= 0.00
= 123.62
= 33.70
35.32 752.316
9.8 137.200
11.34 158.760
2.95 62.835
2.3 32.200
0.32 4.480
8.7 185.310
185.310
2,179.14
116 480.240
40.5 114.210
71 200.220
TOTAL 794.670
1,675.92
323.87
158.14
117.53
12.4 12.400
8 8.000
17.4 17.400
5.6 5.600
17.536 17.536
6.72 6.720
16.8 16.800
0.752 0.752
3.24 3.240
12.3824 12.382
5.52 5.520
36.252 36.252
2.544 2.544
20.988 20.988
182.784
Total Baut
80
80.000
Total Baut
120
120.000
Total Baut
48
16
64.000
TERTERA DI RAB
PASANGAN BATA
Trasraam = 0.60 x 1.00 x 1.00 x 1.00 x 65.60 = 39.360 m2
Pas. Bata dinding = 2.50 x 1.00 x 1.00 x 1.00 x 68.00 = 154.000 m2
Trasraam Saluran = 0.20 x 1.00 x 1.00 x 1.00 x 144.40 = 12.880 m2
PEKERJAAN BETON
Pondasi tapak = 1.00 x 1.00 x 0.40 x 1.00 x 8.00 = 3.200 m3 0.400
Kolom 30/30 = 0.30 x 0.30 x 1.85 x 1.00 x 8.00 = 1.332 m3
Sloof 20/30 = 0.20 x 0.30 x 1.00 x 1.00 x 86.00 = 5.160 m3
Plat Lantai = 15.80 x 17.80 x 0.08 x 1.00 x 1.00 = 22.499 m3
Lantai Kerja = 15.80 x 17.80 x 0.05 x 1.00 x 1.00 = 14.062 m3
Beton Rabat selasar = 0.08 x 66.96 x 1.00 x 1.00 x 1.00 = 5.357 m3
Beton Rabat lantai saluran = 0.05 x 75.00 x 0.25 x 1.00 x 1.00 = 0.938 m3
Kolom Praktis 10/10 = 0.10 x 0.10 x 2.50 x 1.00 x 13.00 = 0.325 m3
Ring Balok 10/20 = 0.10 x 0.20 x 1.00 x 1.00 x 86.00 = 1.720 m3
PINTU
Pondasi tapak = 1.00 x 1.00 x 0.40 x 1.00 x 2.00 = 0.800 m3
Kolom 30/30 = 0.30 x 0.30 x 5.70 x 1.00 x 2.00 = 1.026 m3
Balok gantung 30/30 = 0.30 x 0.30 x 4.00 x 1.00 x 1.00 = 0.360 m3
KODE
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pek. Uitzet & Bouplank 40.000 m¹ A.2.2.1.4.
2 Pek. Pembersihan awal sampai akhir 100.000 m² A.2.2.1.9.
3 Pek. Pembuatan Papan Nama Proyek 0.910 m² A.2.2.1.4.a.
Jumlah I
II. PEKERJAAN TANAH DAN URUGAN
1 Pek. Galian tanah pondasi Kurang 1 m 46.195 m³ A.2.3.1.1.
2 Pek. Urugan tanah kembali 15.398 m³ A.2.3.1.9.
3 Pek. Urugan tanah dalam bangunan 14.965 m³ A.2.3.1.14.
4 Pek. Urugan pasir bawah pondasi dan bawah lantai 8.692 m³ A.2.3.1.11.
Jumlah II
III. PEKERJAAN PASANGAN DAN BETON
1 Pek. Pasangan pondasi batu kali 1:5 9.434 m³ A.3.2.1.3.
2 Pek. Pasangan batu kosong 6.709 m³ A.3.2.1.9.
3 Pek. Pasangan batu bata 1/2 batu 1:5 77.989 m² A.4.4.1.10.
4 Pek. Plesteran 1:5 155.978 m² A.4.4.2.5.
5 Pek. Plesteran Acian 155.978 m² A.4.4.2.27.
6 Pek. Plesteran Siaran Batu 16.772 m² A.4.4.2.26.
7 Pek. Poot Plat 100 x 100 4.685 m³ A.4.1.1.1a
8 Pek. Sloof = 20 x 30 5.580 m³ A.4.1.1.1b1
9 Pek. Kolom = 25 x 35 2.500 m³ A.4.1.1.1c2…..
10 Pek. Balok gantung = 30 x 30 0.774 m³ A.4.1.1.1c2…..
11 Pek. Ring Balok = 10 x 15 33.300 m' A.4.1.1.36.
12 Pek. Plat Lantai = 30 x 30 0.414 m³ A.4.1.1.1a
13 Pek. Rabat Lantai & lantai kerja pondasi footplate 1:3:5 6.772 m³ A.4.1.1.1.
14 Pek. Kolom Praktis - m' A.4.1.1.35.
Jumlah III
IV. PEKERJAAN BESI DAN ALUMUNIUM
1 Pek.Kons.Kuda-Kuda WF100.100.6.8 ( Sertifikat) 1,013.906 kg A.4.2.1.1.
2 Pek. Kolom WF.100.100.6.8 ( Sertifikat) 963.200 kg A.4.2.1.1.
3 Pek. Gording CNP 100.50.6.8,5 dan Lisplang CNP 200.75.20.3,2 1,165.500 kg A.4.2.1.1.
4 Pek. Plat Landas, Kopalel dan Pelat Bohol 384.650 kg A.4.2.1.1.
5 Pek. Baja Siku L 50.50.5.& L 30.30.3 dan Plat Strip 383.574 kg A.4.2.1.1.
6 Pek. Besi Polos Dia 10 Triktang & Kait Angin) 28.472 kg A.4.2.1.1.a.
7 Pek. Pasang Baut D 14 120.000 bh A.4.2.1.5.a.
8 Pek. Pasang Baut D 20 120.000 bh A.4.2.1.5.b.
9 Pek. Pasang Angkar Baut D 22 P= 40 Cm 60.000 bh A.4.2.1.5.c.
10 Pek. Triktang Dia 12 Panjang 8" - bh A.4.2.1.5.e.
11 Pek. Penyetelan dan Erection 3,910.829 kg A.4.2.1.3.
12 Pek. Pengelasan 616.897 cm A.4.2.1.5.
13 Pek. Pembuatan dan pemasangan Pintu sorong 1.000 unit A.4.2.1.4.A
Jumlah IV
V PEKERJAAN ATAP
1 Pek. Pas.Spandek 0,3 mm ( atap & dinding ) 207.917 m² A.4.5.2.36.a.
2 Pek. Nok Spandek T = 0,30 mm Lebar 70 cm 11.250 m¹ A.4.5.2.36.b.
Jumlah V
VI PEKERJAAN PENGECATAN
1 Cat Tembok mutu Menengah 155.978 m² A.4.7.1.10.
2 Pengecatan Baja dengan meni 45.705 m² A.4.7.1.16.
2 Pengecatan Baja dengan cat besi 45.705 m² A.4.7.1.21.a.
Jumlah VII
REKAPITULASI
Kegiatan : Pengelolaan Sumber Daya Pesisir dan Laut (PUGAR)
Pekerjaan : Penyusunan Dokumen Perencanaan Pengembangan Kawasan Usaha Garam Rakyat K
Lokasi : Dusun Bengkang, Desa Buwun Mas, Kec. Sekotong
Kabupaten : Lombok Barat
Tahun Anggaran : 2018
NO JENIS PEKERJAAN
1 2
I. PEKERJAAN PERSIAPAN
V PEKERJAAN ATAP
VI PEKERJAAN PENGECATAN
REAL COST
PPN 10 %
JUMLAH
JUMLAH DIBULATKAN
Terbilang : EMPAT RATUS SEMBILAN BELAS JUTA LIMA RATUS EMPAT PULUH LIMA RIBU RUPIAH
Bertais, Nove
Diperiksa Oleh
Pejabat Pembuat Komitmen Konsultan P
Dinas Kelautan dan Perikanan CV. JAGAD GEMA Y
Kab. Lombok Barat
Mengetahui
Kepala Dinas Kelautan dan Perikanan
Kab. Lombok Barat
Ir. H. SUBANDI
NIP. 19630828 199003 1 006
ANGGARAN BIAYA (RAB)
HARGA
JUMLAH HARGA
SATUAN
(Rp.) (Rp.)
6 7
68,823.19 2,752,927.76
13,766.50 1,376,650.00
113,082.64 102,905.20
4,232,482.96
62,785.25 2,900,364.62
45,710.50 703,865.52
179,143.25 2,680,789.16
222,586.10 1,934,774.03
8,219,793.33
857,387.52 8,088,808.21
429,088.11 2,878,666.31
125,716.18 9,804,479.47
57,591.35 8,982,983.47
34,786.95 5,425,998.89
57,235.00 959,945.45
4,205,900.03 19,704,641.62
7,300,764.53 40,738,266.06
12,641,243.71 31,603,109.28
12,641,243.71 9,784,322.63
123,424.84 4,110,047.17
4,205,900.03 1,741,242.61
998,830.11 6,764,149.41
100,707.75 -
150,586,660.58
35,112.33 35,600,588.02
35,112.33 33,820,196.26
35,112.33 40,923,420.62
35,112.33 13,505,957.73
35,112.33 13,468,162.82
28,407.83 808,830.07
2,112.00 253,440.00
2,156.00 258,720.00
10,736.00 644,160.00
28,462.83 -
3,572.08 13,969,792.81
1,783.30 1,100,111.81
34,660,514.81 34,660,514.81
189,013,894.94
97,181.26 20,205,670.05
63,292.57 712,041.41
20,917,711.46
37,219.05 5,805,352.98
28,423.73 1,299,095.69
29,094.73 1,329,763.50
8,434,212.17
EKAPITULASI
JUMLAH
3
Rp. 4,232,482.96
Rp. 8,219,793.33
Rp. 150,586,660.58
Rp. 189,013,894.94
Rp. 20,917,711.46
Rp. 8,434,212.17
Rp. 381,404,755.45
Rp. 38,140,475.54
Rp. 419,545,230.99
Rp. 419,545,000.00
A LIMA RATUS EMPAT PULUH LIMA RIBU RUPIAH
KODE
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pek. Uitzet & Bouplank 76.000 m¹ A.2.2.1.4.
2 Pek. Pembersihan awal sampai akhir 114.000 m² A.2.2.1.9.
3 Pek. Pembuatan Papan Nama Proyek 1.500 m² A.2.2.1.4.a.
Jumlah I
II. PEKERJAAN TANAH DAN URUGAN
1 Pek. Galian tanah pondasi Kurang 1 m 114.804 m³ A.2.3.1.1.
2 Pek. Galian tanah pondasi lebih dari 2 m - m³ A.2.3.1.2.
3 Pek. Urugan tanah kembali 38.268 m³ A.2.3.1.9.
4 Pek. Urugan tanah dalam bangunan 92.310 m³ A.2.3.1.14.
5 Pek. Urugan pasir bawah pondasi dan bawah lantai 31.472 m³ A.2.3.1.11.
Jumlah II
III. PEKERJAAN PASANGAN DAN BETON
1 Pek. Pasangan pondasi batu kali 1:5 19.350 m³ A.3.2.1.3.
2 Pek. Pasangan batu kosong 13.760 m³ A.3.2.1.9.
3 Pek. Pasangan batu bata 1/2 batu 1:5 289.240 m² A.4.4.1.10.
4 Pek. Plesteran 1:5 578.480 m² A.4.4.2.5.
5 Pek. Plesteran Acian 578.480 m² A.4.4.2.27.
6 Pek. Plesteran Siaran Batu - m² A.4.4.2.26.
7 Pek. Poot Plat 100 x 100 4.000 m³ A.4.1.1.1a
8 Pek. Sloof = 20 x 30 5.160 m³ A.4.1.1.1b1
9 Pek. Kolom = 25 x 35 2.358 m³ A.4.1.1.1c2…..
10 Pek. Balok gantung = 30 x 30 0.360 m³ A.4.1.1.1c2…..
11 Pek. Ring Balok = 10 x 15 68.000 m' A.4.1.1.36.
12 Pek. Plat Lantai = 30 x 30 22.499 m³ A.4.1.1.1a
13 Pek. Rabat Lantai & lantai kerja pondasi footplate 1:3:5 64.749 m³ A.4.1.1.1.
14 Pek. Kolom Praktis 25.000 m' A.4.1.1.35.
Jumlah III
IV. PEKERJAAN BESI DAN ALUMUNIUM
1 Pek.Kons.Kuda-Kuda WF200.100.5,5.8 .WF 150.75.5.7 ( Sertifikat) 3,216.000 kg A.4.2.1.1.
2 Pek. Konstruksi Pipa 3", 4"dan 8" - kg A.4.2.1.1.
3 Pek. Gording CNP 150.50.20.2,3 dan Lisplang CNP 200.75.20.3,2 1,959.600 kg A.4.2.1.1.
4 Pek. Plat Landas, Kopalel dan Pelat Bohol 323.871 kg A.4.2.1.1.
5 Pek. Baja Siku L 50.50.5.& L 30.30.3 dan Plat Strip 604.444 kg A.4.2.1.1.
6 Pek. Besi Polos Dia 10 Triktang & Kait Angin) 176.300 kg A.4.2.1.1.a.
7 Pek. Pasang Baut D 14 128.000 bh A.4.2.1.5.a.
8 Pek. Pasang Baut D 20 240.000 bh A.4.2.1.5.b.
9 Pek. Pasang Angkar Baut D 22 P= 40 Cm 80.000 bh A.4.2.1.5.c.
10 Pek. Triktang Dia 12 Panjang 8" 12.000 bh A.4.2.1.5.e.
11 Pek. Penyetelan dan Erection 5,499.471 kg A.4.2.1.3.
12 Pek. Pengelasan 2,193.413 cm A.4.2.1.5.
13 Pek. Pembuatan dan pemasangan Pintu sorong 1.000 unit A.4.2.1.4.A
Jumlah IV
V. PEKERJAAN ATAP
1 Pek. Pas.Spandek 0,3 mm ( atap & dinding ) 825.903 m² A.4.5.2.36.a.
2 Pek. Nok Spandek T = 0,30 mm Lebar 70 cm 102.240 m¹ A.4.5.2.36.b.
Jumlah V
VI. PEKERJAAN PENGECATAN
1 Cat Tembok mutu Menengah 578.480 m² A.4.7.1.10.
2 Pengecatan Baja dengan meni 243.758 m² A.4.7.1.16.
3 Pengecatan Baja dengan cat besi 243.758 m² A.4.7.1.21.a.
Jumlah VII
REKAPITULASI
Kegiatan : Pengelolaan Sumber Daya Pesisir dan Laut (PUGAR)
Pekerjaan : Penyusunan Dokumen Perencanaan Pengembangan Kawasan Usaha Garam Rakyat Ka
Lokasi : Dusun Bengkang, Desa Buwun Mas, Kec. Sekotong
Kabupaten : Lombok Barat
Tahun Anggaran : 2018
NO JENIS PEKERJAAN
1 2
I. PEKERJAAN PERSIAPAN
V. PEKERJAAN ATAP
VI PEKERJAAN PENGECATAN
REAL COST
PPN 10 %
JUMLAH
JUMLAH DIBULATKAN
Terbilang : DELAPAN RATUS SEMBILAN PULUH TIGA JUTA DUA RATUS TUJUH PULUH ENAM RIBU
Bertais, Nov
Diperiksa Oleh
Pejabat Pembuat Komitmen Konsultan
Dinas Kelautan dan Perikanan CV. JAGAD GEMA Y
Kab. Lombok Barat
Mengetahui
Kepala Dinas Kelautan dan Perikanan
Kab. Lombok Barat
Ir. H. SUBANDI
NIP. 19630828 199003 1 006
ANGGARAN BIAYA (RAB)
HARGA
JUMLAH HARGA
SATUAN
(Rp.) (Rp.)
6 7
68,823.19 5,230,562.74
13,766.50 1,569,381.00
113,082.64 169,623.96
6,969,567.70
62,785.25 7,207,997.84
77,076.45 -
45,710.50 1,749,249.41
179,143.25 16,536,713.41
222,586.10 7,005,229.74
32,499,190.40
857,387.52 16,590,448.51
429,088.11 5,904,252.39
125,716.18 36,362,149.06
57,591.35 33,315,443.69
34,786.95 20,123,554.84
57,235.00 -
4,205,900.03 16,823,600.10
7,300,764.53 37,671,944.95
12,641,243.71 29,808,052.67
12,641,243.71 4,550,847.74
123,424.84 8,392,889.12
4,205,900.03 94,629,385.87
998,830.11 64,673,550.35
100,707.75 2,517,693.75
371,363,813.04
35,112.33 112,921,253.28
35,112.33 -
35,112.33 68,806,121.87
35,112.33 11,371,865.43
35,112.33 21,223,452.80
28,407.83 5,008,286.23
2,112.00 270,336.00
2,156.00 517,440.00
10,736.00 858,880.00
28,462.83 341,553.96
3,572.08 19,644,547.62
1,783.30 3,911,508.66
34,077,234.25 34,077,234.25
278,952,480.09
97,181.26 80,262,294.18
63,292.57 6,471,032.36
86,733,326.53
37,219.05 21,530,476.04
28,423.73 6,928,510.36
29,094.73 7,092,071.98
35,551,058.38
EKAPITULASI
JUMLAH
3
Rp. 6,969,567.70
Rp. 32,499,190.40
Rp. 371,363,813.04
Rp. 278,952,480.09
Rp. 86,733,326.53
Rp. 35,551,058.38
Rp. 812,069,436.15
Rp. 81,206,943.62
Rp. 893,276,379.77
Rp. 893,276,000.00
H TIGA JUTA DUA RATUS TUJUH PULUH ENAM RIBU RUPIAH
PEKERJAAN :
LOKASI :
TA :
PANJANG :
LEBAR :
LEBAR :
Perhitungan
No. Uraian Pekerjaan Satuan Volume Pekerjaa
P x L x
I PEKERJAAN PERSIAPAN
1 Pek. Uitzet & Bouplank m¹ 10 + 10
2 Pek. Pembersihan awal sampai akhir m² 10 x 10
3 Pek. Pembuatan Papan Nama Proyek m² 1.3 x 0.7
3 Pek. Gording CNP 100.50.6.8,5 dan Lisplang CNP 200.75.20.3, kg Panjang Berat
Gording CNP 100 kg 11.25 x 10.6
Lisplang CNP.200 kg 11.25 x 25.3
6 Pek. Besi Polos Dia 10 Triktang & Kait Angin) kg 46.146 x 0.617
V PEKERJAAN ATAP
1 Pek. Pas.Spandek 0,3 mm ( atap & dinding ) m² P L
ATAP m² 13.253 x 11.25
DINDING m² 24.65 x
GUNUNGAN1 m² 8.81 x
GUNUNGAN2 m² 8.81 x
VI PEKERJAAN PENGECATAN
1 Cat Tembok mutu Menengah m²
2 Pengecatan Baja dengan meni m² Luas penampang Panjang
Pek.Kons.Kuda-Kuda WF100.100.6.8 ( Sertifikat) m² 21.9 x 14.737
Pek. Kolom WF.100.100.6.8 ( Sertifikat) m² 21.9 x 56
Gording CNP 100 m² 22.7 x 56.25
Lisplang CNP.200 m² 55.8 x 22.5
Besi Siku 50.50 m² 4.8 x 77.04
Besi Siku 30.30 m² 1.74 x 68.48
x 2 = 40 40.00
= 100 100.00
= 0.91 0.91
46.20
1.75 x 10 = 21.875
1 x = 18.24
1 x 2 = 6.08
15.40
0.2 = 14.9645 14.96
8.69
0.1 x 10 = 1.21
0.1 = 7.48225
9.43
= 7.47
= 1.96425
4.69
0.4 x 10 = 4
0.1 x 10 = 0.685
33.30
= 0
=
n = 1013.91
x 4 = 145.168
x 4 = 868.7376
= 963.2 963.20
n = 1165.50
x 5 = 596.25
x 2 = 569.25
384.65
383.57
x 1 = 290.4408
x 2 = 93.1328
28.47
= 0 120.00
= 0 120.00
= 0 60.00
0.00
= 0
207.92
= 149.09625
1.65 = 40.6725
1.18 x 2 = 10.3958
0.44 x 2 = 7.7528
11.25
155.98
45.70
= 322.7403
= 1226.4
= 1276.875
= 1255.5
= 369.792
= 119.1552
45.70
empat ratus sembilan belas juta lima ratus empat puluh lima ribu rupiah
419,545,000.00
delapan ratus sembilan puluh tiga juta dua ratus tujuh puluh enam ribu rupiah
893,276,000.00
REKAPITULASI
PROGRAM Err:509
KEGIATAN Pengelolaan Sumber Daya Pesisir dan Laut (PUGAR)
PEKERJAAN Penyusunan Dokumen Perencanaan Pengembangan Kawasan Usaha Garam R
LOKASI Dusun Bengkang, Desa Buwun Mas, Kec. Sekotong
TAHUN Lombok Barat
:Disusun Oleh
:Disetujui Oleh Konsultan Perencana
Pejabat Pembuat Komitmen Dinas CV. DELTA PRADANA Consultan
Perindustrian dan Perdagangan
Kabupaten Lombok Barat
Mengetahui
Kepala Dinas Perindustian Perdagangan
Kabupaten Lombok Barat
JUMLAH HARGA
381,404,755.45
381,404,755.45
38,140,475.54
419,545,230.99
Rp 419,545,000.00
:Disusun Oleh
Konsultan Perencana
CV. DELTA PRADANA Consultan
KUSUMA NEGARA,SH
Direktur
REKAPITULASI
PROGRAM Err:509
KEGIATAN Pengelolaan Sumber Daya Pesisir dan Laut (PUGAR)
PEKERJAAN Penyusunan Dokumen Perencanaan Pengembangan Kawasan Usaha Garam R
LOKASI Dusun Bengkang, Desa Buwun Mas, Kec. Sekotong
TAHUN Lombok Barat
:Disusun Oleh
:Disetujui Oleh Konsultan Perencana
Pejabat Pembuat Komitmen Dinas CV. DELTA PRADANA Consultan
Perindustrian dan Perdagangan
Kabupaten Lombok Barat
Mengetahui
Mengetahui Kepala Dinas Pekerjaan Umum
Kepala Dinas Perindustian Perdagangan Kabupaten Lombok Barat
Kabupaten Lombok Barat
JUMLAH HARGA
381,404,755.45
381,404,755.45
38,140,475.54
419,545,230.99
Rp 419,545,000.00
:Disusun Oleh
Konsultan Perencana
CV. DELTA PRADANA Consultan
KUSUMA NEGARA,SH
Direktur
Mengetahui
Kepala Dinas Pekerjaan Umum
Kabupaten Lombok Barat