General:
a. concrete
B Breadth L Length
D Diameter H High
C.L Center Line
b. Reinforcement
@ Spaced at (B) Bottom
(T) Top (T&B) Top and Bottom
(E.F) Each Face (E.W) Each Way
Bar Dia. For Hot rolled mild steel Y Bar Dia. For Hot rolled High Yield Steel
L Branch (Leg of ink) 4L 4 Leg Link
Cont. Continuous Bars Add. Additional Bars to the continuous
G.8 The contractor shall provide all measures and precautions necessary to prevent settlement or damage of
adjacent existing or new construction.
G.9 Details not shown in drawings shall be in accordance with standard details as in British Standard or ACI
detailing manual.
G.10 The construction load on the floors should not exceed the specified live loads during any stage of
construction. The contractor should prepare all the shop drawings for shoring and staging which shall come on any
floor before construction of the floor.
G.11 Shop drawings for reinforcing steel and structural steel shall be submitted and approved by the Engineer before
fabrication may proceed.
G.12 Test results for Cement, Sand, Aggregate and Reinforcement shall be submitted to the consultant for approval.
Foundation notes:
F.1 The allowable net Soil bearing capacity is 170 KN/m2 on the depth of footings (1.5 m).
F.2 There were no underground water table according to Soil Mechanics report.
F.3 Lowering of the water table level must be accomplished as the excavation proceeds. It is recommended that the
ground water level is maintained at least 0.50m below the center of excavation while it remains open restoring the
ground water table to its initial position should be made once the weight of structure exceeds hydrostatic uplift and once
condition as in note (F.1) is fulfilled. (with no additional cost)
F.4 No back fill shall be placed against retaining walls unless the walls are sufficiently braced to prevent
movement of structural damage.
F.6 All foundation and sub-structure concrete/block work to be protected by 1000G polythene and 2 coats of cold
bitumen, and as per contract specifications (submitted to the Engineer's for approval).
F.7 In case proposed foundation level is deeper than the adjacent structure foundations, the contractor should
consult the consultant to decide the depth of foundation. The foundation depth may vary according to the site’s
condition.