You are on page 1of 26

Case study of an ECBC Compliant, Energy

Efficient Building: Aranya Bhawan, Jaipur

Prashant Bhanware
Indo-Swiss Building Energy Efficiency Project (BEEP)

2nd REGIONAL WORKSHOP ON ECBC IMPLEMENTATION IN STATES


March 15 & 16, 2017 | Hyatt, Ahmedabad
Outline of the Presentation

• About Indo-Swiss Building Energy Efficiency


Project (BEEP)
– Overview of BEEP charrettes
• Case study: Aranya Bhawan, Jaipur
• Learnings

Indo-Swiss Building Energy Efficiency Project 2


Indo-Swiss Building Energy Efficiency
Project (BEEP)

Phase I: 2012-2016

Phase II: 2017-2021

To assist Government of India


in mainstreaming thermally
comfortable and energy
efficient building design in
India

Indo-Swiss Building Energy Efficiency Project 3


Indo-Swiss Building Energy Efficiency
Project (BEEP)

Building Design Design support to large building projects

Building
Energy Efficient Building Envelope
Technology

Building
Design Guidelines for Residential & Public Buildings
Policy

Training &
Trainings, Seminars , Web , …
Information

Indo-Swiss Building Energy Efficiency Project 4


Energy Efficient Building Design

• Technical support to18 building projects


(IT buildings, hospital, offices, residential
Hospital Educational campus
complexes, academic institutions,..) Residential township
• >1.4 million m2 built-up area
• 25-40% estimated energy savings

Training institute & govt. office


World Trade Centre
Office & Retail complex

Indo-Swiss Building Energy Efficiency Project 5


Integrated Design Charrette Approach for ECBC
Compliance

100%
Energy Consumption

Passive Measures On-site Renewable


(Orientation, WWR, Active Measures Energy Generation
Business As Usual (Free cooling, ERW,
glazing, Shading,
Insulation, natural Evap. Cooling,
ventilation, Chiller selection & Net Energy
daylight…) operation,
innovative
technologies,…)

Minimize heat gain, Efficient HVAC &


Maximize Daylight lighting system

Indo-Swiss Building Energy Efficiency Project 6


Integrated Design Charrette Approach for ECBC
Compliance

Integrated Design during


Early-Design Phase

Indo-Swiss Building Energy Efficiency Project 7


What is Energy Performance Index (EPI)?

Renewable
electricity 

Grid Main Total
Electricity Meter electricity
(kWh/y)

DG ✓
Electricity
Built-up area (m2)

Built-up area: Total built-up area excluding the basements used for services and/or parking

Source: BEE Star rating for Office Building & BEE Star rating for BPO
Indo-Swiss Building Energy Efficiency Project 8
PUBLIC OFFICE, 70
BENGALURU
46

ARANYA 78
BHAWAN, JAIPUR
53
Buildings

PUBLIC OFFICE BUILDING


IIIDEM, NEW 114
DELHI
80

MIXED-USE 158
DEVELOPMENT,
PUNE 85
Before Charrette

MIXED-USE 132
DEVELOPMENT,

Indo-Swiss Building Energy Efficiency Project


BENGALURU 84

WORLD TRADE 134


Energy Performance Index (EPI) - kWh/m2.y

CENTER (WTC),
GANDHI NAGAR 55

PRIVATE OFFICE 134


PRIVATE OFFICE/IT BUILDING

BUILDING,
BENGALURU 89

MIXED USE 129


DEVELOPMENT,
NOIDA 84
After Charrette
EPI of BEEP Charrette Projects: Commercial

INTERNATIONAL 44
TRAINING
CENTRE, PUNE 35
TRAINING

SYMBIOSIS
UNIVERSITY OF 85
Energy Performance Index (EPI) - kWh/m2.y

APPLIED
SCIENCES, 65
INDORE

MIT UNIVERSITY, 122


UJJAIN
ESTIMATED ENERGY PERFORMANCE INDEXES OF CHARRETTE PROJECTS

68
EDUCATIONAL INSTITUTE

JUPITER 155
HOSPITAL, PUNE
120
HOSPITAL
Click to edit
Master title style

CASE STUDY:
ARANYA BHAWAN, JAIPUR

Indo-Swiss Building Energy Efficiency Project 10


Jaipur: Climate

Jaipur

Indo-Swiss Building Energy Efficiency Project 11


Aranya Bhawan

Aranya Bhawan is the new office building of the Rajasthan Forest


Department in Jaipur, inaugurated in March 2015.

• Built-up area: ~10,000 m2 (excluding basement parking and service area)


• Number of floors: Five (G+4) + one basement for parking and services
• Number of users: ~350
• Types of spaces: Offices, museum, library, auditorium, guest rooms
Indo-Swiss Building Energy Efficiency Project 12
Aranya Bhawan: Project Timeline

December 2012 2013-2015 March 2015 2015-2016

• Design • Construction • Inauguration • Energy


Charrette • Technical Monitoring
support by
BEEP

• Client: Rajasthan Forest Department

• Executing Agency: Rajasthan State


Road Development and Construction
Corporation Ltd. (RSRDC)

• Architects: Mathur, Ugam and


Associates

Indo-Swiss Building Energy Efficiency Project 13


Aranya Bhawan: Passive Measures
Roof Insulation
U-value: 0.6 W/m2.K

Reduction in
Glazed Area
Double-Glazed
Windows
Wall Insulation

U-value: 1.8 W/m2.K


SHGC: 0.24
VLT: 36%
U-value*: 0.5 W/m2.K
Indo-Swiss Building Energy Efficiency Project 14
Reduction in Cooling System Size

Cooling system size (TR)


250

28% reduction
200

150

100

50

0
Before the charrette After charrette

Indo-Swiss Building Energy Efficiency Project 15


Aranya Bhawan: Cooling System

Water Cooled Energy Efficient


Chiller (using water after waste
water treatment)

Indo-Swiss Building Energy Efficiency Project 16


Aranya Bhawan: Solar Energy Generation

Grid connected rooftop solar PV


• Capacity: 45 kWp (annual production:
~60,000 kWh)
Indo-Swiss Building Energy Efficiency Project 17
Aranya Bhawan – Energy Monitoring
• Detailed monitoring of 2 weeks in Winter (Jan.16) & 2 weeks in Summer
(May.16) + Monthly electricity bills for 1 year

Indo-Swiss Building Energy Efficiency Project 18


Monitoring results Aranya Bhawan
Winter (Nov-Feb) Annual Energy Consumption
Miscellaneous HVAC
4% 0%

STP Lighting Lighting


10% 17% 6%

Office
HVAC Equipment
53% 31%
Office
Equipment
69%

STP
3%
Miscellaneous
7%

Summer (Mar-Oct) Break-up of HVAC energy consumption

Lighting AHU
5% 15%

Office Condenser
Equipment Pump
26% 12%
CT Fan
4% Chiller
HVAC 54%
60% Secondary
Pump
10%
STP
2%
Miscellaneous
7%
Primary Pump
Indo-Swiss Building Energy Efficiency Project 5% 19
Electricity Consumption: Simulation &
Actual (EPI)
Monthly EPI Comparison: Simulated vs. Actual
Simulated EPI Actual EPI
7.0 6.7
6.1

6.0 5.7
5.5

5.4

5.3
5.3

5.2
4.9
5.0

4.6

4.5
4.5
kWh/m2.month

3.9
3.9
3.9
4.0

3.4
3.4

3.3

3.2
3.0

2.0
2.0

1.4
1.3
1.2
1.1

1.0

Actual EPI: 43 kWh/m2.year


0.0
May-15 BEE 5 star benchmark: 90 kWh/m2.year
Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16

Indo-Swiss Building Energy Efficiency Project 20


Aranya Bhawan: Overall Cost and
Performance Summary

Indo-Swiss Building Energy Efficiency Project 21


ECBC Compliance
Buildings applying
for ECBC Compliance

Meet Mandatory
Provisions

Whole Building
Prescriptive Method
Performance Method

All building components need Envelope Trade-off Annual Energy Simulation


to comply the code individually Method of Whole Building

Allows trade-off among envelope components (Wall, Roof &


Fenestration) based on total Envelope Performance Factor kWhproposed ≤ kWhprescriptive
EPFproposed ≤ EPFprescriptive

Other building components need to comply the code


individually
Indo-Swiss Building Energy Efficiency Project 22
ECBC Compliance of Aranya Bhawan: Whole Building
Performance Method
ECBC Prescreptive* Proposed#
Opaque Wall U-value (W/m2.K) 0.44 0.5
Roof U-value (W/m2.K) 0.409 0.6
Fenestration
- SHGC 0.25 0.24
- VLT 0.27 0.36
- U-value (W/m2.K) 3.3 1.8
LPD ("building area method") (W/m2) 10.8 7
HVAC: Centralised system
- Water cooled screw chiller (COP) 4.7 5.8
- AHU Constant volume Constant volume
AHUs + FCUs

*Day use office building in Composite climate; Glazing distributed in all 4 sides equally; Baseline
model simulated for 0, 90, 180 & 270 degree orientation and average value taken

#Same building operation assumptions (thermostat setpoints, schedules, internal gains, occupant
loads, etc.); Finalized based on calibrated energy simulation model
Indo-Swiss Building Energy Efficiency Project 23
ECBC Compliance of Aranya Bhawan
Annual Energy Consumption
6,00,000
An ECBC compliant Net Grid Electricity
5,13,657 building design: consumption to
5,00,000 ~20% energy saving reduce by 60,000
kWh/y (Estimated
4,00,000
4,04,554 generation from 45
kWp SPV system)
kWh/y

2,95,245
3,00,000

2,00,000

1,00,000

-
ECBC Prescriptive Proposed Actual
(Simulated) (Simulated) (Measured)

Indo-Swiss Building Energy Efficiency Project 24


Learnings

• The approach for energy efficiency/ECBC


compliance should always be reducing the
demand first through passive measures, use
efficient systems with controls and then
integrate renewable energy system.
• Integrated approach at early design stage for
energy efficiency results in 20-40% energy
savings. Charrettes help in estimating the
techno-economics of energy efficiency measures;
helping in decision making and identifying
acceptable measures for implementation; thus
help in achieving ECBC compliance.
Indo-Swiss Building Energy Efficiency Project 25
Click to edit
Master title style

To download BEEP publications, know about BEEP charrettes


and to apply for a charrette, please visit
www.beepindia.org
THANK YOU !!!

Indo-Swiss Building Energy Efficiency Project 26