Qa QC
Qa QC
• Display of Notices
• Warning tape, lighting arrangement at location of any
excavated trench, electrical installation or mechanical
erection.
• Fire Prevention and Protection
• Environment & Health
• House Keeping
• Lighting
• Monsoon Precaution
• Noise and Vibration
• Personnel protective equipment (PPE) for field staff
• Designs/Drawings for contract
• Maintain design / drawing register at site
• Use only approved drawings for construction
•
• Test laboratory and equipment
• Intimate the details, date of completion with requisite
manufacturers’ and calibration certificates of equipments.
• Maintain the equipments in good condition and calibrate as
necessary
•
• Material receipts Materials testing
• Enter receipts in material register
• Materials to be tested only in approved laboratories
• Prepare concrete mix proportions as per volume as required by
contract and submit test results
• Take test samples in presence of QCwhen requested
• Perform material tests
• Submit test reports to QCwith monthly reports
• Rejected materials
• Entries to be made in material register at site
• Tag and record all rejected materials
• Intimate QCin writing the proposed date of removal of material
from site and confirm after removal
•
• Material consumption
• Enter daily consumption of materials in material register and
indicate balance quantity
•
• Construction equipment
• Intimate ownerthe details, date of mobilization along with
requisite insurance certificate
• Maintain equipments in good working condition
• Intimate breakdown of construction equipments
•
Construction
•
• Intimate owner in writing when construction is going to
commence and what activities are proposed to be
undertaken
• Intimate owner in advance when critical works, such as
concreting, embankment, paving, pipeline laying and
jointing, testing, etc., would be undertaken, along with the
test certificates of the materials proposed to be used in
these works. No critical activity shall start unless the
material is tested. Certificates are verified and approved by
the Engineer.
• Concreting to take place only after pour card is signed.
• To provide any other necessary QA/QC requirement.
•
• Daily work progress
• To maintain in daily log.
•
• Testing of works in progress
• Perform tests as per contract requirements.
• Submit test reports to QC
• Maintain test log during the execution of works.
•
• Rejected work items
• Intimate GPWSC/DWSS in writing the proposed
date of removal from site and confirm after
removal.
• Rectify defective work and invite QC for re-
inspection.
•
• Instructions from Engineer
• Enter change orders, site instructions, letter
and minutes of meetings issued by the Engineer
and Consultants in the Instruction Log.
•
• Inspection of Engineer
• Take instructions in Site Order Book.
• Intimate QCof compliance.
•
• Progress scheduling and control
• Prepare and maintain project schedules and
undertake work in accordance with approved schedule.
•
• Reporting
• Prepare and submit Monthly Progress Reports and
other reports as per contractual requirements.
•
•
• Records Maintain the following records on
Site/Contractor’s Office/Laboratory as given in Annexure C.
• Site Order book
• Material Register
• Daily Progress Report.
• Concrete pour Register
• Test Record
• Design &Drawing Record
• Non conforming item record
• Cube test record
•
• Workmanship All the work executed against the
contract shall be of good workmanship.
• Disposal Of Debris All the Debris should be disposed
of properly after completion of construction work.
Engineer’s Diary
Sample Register
• The register can consist of a ruled book which has columns
ruled vertically, headed in sequence from the left to right
across both pages as follows: