Apspdcl Aug
Apspdcl Aug
Apspdcl Aug
CONTENTS
1.0 SCOPE 2
This document covers the foundation design for Piperack for Tankage area, Railcar area, Waste water treatme
ii) ASCE 7 -2010 - Minimum Design Loads for Buildings and other structures
Piperack foundation consists of various types, such as isolated footing, combined footing & Mat type foundatio
Waste water treatment area ft' - inch" ft' - inch" ft' - inch"
Foundation analysis and design is carried out using Mat3D, a software to carry out foundation design.
Concrete
Reinforcement
For baisc loads and load calculation refer PIPERACK STEEL WORK CALCULATIONS document: USYO-AF-NCST
USYO-AF-NCSTL-Z1-0007
PAGE NO.
4
USYO-AF-NCSTL-Z1-0007
n for Piperack for Tankage area, Railcar area, Waste water treatment area &
es, such as isolated footing, combined footing & Mat type foundation.
Type of footing
Combined footing
Combined footing
Combined footing
USYO-AF-NCSTL-Z1-0007
Combined footing
Combined footing
Combined footing
Isolated footing
Combined footing
Combined footing
Combined footing
Combined footing
Combined footing
Combined footing
Combined footing
Combined footing
Combined footing
Isolated footing
USYO-AF-NCSTL-Z1-0007
Combined footing
Combined footing
Combined footing
Combined footing
(CL. 3.3,USYO-AF-NBDES-Z1-0001)
(Pg.11, USYO-TW-GRZZZ-Z1-0001)
(Pg.11, USYO-TW-GRZZZ-Z1-0001)
(CL. 4.8.1,USYO-AF-NBDES-Z1-0001)
USYO-AF-CDZZZ-Z1-0011
(CL. 7.4,USYO-AF-NBDES-Z1-0001)
(CL. 7.4,USYO-AF-NBDES-Z1-0001)
(CL. 7.4,USYO-AF-NBDES-Z1-0001)
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
ASD Load combinations for Stability Check of Foundations
*Operating with Wind – (Structural Dead Load + Piping / Elec. / Equip Operating + Anchor Loads + Wind)
[DS+DO(+/-)ATX(+/-)ATZ(+/-)0.6W(+/-)0.3W(Perp.)
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
Operating with Thermal – (Structural Dead Load + Piping / Elec. / Equip Operating + Live Load + Anchor / Thermal Loads)-
in basic load for foundation design.
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
*Operating with Wind – (Structural Dead Load + Piping / Elec. / Equip Operating Load + Anchor Loads + Wind+Live load)
*Empty Wind – (Structural Dead Load + Piping / Elec. / Equip Dead Load + Wind)
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
*Uplift/Operating/ Wind – (Structural Dead Load + Piping / Elec. / Equip Operating Load + Uplift Anchor Loads + Wind)
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
*Hydrotest Condition – (Structural Dead Load + Hydrotest Pipe / Equip Loads + Live + Partial Wind)
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
*Operating with Seismic – (Structural Dead Load + Piping / Elec. / Equip Operating + Anchor Loads + Seismic)
*Seismic wind – (Structural Dead Load + Piping / Elec. / Equip Operating load+ Uplift Anchor Loads + Seismic)
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
*Abnormal Conditions – (Structural Dead Load + Piping / Elec. / Equip Operating Load + Abnormal Anchor Loads + Partial W
1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
uip Operating + Live Load + Anchor & Thermal Loads)- Only 50% of TF load considered
1.00
1.00
1.00
1.00
0.60 0.30
0.60 -0.30
0.60 0.60
0.60 0.60
USYO-AF-NCSTL-Z1-0007
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
-0.60 0.30
-0.60 -0.30
-0.60 -0.60
-0.60 -0.60
Load + Wind)
0.60 0.30
0.60 -0.30
0.60 0.60
0.60 0.60
-0.60 0.30
-0.60 -0.30
USYO-AF-NCSTL-Z1-0007
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
-0.60 -0.60
-0.60 -0.60
uip Operating Load + Uplift Anchor Loads + Wind)
0.60 0.30
0.60 -0.30
0.60 0.60
0.60 0.60
-0.60 0.30
-0.60 -0.30
-0.60 -0.60
-0.60 -0.60
uip Loads + Live + Partial Wind)
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
ad Load + Seismic)
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
7E]
USYO-AF-NCSTL-Z1-0007
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
uip Operating + Live Load + Anchor / Thermal Loads)- Only 50% of TF load considered
1.60
USYO-AF-NCSTL-Z1-0007
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
1.60
1.60
1.60
Load + Wind)
1.00 0.50
USYO-AF-NCSTL-Z1-0007
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
1.00 -0.50
1.00 1.00
1.00 1.00
-1.00 0.50
-1.00 -0.50
-1.00 -1.00
-1.00 -1.00
1.00 0.50
1.00 -0.50
1.00 1.00
USYO-AF-NCSTL-Z1-0007
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
1.00 1.00
-1.00 0.50
-1.00 -0.50
-1.00 -1.00
-1.00 -1.00
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
DATE 28-Feb-18
DATE 28-Feb-18
DATE 28-Feb-18
LC LC LC LC LC LC
12 13 14 15 16 17
For water fall of pipes, wind force calculated based on the overall area of piping i.e, assuming a solid wall of pipes.
Sample Calculation
Cf = 2
= 11.4
Date 28/Feb/18
Date 28/Feb/18
Date 28/Feb/18
15.5 ft
9 ft
16.67 ft
150.03 ft^2
(100% of Gross area
150.03 ft^2 considered)
G*qz* Af * Cf
11.4 kips
0.68 klb/ft
Force/ft
Total
Cf width of Remarks
Force
beam
kips
Tankage Area- West
2.000 7.600 0.760 Low Rack
Tankage Area- East
2.000 9.900 0.660 Low Rack
PROJECT GCGV PROJECT CALC No
JOB No 191941 Rev No
CLIENT GCGV ASSET HOLDING, LLC BY
LOCATION GREGORY, TEXAS CHECK
SUBJECT APPR
Sheet No
Date
Date
Date