From No. : FS-F03 Original Date : 22 June 2009 Rev No.

01 Rev Date : 15 November 2010Ref Procedure : FS-PO2

SATISFACTION NOTE
SO NO. 10943034 Propeller Type
Customer Name PT. PELNI (Persero) Hub Type
Name of vessel KM. BINAIYA Seal Type
Alternator Type Taiyo FEK41B-6 / 3 Yard / Hull No.
Phase/525 Kva/ 50 HZ
/380 V/ 1000 Rpm
Running Hrs 0 (new engine) PO No./Date
THE FOLLOWING WORK HAS BEEN CARRIED OUT TO THE SATISFACTION OF UNDERSIGNED
1 Check bearing metal
2 Cleaned generator electric cleaner used and coated red insulator used
3 Test insulator ( megger test )
4 Check Balance couple alternator – engine side
5 Load test engine with load on board -+ (150 KW)
6 Handed over the engine
Note: 3 alternator no.1 , 2 , 3 has been finished

Signed and agreed by customer Signed by PT. Wartsila Indonesia


Or assigned representative

……………………….. ………………………… Surian Syah


27 February 2019 27 February 2019 27 February 2019
C/E MV.BINAIYA Onwer Superintendent Sr. Service Engineer

PT. Wartsila Indonesia Telp :+62 21 8937654


Cikarang Industrial Estate Fax : +62 21 8937660
Jl. Jababeka XVI Kav. W-28
Bekasi 17530 – Indonesia