All Dept Calculation
All Dept Calculation
All Dept Calculation
__________
MBO(TOYODA)
MBO(B2/2)
PORCUPINE-OPENER
STEP CLEANER
22/7 x 62 x 290.6
= ------------------
22/7 x 80 x 2.4
= 93.8
S.SOFGROOVEDROLLER
= ------------------
DRAFT BETWEEN GROOVED ROLLER S.S OF STRIPPING ROLLER
22/7 x 76 x 117.4
= -----------------
22/7 x 120 x 112.8
= 0.65
S.S OF C.C.R
Draft bet. Coiler cal. roller to cal. roller = ----------------
S.S OF CALENDER ROLLER
22/7 x 62 x 290.6
= -----------------
22/7 x 72 x 242.2
= 1.033
S.S OF C.C.R
Draft between doffer to coiler cal. roller = -------------------
S.S OF DOFFER
22/7 x 62 x 290.6
= -----------------
22/7 x 680 x 19
= 1.39
= 1.15 draft
CARDING (C1/3)
11. FLATS SPEED = 1500 x 160/537 x 314/274 x 12/30 x 1/13 x 1/16 x 13/30 x
680/25.4
= 11.24 ipm
22/7 x 62 x 281
= ------------------
22/7 x 80 x 1.85
= 117.7
S.S OF C.C.R
DRAFT BET. COILER CAL. ROLLER TO CAL. ROLLER = -----------------
S.S OF CALENDER ROLLER
22/7 x 62 x 281.0
= -----------------
22/7 x 72 x 225.4
= 1.07
S.S OF C.C.R
DRAFT BET. DOFFER TO COILER CAL. ROLLER = -----------------------
S.S OF DOFFER
22/7 x 62 x 281.0
= -----------------
22/7 x 680 x 17.8
= 1.43
= 1.086 draft
= -----------------
22/7 x 32 x 482.05
= 0.95
(or) = 51/45 x 27/32
= 0.95
1000
X AVG WT IN GMS
22/7 x 25 x 158.24
= -----------------
22/7 x 32 x 92.3
= 1.33
(or) = 21/35 x 40/18 x 25/32
= 1.33
S.S OF TCR
DRAFT BET.FRONT BOTTOM ROLLER TO T.C.R = -----------------------
S.S OF FRONT BOTTOM ROLLER
22/7 x 70 x 275.6
= -----------------
22/7 x 32 x 600
= 1.004
(or) = 35/80 x 21/20 x 70/32
= 1.004
11.GRAMS/MTR = Grains/yard(1.0936
13. FEED PER NIP = (3.14 x feed roller dia)/ No. of teeth on feed
roller.
AVG WT IN GRAMS
STD HANK
DRAW BOX SPEEDS:
I ROLLER = 196(70(N24(62 = 91.5 RPM
75(88(31(19
II ROLLER = 196(18(18 = 75.06 RPM
47(18
III roller = 196 ( 18 = 75.06 RPM
47
IV ROLLER = 196(18(18 = 56.2 RPM
47(24
V COUNT CHANGE GEAR = NEC(LAPWTG/M(1-NOIL%)
100
FEED CHANGE GEAR
7
(FEED CHANGE GEAR
7. Production in kg
= Nips* feed/nip(mm)*Lap wt(gms/mt)*100-noil%*60*8*No.of Dblgs
Min 1000 1000 100
(OR)
= 0.0384 * LSF * (100- waste %)
1000
Where, L = Lap weight in gm/meter
F = Feed in mm / min
S = Speed in nips / min
W = noil extracted in %
8.Nips/min = Motor rpm * motor pulley__ * 0.2028
machine pulley
9.Feed/nip = ( * D
S
Where, D = Feed roller dia ( ( = 25mm )
S = Ratchet feed ( S= 16 )
10. % of noil = Mass of noil______________* 100
Mass of noil + Mass of Combed Sliver
11.Combing Efficiency
=(50% span length Cbd sliver - 50% Span length Cbd lap) * 100
50% span length of comber lap * % of waste extraction
Rating CE% ( for 13-18 % noil )
Good 1.0
poor 0.6
12.Nep removal efficiency
= Neps/100mg in cbr lap - Neps/100mg in Cbr sliver * 100
Neps / 100 mg in comber lap
4. BREAK DRAFT = 28 x 44 x 95 x 37 x 47
----------------------
22 x 40 x 84 x 59 x 30 x 1.1517
= 1.350
38 x 26 x 60 x 22 x 35
5. BETWEEN BACK ROLLER TO T AND G = ----------------------
38 x 20 x 23 x 28 x 94
= 0.992
26 x 20x 38 x 94
6. BETWEEN T AND G ROLLER TO FEED ROLLER = -----------------
37 x 26 x 38 x 51
= 0.996
45 x 71 x 51
7. FEED ROLLER TO CREEL ROLLER = ------------
35 x 55 x 50
= 1.007
28 x 44 x165 x 98 x 44 x 48
8. FRONT ROLLER TO BACK ROLLER = ---------------------------
20 x 40 x 57 x 62 x 49 x 30 x
1.1517
= 7.991
76 x 20 x 106 x 24 x 30
9. COIL NUMBER = -----------------------
23 x 1 x 68 x 35 x 87
= 24.35
= 3.14 x D x N
1000
Rsb - D30
= 1.03
SPEED FRAME
Gear Plan & Prodn Calculations
5. GRAMS/SPINDLE/SHIFT OF 8 HOURS
x 27(K)/67 x 27 x 3.14/1000
= 17.049meters per minute.
9. BOBBIN SPEED CALCULATION:
e= n-a/m-a
n = e(m-a) + a
e = differential ratio.
N = hallow shaft out put speed.
M = Main shaft speed
a = Arm wheel speed.
Main shaft speed = 950.4 rpm
DRAFTS:
= 0.0212
= We x 0.0212
CREEL DRAFT
CREEL CHANGE GEAR(We) CREEL TENSION DRAFT
46 0.976
47 0.997
48 1.018
49 1.04
NYLON CREEL DRIVE ROLLER(54mm)
57 1.16
58 1.15
59 1.13
57 51 10.3
57 52 10.11
57 53 9.919
58 51 10.13
58 52 9.936
58 53 9.748
59 51 9.959
59 52 9.767
59 53 9.583
TOTAL DRAFT = 18
TENSION DRAFT = 1.086
MAIN DRAFT = 10
22. BOTTOM CONE DRUM DIA = TOP CONE DRUM SPEED ( SUM OF DIA
TOP CONE DRUM SPEED + BOTTOM CONE DRUM SPEED
= 100(10½”
100+500
= 3.5”
23. HANK = 7.5 X 1.181 = 15 MTS 15 X 0.5 = 7.5
AVG WT IN GRAMS
Cone Drum Speeds
V = SPEED OF THE DRIVING CONE DRIVING CONE DRUM = 100 REV
D = REQUIRED DIA OF DRIVEN CONE = 12 “
M = GREATEST SPEED OF DRIVEN CONE = 200 REV
P = REQUIRED SPEED OF DRIVING CONE = 100
R = RATIO OF SPEEDS AT THE EXTREME OF DRIVEN CONE = 4
E = SMALLEST DIA OF BOBBIN REPRESENTED BY = 2
G = ANY DIA OF BOBBIN REPRESENTED BY = 4 TO 16
S = SUM OF THE DIAS OF THE CONE DRUM = 10 ½”
= ME
G
= SPEEDS(P)
= S
P+100
= D(DIAMETER)
G = SPEED = 200 REVOLUTIONS
B = SMALLEST DIA OF CONE
A = LARGEST DIA OF CONE
= RATIO OF DIAMETERS
THE SPEED OF THE BOBBIN DEPENDS DIRECTLY UP ON THE SPEED OF THE CONE DRUM THE SPEED
OF THE CONE DRUM MUST VARY INVERSLY AS THE DIAMETER OF THE BOBBIN THE DIA OF CONE DRUM
INVERSLY PROPOTIONAL SPEED OF THE BOBBIN
23. Production/ spl / 8 hrs = 7.2 * Spindle speed * Effy (kg)
TPI * Roving Hank * 100000
(OR)
=Spindle speed * Effy (Hanks)
TPI 6300
_____________
32. Coil / inch = Present coils / inch * / Reqd. Hank
\/ Present Hank
33. Time required in minutes to build a bobbin
= Weight of bobbin(oz.) * 840 * 36 * TPI * Hank
Spindle speed * 16
-------------------------
EXPECTED TPI.
250.6*115*79*82*44*102*29*1*1*25.4
9.TWIST PER INCH = -----------------------------------
21.6*26*86*55*30*103*26*27*3.14*
= 34.11
1*49*112*104*26*27*3.14
10.MAIN DRAFT = -----------------------
32*20*33*29*27*3.14
= 24.22
1*47*32*27*3.14
11.BREAK DRAFT = --------------
21*49*27*3.14
= 1.46
= 24.22*1.46
= 35.36
1*121*62*69*26*3.14*27
13.WINDING LENGTH PER CAM REVOLUTION = ----------------------
2*50*102*29*1000
= 3.85 meters
= 35.36 * 2.4
= 84.86
---------
15. TWIST MULTIPLIER = T.P.I.\/ COUNT
= 0.466 ( A ( C = INCHES/MIN
B(D
18 TPI = 10.848 ( B ( D
(A(C
( 26 ( A ( C ( 30 ( 102 ( 26 ( (.D1
TPM = 250 + 0.6
T = TRASH IN COTTON
C = COMBER NOIL
35.TWIST VARIATION = INTIAL TPI - FINAL TPI
1 GF = 0.9807 CN
1CN/TEX = 1.02 GF/TEX
Winding
\
14.DRUM SPEED (YPM) = MOTOR RPM ( MOTOR PULLEY X 3.14 X DRUM DIA(MM) X1.0936
M/C PULLEY 1000
DRUM DIA = 95 MM(CONE WINDING)
DOUBLER WINDER DRUM DIA (98 MM)
AUTOCONERS DRUM DIAS = (95 MM)
HANK TO CONE WINDING DRUM DIA (78 MM)
a, b, c - Wheels
No. of twists (TPM) = Spindle speed (rpm)* 2
Yarn speed in mpm
TR = TAKE UP ROLLER
9.DENSITY OF TAKE UP PACKAGE
= 3 X COSø
= 0.648 X AMPS
Doubling
1. Doubling yarn strength = 2.5 * Ring yarn strength
REELING
I KNOGHT = 4 HANKS
NO OF THREADS/HANK = 560
SINGLE YARN HANK AND DOUBLE YARN HANK = 1120
SINGING
1.DRUM SPEED = MOTOR RPM x MOTOR PULLEY x FIXED PULLEY DIA x DRUM DIA
M/C PULLEY x DRUM PULLEY DIA x 25.4 x 36 x 7
2.PRODUCTION/DRUM/SHIFT OF 8 HOURS:
1. COSTING
i) Clean cotton cost = Mixing cost___
Yarn Realization
ii)Conversion cost / kg = Expenses/Frame /Day
(Other than Raw material)
Production /Frame / Day
iii)Yarn Realization % = Yarn produced
Effective mixing consumed
Where,
Effective Mixing consumed = Mixing issued + Waste added
+ Opening process stock up to SPG - Closing Process
stock up to SPG -Usable waste produced & used in same
count.
Yarn produced = Yarn packed + Closing stock of yarn in
cops, knots, cones - Opening stock of yarn in cops,
Knots, Cones.
PRODUCTIVITY
i)Productivity Index (PI) = Machine Productivity Index(MPI)
Labour Employment Ratio(LER)
Where, MPI = Production / M/C Shift in a mill *100
Production / M/C Shift in a std mill
LER = No. of operatives per shift in a mil *100
No. of operatives per shift in a Std mill
ii)Mill Efficiency Index = Mill Efficiency *100
Efficiency in a Std Mill
3. Limit Irregularity
In a strand of material in which fibre ends are laid in a
random order, the irregularity is given by the formula,
Index Irregularity (I) = V
Vr
Where, V = Actual yarn Irregularity CV%
Vr= Calculated limit Irregularity CV%
of cotton.
= (7.5 + 80 + 500)* N2
c t2
This expression is applicable to 178 mm lift & 41.3 mm
Ring dia. frames.
Where, C = Count
t = TPI
N = Spindle speed in 10,000’s
HUMIDITY
DATA:
COUNT = 60S/1 BD
SPINDLE SPEED = 17500
TPI = 27.9
NO OF SPINDLES = 5760
PRODUCTION OF SPINNING:
(6
= SPIDLE SPEED(60(8(95 ( 960
TPI ( 36 ( 840 ( 2.204 ( 60
= 433.6 ( 2.1
100
= PRODUCTION OF SIMPLEX
= SPIDLE SPEED(60(8(82
TPI ( 36 ( 840 ( 2.204 (1.6
= 442.70/334.250
WASTE IN SIMPLEX = 1 %
= 433.250 ( 1 %/100
= 4.3 KGS
= 1356 KGS
= 437.5/1356
= 0.32 DRAWINGS
442.7 + 88.02
= 530.72 KGS
= 530.3 KGS
SL/RL:
WASTE% = 2.12
= 433.2 ( 2.12/100
= 9.18 KGS
= 433.1 ( 4.5/100
= 19.4 KGS
= 2 CARDS
AUTOCONERS:
WASTE % = 0.41
= 210.1(0.41/100
= 0.86 + 210.1
= 433.6 + 0.86
= 444/210.3
REELING:
COUNT = 80S CX
NO OF RING FRAMES = 22
PRODN/RF = 47 KGS
General
LAP=200MTRS,WT=11.25KGS,
11.25*2.2046=24.81 LBS
GMS/MTR=24.81/0.4409=56.27 GMS/MTR
2.GRAINS/YARD
3.GMS/MTR=1*1.0936(LENGTH IN YDS)*453.6/HANK
GMS/MTR=WT/YARDIN GMS *1.05