Thierry Clement
Thierry Clement
Thierry Clement
for
Thierry CLEMENT
Business Development Manager
This document contains information resulting from testing, experience and know-how of GTT, which are protected under the legal regime of undisclosed information and trade secret
(notably TRIPS Art. 39) and under Copyright law. This document is strictly confidential and the exclusive property of GTT. It cannot be copied, used, modified, adapted, disseminated,
published or communicated, in whole or in part, by any means, for any purpose, without express prior written authorization of GTT. Any violation of this clause may give rise to civil or
criminal liability - © GTT, 2010-2011
From 1963 to now …
GTT in brief
• An engineering company with more than 50 years of
experience in the design of the Membrane Cargo
Containment Systems
• After contract, detailed engineering for Cargo Containment System and Cargo Handling System.
Design
• Material specification & certification
GTT CS1
Membrane
Technology
for LNG storage
NO96
Mark III
*1000 m3
capacity is covered by membrane systems 250
200
Ship capacity
Spherical tanks are mainly between 150
125,000m3 and 150,000m3
100
50
• Due to economies of scale, the new range
0
of “conventional” LNGCs is increasing, 1965 1980 1995 2010
•
100
GTT has introduced smoothly two 80
80
80
60
60
evolutions of its well-known technologies 60
40
40
40
for lower BOR: NO96 Evolution and Mark 20
20
20
00
III Flex (42 orders) 0
Spherical - Delivered
Spherical - Delivered Spherical - On
Spherical order
- On order
Membrane - Delivered Membrane - On order
FLNG
LNG Distribution
Conversion of two MISC vessels into FSUs (130,000 m3 NO88 LNGCs – Tenaga Satu and Tenaga
Empat), moored at an island jetty
Terminal launched early June 2012, first gas planned for August 2012
LNG-FPSOs with membrane
• For offshore applications, if required in order to solve sloshing
issues, a solution is to decrease sloshing loads by introducing a
two-row arrangement
• Too-row arrangement provides large benefits, without reducing One-row vs. Two-row arrangement
Petronas FLNG 1
• All clients having studied a membrane solution have been confident in the technologies
25%H
15%H
Period [s]
Two-row arrangement
Sloshing intensity
Acceptable impacts on
the ceiling and chamfers
Acceptable impacts on
the longitudinal walls
and chamfers
Sloshing
response
Sea-keeping computation :
Interaction between FLNG and LNGC L
F N
Wave
L G
Operating envelope to be calculated based height
N C
on capabilities of loading arms, fenders, G
mooring lines, wind, tugs, relative motions
between both FLNG and LNGC (collision)…
Determination of the operating envelope per ship capacity range and per membrane
containment system reinforcement
9/9/2013 18
On-site maintenance and inspection
Control of primary and secondary barriers performed while the
tank is in operation
Continuous gas concentration measurement system
Thermographic Assessment of Membrane Integrity (secondary
barrier)
22
32k LNG feeder
- 26 -
Bunker ship 4000 m3 LNG; 1000 m3 MDO
LOA 106 m 90 m
LBP 99,8 m 85,9 m
Breadth 16,5 m 15,7 m
Depth 9,0 m 9,4 m
Design Draught 5,1 m 5,0 m
Cb 0,75 0,77
• GTT membrane systems with their feed back, with their compact, modular
and cost effective designs are well suited to adapt to any market and
specific constraints of shipping, offshore and onshore applications.
Thierry CLEMENT
Business Development Manager
Email: tclement@gtt.fr
Tel: +33 1 30 23 48 28
Mob: +33 6 77 46 14 60