TM-16 TA: Completion Name Test Date Time BS&W BFPD Bopd BWPD MCFD GOR
TM-16 TA: Completion Name Test Date Time BS&W BFPD Bopd BWPD MCFD GOR
TM-16 TA: Completion Name Test Date Time BS&W BFPD Bopd BWPD MCFD GOR
TYPE TOP, ft
KB : WIRELINE 62 +
S-VALVE : TRSV - +
PACKER : RDH - + DEV. MAX @ PERFS
L-NIPPLE : "X" 2.75" ID 154 + ANGLE : 37.6 24
ZONE REMARKS
TAF B
FIELD/
NO BU's Reservoir/Zone
STRUCTURE
Developed Fields
1 TM-10, BRF S BATU RAJA
2 TM-16, TAF S TALANG AKAR
3 TM-21, BRF S BATU RAJA
4 5 6
Type
Structure Fault Block
of Trap
Reservoir
Discovery
Discovered By Lithology Depth,
Date
feet subsea
LIMESTONES 3,200
SANDSTONES 3,700
LIMESTONES 3,300
11 12 13 14 15 16 17
Lowest
Highest
Closing Fluid Contact, feet subsea Vertical Areal Exten
Closing
Contour, Closure,
Contour,
feet feet
feet subsea Oil
subsea Gas/Oil Gas/Water Oil/Water
Devel
Maximum Fluid
Areal Extent, acres Column,
feet
Remarks
FIELD/
NO BU's Formation
Reservor & Fluid Data
Average Net Pay Thickness, feet Fluid Contact, feet subsea Average Effective Porosity
Formation Volume
Original Solution Gas-Oil Ratio Gas Deviation Factor (Z)
Factor
Gravity Crude
Oil (deg API)
How to Determine Oil Free Gas Initial
B C
Remarks
ZONE INFORMATION
PERFS INTERVAL 4234' - 4244' MD
4304' - 4314' MD
STATIC BHP 437 PSI (SBHP STARTUP ON 27 DES 2017)
SAND PRODUCTION YES
SCALE PROBLEM NO
SCALE TREATMENT -
ESP INFORMATION
CURRECT ESP TYPE QN70 137 STAGES 273 HP 1936 V 82 A SENSOR
PRODUCTION RATE 6576 BFPD, 131.5 BOPD, 17 MCFD, 98% WATER CUT (1 MAY 2018)
ESP RUN TIME 170 DAYS
TARGET ESP RUN TIME 799 DAYS
ESP AVERAGE RUN TIME 478 DAYS (LAST 3 INSTALLATION)
KB 62.00
In order to design the ESP,
Solution GOR is 644 scf/stb
Oil gravity is 36.4 API
Gas Gravity is 0.8233 sp.gravity
Water salinity is 10000 ppm
and other fluid input data required such as (if necessary):
Production Range
if we set the Pump:
less than 3110 ft MD, the maximum pump OD would be 8.755 inches
3110 - 3948 ft MD, the maximum pump OD would be 6.184 inches
3948 - 4234 ft MD, the maximum pump OD would be 4.408 inches
efore workover)
200 psig
D should be deeper than 2210.57 ft TVD or 2421.586624 ft MD