Field Inspection and Test Report
Field Inspection and Test Report
Field Inspection and Test Report
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 80112C
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Construction and Operation Check.
2 Main Contact Resistance Measurement.
3 Insulation Resistance Measurement.
4 Timing & Motion test.
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 1 of 19
FIELD INSPECTION AND TEST REPORT
Technical data
Manufacture Rated line-charging breaking current A
Type designation Rated cable charging breaking current A
Serial number Rated SF6 gas pressure for interuption Pe Mpa
Rated voltage kV Rated supply voltage of closing and opening device V DC
Rated lightning imp. withstand voltage kV Rated supply voltage of auxiliary circuits V DC
Rated switching imp. withstand voltage kV Rated supply voltage of motor V DC
Rated frequency Hz Contains fluorinate greenhouse gases covered by
Rated normal current A the Kyoto Protocol
Rated duration of short-current s Mass of SF6 gas kg
Rated short-circuit breaking current kA Mass kg
Rated short-circuit making current kA Rated operating sequence
First-pole-to-clear factor Standart to which manufacture
Rated out-of-phase breaking current kA Year of manufacture
Temerature class
EGAT Serrial Number Contact No.
NAME PLATE
Signature
Name
Date
Page 2 of 19
FIELD INSPECTION AND TEST REPORT
Signature
Name
Date
Page 3 of 19
FIELD INSPECTION AND TEST REPORT
100 Adc.
Signature
Name
Date
Page 4 of 19
FIELD INSPECTION AND TEST REPORT
Signature
Name
Date
Page 5 of 19
FIELD INSPECTION AND TEST REPORT
Note : - Operated voltage of Closing coil is 85% t0 110% 0f rated supply voltage
Vrated = 125 Vdc Vmin = 106.25 Vdc Vmax = 137.5 Vdc
- Operated voltage of Tripping coil is 70% t0 110% 0f rated supply voltage
Vrated = 125 Vdc Vmin = 87.5 Vdc Vmax = 137.5 Vdc
Travel Parameter
CONDITION PHASE Travel Speed Contact Stroke Over Travel Rebounce Damping Time
(m/s) (mm) (mm) (ms) (ms)
Close A
B
C
Open A
B
C
O-C-O A
B
C
C-O A
B
C
Signature
Name
Date
Page 6 of 19
FIELD INSPECTION AND TEST REPORT
CLOSING 125Vdc.
Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :
Date of test :
Tested by CECO :
Confirmed by :
Witnessed by EGAT :
Page 7 of 19
FIELD INSPECTION AND TEST REPORT
CLOSING 125Vdc.
Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :
Date of test :
Tested by CECO :
Confirmed by :
Witnessed by EGAT :
Page 8 of 19
FIELD INSPECTION AND TEST REPORT
CLOSING 125Vdc.
Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :
Date of test :
Tested by CECO :
Confirmed by :
Witnessed by EGAT :
Page 9 of 19
FIELD INSPECTION AND TEST REPORT
CLOSING 125Vdc.
Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :
Date of test :
Tested by CECO :
Confirmed by :
Witnessed by EGAT :
Page 10 of 19
FIELD INSPECTION AND TEST REPORT
CLOSING 125Vdc.
Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :
Date of test :
Tested by CECO :
Confirmed by :
Witnessed by EGAT :
Page 11 of 19
FIELD INSPECTION AND TEST REPORT
CLOSING 125Vdc.
Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :
Date of test :
Tested by CECO :
Confirmed by :
Witnessed by EGAT :
Page 12 of 19
FIELD INSPECTION AND TEST REPORT
CLOSING 125Vdc.
Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :
Date of test :
Tested by CECO :
Confirmed by :
Witnessed by EGAT :
Page 13 of 19
FIELD INSPECTION AND TEST REPORT
CLOSING 125Vdc.
Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :
Date of test :
Tested by CECO :
Confirmed by :
Witnessed by EGAT :
Page 14 of 19
FIELD INSPECTION AND TEST REPORT
CLOSING 125Vdc.
Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :
Date of test :
Tested by CECO :
Confirmed by :
Witnessed by EGAT :
Page 15 of 19
FIELD INSPECTION AND TEST REPORT
CLOSING 125Vdc.
Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :
Date of test :
Tested by CECO :
Confirmed by :
Witnessed by EGAT :
Page 16 of 19
FIELD INSPECTION AND TEST REPORT
CLOSING 125Vdc.
Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :
Date of test :
Tested by CECO :
Confirmed by :
Witnessed by EGAT :
Page 17 of 19
FIELD INSPECTION AND TEST REPORT
CLOSING 125Vdc.
Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :
Date of test :
Tested by CECO :
Confirmed by :
Witnessed by EGAT :
Page 18 of 19
FIELD INSPECTION AND TEST REPORT
CLOSING 125Vdc.
Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :
Date of test :
Tested by CECO :
Confirmed by :
Witnessed by EGAT :
Page 19 of 19