Field Inspection and Test Report

Download as pdf or txt
Download as pdf or txt
You are on page 1of 19

FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 80112C

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Construction and Operation Check.
2 Main Contact Resistance Measurement.
3 Insulation Resistance Measurement.
4 Timing & Motion test.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 1 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

Technical data
Manufacture Rated line-charging breaking current A
Type designation Rated cable charging breaking current A
Serial number Rated SF6 gas pressure for interuption Pe Mpa
Rated voltage kV Rated supply voltage of closing and opening device V DC
Rated lightning imp. withstand voltage kV Rated supply voltage of auxiliary circuits V DC
Rated switching imp. withstand voltage kV Rated supply voltage of motor V DC
Rated frequency Hz Contains fluorinate greenhouse gases covered by
Rated normal current A the Kyoto Protocol
Rated duration of short-current s Mass of SF6 gas kg
Rated short-circuit breaking current kA Mass kg
Rated short-circuit making current kA Rated operating sequence
First-pole-to-clear factor Standart to which manufacture
Rated out-of-phase breaking current kA Year of manufacture
Temerature class
EGAT Serrial Number Contact No.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 2 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

1. Construction and Operation Check.


General check
- Machanical inspection check Satisfy Un-Satisfy
- Equipment checked againt specification sheet Satisfy Un-Satisfy
- All component check for signs of damage Satisfy Un-Satisfy
- All accessories fastening check Satisfy Un-Satisfy
- Check against wiring schematic and diagrams Satisfy Un-Satisfy
- No gas leakage check Satisfy Un-Satisfy
- Densimeter check Satisfy Un-Satisfy
- Insulation resistance of wiring / control 500 Vdc
- Closing circuit (CB open) MΩ
- Tripping circuit 1 (CB close) MΩ
- Tripping circuit 2 (CB close) MΩ
- Motor circuit MΩ
- Heater and lighting circuit MΩ
Operation check
Manual operation check
- Manual Close Satisfy Un-Satisfy
- Manual Open Satisfy Un-Satisfy
- Emergency Trip Satisfy Un-Satisfy
- Manual operated motor drive round

Electrical operation check


- Motor spring charging operation check Satisfy Un-Satisfy
- Spring charged indicator check Satisfy Un-Satisfy
- Spring charging time seconds
- Motor current consuption ampere

- Electrical Close Satisfy Un-Satisfy


- Electrical Open Satisfy Un-Satisfy
- Emergency Trip
- Counter operation check Satisfy Un-Satisfy
- Antipumping operation function check Satisfy Un-Satisfy

- Space heater&cubicle lighting operated current ampere


- heater current A
- lighting current A

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 3 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

2. Main Contact Resistance Measurement.


Instrument : Date of test :
Manufacture : Ambient Temperature : C
Model : Humidity : %
Serial No. :
Cal Date :

Main Contact Resistance Reading ( mΩ )


Test Current Criteria
Pole A Pole B Pole C

100 Adc.

3. Insulation Resistance Measurement.


Instrument : Date of test : :
Manufacture : Ambient Temperature : C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Insulation Resistance at 1 minute (MΩ)


Energize Ground (Vdc) Pole A Pole B Pole C
Part 1 Part 2 5,000
Part 1 Ground 5,000
Part 2 Ground 5,000

4. Timing & Motion test.


Instrument : Date of test : :
Manufact : Ambient Temperature : C
Model : Humidity : %
Serial No. :
Cal Date :

Time at Rated Voltage (msec)


Channel Contact Criteria
Close Trip1 Trip2 CO1 CO2
Pole A Tolerance
Pole B Closing time <….. ms
Pole C Opening time min …. ms - max …. ms

AUX. NO Ph.A Close-Open time <…. ms


AUX. NC Ph.A
AUX. NO Ph.B
AUX. NC Ph.B
AUX. NO Ph.C
AUX. NC Ph.C

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 4 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

Main test sequence Open-0.3s-Close-Open Trip 1


Time at Rated Voltage (msec)
Channel Contact Criteria
Open Interval Time Close-Open
Pole A Tolerance
Pole B Closing time <….. ms
Pole C Opening time min …. ms - max …. ms

AUX. NO Ph.A Close-Open time <…. ms


AUX. NC Ph.A
AUX. NO Ph.B
AUX. NC Ph.B
AUX. NO Ph.C
AUX. NC Ph.C

Main test sequence Open-0.3s-Close-Open Trip 2


Time at Rated Voltage (msec)
Channel Contact Criteria
Open Interval Time Close-Open
Pole A Tolerance
Pole B Closing time <….. ms
Pole C Opening time min …. ms - max …. ms

AUX. NO Ph.A Close-Open time <…. ms


AUX. NC Ph.A
AUX. NO Ph.B
AUX. NC Ph.B
AUX. NO Ph.C
AUX. NC Ph.C

Time at Minimum Voltage (msec)


Channel Contact
Close Trip1 Trip2
Pole A
Pole B
Pole C
AUX. NO Ph.A
AUX. NC Ph.A
AUX. NO Ph.B
AUX. NC Ph.B
AUX. NO Ph.C
AUX. NC Ph.C

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 5 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

Time at Maximum Voltage (msec)


Channel Contact
Close Trip1 Trip2
Pole A
Pole B
Pole C
AUX. NO Ph.A
AUX. NC Ph.A
AUX. NO Ph.B
AUX. NC Ph.B
AUX. NO Ph.C
AUX. NC Ph.C

Note : - Operated voltage of Closing coil is 85% t0 110% 0f rated supply voltage
Vrated = 125 Vdc Vmin = 106.25 Vdc Vmax = 137.5 Vdc
- Operated voltage of Tripping coil is 70% t0 110% 0f rated supply voltage
Vrated = 125 Vdc Vmin = 87.5 Vdc Vmax = 137.5 Vdc

Travel Parameter
CONDITION PHASE Travel Speed Contact Stroke Over Travel Rebounce Damping Time
(m/s) (mm) (mm) (ms) (ms)
Close A
B
C
Open A
B
C
O-C-O A
B
C
C-O A
B
C

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 6 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 7 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 8 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 9 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 10 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 11 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 12 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 13 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 14 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 15 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 16 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 17 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 18 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 19 of 19