Field Inspection and Test Report
Field Inspection and Test Report
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 230KV GIS POWER SUPPLY CHECK
2 230KV INDICATION CHECK
3 230KV AUXILIARY CONTACT CHECK
4 230KV FUNCTION ALARM CHECK
5 230KV GIS FUNCTION CHECK
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 1 of 1
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 1 of 1
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 1 of 1
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 1 of 9
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 2 of 9
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 3 of 9
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 4 of 9
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 5 of 9
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 6 of 9
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 7 of 9
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 8 of 9
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 9 of 9
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 1 of 1
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
4 Normal Remote On By Pass Not OP On - Close Close - Open - Open CB Open S50 Close Not Closed
5 Normal Remote - - Not OP On Open Close Close - Open - Open CB Open Remote C. Not Closed
6 Normal Remote - - Not OP On Close Open Close - Open - Open CB Open Remote C. Not Closed
7 Normal Remote - - Not OP On Open Open Close - Open - Open CB Open Remote C. Not Closed
8 Normal Remote - - Not OP On Close Close Close - Open - Open CB Open Remote C. Closed
9 Normal Remote - - OP On Close Close Close - Open - Open CB Open Remote C. Not Closed
10 Normal Remote - - Not OP Off Close Close Close - Open - Open CB Open Remote C. Not Closed
11 Normal Remote - - Not OP On Close Close Close - Open - Close CB Open Remote C. Not Closed
12 Normal Remote - - Not OP On Close Close Open - Open - Open CB Open Remote C. Not Closed
13 Normal Local - - - On - Close Close - Open Open - CB Open S50 Close Not Closed
14 Normal Local - - - On - Close Open - Close Open - CB Open S50 Close Not Closed
15 Normal Local - - - On - Close Open - Open Close - CB Open S50 Close Not Closed
16 Normal Local - - - On - Close Open - Open Open - CB Open S50 Close Not Closed
17 Normal Local - - - On - Close Close - Close Close - CB Open S50 Close Closed
18 Normal Local - - - Off - Close Close - Close Close - CB Open S50 Close Not Closed
19 Normal Local - - - On - - - - - - - CB Close S50 Open Open TC1,TC2
20 Normal Remote - - - On - - - - - - - CB Close S50 Open Not Open
21 Normal Remote - - - On - - - - - - - CB Close Remote O. Open TC1,TC2
22 Normal Local - - - On - - - - - - - CB Close Remote O. Not Open
22 Normal Local - - - On - - Close - Open Open - CB Close Pri. RLY O. Open TC1,TC2
22 Normal Local - - - On - - Open - Open Open - CB Close Pri. RLY O. Not Open
22 Normal Local - - - On - - Close - Open Open - CB Close BU. RLY O. Open TC1,TC2
22 Normal Local - - - On - - Open - Open Open - CB Close BU. RLY O. Not Open
22 Normal Local - - - On - - Close - Open Open - CB Close Pole Discrepancy Open TC1,TC2
22 Normal Local - - - On - - Open - Open Open - CB Close Pole Discrepancy Not Open
Signature
Name
Date
Page 1 of 2
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Equipment DETAIL A
IF(DETAIL A==Close) {ES11BAA30GS600 & ESxx & ESxx & ESxx & ES11BBt10GS600 & ES11BBT10GS601=Close}
IF(DETAIL A==Open) {ES11BAA30GS600 & ESxx & ESxx & ESxx & ES11BBt10GS600 & ES11BBT10GS601=Open}
Equipment DETAIL B
IF(DETAIL B==On) {Spring Charged=ready, Pumping Prev. Reel. Ph.A&Ph.B&Ph.C=ready, SF6 = High}
IF(DETAIL B==Off) {Spring Charged=Not ready, Pumping Prev. Reel. Ph.A&Ph.B&Ph.C= Not ready, SF6 = Low}
Signature
Name
Date
Page 2 of 2
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 1 of 1
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 1 of 1
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:
Signature
Name
Date
Page 1 of 1