H01 Panel
H01 Panel
H01 Panel
Rated Frequency 60 Hz
Auxiliary supply for cubicle heating (L/N) 230Vac REV. DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.
Auxiliary supply for cubicle lighting (L/N) 230Vac DRAWING COMPLETION CERTIFICATE (DCC)
CLIENT:
Average ambient temperature for rated values 40°C
PROJECT:
IP Protection, Primary part IP 65 CONTRACTOR:
IP Protection, LV Compartment IP 4X
FACTORY
THIS DRAWING IS NOT TO BE USED FOR APPROVAL/CERTIFICATION INFORMATION
AS-BUILT CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED DOC. NO. REV. NO.
1
Project: 909611 P OF
1 *
Archive: =H01 / A / / / 1
1 2 3 4 5 6 7 8
Archive: =H01 / A / A / 1
Designation Sheet Sheets Date Description Prepared by
Customer document number
A =H01 /1 (3)2-RMPP-6H2-UH011-* 1- 1 19.01.20 8DA10 33kV GIS SWITCHGEAR, =H01+H01 EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
Cover sheet
B B
Translate file A: A_COC_DE
D D
FEEDER OVERVIEW
Overview diagram
S =H01 B3 (3)2-RMPP-6H2-SH013-* 3- 3 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
FEEDER OVERVIEW
CopyRight (C) Siemens AG 2014 All Rights Reserved
Overview diagram
S =H01 G1 (3)2-RMPP-6H2-SH014-* 1+ 2 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
POWER SUPPLY DC 110V
Circuit diagram
S =H01 G2 (3)2-RMPP-6H2-SH014-* 2- 2 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
E +H01 PP INCOMING FEEDER CUBICLE E
POWER SUPPLY AC 230V
Circuit diagram
S =H01 M1 (3)2-RMPP-6H2-SH015-* 1+ 21 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
CLOSING CIRCUIT
Circuit diagram
S =H01 M2 (3)2-RMPP-6H2-SH015-* 2+ 21 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
F CLOSING CIRCUIT F
Circuit diagram
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg No. A =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE +H01 A1
Sheet 1+
909611 (3)2-RMPP-6H2-LH012-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by List of documents 6 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Archive: =H01 / A / A / 2
Designation Sheet Sheets Date Description Prepared by
Customer document number
S =H01 M3 (3)2-RMPP-6H2-SH015-* 3+ 21 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
OPENING CIRCUIT
Circuit diagram
S =H01 M4 (3)2-RMPP-6H2-SH015-* 4+ 21 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
UVR & CONTROL
Circuit diagram
S =H01 M5 (3)2-RMPP-6H2-SH015-* 5+ 21 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
Translate file C: C_FB_EN.etr, 04-11-24
D D
CONTROL / INDICATION
Circuit diagram
S =H01 M12 (3)2-RMPP-6H2-SH015-* 12+ 21 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
INTERLOCKING
CopyRight (C) Siemens AG 2014 All Rights Reserved
Circuit diagram
S =H01 M13 (3)2-RMPP-6H2-SH015-* 13+ 21 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
BB SF6 MONITORING & SIGNALLING
Circuit diagram
S =H01 M14 (3)2-RMPP-6H2-SH015-* 14+ 21 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
E +H01 PP INCOMING FEEDER CUBICLE E
SIGNALLING ATS
Circuit diagram
S =H01 M15 (3)2-RMPP-6H2-SH015-* 15+ 21 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
SIGNALLING ATS
Circuit diagram
S =H01 M16 (3)2-RMPP-6H2-SH015-* 16+ 21 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
F SIGNALLING F
Circuit diagram
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg No. A =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE +H01 A2
Sheet 2+
909611 (3)2-RMPP-6H2-LH012-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by List of documents 6 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Archive: =H01 / A / A / 3
Designation Sheet Sheets Date Description Prepared by
Customer document number
S =H01 M17 (3)2-RMPP-6H2-SH015-* 17+ 21 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
SIGNALLING
Circuit diagram
S =H01 M18 (3)2-RMPP-6H2-SH015-* 18+ 21 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
SIGNALLING
Circuit diagram
S =H01 M19 (3)2-RMPP-6H2-SH015-* 19+ 21 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
Translate file C: C_FB_EN.etr, 04-11-24
D D
TRANSFORMER CIRCUITS
Circuit diagram
S =H01 S5 (3)2-RMPP-6H2-SH016-* 5+ 7 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
TRANSFORMER CIRCUITS
CopyRight (C) Siemens AG 2014 All Rights Reserved
Circuit diagram
S =H01 S6 (3)2-RMPP-6H2-SH016-* 6+ 7 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
TRANSFORMER CIRCUITS
Circuit diagram
S =H01 S7 (3)2-RMPP-6H2-SH016-* 7- 7 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
E +H01 PP INCOMING FEEDER CUBICLE E
TRANSFORMER CIRCUITS
Circuit diagram
S =H01 Z1 (3)2-RMPP-6H2-SH017-* 1+ 18 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
CIRCUIT BREAKER
Equipment Diagram
S =H01 Z2 (3)2-RMPP-6H2-SH017-* 2+ 18 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
F THREE POSITION SWITCH F
Equipment Diagram
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg No. A =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE +H01 A3
Sheet 3+
909611 (3)2-RMPP-6H2-LH012-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by List of documents 6 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Archive: =H01 / A / A / 4
Designation Sheet Sheets Date Description Prepared by
Customer document number
S =H01 Z3 (3)2-RMPP-6H2-SH017-* 3+ 18 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
THREE POSITION SWITCH
Equipment Diagram
S =H01 Z4 (3)2-RMPP-6H2-SH017-* 4+ 18 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
CB SF6 Pressure Monitoring
Equipment Diagram
S =H01 Z5 (3)2-RMPP-6H2-SH017-* 5+ 18 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
Translate file C: C_FB_EN.etr, 04-11-24
D D
SECONDARY DEVICE
Equipment Diagram
S =H01 Z12 (3)2-RMPP-6H2-SH017-* 12+ 18 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
SECONDARY DEVICE
CopyRight (C) Siemens AG 2014 All Rights Reserved
Equipment Diagram
S =H01 Z13 (3)2-RMPP-6H2-SH017-* 13+ 18 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
SECONDARY DEVICE
Equipment Diagram
S =H01 Z14 (3)2-RMPP-6H2-SH017-* 14+ 18 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
E +H01 PP INCOMING FEEDER CUBICLE E
SECONDARY DEVICE
Equipment Diagram
S =H01 Z15 (3)2-RMPP-6H2-SH017-* 15+ 18 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
SECONDARY DEVICE
Equipment Diagram
S =H01 Z16 (3)2-RMPP-6H2-SH017-* 16+ 18 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
F SECONDARY DEVICE F
Equipment Diagram
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg No. A =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE +H01 A4
Sheet 4+
909611 (3)2-RMPP-6H2-LH012-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by List of documents 6 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Archive: =H01 / A / A / 5
Designation Sheet Sheets Date Description Prepared by
Customer document number
S =H01 Z17 (3)2-RMPP-6H2-SH017-* 17+ 18 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
SECONDARY DEVICE
Equipment Diagram
S =H01 Z18 (3)2-RMPP-6H2-SH017-* 18- 18 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+H01 PP INCOMING FEEDER CUBICLE
SECONDARY DEVICE
Equipment Diagram
V =H01 /1 (3)2-RMPP-6H2-SH018-* 1+ 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
Translate file C: C_FB_EN.etr, 04-11-24
D D
+.B-X5
Terminal strip
V =H01 /8 (3)2-RMPP-6H2-SH018-* 8+ 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+.B PP INCOMING FEEDER CUBICLE
+.B-X5
CopyRight (C) Siemens AG 2014 All Rights Reserved
Terminal strip
V =H01 /9 (3)2-RMPP-6H2-SH018-* 9+ 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+.B PP INCOMING FEEDER CUBICLE
+.B-X5
Terminal strip
V =H01 /10 (3)2-RMPP-6H2-SH018-* 10+ 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
E +.B PP INCOMING FEEDER CUBICLE E
+.B-X6
Terminal strip
V =H01 /11 (3)2-RMPP-6H2-SH018-* 11+ 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+.B PP INCOMING FEEDER CUBICLE
+.B-X7
Terminal strip
V =H01 /12 (3)2-RMPP-6H2-SH018-* 12+ 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+.B PP INCOMING FEEDER CUBICLE
F +.B-X7 F
Terminal strip
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg No. A =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE +H01 A5
Sheet 5+
909611 (3)2-RMPP-6H2-LH012-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by List of documents 6 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Archive: =H01 / A / A / 6
Designation Sheet Sheets Date Description Prepared by
Customer document number
V =H01 /13 (3)2-RMPP-6H2-SH018-* 13+ 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+.B PP INCOMING FEEDER CUBICLE
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
+.B-X9
Terminal strip
V =H01 /14 (3)2-RMPP-6H2-SH018-* 14+ 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+.B PP INCOMING FEEDER CUBICLE
+.B-X40
Terminal strip
V =H01 /15 (3)2-RMPP-6H2-SH018-* 15+ 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
Translate file C: C_FB_EN.etr, 04-11-24
D D
+.B-XQ1
Terminal strip
V =H01 /22 (3)2-RMPP-6H2-SH018-* 22+ 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+.B PP INCOMING FEEDER CUBICLE
+.B-XQ1
CopyRight (C) Siemens AG 2014 All Rights Reserved
Terminal strip
V =H01 /23 (3)2-RMPP-6H2-SH018-* 23+ 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+.B PP INCOMING FEEDER CUBICLE
+.B-XR1
Terminal strip
V =H01 /24 (3)2-RMPP-6H2-SH018-* 24+ 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
E +.B PP INCOMING FEEDER CUBICLE E
+.B-XSH
Terminal strip
V =H01 /25 (3)2-RMPP-6H2-SH018-* 25+ 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+.B PP INCOMING FEEDER CUBICLE
+.B-XV
Terminal strip
V =H01 /26 (3)2-RMPP-6H2-SH018-* 26- 26 19.01.20 8DA10 33kV GIS SWITCHGEAR EM MS MV
+.N PP INCOMING FEEDER CUBICLE
F +.N-XSH1 F
Terminal strip
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg No. A =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE +H01 A6
Sheet 6-
909611 (3)2-RMPP-6H2-LH012-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by List of documents 6 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Archive: =H01 / S / B / 1
FBSTP2
LEGEND AND SYMBOLS:
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
1N
3
5
-X06
1
2
-F -F -F
-Q0
1
I > I > I > I > I > I > I > -M1 M SF6 CIRCUIT BREAKER DRIVE MOTOR
MINIATURE CIRCUIT BREAKER FLUORESCENT LAMP
4
4
2
6
2N
DC
2
Translate file C: C_FB_EN.etr, 04-11-24
1
1
2
2
Translate file D: leer2
Translate file B: leer1
21
CONTROL/AUX. RELAY COIL -K
TIME DELAY CHANGE OVER CONTACT
NORMALLY CLOSE CONTACT
22
23
13
13
2-ELEMENT PUSH BUTTON SWITCH NORMALLY OPEN CONTACT WINDING COIL
14
24
14
C C
L
S31
8MR2170-1C
Test switch
TEST SWITCH
> θ THERMOSTAT MODULE FOR HEATER BI-STABLE LATCHED CONTACTOR RELAY
2
3
library 2: PTD_M2_CoC_E
library 1: PTD60617
23
13
F15
21
13
BI5 - RELAY BINARY INPUT
library 3:
library 4:
LIMIT SWITCH
SEQUENTIAL SELECTOR SWITCH -
14
22
14
24
Symbol
Symbol
Symbol
Symbol
D D
13
-X..
4
2
3
CopyRight (C) Siemens AG 2014 All Rights Reserved
+
A AMMETER
RELAY POWER SUPPLY MODULE GROUND
-
+.T
E E
2
4
4
REMOTE
-S11
LOCAL
4
2
3
2-POS. SEL. SW.
2
1
CH10
3
1
L
X1
Red
X5
N
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
LEGEND AND SYMBOLS
+H01 B1
Sheet 1+
909611 (3)2-RMPP-6H2-SH013-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Overview diagram 3 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
A A
-Q1-S5
B -Q1-S1 B
Translate file A: A_COC_DE
S1
-Q0
1250A
CB1
M
-A51
C C
P1
L1,L2,L3
T1/1
1250-800/1A
CL 5P20, 45-30VA
Rct<=8-5 Ohms
Vk=1200-800V
library 2: PTD_M2_CoC_E
MAIN-1
library 1: PTD60617
T1/2
1250-800/1A
CL 5P20, 45-30VA
Rct<=8-5 Ohms
library 3:
library 4:
Vk=1200-800V
MAIN-2
T1/3
1250/1A
Symbol
Symbol
Symbol
Symbol
D CL 5P20, 25VA D
P2
Rct<=3 Ohms
87B
CopyRight (C) Siemens AG 2014 All Rights Reserved
INTERFACE
3 x S3
L1,L2,L3
33kV 110V 110V
-T5
3 3 3
25VA Cl. 0,2/3P
E 25VA Cl. 0,2/3P E
FACTORY
F AS-BUILT F
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
FEEDER OVERVIEW
+H01 B2
Sheet 2+
909611 (3)2-RMPP-6H2-SH013-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Overview diagram 3 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / B / 3
=H01
+H01
=HZ01
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
LEGEND
4 INTERROGATION LEVER
B B
Translate file A: A_COC_DE
SHT /D12 FOR DETAILS 6 CLOSED/OPEN POSITION INDICATOR FOR VACUUM CIRCUIT BREAKER
14 LEVER FOR LOCKING THE VACUUM CIRCUIT BREAKER AGAINST 'DE-EARTHING" (PADLOCKABLE)
7
15 CIRCUIT BREAKER SPRING CHARGED INDICATOR
library 2: PTD_M2_CoC_E
D 16 14 D
17
+.N NICHE
600
FACTORY
PP INCOMING FEEDER CUBICLE
F AS-BUILT F
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
FEEDER OVERVIEW
+H01 B3
Sheet 3-
909611 (3)2-RMPP-6H2-SH013-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Overview diagram 3 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Archive: =H01 / S / G / 1
FBSTP2
A A
DC 110V DC 110V
L+ L- L+ L-
ADJACENT PANEL
+.B
-XR1 1 RIGHT SIDE
+.B BUS WIRE DIAGRAM
Translate file C: C_FB_EN.etr, 04-11-24
C
-XR1 2
=H00 SHEET /G1
C +.B
-XR1 3
B B
Translate file A: A_COC_DE
C +.B
-XR1 4
Translate file D: leer2
Translate file B: leer1
C C
library 2: PTD_M2_CoC_E
LV COMPARTMENT
library 1: PTD60617
4
2
2
-F10 -F20 -F30 -F40
library 3:
library 4:
D D
1
3
CopyRight (C) Siemens AG 2014 All Rights Reserved
H07Z-K 1,5 GY
+.B A A
27
28
H07Z-K 1,5 GY H07Z-K 1,5 GY -XQ0 H07Z-K 1,5 GY H07Z-K 1,5 GY
E E
-Q0
/Z1.1
-M1 M
DC
FACTORY
40L+
40L-
20L+
20L-
30L+
30L-
10L+
10L-
CB.
AS-BUILT
/M1.1
/M1.1
/M4.1
/M4.1
/M11.1
/M11.1
/M13.2
/M13.2
F F
ALL UNIDENTIFIED WIRES H07Z-K 2,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
POWER SUPPLY DC 110V
+H01 G1
Sheet 1+
909611 (3)2-RMPP-6H2-SH014-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 2 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
A A
+.B
-XR1 11
ADJACENT PANEL
A RIGHT SIDE
+.B
-XR1 12 BUS WIRE DIAGRAM
A
=H00 SHEET /G1
Translate file C: C_FB_EN.etr, 04-11-24
B B
Translate file A: A_COC_DE
H07Z-K 2,5 BK
H07Z-K 2,5 BK
+.B +.B
N
1
1
-F151 -F152
/Z12.1 /Z12.1
10A 3A
C I > I > I > I > C
(N)
(N)
+.B +.B +.B
3
Y X A
A B +.B
3
-XE13
+.B
L
library 2: PTD_M2_CoC_E
-B151
/Z18.5
library 1: PTD60617
8MR2170-1C
θ
library 3:
library 4:
+.B
21
-S13
3
+.B
/Z18.2
Symbol
Symbol
Symbol
Symbol
+.B
22
BYPASS
6
D -XPE D
4
-XSH
AUTO
21
-S20
+.B
L
PE
-E12
/Z18.2
14
22
CopyRight (C) Siemens AG 2014 All Rights Reserved
/Z18.5 +.B B
-XE13
1
+.B +.B A +.N
A
9
B D C B
BK
BK
A A
=H01-W1 -W1
N
1
+.B +.N
+.L -X08
1
-R02 -R03
-Q0 +.B
E /Z18.7 /Z18.7 -E13 E
/Z1.1
/Z18.2
-R01
2
GNYE PE
GNYE PE
2
2
BK
BK
CB.
-X08
0
2
SIHSI-Cu 3x0,5mm2 SIHSI-Cu 3x0,5mm2 -XE13
+.B A B +.N A A
PE
PE
2
-XSH -XSH1
H07Z-K 1,5 GNYE H07Z-K 1,5 GNYE
B
+.B FACTORY
4
B A B B -XE13
+.B A +.B
AS-BUILT
2
-XPE
+.B +.B C -PE
10
10
-XQ0 -XQ0
F F
D A
ALL UNIDENTIFIED WIRES H07Z-K 1,5 BK
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
POWER SUPPLY AC 230V
+H01 G2
Sheet 2-
909611 (3)2-RMPP-6H2-SH014-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 2 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 1
*
CB PERMIT INTERLOCKING FAULT
TO CLOSE (INCOMER-2)
10LA+
/M2.5
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A +.B +.B A
10L+ -X40 1 -X40 2 10L+
/G1.2 /M2.1
110VDC B Y X B
+.B A
18
-X40
+.T +.T
G15
7
=H02 +.T -27DC1 -74TC1
-F31 B
NO FAULT (27/59)
DC1 HEALTHY
DC1 HEALTHY
+H02 /Z11.2 /Z11.5
/Z8.1 =H06 =H11
R13 +.B A
58
Translate file C: C_FB_EN.etr, 04-11-24
-X7
+.T +H06 +.B +.B +H11
7
A A
28
29
-74TC2 -X9 -X9
XR152
XR351
DC1 HEALTHY
=H02/Z6.5
P543
25A
=H04
5
G14
B -X6 B
G13
Translate file A: A_COC_DE
REFER TO =H11/M15
+H04
Translate file D: leer2
Translate file B: leer1
3
B
LOCKOUT HEALTHY
9
-X40 -27DC2 -F86.1 -F31
DC2 HEALTHY
5
121
R12
A -XQ0
-K50BF
+.B
19
+.T
7
-X40
TR-241
REFER TO =H06/M12
+.B
XR152
-27DC3 A
-X5 31 B
DC1 HEALTHY
=H02/Z6.2 A +.B
60
5
1
-X7
26A
B +.B B -Q0
28
LOCKOUT HEALTHY -X6 -X5
+.T
3
S1 A
-F86.2
XR152
A
=H02/Z4.2 =H10 +.B +.B A
5
14
15
+.B +.B
133
A -X9 -X9
34
=EXT +H10
XX
C -X5 -XQ1
X
C
TR-241
+MC
122
B
Reverse Logic
+.D -X11
X42.8
1
-XQ0
1
+.T -Q1
-F32
NO FAULT (27/59)
MARSHALLING CABINET
=H02/Z2.1
133
21
REFER TO =H10/M5
-K32 +.B +.B
36
37
library 2: PTD_M2_CoC_E
-X9 -X9
=H02/Z7.1
RED 670
3 POS. SW.
22
library 1: PTD60617
A A
X42.7
XX
134
X +.B +.B
22
23
-X9 -X9
-X11
library 3:
library 4:
134 0
+.B B +.B B A
32
33
29
Y X -X5
A
Symbol
Symbol
Symbol
Symbol
D A D
B
* +.B A
20
-X40
+.B B +.B
10
LV COMP.
11
-X40 -X40
B
Y X
21
A A +.B
-KSF6.1
CopyRight (C) Siemens AG 2014 All Rights Reserved
51A
14
15
91A
22
-XQ0 -X6 -X6 CB SF6 LOW
-XQ0 -X6
+H11 +H06 +H03
13
-KVT1
21
+.B
-KBSF6.1
/Z17.1
14
-Q0
-Q1
-Q0 -K87B.1 BB SF6 LOW 22
13
E -KVT4 E
13
+.B
-KH01
14
52A
/Z15.6
34A
92A
14
-XQ0
-XQ0 -X6
FACTORY
A1
+.B
-KCBR
+.B A +.B A /Z15.1
AS-BUILT
12
13
A2
-X40 -X40
Y X B
10L- 10L-
/G1.2 /M2.1
F F
* RETROFITTING OF PP MV SWBD
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
CLOSING CIRCUIT
+H01 M1
Sheet 1+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
+.B
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
/M1.8
+.T
4
-S11
REMOTE
/Z10.2
LOCAL
13
+.B
10LA+
+.B
4
-K0E
3
-KRC
Translate file C: C_FB_EN.etr, 04-11-24
/Z17.1
CH10-A722-600
/Z13.6
14
CB CLOSE
5
7
CMD
3 REMOTE
1 LOCAL
+.B
POS.
B B
POS
Translate file A: A_COC_DE
2
-X40
Translate file D: leer2
Translate file B: leer1
+.B
4
-KRC
/Z13.6
13
+.B
6
8
+.B B +.B B -KCBR
14
16
-X40 -X40
/Z15.1
14
PERMIT
A A =H06 TO CLOSE
+.B A
81
-X6
+H06
+.T
7
=EXT
XX
XX
-S10
X X
OFF +MC
ON
/Z10.2
0
REFER TO =H06/M12
C C
-F87B
R21
MARSHALLING CABINET
CHR10
8 CB CLOSE
OPEN CLOSE
6 CB OPEN CMD CMD
CMD
CMD
library 2: PTD_M2_CoC_E
+.B
XX
XX
82
X X -X6
library 1: PTD60617
A
+.B A
17
-XQ0
library 3:
library 4:
+.B A +.B A
15
17
-X40 -X40
-X11
9
B
B +.L
Symbol
Symbol
Symbol
Symbol
D -Q0 D
/Z1.1
22
13
11
-K1 -K1 -S1
21
+.B -S3
B A
36
37
31
14
21
12
-X40 -K1
CB.
22
Y X B
CopyRight (C) Siemens AG 2014 All Rights Reserved
Man. OFF
32
-K1 -Y9
CC
Anti-Pumping
13
-S12 Man. ON sealed
14
E E
-X11
8
(+)2
A1
A1
A2
(-)1
AS-BUILT
+.B B
18
10L- -XQ0 10L-
/M1.8 /M3.1
F A D F
* RETROFITTING OF PP MV SWBD
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
CLOSING CIRCUIT
+H01 M2
Sheet 2+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 3
LOC/REM CB CB SF6 TRIP BB SF6 TRIP 50CBF TRIP CB OPENING BB PROT. TRIP TRIP ORDER PROTECTION TRIP * SUPERVISION
OPENING VERY LOW VERY LOW =H04 VIA INTERPOSING =H06 MAIN-1
PRESSURE PRESSURE RELAY
+.B
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A 10L+ -X40 4 5 6 7 8 A
/M2.8
110VDC B Y X Y X B A Y X
A B A B B
+.B +.B
1
-R74.11 -R74.13
+.T
H12
10
+.T -F86.1 /Z11.6 /Z11.6
+.B
Translate file C: C_FB_EN.etr, 04-11-24
27A
22A
2
/Z9.2 -KRT
R5 SHALL OPERATE
-X6 -X6 /Z8.1
+H04 +H06
5
7
26
27
53
73
13
TR241
/Z17.1 /Z15.5 /Z17.1 A A
P543
14
54
74
OPEN
Translate file D: leer2
Translate file B: leer1
21
28
-74TC1
H10
H11
12
-K50BF -K87B.1
/Z11.5
+.B A B
4
PP OUTGOING CUBICLE
-KRT
/Z13.6
6
8
XR351
+.T
20
A B C
-S31
28A
23A
2RMLG02
-X6 -X6 /Z10.6
PE
22
27
14
13
19
H07Z-K 2,5 GNYE
+.B A +.B B
28
C -X40 -XPE 4 C
B
+.B
LV COMPARTMENT
1
-R74.12
+.B A A
24
23
25
library 2: PTD_M2_CoC_E
-X40 /Z11.6
2
B Y X Y X B
library 1: PTD60617
+.B A
38
-X40
B
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D +.B B +.B B D
-X40 22 -X40 21
Y X
A
+.B +.B A
-X40 29 -X40 30
B Y X
+.B A +.B A +.B A +.B A +.B B
CopyRight (C) Siemens AG 2014 All Rights Reserved
20
13
31
-XQ0 -XQ0 -XQ0 22 -XQ0 -XQ0 93
543
+.B A
541
+.B A A -XQ1
-XQ1
+.L -X10 -X11 -X11 -X12 -X15
3
9
-Q0
+.D -X52
1
23
93
13
31
+.D -X52 /Z1.1
3
EARTHED
/Z3.1
EARTHED
543
/Z3.1
541
14
24
32
94
OFF
ON
OFF
E E
ON
(+)2
-S1
3 POS. SW.
CB.
+.B
3 POS. SW.
-KRT -Y1
0 544
/Z13.6
2 542
(-)1
-X52
-X52
-X10 -X11 -X12 -X15
4
2
8
FACTORY
544
+.B
542
94
32
14
21
40
39
10L- -X40 34 35
F /M2.8 F
A Y X A
* RETROFITTING OF PP MV SWBD
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
OPENING CIRCUIT
+H01 M3
Sheet 3+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 4
A A
+.B +.B
20L+ -X5 1 -X5 2 20L+
/G1.3 /M5.1
110VDC B Y X A
A B
Translate file C: C_FB_EN.etr, 04-11-24
+.B B
30
-X5
B A B
Translate file A: A_COC_DE
XX
=EXT
X
+MC
MARSHALLING CABINET
ETS TRIP
NOTE:
Note 1
ORDER
13
+.B
+.T
H2
-KRS
1. Contact position changed to closed -F31
/Z15.6
/Z8.1
14
XX at normal condition (Emerg. PB not pressed).
R1
X
P543
C +.B A
C
31
H1
-X5
+.B B
34
B -X5
+.T
18
LV COMPARTMENT
-S31 A
2RMLG02
/Z10.6
library 2: PTD_M2_CoC_E
library 1: PTD60617
17
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
+.B +.B A
43
46
-XQ0 -XQ0
A
+.L
CopyRight (C) Siemens AG 2014 All Rights Reserved
-X13 +.T
9
27
25
-Q0
-F86.1
/Z1.1
/Z9.2
-Y7
43
-S1
UVR
+.B
44
40
37
38
39
TR241
A1
-KH01
R1
/Z15.6
A2
RESET
E E
FACTORY
PE
28
26
-X13
AS-BUILT
8
-XQ0 +.B A
-XPE 5
A
F F
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
UVR & CONTROL
+H01 M4
Sheet 4+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 5
SELECTOR SWITCH LOCAL RESET REMOTE REMOTE BI-STABLE RELAY GAS PRESSURE MONITORING
LOCAL REMOTE ORDER IED1 & 2 RESET ORDER RESET ORDER BB PROT. BB PROT. CIRCUIT BREAKER -Q0
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
IED1 IED2 CT ACTIVE CT SHORTED P<< P<
+.B B +.B B
43
41
B -X5 -X5 B
Translate file A: A_COC_DE
A A
Translate file D: leer2
Translate file B: leer1
890
+.B A
-XQ1
=EXT +.B
521
XX
XX
A
X X -XQ1
+MC
-X88
3
+.T
23
13
-S02
MARSHALLING CABINET
+.D
+.T -X51
6
6
-B0
-S11 +.D
K&N CH10-A722-600
/Z14.6 /Z4.2
14
24
-Q1
REMOTE
/Z10.2
LOCAL
EARTHED
/Z3.1
523
521
4
-B0
OFF
XX
XX
ON
C X X -S1 C
3 POS. SW.
522
524
5
-X51 1 2 3
4
5
+.B A +.B A
44
42
library 2: PTD_M2_CoC_E
-X5 -X5
524
library 1: PTD60617
522
B B +.B
-XQ1
+.B A +.B A
84
83
-X5 -X5
A A
library 3:
library 4:
B B
+.B A
19
-X5 -X88
0
1
Symbol
Symbol
Symbol
Symbol
D B
D
+.B A
20
892
893
+.B
891
-X5
-XQ1
B
A A A
CopyRight (C) Siemens AG 2014 All Rights Reserved
+.B
122
212
-KCT
/Z14.5
A1
A1
A1
A1
A1
+.B +.B +.B +.B +.B +.B
E1
A2
A2
A2
A2
A2
E E
RXMVB 2
FACTORY
121
211
AS-BUILT
20L- 20L-
/M4.8 /M6.1
F F
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
CONTROL
+H01 M5
Sheet 5+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 6
A A
B B
Translate file A: A_COC_DE
+.B +.B
103
A A
101
+.B A +.B A
511
-XQ0 -XQ0
111
-XQ1 -XQ1
Y X
5
-Q0
+.D -X11 -X51
9
/Z1.1 -Q1 +.D
-Q1
/Z2.1
103
101
EARTHED
-S1 -S1 /Z3.1
EARTHED
513
511
113
111
CB.
OFF
C C
ON
OFF
102
104
-S1
ON
3 POS. SW.
-S1
3 POS. SW.
512
514
-X15 -X15
112
114
4
6
LV COMPARTMENT
104
+.B +.B
102
-X51
7
library 2: PTD_M2_CoC_E
7
library 1: PTD60617
A A
514
+.B +.B
512
114
112
-XQ1 -XQ1
A A A A
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
A1
A1
A1
+.B +.B +.B +.B +.B +.B
E1
E1
E1
-KLQ0 -KLQ0 -KLQ1 -KLQ1 -KLQ1E -KLQ1E
/Z15.1 /Z15.1 /Z16.4 /Z16.4 /Z15.1 /Z15.1
E2
A2
E2
A2
E2
A2
E E
FACTORY
AS-BUILT
+.B
20L- -X5 24 20L-
/M5.8 /M7.1
B A
F F
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
CONTROL
+H01 M6
Sheet 6+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 7
CIRCUIT BREAKER, -Q0 DISCONNECT SWITCH EARTHING SWITCH SELECTOR SWITCH CB PERMIT
OPEN CLOSED OPEN CLOSED OPEN CLOSED LOCAL REMOTE TO CLOSE
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
+.B +.B
20L+ -X5 9 -X5 10 20L+
/M6.8 /M8.1
110VDC X Y X A
B B
Translate file C: C_FB_EN.etr, 04-11-24
B B
Translate file A: A_COC_DE
+.B A +.B A
83
Translate file D: leer2
81
Translate file B: leer1
-XQ0 -XQ0
3
-Q0
/Z1.1
83
23
81
21
13
21
13
21
13
-S1 -S1 +.B +.B +.B +.B
CB.
84
22
14
22
14
22
14
24
C C
*
-X14 -X14
4
13
+.B
+.B +.B
LV COMPARTMENT
-KXCB
84
82
-XQ0 -XQ0
/Z13.6
library 2: PTD_M2_CoC_E
14
A A
library 1: PTD60617
library 3:
library 4:
46
47
48
49
50
51
-X5 -X5 -X5 -X5 -X5 -X5 -X5
Symbol
Symbol
Symbol
Symbol
D A A A A A A A D
CopyRight (C) Siemens AG 2014 All Rights Reserved
+.T
D2
D4
D6
D8
D10
D12
D14
D16
F2
-F31
/Z8.1
OPTO 1 OPTO 2 OPTO 3 OPTO 4 OPTO 5 OPTO 6 OPTO 7 OPTO 8 OPTO 9
P 543
E E
D13
D15
D11
FACTORY
D3
D5
D7
D9
D1
F1
AS-BUILT
20L- 20L-
/M6.8 /M8.1
F F
* RETROFITTING OF PP MV SWBD
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
BINARY INPUT
+H01 M7
Sheet 7+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 8
*
LOC/REMOTE VT MEASUREMENT RESET TRIP LOCKOUT RELAY 50BF FROM ETS TRIP SPARE MAIN-1 PROT. RELAY
CB CLOSE CMD FAULT ORDER OPERATED BB PROT. RELAY ORDER (IED1) POWER SUPPLY
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
+.B B
32
-X5
B B
Translate file A: A_COC_DE
A
Translate file D: leer2
Translate file B: leer1
XX
=H02 =H06 =EXT
X
24A
+.B A
35
+H02 -X5 +H06 -X6 +MC
MARSHALLING CABINET
NOTE:
ETS TRIP
Note 1.
53
23
ORDER
13
13
+.B +.N +.N +.B 1. Contact position changed to closed
-K0E -KVT5 -KVT6 -KRS -F86 F87B
+.T
7
at normal condition (Emerg. PB not pressed).
/Z17.1 /Z16.5 /Z16.5 /Z15.6 -F86.1 R9
54
14
14
24
CB CLOSE
/Z9.2
CMD
XX
X
25A
+.B
36
-X5 -X6
TR241
C A C
5
+.B A
33
-X5
B
LV COMPARTMENT
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
53
56
57
58
-X5 -X5 -X5 +.B B -X5 -X5 -X5
55
-X5
A A A A A A
Symbol
Symbol
Symbol
Symbol
D A D
FACTORY
CopyRight (C) Siemens AG 2014 All Rights Reserved
AS-BUILT
+.T
F4
F6
F8
F10
F12
F14
F16
J2
-F31
/Z8.1
OPTO 10 OPTO 11 OPTO 12 OPTO 13 OPTO 14 OPTO 15 OPTO 16
E E
P 543
F13
F15
F11
PE
F3
F5
F7
F9
J1
+.B B H07Z-K 4,0 GNYE
-XPE 6
20L- 20L-
/M7.8 /M9.1
F F
* RETROFITTING OF PP MV SWBD
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
BINARY INPUT
+H01 M8
Sheet 8+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 9
*
A (COMPLEMENT) A
+.B
20L+ -X5 16 20L+
/M8.8 /M10.1
110VDC X B
A
Translate file C: C_FB_EN.etr, 04-11-24
B B
Translate file A: A_COC_DE
+.B A +.B A
23
41
-XQ0 -XQ0
1
-Q0
/Z1.1
41
13
-S41 -S1
CB.
14
42
C -X11 -X12 C
0
+.B +.B
24
42
-XQ0 -XQ0
A A
LV COMPARTMENT
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
+.N +.N
A1
A1
-F27.1 -F27.2
/Z17.6 /Z17.6
Symbol
Symbol
Symbol
Symbol
D D
VMD420
VMD420
A2
A2
PE
PE
CopyRight (C) Siemens AG 2014 All Rights Reserved
+.B A +.B A
4
3
-XPE -XPE
E E
FACTORY
A1
+.B
-KXCB
/Z13.6
AS-BUILT
A2
+.B
85
86
87
88
89
90
-X5
+.B B +.B
20L- -X5 25 -X5 26 20L-
/M8.8 /M10.1
A Y X B
F F
* RETROFITTING OF PP MV SWBD
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
CONTROL / INDICATION
+H01 M9
Sheet 9+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 10
POWER SUPPLY CAPACITIVE VOLTAGE DETECTING SYSTEM VT MEASUREMENT VT MEASUREMENT DC SUPERVISION
CAPDIS S2+ FAULT WDG-1 FAULT WDG-2
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
+.B +.B
20L+ -X5 17 -X5 18
/M9.8
110VDC A B B A
Translate file C: C_FB_EN.etr, 04-11-24
+.N +.N
21
21
-F27.1 -F27.2
B /Z17.6 /Z17.6 B
VT WDG.2
SEE NOTE
SEE NOTE
VT WDG.1
Translate file A: A_COC_DE
K2 K2
Translate file D: leer2
Translate file B: leer1
VMD420
VMD420
+.B A +.B +.B A
-XH1 2 -XH1 5 -XH1 8
24
24
22
22
D D A D
-XH1-A51 -XH1-A51
8
2
RD
PK
GN
43
43
53
13
=H01-W01-A51 +.N +.N +.N +.N
-KVT2 -KVT1 -KVT2 -KVT1
/Z16.1 /Z16.1 /Z16.1 /Z16.1 +.B +.B
11
11
14
44
44
54
-F601 -F501
+.F
2
4
-A51 /Z13.1 /Z13.1
14
12
14
12
43
53
83
+
13
C /Z6.1 +.N +.N +.N +.N C
R1 R2 -KVT3 -KVT3 -KVT3 -KVT3
CAPDIS-S2+
14
44
54
84
-
PE
+.B +.B
LV COMPARTMENT
A A
59
60
6
8
3
5
1
-X5 -X5
library 2: PTD_M2_CoC_E
B B
WH
GY
BU
BN
YE
library 1: PTD60617
=H01-W01-A51
33
33
+.B +.B
-F501 -F601
H05V-K 1,0 GNYE
4
9
1
/Z13.1 /Z13.1
library 3:
library 4:
-XH1-A51 -XH1-A51
34
34
+.B +.B
+.F
-XH1 4 6 -XH1 7 9
Symbol
Symbol
Symbol
Symbol
-PE +.T
13
D -27DC1
D
A A A A
/Z11.2
XR152
CopyRight (C) Siemens AG 2014 All Rights Reserved
+.B B +.B B
62
61
PE
14
-X5 -X5
H07Z-K 2,5 GNYE
A A
+.B A
-XPE 7
E E
A1
A1
A1
A1
A1
A1
+.N +.N +.N +.N +.N +.N
-KVT1 -KVT2 -KVT3 -KVT4 -KVT5 -KVT6
/Z16.1 /Z16.1 /Z16.5 /Z16.1 /Z16.5 /Z16.5 NOTE:
A2
A2
A2
A2
A2
A2
K2 OPERATING PRINCIPLE
UNDERVOLTAGE < U, NORMALLY ENERGIZED OPERATION
FACTORY
AS-BUILT
+.B +.B
20L- -XH1 1 -X5 27
/M9.8
A D B A
F F
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
CONTROL
+H01 M10
Sheet 10+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 11
GAS PRESSURE INDICATION
EXTERNAL TRIP CIRCUIT BREAKER -Q0 PERMIT TO SECURED AUX. VT MEASUREMENT LAMP TEST DC SUPERVISION
INDICATION OPEN CLOSED CLOSE LOW SF6 PRESSURE VERY LOW SF6 PRESSURE DC VOLTAGE FAULT
ALARM FAULT PRESENCE
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
+.B
30L+ -X6 1
/G1.6
110VDC B A
Translate file C: C_FB_EN.etr, 04-11-24
X1
X1
X1
X1
X1
X1
X1
X1
+.T +.T +.T +.T +.T +.T +.T +.T
B -H01 -H02 -H03 -H04 -H05 -H06 -H07 -H08 B
Translate file A: A_COC_DE
X5
X5
X5
X5
X5
X5
X5
X5
X2
X2
X2
X2
X2
X2
X2
X2
RED GREEN RED WHITE YELLOW RED WHITE RED
Translate file D: leer2
Translate file B: leer1
+.T
3
C -27DC1 +.T C
13
-LT
/Z11.2
/Z18.2
14
+.B +.B +.B +.B +.B +.B +.B
LV COMPARTMENT
A A A A A A A
XR152
4
2
8
-X6 -X6 -X6 -X6 -X6 -X6 -X6
library 2: PTD_M2_CoC_E
1
+.T
13
B B B B B B B
-27DC2
library 1: PTD60617
+.B +.B
18
19
+.T /Z11.2
3
-X6 -X6
-27DC2
Y X B
A A /Z11.2
library 3:
library 4:
XR152
=H06 =H04
XR152
33
53
33
33
21
21
13
13
13
13
PE
+.B +.B +.B +.B +.B +.B +.B +.N +.N
14
31A
Symbol
Symbol
Symbol
Symbol
D +.B A -KH01 -KLQ0 -KCBR -KSF6.1 -KBSF6.1 -KSF6.2 -KBSF6.2 -KVT5 -KVT6 D
64
1
/Z15.6 /Z15.1 /Z15.1 /Z15.6 /Z17.1 /Z15.5 /Z17.1 /Z16.5 /Z16.5
22
22
14
34
14
54
14
14
34
34
+.B A
+.T
3
-XPE 8
-74TC1
14
*
8
-K87B.1 -K50BF
/Z11.5 +.B
-PE
CopyRight (C) Siemens AG 2014 All Rights Reserved
16
32A
23
+.B +.B
XR351
65
1
/Z13.6
24
E E
+.B A
12
-X6
B FACTORY
+.B A +.B A +.B
AS-BUILT
10
F F
* RETROFITTING OF PP MV SWBD
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
CONTROL / INDICATION
+H01 M11
Sheet 11+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 12
DISCONNECTOR EARTHING SWITCH INTERLOCKING COIL BB EARTHING SWITCH
RELEASED RELEASED CB. OPER.MECHANISM BLOCKED RELEASED
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
+.B +.B
13
13
-XR1 -XR1 ADJACENT PANEL
+.B C A
RIGHT SIDE
15
-XR1
BUS WIRE DIAGRAM
Translate file C: C_FB_EN.etr, 04-11-24
16
16
-XR1 -XR1
B C A +.B B
17
Translate file A: A_COC_DE
-XR1
+.B A A
Translate file D: leer2
Translate file B: leer1
13
+.N +.B +.B
2
-XV
18
19
-KVT1 -XR1 -XR1
/Z16.1
14
C C
+.B
13
533
-XV +.N +.B A
1
-KVT4 -XQ1
B /Z16.1
14
+.D -X51
1
-Q1
EARTHED
/Z3.1
533
OFF
ON
C C
3 POS. SW.
0 534
-X51
534
+.B
-XQ1
library 2: PTD_M2_CoC_E
LV COMPARTMENT
A
library 1: PTD60617
+.B A +.B A
91
11
-XQ0 -XQ0
library 3:
library 4:
1
-Q0 -Q0
/Z1.1 /Z1.1 +.B A
131
13
-S1 -XQ1
830
Symbol
Symbol
Symbol
Symbol
D +.B A +.B A D
-XQ1 -XQ1 832
14
91
+.D -X11
3
-S1
EARTHED
CB.
-Q1
+.D -X84 -X85
1
131
-Q1 /Z2.1
A1
OFF
92
ON
/Z3.1
E1
E1
-Y16 -S1
-Y1 -Y5
CopyRight (C) Siemens AG 2014 All Rights Reserved
3 POS. SW.
3 POS. SW.
U
A2
E2
E2
132
CB.
2
-X84 -X85
0
+.B
132
833
-XQ1
92
12
-XQ1 -XQ1 -XQ0 -XQ0
A
A A A A
E E
+.B B +.B B +.B B
20
15
17
FACTORY
AS-BUILT
F F
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
INTERLOCKING
+H01 M12
Sheet 12+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 13
BUSBAR-1 COMPT SF6 BUSBAR-1 COMPT SF6 GAS PRESSURE MONITORING BUSBAR 1
LOW PRESSURE VERY LOW PRESSURE
ALARM FAULT P<< P< P>
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
ADJACENT PANEL
+.B
7
-XR1 RIGHT SIDE
C BUS WIRE DIAGRAM
+.B
8
-XR1 =H00 SHEET /G1
C
+.B
Translate file C: C_FB_EN.etr, 04-11-24
9
-XR1
C
+.B
10
-XR1
B B
Translate file A: A_COC_DE
C
Translate file D: leer2
Translate file B: leer1
43
43
53
13
+.B +.B
-KBSF6.1 -KBSF6.2
/Z17.1 /Z17.1
14
44
44
54
BB SF6 BB SF6
ALARM FAULT
+.B
100
C A C
-XB11
-XB11
3
+.F
library 2: PTD_M2_CoC_E
LV COMPARTMENT
-B11
/Z5.2
library 1: PTD60617
4 4 4
library 3:
library 4:
D D
1 2 3 1 2 3 1 2 3
CopyRight (C) Siemens AG 2014 All Rights Reserved
-XB11
2
0
1
+.B
102
103
101
-XB11
E A A A
E
FACTORY
A1
A1
+.B +.B
-KBSF6.2 -KBSF6.1
/Z17.1 /Z17.1
AS-BUILT
A2
A2
40L+
40L-
/G1.7
/G1.7
F F
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
BB SF6 MONITORING & SIGNALLING
+H01 M13
Sheet 13+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 14
ELECTRICAL INTERLOCKING FAULT IED-1&2 (INCOMER-1) IED-1&2 (INCOMER-1)
DISCONNECT SWITCH (-Q1) OPEN CIRCUIT BREAKER (-Q0)
INTERLOCKING DETECTION SWITCHING FAULT OVERLOAD DETECTION
OR EARTHING SWITCH ON OPEN
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
Translate file C: C_FB_EN.etr, 04-11-24
+.B B +.B B
14
61
-X6 -X7
B A A B
Translate file A: A_COC_DE
=H02 =H02
Translate file D: leer2
Translate file B: leer1
+H02 +H02
55A
57A
+.T +.T +.T
G18
H4
G6
-F31 -F31 -X5 -F31 -X5
/Z8.1 /Z8.1 /Z8.1
R14
R2 R10
+.B A +.B
151
61
P543
G16
G17
P 543
P 543
H3
G5
56A
58A
+.L -X13 +.D -X13
2
C +.B C
141
-Q0 -Q1 A -X5 -X5
-XQ1
/Z1.1 /Z2.1
151
63
61
-S1 -S1
3 POS. SW.
+.D -X12
3
EARTHED
31
-S1 -Q1 +.B
CB.
141
-KLQ0
/Z2.1
62
64
library 2: PTD_M2_CoC_E
OFF
/Z15.1
LV COMPARTMENT
ON
32
152
55
62
3 POS. SW.
library 1: PTD60617
-X7 -X7
-X13 -X13 -X13
0
2
1
B B
2 142
+.B
64
-XQ0 -X12
library 3:
library 4:
4
A
6
-X9 -X9 -X9 -X9
62
D D D A A A A D
A A
+.B B +.B B +.B B B +.B +.B +.B +.B
24
22
23
27
28
29
30
21
=H06
67A
88A
48B
27A
73A
29A
75A
10A
12A
51A
21A
+H06
4A
-X40 -X40 -X5 -X5 -X5 -X5 -X5 -X5 -X5 -X5 -X5 -X5
E E
FACTORY
AS-BUILT
F F
* RETROFITTING OF PP MV SWBD
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SIGNALLING ATS
+H01 M14
Sheet 14+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 15 *
ELECTRICAL
INTERLOCKING
=H06 =H06
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
+H06 +H06
+.B
35
+.B -X9
94
-X5
A
A
Translate file C: C_FB_EN.etr, 04-11-24
+.B A
7
-X9
B B
Translate file A: A_COC_DE
B +.B A
58
-X7
Translate file D: leer2
Translate file B: leer1
+.B A +.B
161
51
-XQ0 -XQ1
D D
-X13 -X14
5
3
+.L +.D
-Q0 -Q1
+.T +.T
H9
G12
EARTHED
/Z1.1 /Z2.1 -F31 -F31
161
53
51
OL DETECTION
OFF
C C
ON
-S1 R4 R12
3 POS. SW.
52
54
P543
162
P543
G10
G11
CB.
H7
H8
-X13 -X14
4
2
library 2: PTD_M2_CoC_E
LV COMPARTMENT
54
library 1: PTD60617
+.B +.B
162
A
52
-XQ0 -XQ1
D D
library 3:
library 4:
A
Symbol
Symbol
Symbol
Symbol
D D
+.B B +.B B
59
60
8
-X9 -X7
Y X
A A
CopyRight (C) Siemens AG 2014 All Rights Reserved
=H11
10A
12A
+H11
-X40 -X40 =H11 =H02
7
-X9
15
E -X9 E
FACTORY
AS-BUILT
F F
* RETROFITTING OF PP MV SWBD
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SIGNALLING ATS
+H01 M15
Sheet 15+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 16
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
B B
Translate file A: A_COC_DE
31
+.B
-KLQ1E
/Z15.1
32
43
43
43
31
61
+.B +.B +.B
43
43
31
-KS11 -KLQ0 +.B +.B -KCBR
C /Z15.1 /Z15.1
-KLQ1 -KLQ1E
/Z15.1 C
/Z16.4 /Z15.1
32
44
62
44
44
32
44
44
*
LV COMPARTMENT
library 2: PTD_M2_CoC_E
33
+.B
library 1: PTD60617
-KXCB
/Z13.6
34
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
+.B B B B B +.B B B B B B B B B B B B B
14
10
12
13
15
16
11
4
2
9
-X7 -X7
1
CopyRight (C) Siemens AG 2014 All Rights Reserved
A A A A A A A A A A A A A A A A FACTORY
AS-BUILT
=EXT
E E
+MC
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X
MARSHALLING CABINET
F F
* RETROFITTING OF PP MV SWBD
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SIGNALLING
+H01 M16
Sheet 16+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 17
B B
Translate file A: A_COC_DE
+.T
8
Translate file D: leer2
Translate file B: leer1
-74TC1
/Z11.5
+.B
XR351
A
41
=H02 -X5
43
43
43
43
63
63
+H02 B +.N +.N +.B +.B +.B +.B
13
8
/Z12.1 +.T
44
44
44
64
44
64
-27DC1
14
-74TC2
/Z11.2
=H02/Z6.5
C C
XR152
XR351
6
6
LV COMPARTMENT
13
+.B +.T
8
library 2: PTD_M2_CoC_E
+.T
8
-F152 -27DC2
-27DC3
/Z12.1 /Z11.2
library 1: PTD60617
=H02/Z6.2
14
XR152
XR152
library 3:
library 4:
6
Symbol
Symbol
Symbol
Symbol
D +.B B +.B B
D
42
13
-X6 -X5
A
A
+.B B
17
-X7 B B B B B B B B B
24
CopyRight (C) Siemens AG 2014 All Rights Reserved
20
22
23
25
26
FACTORY
18
19
21
A
A A A A A A A A A
AS-BUILT
=EXT
E E
+MC
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X
MARSHALLING CABINET
F F
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SIGNALLING
+H01 M17
Sheet 17+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 18
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
IED-1 IED-2 IED-1 IED-1 IED-1 IED-1
33kV PRESENT CABLE SIDE 33kV PRESENT CABLE SIDE GENERAL TRIP ORDER FO COMM. FAULT PROT. INHIBITED WATCHDOG
Translate file C: C_FB_EN.etr, 04-11-24
B B
Translate file A: A_COC_DE
+.B A
43
=H02 -X5
Translate file D: leer2
Translate file B: leer1
+H02 B
X61.14
H6
H15
H18
J12
18
-F31 -F32 -F31 -F86.1
/Z8.1 =H02/Z3.1 /Z8.1 /Z9.2
R8 BO33 R3 R6 R7
RED670
TR241
P543
P543
X61.13
H14
H13
H16
H17
J11
H5
20
G1
C C
LV COMPARTMENT
library 2: PTD_M2_CoC_E
library 1: PTD60617
+.B B
44
-X5
library 3:
library 4:
A
Symbol
Symbol
Symbol
Symbol
D D
+.B B B B B B B B B B B B B
34
CopyRight (C) Siemens AG 2014 All Rights Reserved
27
28
29
30
32
33
35
36
37
38
31
-X7
A A A A A A A A A A A A
=EXT
E E
+MC
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X
FACTORY
MARSHALLING CABINET
AS-BUILT
F F
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SIGNALLING
+H01 M18
Sheet 18+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 19
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
IED-2 IED-2 IED-2 IED-2 SPARE IED-1 IED-2
GENERAL TRIP ORDER FO COMM. FAULT PROT. INHIBITED WATCHDOG CONNECTION BF TRIP (50BF) BF TRIP (50BF)
Translate file C: C_FB_EN.etr, 04-11-24
=H02 =H02
+H02 +H02
+.B A
53
B -X5 B
Translate file A: A_COC_DE
B
Translate file D: leer2
Translate file B: leer1
+.T
X61.11
-F32
+.T +.T +.T =H02/Z3.1
X61.2
X61.5
X61.8
18
G9
-F32 -F86.2 -F31
=H02/Z3.1 =H02/Z4.2 /Z8.1 BO31 BO32
RED670
R11
31
B025 B026 B027 B028 B029 B030 +.B
-K32
X61.10
X61.12
RED670
TR241
=H02/Z7.1
P543
32
X61.4
X61.3
X61.6
X61.7
X61.9
X61.1
G7
G8
20
C C
LV COMPARTMENT
+.B B B B B B B B B
45
46
47
48
49
50
52
51
library 2: PTD_M2_CoC_E
-X5
+.B B
54
library 1: PTD60617
A A A A A A A A -X5
A
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
+.B B B B B B B B B B B B B
44
40
42
43
45
46
47
48
49
CopyRight (C) Siemens AG 2014 All Rights Reserved
39
50
52
FACTORY
41
51
-X7
A A A A A A A A A A A A A A
AS-BUILT
=EXT
E E
+MC
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X
MARSHALLING CABINET
F F
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SIGNALLING
+H01 M19
Sheet 19+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Archive: =H01 / S / M / 20
FBSTP2
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
SPARE CONNECTION SPARE CONNECTION
*
Translate file C: C_FB_EN.etr, 04-11-24
B B
Translate file A: A_COC_DE
C C
LV COMPARTMENT
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
+.B +.B B
54
64
CopyRight (C) Siemens AG 2014 All Rights Reserved
53
56
57
63
-X7 -X7
A A A A
=EXT
E E
+MC
XX
XX
XX
XX
X X
FACTORY
MARSHALLING CABINET
AS-BUILT
F F
* RETROFITTING OF PP MV SWBD
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SIGNALLING
+H01 M20
Sheet 20+
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / M / 21
S P A R E C O N T A C T S
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
*
Translate file C: C_FB_EN.etr, 04-11-24
15
18
13
11
-X9
9
-X9 -X9
1
Translate file D: leer2
Translate file B: leer1
B B B B B B
14
17
11
11
-F86.1 -F27.1 -F27.2
/Z9.2 /Z17.6 /Z17.6
K1 K1
TR241
VMD420
VMD420
14
14
16
19
12
12
C C
20
16
17
19
14
10
12
-X9
2
-X9 -X9
library 3:
library 4:
+.B
23
25
21
-X9
Symbol
Symbol
Symbol
Symbol
D B B B D
XR351
XR152
XR152
2
+.B B B B +.B
24
34
22
26
27
28
29
30
32
33
35
31
E -X9 -X9 E
B B B B B B B B B
FACTORY
AS-BUILT
F F
* RETROFITTING OF PP MV SWBD
ALL UNIDENTIFIED WIRES H07Z-K 1,5 GY
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SPARES
+H01 M21
Sheet 21-
909611 (3)2-RMPP-6H2-SH015-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 21 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Archive: =H01 / S / S / 1
FBSTP2
CT Protection Core
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
1S3
1S3
1S3
HV COMP.
1S1
1S1
1S1
Rct<=8-5 Ohms
Vk=1200-800V
Translate file C: C_FB_EN.etr, 04-11-24
YE
YE
YE
YE
YE
YE
YE
YE
YE
MAIN-1
H07V-K 4,0
B B
Translate file A: A_COC_DE
+.B NOTE:
-XPE
1
H07Z-K 4,0 GNYE 1. FOR SHORTING AND EARTHING OF CT CORE
B
CLOSE TB's 112, 122, 132 AND OPEN 111, 121, 131, 135
C90
124
134
+.B +.B +.B
122
132
135
123
133
114
B B B B B B B B B B B B B
112
121
131
113
111
C90
124
134
+.B +.B +.B
122
132
135
123
133
114
112
121
131
113
111
CT TAP CT RATIO
LV COMPARTMENT
library 2: PTD_M2_CoC_E
D D
+.T
21
23
25
27
-S31
2RMLG02
/Z10.6
24
PE
22
26
28
CopyRight (C) Siemens AG 2014 All Rights Reserved
+.B B
3
-XPE
+.T
C1
C2
C3
C4
C5
C6
C7
C8
C9
5A C13
C14
1A C15
E -F31
E
5A
5A
5A
/Z8.1
1A
1A
1A
P543
FACTORY
Ia
Ib
In
Ic
AS-BUILT
F F
ALL UNIDENTIFIED WIRES H07Z-K 2,5 YE
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
TRANSFORMER CIRCUITS
+H01 S1
Sheet 1+
909611 (3)2-RMPP-6H2-SH016-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 7 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / S / 2
CT Protection Core
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
2S3
2S3
2S3
HV COMP.
2S1
2S1
2S1
Rct<=8-5 Ohms
Vk=1200-800V
Translate file C: C_FB_EN.etr, 04-11-24
YE
YE
YE
YE
YE
YE
YE
YE
YE
MAIN-2
H07V-K 4,0
B B
Translate file A: A_COC_DE
+.B
2
-XPE
Translate file D: leer2
Translate file B: leer1
C90
124
134
+.B +.B +.B
122
132
135
123
133
114
B B B B B B B B B B B B B
112
121
131
113
111
C90
124
134
+.B +.B +.B
122
132
135
123
133
114
112
121
131
113
111
-X1B -X1B -X1B CLOSE TB's 111, 114, 121, 124, 131, 134, 135 AND
A YX A A YX A A YX A A OPEN TB's 112, 113, 122, 123, 132, 133
A Y A Y A Y A X X X
3. FOR SERVICE CONDITION OF CT CORE AT 800A TAP
CLOSE TB's 111, 113, 121, 123, 131, 133, 135 AND
C OPEN TB's 112, 114, 122, 124, 132, 134 C
CT TAP CT RATIO
LV COMPARTMENT
library 2: PTD_M2_CoC_E
=H02
+H02
Symbol
Symbol
Symbol
Symbol
D D
+.B +.B +.B
135
A A A A
121
131
111
B B B B
CopyRight (C) Siemens AG 2014 All Rights Reserved
+.T
21
23
25
27
-S32
2RMLG02
=H02/Z5.6
24
PE
22
26
28
+.B B
4
-XPE
E E
+.T
X401.2
X401.1
X401.4
X401.3
X401.6
X401.5
X401.8
X401.7
-F32
=H02/Z2.1
FACTORY
3L0
I L2
I L3
RED 670
I L1
AS-BUILT
F F
ALL UNIDENTIFIED WIRES H07Z-K 2,5 YE
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
TRANSFORMER CIRCUITS
+H01 S2
Sheet 2+
909611 (3)2-RMPP-6H2-SH016-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 7 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
A A
T1/3:
1250/1A
CL 5P20, 25VA
3S1
3S1
3S1
+.F +.F +.F
Rct<=3 Ohms -T1L1 -T1L2 -T1L3
HV COMP.
3S2
3S2
3S2
YE
YE
YE
YE
YE
YE
H07V-K 4,0
Translate file C: C_FB_EN.etr, 04-11-24
B +.B B
Translate file A: A_COC_DE
5
-XPE
Translate file D: leer2
Translate file B: leer1
B90
+.B
120
114
B B B B B B B B B B
112
113
115
116
117
118
119
121
111
-X1C NOTE:
YX YX YX BB YX ZZ
1. FOR SHORTING AND EARTHING OF CT CORE
CLOSE TB's 111, 113, 115 AND OPEN 112, 114, 116, 117
B90
+.B
120
114
112
113
115
116
117
118
119
121
111
-X1C 2. FOR SERVICE CONDITION OF CT CORE
YX YX Y X CLOSE TB's 112, 114, 116, 117 AND OPEN 111, 113, 115
A A A A A A A A A A A
C C
10
11
5
9
-X1CA -X1CA -X1CA
YX YX YX
B B B B B B B H07Z-K 1,5 YE
library 2: PTD_M2_CoC_E
LV COMPARTMENT
library 1: PTD60617
+.B
113
213
115
227
117
225
-KCT
/Z14.5
library 3:
library 4:
RXMVB 2
Symbol
Symbol
Symbol
Symbol
D D
228
226
214
114
116
+.B B B B
14
12
13
-X1CA
CopyRight (C) Siemens AG 2014 All Rights Reserved
Y X Y X A
A
+.B B B B B
4
2
-X1CA
1
E E
+.B
4
2
-X1CA
1
A A A A
=H06
FACTORY
+H06
4A
2A
3A
1A
F F
ALL UNIDENTIFIED WIRES H07Z-K 2,5 YE
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
TRANSFORMER CIRCUITS
+H01 S3
Sheet 3+
909611 (3)2-RMPP-6H2-SH016-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 7 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / S / 4
=H02 Line Voltage Transformer
(Wdg-1)
=H02
VT
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
-T5/1
HV COMP.
1n
1n
1n
33kV 110V
-T5L1 -T5L2 -T5L3
3 3 =H02/Z1.2 =H02/Z1.2 =H02/Z1.2
1a
1a
1a
25VA Cl. 0,2/3P
H07V-K 4,0 RD
Translate file C: C_FB_EN.etr, 04-11-24
B B
Translate file A: A_COC_DE
504
502
506
507
+.B A A A
-X2A
Y X Y X Y X
504
502
506
507
503
505
+.B +.B +.B
501
A A A
-X2A B -X2A B -X2A B B H07Z-K 2.5 GNYE
+.B B
7
-XPE
503
505
+.B
501
-X2A
B B B
C C
+.B
-X2A 508
B Y
LV COMPARTMENT
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
+.B +.B
3
5
1
1
-F501 -F502
/Z13.1 /Z13.1
3A 3A
CopyRight (C) Siemens AG 2014 All Rights Reserved
6
509
514
+.B +.B +.B
510
512
513
515
516
517
B B B B B B B B B
511
A A A A A A A A A
+.N
L1
L2
L3
-F27.1
V1L4
V1L2
V1L3
V1L1
SPARE
/Z17.6 FACTORY
VL2
VL3
VL1
/S6.2
AS-BUILT
VMD420
F F
ALL UNIDENTIFIED WIRES H07Z-K 2,5 RD
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
TRANSFORMER CIRCUITS
+H01 S4
Sheet 4+
909611 (3)2-RMPP-6H2-SH016-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 7 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / S / 5
Line Voltage Transformer
+H02
(Wdg-2)
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
VT +.F +.F +.F
2n
2n
2n
-T5L1 -T5L2 -T5L3
-T5/2
=H02/Z1.2 =H02/Z1.2 =H02/Z1.2
33kV 100V
2a
2a
2a
HV COMP.
3 3 H07V-K 4,0 RD
B B
Translate file A: A_COC_DE
604
Translate file B: leer1
602
606
607
+.B A A A
-X2B
Y X Y X Y X
604
602
606
607
603
605
+.B +.B +.B
601
A A A
-X2B B -X2B B -X2B B B H07Z-K 2.5 GNYE
+.B B
8
-XPE
603
605
+.B
601
-X2B
B B B
608
+.B
-X2B
C B C
LV COMPARTMENT
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
+.B +.B
3
5
1
1
-F601 -F602
/Z13.1 /Z13.1
3A 3A
I > I > I > I > I > I >
CopyRight (C) Siemens AG 2014 All Rights Reserved
6
609
614
+.B +.B +.B
610
612
613
615
616
617
B B B B B B B B B
611
SPARE
+.N
L1
L2
L3
-F27.2
V2L4
V2L2
V2L3
V2L1
/Z17.6 FACTORY
VL2
VL3
VL1
AS-BUILT
/S6.6
VMD420
F F
ALL UNIDENTIFIED WIRES H07Z-K 2,5 RD
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
TRANSFORMER CIRCUITS
+H01 S5
Sheet 5+
909611 (3)2-RMPP-6H2-SH016-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 7 Sh.
1 2 3 4 5 6 7 8
F
E
D
C
B
A
1
*
CopyRight (C) Siemens AG 2014 All Rights Reserved Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
ELCAD-Version 7.7.1 SP2
Symbol library 1: PTD60617 Translate file A: A_COC_DE Last used: 19.01.20
Symbol library 2: PTD_M2_CoC_E Translate file B: leer1 FBSTP2
Symbol library 3: Translate file C: C_FB_EN.etr, 04-11-24
Symbol library 4: Translate file D: leer2 Archive: =H01 / S / S / 6
LV COMPARTMENT
1
1
As Manuf
Revision Modification
Retrofitting
Date
19.01.20
04.10.17
GN
GN
/Z8.1
-F31
+.T
/Z10.6
-S31
+.T
Date
2RMLG02
Name Norm
Appr.
Drawn
P543
2
2
GN
HEB
SAG
C19 2 1 V1L1
05.03.17
VL1
C20 4 3 V1L2
VL2
/S4.2
3
3
Orig./Prep.for/Prep.by
RIYADH METRO PP6H2
C21 6 5 V1L3
C22 8 7 V1L4
4
4
+H02
=H02
Siemens AG
5
5
=H02/Z5.6
-S32
+.T
+.T
=H02/Z2.1
-F32
Circuit diagram
2RMLG02
RED 670
VA
-X2B
+.B
-X2B
+.B
A
A
TRANSFORMER CIRCUITS
PP INCOMING FEEDER CUBICLE
8DA10 33kV GIS SWITCHGEAR
VB
6
6
A
A
/S5.2
909611
VC
A
A
7
7
A
A
=HZ01
(3)2-RMPP-6H2-SH016-*
ALL UNIDENTIFIED WIRES H07Z-K 2,5 RD
S
+H01
=H01
8
8
FACTORY
S6
AS-BUILT
Sheet 6+
7 Sh.
F
E
D
C
B
A
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / S / 7
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
Translate file C: C_FB_EN.etr, 04-11-24
B B
Translate file A: A_COC_DE
C L1 L2 L3
C
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
+.F
L1
L2
L3
X
-A51
/Z6.1
CopyRight (C) Siemens AG 2014 All Rights Reserved
L1 L3
E E
CAPDIS-S2+
L2
H07Z-K 4,0 GNYE
+.B A FACTORY
4
2
-XPE
1
+.B
-PE AS-BUILT
F F
ALL UNIDENTIFIED WIRES H07Z-K 2,5 YE
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
TRANSFORMER CIRCUITS
+H01 S7
Sheet 7-
909611 (3)2-RMPP-6H2-SH016-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Circuit diagram 7 Sh.
1 2 3 4 5 6 7 8
F
E
D
C
B
A
1
*
CopyRight (C) Siemens AG 2014 All Rights Reserved Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
ELCAD-Version 7.7.1 SP2
Symbol library 1: PTD60617 Translate file A: A_COC_DE Last used: 19.01.20
Symbol library 2: PTD_M2_CoC_E Translate file B: leer1 FBSTP2
Symbol library 3: Translate file C: C_FB_EN.etr, 04-11-24
Symbol library 4: Translate file D: leer2 Archive: =H01 / S / Z / 1
*
-Q0
+.L
1
1
As Manuf
867-3025.5C
Revision Modification
Retrofitting
-M1
-XQ0
+.B
-X12
-S11
-S22
-S21
-S10
-X12
-XQ0
+.B
28 8 22 21 21 22 D2(-) A1(+) 22 21 22 21 9 27
M
DC
/G1.5 MOTOR OP. MECH.
B
B
Date
19.01.20
04.10.17
-K1
-S3
-X11
GN
GN
U
A2 A1 22 21 7 19
B
-K1
RETROFITTING OF PP MV SWBD
14 13
Date
Name Norm
Appr.
FACTORY
Drawn
AS-BUILT
4)
2
2
-X11
-S12
-K1
-S1
GN
HEB
8 9
SAG
18 14 13 A2 A1 32 31 22 21 12 11 17
/M2.7 CLOSING
B
B
05.03.17
U
4 22
SEALABLE
B
MANUAL ON
MANUAL OFF
-Y1
-S1
21 5 A2 A1 24 23 6 20
/M3.4 FIRST SHUNT RELEASE
B
B
-X13
U 7 45
B
3
3
-Y2
-X12
-S1
-X12
Orig./Prep.for/Prep.by
RIYADH METRO PP6H2
34 2 A2 A1 34 33 3 33
B
B
-Y7
44 8 2 1 D2 D1 9 43
/M4.3 UNDERVOLTAGE RELEASE
B
B
-S1
U 6
44 43 46
4
4
-X08
-R01
-X08
10 0 2 1 1 9
/G2.3 HEATER
B
B
-X10
-S16
-X10
1)
14 2 14 13 3 13
/M3.3 CB. OPER.MECHANISM UNLOCKED
B
B
16 0 22 21 1 15
CB. OPER.MECHANISM BLOCKED
B
B
*
-X11
-S41
-X11
24 2 14 13 3 23
/M9.4 MECHANISM CHARGED
B
B
Siemens AG
-S42
26 0 22 21 1 25
MECHANISM NOT CHARGED
B
B
5
5
-X12
-S6
-S7
-X12
3)
2)
30 6 21 22 14 13 7 29
B C.B. TRIPPING SIGNAL
B
-S1
32 4 32 31 5 31
Equipment Diagram
/M3.5 OFF
B
B
CIRCUIT BREAKER
42 0 42 41 1 41
/M9.5 OFF
B
B
52 4 52 51 5 51
/M15.2 OFF
B
B
6
6
54 3 54 53
/M15.3 ON
B
62 1 62 61 2 61
/M14.2 OFF
B
B
64 0 64 63
/M14.2 ON
B
-X14
-X14
909611
72 8 72 71 9 71
=H02/M1.5 OFF
B
B
74 6 74 73 7 73
=H02/M1.6 ON
B
B
82 4 82 81 5 81
/M7.2 OFF
B
B
84 2 84 83 3 83
/M7.2 ON
B
B
92 0 92 91 1 91
/M12.4 OFF
B
B
7
7
-X15
-X15
94 8 94 93 9 93
/M3.5 ON
B
B
4) INTERLOCKING OF ELECTRICAL CLOSING OF THE CB IN CASE OF MANUAL OPERATION OF THE THREE-POSITION SWITCH
=HZ01
(3)2-RMPP-6H2-SH017-*
=H02/M3.2 ON
B
B
S
-X16
-X16
+H01
=H01
-X17
-X17
ON
B
B
-Y16
-X09
-X09
12 0 A2 A1 14 13 1 11 INTERLOCKING COIL
/M12.5
B
B
U
Sheet 1+
18 Sh.
F
E
D
C
B
A
F
E
D
C
B
A
1
*
CopyRight (C) Siemens AG 2014 All Rights Reserved Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
ELCAD-Version 7.7.1 SP2
Symbol library 1: PTD60617 Translate file A: A_COC_DE Last used: 19.01.20
Symbol library 2: PTD_M2_CoC_E Translate file B: leer1 FBSTP2
Symbol library 3: Translate file C: C_FB_EN.etr, 04-11-24
Symbol library 4: Translate file D: leer2 Archive: =H01 / S / Z / 2
-Q1
+.D
SIEMENS
THREE POSITION SWITCH 8DA
1
1
867-3517.5B
As Manuf
Revision Modification
Retrofitting
Date
H07V-K 1,5 BK
19.01.20
04.10.17
1) SHOWN WITH LEVER INSERTED
GN
GN
ALL UNIDENTIFIED WIRES
ON
Date
Name Norm
OFF
Appr.
Drawn
EARTHED
2
2
-XQ1
+.B
-X11
-S1
GN
-X11
-XQ1
+.B
HEB
8
SAG
112 112
/M6.4 9
B
111 111
OPEN
05.03.17
113
114 7 114
/M6.4
B
CLOSED
122 5 122
6
B
121 121
OPEN
B
123
124 4 124
B
CLOSED
132 2 132
/M12.6 3
B
131 131
OPEN
3
3
133 1 133
0
B
134 134
/M1.4
Orig./Prep.for/Prep.by
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
CLOSED
-X12
B
141 141
DISCONNECTOR
OPEN
143 1 143
0
B
144 144
B
CLOSED
-X13
-X13
152 2 152
/M14.2 3
B
151 151
OPEN
153 1 153
0
B
154 154
B
CLOSED
4
4
-X14
-X14
162 2 162
/M15.4 3
B
161 161
OPEN
163 1 163
0
B
164 164
B
CLOSED
-X15
-X15
172 2 172
3
B
171 171
OPEN
173 1 173
0
B
174 174
B
CLOSED
Siemens AG
FACTORY
AS-BUILT
5
5
Equipment Diagram
THREE POSITION SWITCH
PP INCOMING FEEDER CUBICLE
8DA10 33kV GIS SWITCHGEAR
6
6
1)
-X82
-S25
-X82
816 2 14 13 3 815
B
B
NOT PLUGGED
909611
818 0 22 21 1 817
B
B
OPERATING KEY
INSERTED
7
7
=HZ01
(3)2-RMPP-6H2-SH017-*
S
+H01
=H01
8
8
Z2
/Z3.1
Sheet 2+
18 Sh.
F
E
D
C
B
A
F
E
D
C
B
A
1
*
CopyRight (C) Siemens AG 2014 All Rights Reserved Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
ELCAD-Version 7.7.1 SP2
Symbol library 1: PTD60617 Translate file A: A_COC_DE Last used: 19.01.20
Symbol library 2: PTD_M2_CoC_E Translate file B: leer1 FBSTP2
Symbol library 3: Translate file C: C_FB_EN.etr, 04-11-24
Symbol library 4: Translate file D: leer2 Archive: =H01 / S / Z / 3
-Q1
+.D
1
1
As Manuf
8DA
Revision Modification
Retrofitting
/Z2.8
867-3517.5B
H07V-K 1,5 BK
Date
19.01.20
04.10.17
GN
GN
ALL UNIDENTIFIED WIRES
-Y1
-XQ1
+.B
-X84
-X84
-XQ1
+.B
Date
Name Norm
Appr.
Drawn
831 0 E2 E1 1 830
/M12.2
B
B
2
2
GN
DISCONNECTOR
HEB
SAG
05.03.17
U
-Y5
-X85
-X85
INTERLOCKING COIL
833 0 E2 E1 1 832
/M12.3
B
B
EARTHING SWITCH
3
3
Orig./Prep.for/Prep.by
ON
-S1
-X51
-X51
511 9 511
8
B
512 512
/M6.5
B
OPEN
514 7 514
/M6.6
B
513
CLOSED
521 6 521
5
B
522 522
/M5.5
4
4
OPEN
524 4 524
/M5.6
B
523
CLOSED
531 3 531
2
B
532 532
B
OPEN
534 0 534
/M12.5 1
B
533 533
B
CLOSED
-X52
Siemens AG
-X52
541 3 541
2
B
542 542
/M3.2
B
EARTHING SWITCH
OPEN
5
5
544 0 544
/M3.7 1
B
543 543
B
CLOSED
-X53
-X53
Equipment Diagram
551 3 551
2
B
552 552
=H02/M1.3
B
OPEN
554 0 554
=H02/M1.8 1
B
553 553
B
-X54
-X54
561 3 561
562 562
B
OPEN
6
6
564 0 564
1
B
563 563
B
CLOSED
-X55
-X55
571 3 571
2
B
572 572
B
OPEN
909611
574 0 574
1
B
573 573
B
CLOSED
7
7
=HZ01
FACTORY
AS-BUILT
(3)2-RMPP-6H2-SH017-*
S
+H01
=H01
8
8
Z3
Sheet 3+
18 Sh.
F
E
D
C
B
A
1 2 3 4 5 6 7 8
FBSTP2
A A
PLEASE NOTE:
B B
Translate file A: A_COC_DE
/M5.7
Translate file D: leer2
Translate file B: leer1
890
+.B
-XQ1
-X88
3
+.D
-B0
C 4
C
-B0
library 2: PTD_M2_CoC_E
1 2 3
library 1: PTD60617
867-3341.5A
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
-X88
2
0
1
892
893
+.B
891
B B B
-XQ1
CopyRight (C) Siemens AG 2014 All Rights Reserved
/M5.7
/M5.7
/M5.8
E E
FACTORY
AS-BUILT
F F
ALL UNIDENTIFIED WIRES H07V-K 1,5 BK
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
CB SF6 Pressure Monitoring
+H01 Z4
Sheet 4+
909611 (3)2-RMPP-6H2-SH017-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Equipment Diagram 18 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
A A
PLEASE NOTE:
B B
Translate file A: A_COC_DE
/M13.4
+.B
100
-XB11
B
H07V-K 1,5 BK
-XB11
3
+.F
-B11
C C
library 2: PTD_M2_CoC_E
4 4 4
-B11 -B12 -B13
library 1: PTD60617
library 3:
library 4:
1 2 3 1 2 3 1 2 3
Symbol
Symbol
Symbol
Symbol
D D
867-3347.5B
CopyRight (C) Siemens AG 2014 All Rights Reserved
-XB11
2
0
1
H07V-K 1,5 BK
+.B
102
103
B B B
101
-XB11
/M13.4
/M13.5
/M13.5
E E
FACTORY
AS-BUILT
F F
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
BB SF6 Pressure Monitoring
+H01 Z5
Sheet 5+
909611 (3)2-RMPP-6H2-SH017-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Equipment Diagram 18 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / Z / 6
Relaisfunktionen Definitinon der Relaisfunktion abgeleitet aus Relaiszustände MEASURING LEAD Relay Function for Definitinon of relay funktion derived from Relay status
SELECT.
nur CAPDIS-S2+ den Anzeigebereichen nach IEC 61243-5 CAPDIS-S2+ indication ranges according to IEC 61243-5
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
Erdschluss, Asymmetrie UL1 v UL2 v UL3 > 0,45xUn und Hilfsspannung vorhanden Relais 1 Ein Earth fault, asymmetry UL1 v UL2 v UL3 > 0,45xUn and aux.volt. present Relay 1 on
& UL1 v UL2 v UL3 < 0,1xUn und Hilfsspannung vorhanden Relais 2 Ein & UL1 v UL2 v UL3 < 0,1xUn and aux.volt. present Relay 2 on
WIRE LENGTH DEP. ON DESIGN
B B
Translate file A: A_COC_DE
+.F
-A51
L1 L2 L3
L2
ATTENTION: THE ANNUCIATION CONTACT IS UNSUITABLE
FOR WIRING DIRECTLY TO THE INTERLOCKING COILS
C C
LC DISPLAY
-R1
library 2: PTD_M2_CoC_E
library 1: PTD60617
L1 L3 SENSOR/
LOGIC
-R2
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
24V DC + -
730-0401.5H
CAPDIS-S2+
IN+ IN-
E 24...230V AC/DC
E
~/+
~/-
PE
L2
L3
L1
7
X
/M10.2
WH
GY
RD
BU
BN
YE
GN
PK
/S7.7
/S7.7
/S7.8
/S7.8
=H01-W01-A51
OR LIYY 8x0,25
+.B
4
9
0
-XH1-A51
1
FACTORY +.B B B B B B B B B B B
10
4
2
3
-XH1
1
AS-BUILT
/M10.4
/M10.4
/M10.4
/M10.2
/M10.2
/M10.3
/M10.3
/M10.3
L1 L2 L3
F F
WITH SIGNAL-LEAD TEST WITHOUT SIGNAL-LEAD TEST
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
Capdis S2+
+H01 Z6
Sheet 6+
909611 (3)2-RMPP-6H2-SH017-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Equipment Diagram 18 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / Z / 7
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
3S1
2S1
1S1
2S2
1S2
3S2
2S3
1S3
Translate file C: C_FB_EN.etr, 04-11-24
/S3.3
/S2.2
/S1.2
4MC4_90
+.F C1: 1250-800/1A,CL 5P20, 45-30VA,Rct<=8-5 Ohms,Vk=1200-800V,MAIN-1
B B
Translate file A: A_COC_DE
/S3.3
/S2.3
/S1.3
4MC4_90
+.F C1: 1250-800/1A,CL 5P20, 45-30VA,Rct<=8-5 Ohms,Vk=1200-800V,MAIN-1
-T1L2 C2: 1250-800/1A,CL 5P20, 45-30VA,Rct<=8-5 Ohms,Vk=1200-800V,MAIN-2
C3: 1250/1A,CL 5P20, 25VA,Rct<=3 Ohms,87B
CURRENT TRANSFORMER, -T1
/S3.4
/S2.3
/S1.4
4MC4_90
+.F C1: 1250-800/1A,CL 5P20, 45-30VA,Rct<=8-5 Ohms,Vk=1200-800V,MAIN-1
-T1L3 C2: 1250-800/1A,CL 5P20, 45-30VA,Rct<=8-5 Ohms,Vk=1200-800V,MAIN-2
C3: 1250/1A,CL 5P20, 25VA,Rct<=3 Ohms,87B
C CURRENT TRANSFORMER, -T1 C
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
FACTORY
AS-BUILT
F F
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
PRIMARY DEVICE
+H01 Z7
Sheet 7+
909611 (3)2-RMPP-6H2-SH017-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Equipment Diagram 18 Sh.
1 2 3 4 5 6 7 8
F
E
D
C
B
A
1
*
CopyRight (C) Siemens AG 2014 All Rights Reserved Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
ELCAD-Version 7.7.1 SP2
Symbol library 1: PTD60617 Translate file A: A_COC_DE Last used: 19.01.20
Symbol library 2: PTD_M2_CoC_E Translate file B: leer1 FBSTP2
Symbol library 3: Translate file C: C_FB_EN.etr, 04-11-24
Symbol library 4: Translate file D: leer2 Archive: =H01 / S / Z / 8
*
-F31
+.T
ALSTOM
1
1
PROTECTION RELAY
GNX:P543-91NC7M0760M 5A
As Manuf
C1
/S1.2
Revision Modification
Retrofitting
Ia C2
/S1.2
J11
/M18.6 1A C3
J12 WATCHDOG CONTACT /S1.2
/M18.6
Date
5A C4
19.01.20
/S1.2
04.10.17
J13 Ib C5
/S1.3
GN
GN
WATCHDOG CONTACT
PHASE
J14
1A C6
/S1.3
CURRENT INPUT
5A C7
H1 /S1.3
/M4.7
Date
RETROFITTING OF PP MV SWBD
R1 Ic
Name Norm
H2 C8
Appr.
Drawn
/M4.7 /S1.3
*
1A C9
/S1.4
2
2
GN
H3
HEB
/M14.6 5A
SAG
C10
H4 R2 IED-1 SWITCHING
/M14.6
05.03.17
FAULT Im C11
MUTUAL
H5 1A C12
/M18.4
H6 R3
/M18.4 5A C13
/S1.4
*
In C14
H7 /S1.4
/M15.5
NEUTRAL
H8 1A C15
/M15.5 R4 IED-1 OVERLOAD /S1.4
H9
/M15.5 DETECTION (NC)
H10
/M3.4
3
3
H11 VA C19
/M3.5 R5 /S6.2
Orig./Prep.for/Prep.by
H12
H15 /S6.3
/M18.5
VOLTAGE INPUTS
VN C22
H16 /S6.4
/M18.6
H17
/M18.6 R7
H18
/M18.6 V(BUS) C23
4
4
G1
/M18.2 C24
G2 R8
/M18.2
G3
=H02/M5.4
G4 R9
=H02/M5.4 - D1
/M7.2
*
OPTO1 + D2
/M7.2
G5
/M14.7 - D3
G6 R10 IED-1 OVERLOAD /M7.2
/M14.7 OPTO2 + D4
DETECTION /M7.2
Siemens AG
- D5
G7 /M7.3
/M19.6 OPTO3 + D6
G8 /M7.3
/M19.6 R11
5
5
G9 - D7
/M19.6 /M7.4
OPTO4 + D8
*
/M7.4
G10 - D9
/M15.6 /M7.5
Equipment Diagram
G11 OPTO5 + D10
/M15.7 R12 IED-1 INTERLOCKING /M7.5
G12
/M15.7 FAULT (NC) - D11
/M7.5
SECONDARY DEVICE
OPTO6 + D12
/M7.5
G13
/M1.2 - D13
G14 /M7.6
/M1.2 R13 OPTO7 + D14
G15 /M7.6
/M1.2
6
6
G17 D17
/M14.5 R14
G18 COMMON D18
/M14.5
- F1
/M7.7
OPTO9 + F2
/M7.7
- F3
909611
/M8.2
BINARY INPUTS
OPTO10 + F4
/M8.2
- F5
/M8.2
Customer Dwg. No.
J17 - OPTO11 + F6
COMMUNICATION /M8.2
J18 + OPTION - F7
/M8.3
OPTO12 + F8
J16 /M8.3
7
7
SCN - F9
/M8.4
OPTO13 + F10
/M8.4
- F11
/M8.6
OPTO14 + F12
/M8.6
- F13
IRIG-B PORT /M8.6
=H02/M8.3 OPTO15 + F14
IRIG-B /M8.6
=HZ01
(3)2-RMPP-6H2-SH017-*
- F15
/M8.7
OPTO16 + F16
S
/M8.7
F17
COMMON F18
+H01
=H01
8
8
FACTORY
AS-BUILT
L- J1
/M8.8
L+ J2
/M8.8
POWER
SUPPLY
Z8
PE
/M8.7
Sheet 8+
18 Sh.
F
E
D
C
B
A
F
E
D
C
B
A
1
*
CopyRight (C) Siemens AG 2014 All Rights Reserved Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
ELCAD-Version 7.7.1 SP2
Symbol library 1: PTD60617 Translate file A: A_COC_DE Last used: 19.01.20
Symbol library 2: PTD_M2_CoC_E Translate file B: leer1 FBSTP2
Symbol library 3: Translate file C: C_FB_EN.etr, 04-11-24
Symbol library 4: Translate file D: leer2 Archive: =H01 / S / Z / 9
1
1
As Manuf
Revision Modification
Retrofitting
Date
19.01.20
04.10.17
GN
GN
TR241, 4NO+6NC,110V DC
LOCKOUT RELAY
-F86.1
+.T
Date
Name Norm
Appr.
Drawn
7PG1524-1EG60-1AF0
2
2
RL1
GN
HEB
SAG
28 27
/M4.7 /M4.7
05.03.17
R1
PE
/M4.7
RESET
26 25
/M4.7 /M4.7
3
3
3 1
/M1.4 /M1.4
Orig./Prep.for/Prep.by
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
KING ABDULAZIZ PROJECT
4 2
7 5
/M8.4 /M8.4
4
4
8 6
11 9
=H02/M4.2 =H02/M4.2
12 10
/M3.5 /M3.5
Siemens AG
5
5
15 13
Equipment Diagram
16 14
/M21.4 /M21.4
SECONDARY DEVICE
19 17
/M21.5 /M21.5
6
6
909611
Customer Dwg. No.
7
7
=HZ01
(3)2-RMPP-6H2-SH017-*
S
+H01
=H01
8
8
FACTORY
AS-BUILT
Z9
Sheet 9+
18 Sh.
F
E
D
C
B
A
F
E
D
C
B
A
1
*
CopyRight (C) Siemens AG 2014 All Rights Reserved Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
ELCAD-Version 7.7.1 SP2
Symbol library 1: PTD60617 Translate file A: A_COC_DE Last used: 19.01.20
Symbol library 2: PTD_M2_CoC_E Translate file B: leer1 FBSTP2
Symbol library 3: Translate file C: C_FB_EN.etr, 04-11-24
Symbol library 4: Translate file D: leer2 Archive: =H01 / S / Z / 10
1
1
As Manuf
Revision Modification
Retrofitting
Date
19.01.20
04.10.17
GN
GN
Date
Name Norm
Appr.
Drawn
2
2
GN
HEB
SAG
SWITCH
2-POS. SELECTOR
KRAUS & NAIMER
-S11
+.T
KNS:CH10A722-600FT2+S0V840A/A1D1-FT2-F758
05.03.17
SWITCH
BREAKER CONTROL
KRAUS & NAIMER
-S10
+.T
KNS:CHR10_UA5004-600_EG+S1V840A/B21A2+S1M120/B11A+F_UA5011
LOCAL
REMOTE O
2 1 N
/M2.3 /M2.3
C
2 CB Off 1
3
3
4 3 CMD
/M2.4 /M2.4
Orig./Prep.for/Prep.by
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
KING ABDULAZIZ PROJECT
4 CB On 3
6 5 CMD
/M5.2 /M5.2
6 CB Off 5
/M2.3 /M2.3
8 7 CMD
/M5.2 /M5.2
8 CB On 7
/M2.4 /M2.4
10 9 CMD
4
4
10 NORMAL 9
12 11 POS.
12 NORMAL 11
POS.
Siemens AG
KRAUS & NAIMER (GERMANY)
5
5
Equipment Diagram
SECONDARY DEVICE
2RMLG02
-S31
+.T
7XG2220-2AA00-0AA0
2 1
4 3
/S6.3 /S6.3
6
6
6 5
/S6.3 /S6.3
8 7
/S6.4 /S6.4
10 9
909611
12 11
Customer Dwg. No.
14 13
16 15
7
7
18 17
/M4.7 /M4.7
20 19
/M3.5 /M3.5
22 21
/S1.2 /S1.2
24 23
=HZ01
/S1.3 /S1.3
(3)2-RMPP-6H2-SH017-*
26 25
S
/S1.4 /S1.4
28 27
/S1.4 /S1.4
+H01
=H01
8
8
PE
/S1.5
FACTORY
AS-BUILT
Z10
Sheet 10+
18 Sh.
F
E
D
C
B
A
F
E
D
C
B
A
1
*
CopyRight (C) Siemens AG 2014 All Rights Reserved Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
ELCAD-Version 7.7.1 SP2
Symbol library 1: PTD60617 Translate file A: A_COC_DE Last used: 19.01.20
Symbol library 2: PTD_M2_CoC_E Translate file B: leer1 FBSTP2
Symbol library 3: Translate file C: C_FB_EN.etr, 04-11-24
Symbol library 4: Translate file D: leer2 Archive: =H01 / S / Z / 11
1
1
As Manuf
Revision Modification
Retrofitting
Date
19.01.20
04.10.17
GN
GN
RELAY, XR152
DC SUPVN
SIEMENS
RELAY, XR152
DC SUPVN
SIEMENS
-27DC2
+.T
-27DC1
+.T
Date
Name Norm
Appr.
Drawn
7PG1741-3DB10-4AA0 7PG1741-3DB10-4AA0
2
2
GN
HEB
SAG
05.03.17
14 13 14 13
/M11.8 /M11.8 /M10.8 /M10.8
PE PE
/M11.8 /M10.8
1 1
/M11.7 /M11.7
2 2
/M21.3 /M21.2
3 3
/M11.7 /M11.7
4 4
/M21.3 /M21.2
5 5
/M1.3 /M1.3
3
3
6 6
/M17.3 /M17.3
Orig./Prep.for/Prep.by
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
7 7
/M1.3 /M1.3
4
4
Siemens AG
5
5
(GERMANY)
Equipment Diagram
SIEMENS-REYROLLE
-74TC1
+.T
7PG1753-1DB10-4BE0
SECONDARY DEVICE
A
22 21
/M3.7 /M3.7
6
6
14 13
/M3.7 /M3.7
C
27 28
/M3.8 /M3.8
909611
2 4
-R74.12
-R74.11
-R74.13
/M21.1 /M21.1
Customer Dwg. No.
+.B 2 KΩ
+.B 3,3 KΩ
+.B 3,3 KΩ
1 3
/M11.7 /M11.7
7
7
VCE:410A13213
VCE:410A13288
VCE:410A13288
SIEMENS-REYROLLE (GERMANY)
5 7
/M1.4 /M1.4
=HZ01
6 8
(3)2-RMPP-6H2-SH017-*
/M17.3 /M17.3
S
PE
/M3.8
/M3.7 /M3.7 /M3.8 2 1
+H01
=H01
8
8
FACTORY
AS-BUILT
Z11
Sheet 11+
18 Sh.
F
E
D
C
B
A
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / Z / 12
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
13
21
13
21
N
4
2
1
14
22
14
22
I > I > I > I >
(N)
3
Translate file C: C_FB_EN.etr, 04-11-24
/G2.4
/G2.5
/M17.2
/G1.2
/G1.2
SIEMENS/ 5SY4510-7 SIEMENS/ 5SY5206-7
+.B MCB for Heater & Outlet +.B MCB FOR CC & OC
-F151 5ST3010 -F10 5ST3010
B B
Translate file A: A_COC_DE
1N
13
21
13
21
4
2
1
14
22
14
22
I > I > I > I >
2N
3
/G2.6
/G2.6
/M17.2
/G1.3
/G1.3
C SIEMENS/ 5SY4503-7 SIEMENS/ 5SY5206-7 C
+.B MCB for Panel Lighting +.B MCB FOR UT & CP
-F152 5ST3010 -F20 5ST3010
library 2: PTD_M2_CoC_E
library 1: PTD60617
13
21
4
2
library 3:
library 4:
14
22
Symbol
Symbol
Symbol
Symbol
D I > I > D
3
/G1.5
/G1.5
SIEMENS/ 5SY5206-7
+.B MCB FOR MD & IL
-F30 5ST3010
CopyRight (C) Siemens AG 2014 All Rights Reserved
13
21
4
2
E E
14
22
I > I >
3
/G1.7
/G1.7
SIEMENS/ 5SY5206-7
+.B MCB FOR BUS COMPT. SF6 LOW PRESSURE
-F40 5ST3010
FACTORY
AS-BUILT
F F
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SECONDARY DEVICE
+H01 Z12
Sheet 12+
909611 (3)2-RMPP-6H2-SH017-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Equipment Diagram 18 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / Z / 13
*
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
33
14
41
12
3
5
1
11
34
42
(+)2
4
3
I > I > I >
(-)1
5
7
6
8
/S4.2
/S4.2
/S4.3
/M10.7
/M10.5
SIEMENS/ 3RV1611-1DG14
Translate file C: C_FB_EN.etr, 04-11-24
/M2.6
/M2.7
/M2.7
+.B 3-pol, 3A RD-2R-HB 110V DC 0 0 0 0
-F501 MCB FOR MAIN-1 RELAY +.B 110VDC, 2CO
3RV1901-1A -KRC CB ON INTERPOSING RELAY
B B
Translate file A: A_COC_DE
1NO + 1NC
/S4.5
/S4.6
/S4.6
/M3.1
/M3.6
/M3.6
SIEMENS/ 3RV1611-1DG14 RD-2R-HB 110V DC 0 0 0 0
Translate file D: leer2
Translate file B: leer1
C C
43
23
33
13
A1
A2
14
24
34
44
library 2: PTD_M2_CoC_E
/M9.5
/M7.7
/M11.4
/M16.7
=H02/M3.6
SIEMENS / 3RH2140-1BF40
33
14
41
library 1: PTD60617
12
+.B 3RT2916-1DG00
3
5
1
-KXCB
11
34
42
library 3:
library 4:
6
Symbol
Symbol
Symbol
Symbol
D D
/S5.2
/S5.2
/S5.3
/M10.6
+.B 3-pol, 3A
-F601 MCB FOR MAIN-2 RELAY
3RV1901-1A
1NO + 1NC
CopyRight (C) Siemens AG 2014 All Rights Reserved
/S5.5
/S5.6
/S5.6
SIEMENS/ 3RV1611-1DG14
+.B 3-pol, 3A
-F602 SPARE MCB
3RV1901-1A
1NO + 1NC
E E
FACTORY
AS-BUILT
F F
* RETROFITTING OF PP MV SWBD
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SECONDARY DEVICE
+H01 Z13
Sheet 13+
909611 (3)2-RMPP-6H2-SH017-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Equipment Diagram 18 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / Z / 14
X1
X1
RESET ORDER
RESET ORDER
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
X2
X5
X2
X5
23
13
/M11.3
/M11.6
SIEMENS/ 3SB3501-6BA20 3SB3501-6BA60
+.T EXTERNAL TRIP +.T SECURED AUX.
14
24
Translate file C: C_FB_EN.etr, 04-11-24
/M5.3
/M5.3
3SB3901-1CF 3SB3400-1L SIEMENS / 3SB3500-0AA11
B 3SB3901-1QF +.T LOCAL RESET PUSH BUTTON B
Translate file A: A_COC_DE
-S02 3SB3400-0D
Translate file D: leer2
Translate file B: leer1
/M11.3
SIEMENS/ 3SB3501-6BA40
+.T MVCB OPEN POSITION
-H02 GREEN 110V DC
3SB3400-1L
3SB3901-1DF
/M11.4
3SB3501-6BA20
+.T MVCB CLOSED POSITION
-H03 RED 110V DC
3SB3400-1L
C 3SB3901-1CF
C
3SB3501-6BA60 /M11.4
+.T PERMIT TO CLOSE
library 2: PTD_M2_CoC_E
3SB3901-1QF
library 3:
library 4:
/M11.5
3SB3501-6BA30
+.T LOW SF6 PRESSURE ALARM
Symbol
Symbol
Symbol
Symbol
/M5.6
/S3.4
/S3.4
/S3.4
/M5.5
/S3.3
/S3.3
/S3.3
+.B
212
223
225
227
213
123
117
115
113
122
/M11.5
3SB3501-6BA20 -KCT
CopyRight (C) Siemens AG 2014 All Rights Reserved
224
/M11.6
3SB3501-6BA20
226
228
214
124
114
211
118
116
121
E +.T VT MEASUREMENT FAULT
E
/M5.6
/S3.4
/S3.4
/S3.3
/S3.4
/S3.3
/S3.3
/M5.5
-H08 RED 110V DC
3SB3400-1L
3SB3901-1CF
BB CT IN SERVICE BB CT SHORTING
FACTORY
AS-BUILT
F F
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SECONDARY DEVICE
+H01 Z14
Sheet 14+
909611 (3)2-RMPP-6H2-SH017-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Equipment Diagram 18 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / Z / 15
43
53
63
73
83
13
21
31
A1
A2
14
22
32
44
54
64
74
84
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
/M5.7
/M11.5
/M17.7
/M3.2
=H02/M1.5
3RH2122-1BF40
+.B 3RT2916-1DG00
-KSF6.2 3RH2911-1FA40
Translate file C: C_FB_EN.etr, 04-11-24
43
53
83
13
21
31
61
71
A1
E1
B B
Translate file A: A_COC_DE
E2
A2
14
22
32
44
54
62
72
84
Translate file D: leer2
Translate file B: leer1
43
13
21
31
A1
/M6.2
/M6.3
/M11.4
/M11.3
/M14.4
/M16.4
/M16.3
3RH1422-1BF40
+.B 3RH1911-1FA22
A2
14
22
32
44
-KLQ0 3RT1916-1DG00
3RT1916-1DG00 CB SF6 LOW RELAY (STAGE-1)
/M5.8
/M11.5
/M1.5
/M17.6
SIEMENS / 3RH2122-1BF40
+.B 3RT2916-1DG00
-KSF6.1
43
53
83
13
21
31
61
71
A1
E1
C C
E2
A2
14
22
32
44
54
62
72
84
/M6.5
/M6.6
/M7.5
/M7.5
/M16.5
/M16.6
=H02/M3.5
=H02/M3.4
3RH1422-1BF40
43
13
21
31
library 2: PTD_M2_CoC_E
A1
+.B 3RH1911-1FA22
-KLQ1E 3RT1916-1DG00
library 1: PTD60617
A2
14
22
32
44
3RT1916-1DG00
/M4.2
/M1.5
/M11.3
SIEMENS / 3RH2122-1BF40
+.B 3RT2916-1DG00
-KH01
Symbol
Symbol
Symbol
Symbol
D D
43
53
83
13
21
31
61
71
A1
E1
E2
A2
14
22
32
44
54
62
72
84
CopyRight (C) Siemens AG 2014 All Rights Reserved
/M5.2
/M5.2
/M7.7
/M7.6
/M16.2
/M16.2
=H02/M3.6
=H02/M3.5
3RH1422-1BF40
+.B 3RH1911-1FA22
-KS11 3RT1916-1DG00
3RT1916-1DG00
43
23
33
13
A1
A2
14
24
34
44
E E
/M5.4
/M4.7
/M8.3
SIEMENS / 3RH2140-1BF40
43
23
33
53
83
13
61
71
A1
+.B 3RT2916-1DG00
-KRS
A2
14
24
34
44
54
62
71
84
/M5.4
=H02/M4.2
=H02/M2.6
SIEMENS / 3RH2140-1BF40
+.B 3RT2916-1DG00
-KRS2
/M1.5
/M2.6
/M7.7
/M11.4
/M16.7
=H02/M3.6
SIEMENS / 3RH2140-1BF40
+.B CB PERMIT TO CLOSE FACTORY
-KCBR 3RH2911-1FA22
F 3RT2916-1DG00 AS-BUILT F
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SECONDARY DEVICE
+H01 Z15
Sheet 15+
909611 (3)2-RMPP-6H2-SH017-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Equipment Diagram 18 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / Z / 16
43
53
83
13
21
31
61
71
A1
E1
E2
A2
14
22
32
44
54
62
72
84
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
/M6.4
/M6.4
/M7.4
/M7.3
/M16.5
/M16.5
=H02/M3.3
=H02/M3.3
3RH1422-1BF40
+.B 3RH1911-1FA22
-KLQ1 3RT1916-1DG00
3RT1916-1DG00
Translate file C: C_FB_EN.etr, 04-11-24
43
53
83
13
21
31
61
71
A1
B B
Translate file A: A_COC_DE
A2
14
22
32
44
54
62
72
84
Translate file D: leer2
Translate file B: leer1
CAPDIS RELAY
/M10.2
/M12.3
/M10.5
/M10.6
SIEMENS / 3RH2122-1BF40
+.N 3RT2916-1DG00
-KVT1 3RH2911-1FA22
43
53
83
13
21
31
61
71
A1
A2
14
22
32
44
54
62
72
84
CAPDIS RELAY
/M10.3
/M10.5
/M10.5
/M10.6
/M10.6
SIEMENS / 3RH2122-1BF40
+.N 3RT2916-1DG00
C -KVT3 3RH2911-1FA22
C
library 2: PTD_M2_CoC_E
library 1: PTD60617
43
43
library 3:
library 4:
33
53
83
13
21
31
13
21
61
71
A1
A1
A2
14
22
32
44
A2
14
22
34
44
54
62
72
84
Symbol
Symbol
Symbol
Symbol
D D
CAPDIS RELAY VT MEASUREMENT FAULT WDG-1
/M10.3
/M10.5
/M10.6
/M10.5
/M8.2
/M11.6
/M17.5
=H02/M3.7
SIEMENS / 3RH2122-1BF40 SIEMENS / 3RH2131-1BF40
+.N 3RT2916-1DG00 +.N 3RT2916-1DG00
-KVT2 -KVT5 3RH2911-1FA22
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
43
33
53
83
13
21
61
71
A1
43
13
21
31
A1
A2
14
22
34
44
54
62
72
84
A2
14
22
32
44
/M10.6
/M8.3
/M11.7
/M17.5
=H02/M3.8
SIEMENS / 3RH2131-1BF40
CAPDIS RELAY
+.N 3RT2916-1DG00
/M10.4
/M12.3
SIEMENS / 3RH2122-1BF40
-KVT6 3RH2911-1FA22
+.N 3RT2916-1DG00
-KVT4
FACTORY
F F
AS-BUILT
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SECONDARY DEVICE
+H01 Z16
Sheet 16+
909611 (3)2-RMPP-6H2-SH017-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Equipment Diagram 18 Sh.
1 2 3 4 5 6 7 8
F
E
D
C
B
A
1
*
CopyRight (C) Siemens AG 2014 All Rights Reserved Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
ELCAD-Version 7.7.1 SP2
Symbol library 1: PTD60617 Translate file A: A_COC_DE Last used: 19.01.20
Symbol library 2: PTD_M2_CoC_E Translate file B: leer1 FBSTP2
Symbol library 3: Translate file C: C_FB_EN.etr, 04-11-24
Symbol library 4: Translate file D: leer2 Archive: =H01 / S / Z / 17
1
1
As Manuf
Revision Modification
Retrofitting
Date
19.01.20
04.10.17
-K0A
GN
GN
CB OPEN COMMAND RELAY
-KBSF6.2 3RH2911-1FA40
-KBSF6.1 3RH2911-1FA40
-K0E 3RH2911-1FA40
+.B 3RT2916-1DG00
3RH2122-1BF40
+.B 3RT2916-1DG00
3RH2122-1BF40
+.B 3RT2916-1DG00
3RH2122-1BF40
+.B 3RT2916-1DG00
SIEMENS / 3RH2122-1BF40
Date
RETROFITTING OF PP MV SWBD
Name Norm
BB SF6 VERY LOW PRESSURE RELAY
Appr.
Drawn
2
2
GN
HEB
SAG
05.03.17
A2 A1 A2 A1 A2 A1 A2 A1
14 13 14 13 14 13 14 13
/M11.6 /M13.2 /M2.6 /M3.1
3
3
Orig./Prep.for/Prep.by
22 21 22 21 22 21 22 21
44 43 44 43 44 43 44 43
/M13.3 /M13.2
54 53 54 53 54 53
/M13.3 /M11.5 /M8.2
4
4
/M3.2 74 73 74 73 74 73
=H02/M1.5 84 83 84 83 84 83
Siemens AG
5
5
Equipment Diagram
SECONDARY DEVICE
PP INCOMING FEEDER CUBICLE
8DA10 33kV GIS SWITCHGEAR
6
6
RELAY
VOLTAGE MONITORING
BENDER: VMD420
-F27.2
+.N
BENDER: VMD420
-F27.1
+.N
RELAY
VOLTAGE MONITORING
BWD:B93010006 BWD:B93010006
VA
VA
L1 L1
909611
/S5.4 /S4.4
VB
VB
L2 L2
Customer Dwg. No.
/S5.4 /S4.4
VC
VC
L3 L3
/S5.5 /S4.5
7
7
N N
/S5.5 /S4.5
K1
K1
A1 A1
11 /M9.7 11 /M9.6
/M21.7 /M21.6
12 12
/M21.7 /M21.6
=HZ01
14 14
110VDC
110VDC
(3)2-RMPP-6H2-SH017-*
/M21.7 A2 /M21.6 A2
Aux. Supply
Aux. Supply
/M9.7 /M9.6
S
K2
K2
21 21
/M10.6 /M10.5
22 22
/M10.6 /M10.5
+H01
=H01
24 PE 24 PE
/M10.6 /M9.6 /M10.5 /M9.5
FACTORY
AS-BUILT
8
8
Z17
Sheet 17+
18 Sh.
F
E
D
C
B
A
1 2 3 4 5 6 7 8
FBSTP2
Archive: =H01 / S / Z / 18
TEMP. CONTROLLER
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
2
PANEL LAMP
/G2.6
SGO:02542.3-11
+.B
-E13 LED lamp
/G2.3
/G2.2
+.B
+.B
1
-R02
-B151
Translate file C: C_FB_EN.etr, 04-11-24
8MR2110-3B
HEATER IN MANUAL
8MR2170-1C
HEATER
HEATER IN AUTO
SIEMENS
TEMP. CONTROLLER θ AC/DC 120-240V
30W
PE
B B
2
Translate file A: A_COC_DE
/G2.2
/G2.2
Translate file D: leer2
Translate file B: leer1
2
AUTO
MAN
/G2.2
/G2.3
13
21
14
22
/G2.2
/G2.3
SIEMENS / 3SB3601-2KA11
+.T HEATER SELECTOR SWITCH
-S20
C C
LAMP TEST
NOT USED
library 2: PTD_M2_CoC_E
library 1: PTD60617
23
13
14
24
library 3:
library 4:
/G2.4
/G2.3
+.B +.N
1
/M11.7
GWJ:GW20208
Symbol
Symbol
Symbol
Symbol
8MR2110-3B
AC 230V HEATER
-LT 3SB3400-0D AC/DC 120-240V
GWJ:GW26410 30W
PE
PE
N
2
/G2.4
/G2.4
/G2.3
/G2.3
CopyRight (C) Siemens AG 2014 All Rights Reserved
DOOR SWITCH
NOT USED
13
21
E E
14
22
/G2.6
MEYLE / 3AX4206
+.B DOOR SWITCH
-S13
FACTORY
AS-BUILT
F F
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. S =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
SECONDARY DEVICE
+H01 Z18
Sheet 18-
909611 (3)2-RMPP-6H2-SH017-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Equipment Diagram 18 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminal Terminal block type Wire type
Last used: 19.01.20 Cable designation Type, no.of cores, cross sec. Destination, equipment code Level
ELCAD-Version 7.7.1 SP2
FBKLP2-11_I
Archive: =H01 / V / / / 1
111 - C90 OTTA 6-T P/P
1 2 3 2 1
1
3 1) Test socket
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4 2) Jumper
5 3) Disconnecting link
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X1A
+.T -S31 :21 111 /S1.2 +.F -T1L1 :1S1
112 /S1.2
-X1A :135 B 113 /S1.4 +.F -T1L1 :1S2
-X1A :123 A 114 /S1.5 +.F -T1L1 :1S3
+.T -S31 :23 121 /S1.3 +.F -T1L2 :1S1
122 /S1.3
-X1A :114 A 123 /S1.5 +.F -T1L2 :1S2
C -X1A :133 A 124 /S1.5 +.F -T1L2 :1S3
C
+.T -S31 :25 131 /S1.4 +.F -T1L3 :1S1
132 /S1.4
-X1A :124 A 133 /S1.5 +.F -T1L3 :1S2
-X1A :C90 A 134 /S1.6 +.F -T1L3 :1S3
library 2: PTD_M2_CoC_E
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
Archive: =H01 / V / / / 2
FBKLP2-11_I 111 - C90 OTTA 6-T P/P
1 2 3 2 1
1
3 1) Test socket
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4 2) Jumper
5 3) Disconnecting link
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X1B
=H02 +.B -X1B :111 A 111 /S2.2 +.F -T1L1 :2S1
112 /S2.2
-X1B :135 B 113 /S2.4 +.F -T1L1 :2S2
-X1B :123 A 114 /S2.4 +.F -T1L1 :2S3
=H02 +.B -X1B :121 A 121 /S2.3 +.F -T1L2 :2S1
122 /S2.3
-X1B :114 A 123 /S2.5 +.F -T1L2 :2S2
C -X1B :133 A 124 /S2.5 +.F -T1L2 :2S3
C
=H02 +.B -X1B :131 A 131 /S2.3 +.F -T1L3 :2S1
132 /S2.4
-X1B :124 A 133 /S2.5 +.F -T1L3 :2S2
-X1B :C90 A 134 /S2.5 +.F -T1L3 :2S3
library 2: PTD_M2_CoC_E
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
Archive: =H01 / V / / / 3
FBKLP2-11_I 111 - B90 OTTA 6-T P/P
1 2 3 2 1
1
3 1) Test socket
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4 2) Jumper
5 3) Disconnecting link
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X1C
-X1C :121 A 111 /S3.3
-X1CA :6 A 112 /S3.3 +.F -T1L1 :3S2
-X1C :120 A 113 /S3.3
-X1CA :8 A 114 /S3.3 +.F -T1L2 :3S2
-X1C :119 A 115 /S3.4
-X1CA :10 A 116 /S3.4 +.F -T1L3 :3S2
-X1CA :14 A 117 /S3.5 -X1C :118 B
C 118 /S3.5 -X1C :117 B
C
-X1C :115 A 119 /S3.5 +.F -T1L3 :3S1
-X1C :113 A 120 /S3.5 +.F -T1L2 :3S1
-X1C :111 A 121 /S3.5 +.F -T1L1 :3S1
B90 /S3.6 -XPE :5 B
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
Archive: =H01 / V / / / 4
FBKLP2-11_I 1 -14 OTTA 6-T P/P
1 2 3 2 1
1
3 1) Test socket
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4 2) Jumper
5 3) Disconnecting link
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X1CA
=H06 +.B -X1A :1 A 1 /S3.3 -KCT :214
=H06 +.B -X1A :2 A 2 /S3.4 -KCT :228
=H06 +.B -X1A :3 A 3 /S3.4 -KCT :226
=H06 +.B -X1A :4 A 4 /S3.5 -X1CA :12 A
5 /S3.3
-X1C :112 A 6 /S3.3 -KCT :113
7 /S3.3 -KCT :213
C -X1C :114 A 8 /S3.3 -KCT :115
C
9 /S3.4 -KCT :227
-X1C :116 A 10 /S3.4 -KCT :117
11 /S3.4 -KCT :225
-X1CA :4 B 12 /S3.3 -KCT :114
library 2: PTD_M2_CoC_E
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
Archive: =H01 / V / / / 5
FBKLP2-11_I 501-517 USST 6-T
1 2 3 2 1
1 PSBJ-URTK 6 RD - 3026719
2
3 1) Jumper
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4 2) Test socket
3) Disconnecting link
5
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X2A
=H02 +.F -T5L1 :1a 501 /S4.2 -F501 :1
=H02 +.F -T5L1 :1n 502 /S4.2 +.N -F27.1 :N
=H02 +.F -T5L2 :1a 503 /S4.2 -F501 :3
=H02 +.F -T5L2 :1n 504 /S4.3 -X2A :508 B
=H02 +.F -T5L3 :1a 505 /S4.3 -F501 :5
=H02 +.F -T5L3 :1n 506 /S4.3 +.T -S31 :7
507 /S4.3 -XPE :7 B
C 508 /S4.6 -X2A :504 B
C
+.N -F27.1 :L1 509 /S4.4 -F501 :2
+.N -F27.1 :L2 510 /S4.4 -F501 :4
+.N -F27.1 :L3 511 /S4.5 -F501 :6
512 /S4.5 -F502 :2
library 2: PTD_M2_CoC_E
515 /S4.7
516 /S4.7
517 /S4.8
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
Archive: =H01 / V / / / 6
FBKLP2-11_I 601-621 USST 6-T
1 2 3 2 1
1 PSBJ-URTK 6 RD - 3026719
2
3 1) Jumper
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4 2) Test socket
3) Disconnecting link
5
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X2B
=H02 +.F -T5L1 :2a 601 /S5.2 -F601 :1
=H02 +.F -T5L1 :2n 602 /S5.2 +.N -F27.2 :N
=H02 +.F -T5L2 :2a 603 /S5.2 -F601 :3
=H02 +.F -T5L2 :2n 604 /S5.3 -X2B :608 B
=H02 +.F -T5L3 :2a 605 /S5.3 -F601 :5
=H02 +.F -T5L3 :2n 606 /S5.3 -X2B :621 B
607 /S5.3 -XPE :8 B
C 608 /S5.6 -X2B :604 B
C
+.N -F27.2 :L1 609 /S5.4 -F601 :2
+.N -F27.2 :L2 610 /S5.4 -F601 :4
+.N -F27.2 :L3 611 /S5.5 -F601 :6
612 /S5.5 -F602 :2
library 2: PTD_M2_CoC_E
615 /S5.7
616 /S5.7
617 /S5.8
library 3:
library 4:
E E
FBKLP2-11
Archive: =H01 / V / / / 7
1 - 90 USST 4
1
1
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
7
1) Bridge insert
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X5
-X5 :30 B 1 /M4.2 -F20 :1
+.T -F31 :H2 2 /M4.7 -KRS :13
-X5 :41 B 3 /M5.4 +.T -S02 :23
-X5 :43 B 4 /M5.4 -XQ1 :521 A
5 /M5.7 -XQ1 :890 A
6 /M6.2 -XQ0 :101 A
7 /M6.4 -XQ1 :111 A
C 8 /M6.5 -XQ1 :511 A
C
9 /M7.2 -XQ0 :81 A
-KLQ1 :21 10 /M7.2 -XQ0 :83 A
+.T -F86.1 :7 11 /M8.4 -KRS :23
=H02 +.B -X5 :35 A 12 /M8.5
library 2: PTD_M2_CoC_E
FBKLP2-11
Archive: =H01 / V / / / 8
1 - 90 USST 4
1
1
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
7
1) Bridge insert
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X5
=EXT +MC -X :XX 41 /M5.4 -X5 :3 A
=EXT +MC -X :XX 42 /M5.4 -KRS :A1
=EXT +MC -X :XX 43 /M5.4 -X5 :4 A
=EXT +MC -X :XX 44 /M5.4 -KRS2 :A1
+.T -F31 :D6 45 /M7.3 -KLQ1 :22
+.T -F31 :D8 46 /M7.4 -KLQ1 :14
+.T -F31 :D10 47 /M7.5 -KLQ1E :22
C +.T -F31 :D12 48 /M7.5 -KLQ1E :14
C
+.T -F31 :D14 49 /M7.6 -KS11 :22
+.T -F31 :D16 50 /M7.7 -KS11 :14
+.T -F31 :F2 51 /M7.7 * -KXCB :14
+.T -F31 :F4 52 /M8.2 -K0E :54
library 2: PTD_M2_CoC_E
F PE-PEN-bus C Screwed cable gland Higher level insulation plate * RETROFITTING OF PP MV SWBD F
Used cores total D Plug housing Test socket
Continued on sheet E Insulated Disconnector
Date 05.03.17 KING ABDULAZIZ PROJECT 8DA10 33kV GIS SWITCHGEAR Customer Dwg. No. V =H01
=HZ01
1
*
As Manuf
Retrofitting
04.10.17
19.01.20
GN
GN
Drawn
Appr.
GN
HEB
RIYADH METRO PP6H2
RIYADH, SAUDI ARABIA
Siemens AG PP INCOMING FEEDER CUBICLE
=H01+.B-X5
+.B /8
Sheet 8+
909611 (3)2-RMPP-6H2-SH018-*
Revision Modification Date Name Norm SAG Orig./Prep.for/Prep.by Terminal strip 26 Sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminal Terminal block type Wire type
Last used: 19.01.20 Cable designation Type, no.of cores, cross sec. Destination, equipment code Level A B
ELCAD-Version 7.7.1 SP2
FBKLP2-11
Archive: =H01 / V / / / 9
1 - 90 USST 4
1
1
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
7
1) Bridge insert
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X5
=H02 +.B -X41 :4 A 81 =H02/M1.5 -KSF6.2 :63
=H02 +.B -X41 :12 A 82 =H02/M1.5 -KSF6.2 :64
+.T -S11 :5 83 /M5.2 -KS11 :E1
+.T -S11 :7 84 /M5.2 -KS11 :A1
85 /M9.2
86 /M9.3
87 /M9.3
C 88 /M9.3
C
89 /M9.3
90 /M9.3
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
FBKLP2-11
Archive: =H01 / V / / / 10
1 - 30 USST 4
1
1
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
7
1) Bridge insert
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X6
+.T -H01 :X1 1 /M11.1 -F30 :1
+.T -H01 :X2 2 /M11.3 -KH01 :21
+.T -H02 :X2 3 /M11.3 -KLQ0 :21
+.T -H03 :X2 4 /M11.4 -KLQ0 :13
+.T -H04 :X2 5 /M11.4 -KCBR :33
+.T -H05 :X2 6 /M11.5 -KSF6.1 :13
+.T -H06 :X2 7 /M11.5 -KSF6.2 :13
C +.T -H08 :X2 8 /M11.6 +.N -KVT5 :33
C
=H06 +.B -X6 :65 A 9 /M11.2 -F30 :3
=H04 +.B -X6 :32 A 10 /M11.2 -KH01 :22
+.N -KVT5 :34 11 /M11.6 -KBSF6.2 :14
+.T -74TC1 :1 12 /M11.7 +.N -KVT6 :34
library 2: PTD_M2_CoC_E
D 20 /M12.4 D
=H06 +.B -X5 :21 A 21 /M14.4 -KLQ0 :31
=H06 +.B -X5 :67 A 22 /M14.4 -KLQ0 :32
E E
FBKLP2-11
Archive: =H01 / V / / / 11
1 - 64 USST 4-MT
1 2 3 2 1
1
3 1) Jumper
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4 2) Test socket
3) Disconnecting link
5
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X7
=EXT +MC -X :XX 1 /M16.2 -KS11 :31
=EXT +MC -X :XX 2 /M16.2 -KS11 :32
=EXT +MC -X :XX 3 /M16.2 -KS11 :43
=EXT +MC -X :XX 4 /M16.2 -KS11 :44
=EXT +MC -X :XX 5 /M16.3 -KLQ0 :61
=EXT +MC -X :XX 6 /M16.3 -KLQ0 :62
=EXT +MC -X :XX 7 /M16.4 -KLQ0 :43
C =EXT +MC -X :XX 8 /M16.4 -KLQ0 :44
C
=EXT +MC -X :XX 9 /M16.4 -KLQ1E :31
=EXT +MC -X :XX 10 /M16.5 -KLQ1 :32
=EXT +MC -X :XX 11 /M16.5 -KLQ1 :43
=EXT +MC -X :XX 12 /M16.5 -KLQ1 :44
library 2: PTD_M2_CoC_E
FBKLP2-11
Archive: =H01 / V / / / 12
1 - 64 USST 4-MT
1 2 3 2 1
1
3 1) Jumper
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4 2) Test socket
3) Disconnecting link
5
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X7
=EXT +MC -X :XX 41 /M19.2 =H02 +.B -X5 :47 A
=EXT +MC -X :XX 42 /M19.3 =H02 +.B -X5 :48 A
=EXT +MC -X :XX 43 /M19.3 =H02 +.B -X5 :49 A
=EXT +MC -X :XX 44 /M19.3 =H02 +.B -X5 :50 A
=EXT +MC -X :XX 45 /M19.4 =H02 +.B -X5 :51 A
=EXT +MC -X :XX 46 /M19.4 =H02 +.B -X5 :52 A
=EXT +MC -X :XX 47 /M19.5
C =EXT +MC -X :XX 48 /M19.5
C
=EXT +MC -X :XX 49 /M19.5 +.T -F31 :G9
=EXT +MC -X :XX 50 /M19.6 +.T -F31 :G7
=EXT +MC -X :XX 51 /M19.7 =H02 +.B -X5 :53 A
*
=EXT +MC -X :XX 52 /M19.7 =H02 +.B -X5 :54 A
library 2: PTD_M2_CoC_E
*
=H02 +.B -X5 :56 A 55 /M14.6 +.T -F31 :H3
=EXT +MC -X :XX 56 /M20.4
* =EXT +MC -X :XX 57 /M20.4
library 3:
library 4:
E E
FBKLP2-11
Archive: =H01 / V / / / 13
1 - 35 USST 4
1
1
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
7
1) Bridge insert
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X9
1 /M21.1
* 2 /M21.1
=H06 +.B -X5 :27 A 3 /M14.5 +.T -F31 :H4
=H06 +.B -X5 :73 A 4 /M14.6 +.T -F31 :H3
=H06 +.B -X5 :29 A 5 /M14.7 +.T -F31 :G6
=H06 +.B -X5 :75 A 6 /M14.7 +.T -F31 :G5
=H06 +.B -X5 :94 A 7 /M15.5 +.T -F31 :H9
C =H11 +.B -X9 :7 A 8 /M15.5 +.T -F31 :H7
C
9 /M21.3
10 /M21.3
11 /M21.4 +.T -F86.1 :14
12 /M21.4 +.T -F86.1 :16
library 2: PTD_M2_CoC_E
Archive: =H01 / V / / / 14
FBKLP2-11 1 - 40 USST 4
1
1
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
7
1) Bridge insert
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X40
1 /M1.2 -F10 :1
* =H06 +.B -X6 :81 A 2 /M1.2 +.T -74TC1 :7
+.T -S11 :4 3 /M2.4 -K0E :13
=H04 +.B -X6 :27 A 4 /M3.3 -KBSF6.2 :73
5 /M3.3 * -KRT :3
=H06 +.B -X6 :22 A 6 /M3.4 +.T -F31 :H12
+.T -F86.1 :10 7 /M3.7 -R74.11 :1
C 8 /M3.8 -R74.13 :1
C
=H02 +.B -X5 :31 A 9 /M1.2 +.T -F31 :G13
=H11 +.B -XQ0 :51 A 10 /M1.1 =H02 +.B -X5 :32 A
=H06 +.B -XQ0 :91 A 11 /M1.2
=H11 +.B -XQ0 :52 A 12 /M1.1
library 2: PTD_M2_CoC_E
FBKLP2-13-VBSTB4
Archive: =H01 / V / / / 15
A B C D 100 - 103 VBSTB 4-FS
1
2 1 2
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
no. ref.
Translate file B: leer1
C C
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
FBKLP2-11
Archive: =H01 / V / / / 16
1 - 4 USST 4
1
1
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
7
1) Bridge insert
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -XE13
-E13 :1 1 /G2.6 -S13 :22
-E13 :2 2 /G2.6 -F152 :(N)
3 /G2.7
4 /G2.7
C C
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
Archive: =H01 / V / / / 17
A B C D 1 - 10 VBSTB 4-FS
1 =H01-W01-A51 LIYY 8x0,25 mm²
2 1 2
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
no. ref.
Translate file B: leer1
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
FBKLP2-11
Archive: =H01 / V / / / 18
A B 1 - 8 UT4-PE
1 1
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
6
1 = Plug-in bridge left
7
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
-XPE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 JUMPER
=H01 +.B -PE 1 /S1.6 -X1A :C90 B
-XSH :PE A 2 /G2.2 -X1B :C90 B
+.N -F27.1 :PE 3 /M9.5 +.T -S31 :PE
+.N -F27.2 :PE 4 /M3.8 +.T -74TC1 :PE
+.T -F86.1 :PE 5 /M4.7 -X1C :B90 B
-E12 :PE 6 /G2.4 +.T -F31 :PE
+.T -27DC1 :PE 7 /M10.8 -X2A :507 B
C +.T -27DC2 :PE 8 /M11.8 -X2B :607 B
C
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
Archive: =H01 / V / / / 19
A B C D 9 - 124 VBSTB 4-FS
1
2 1 2
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
no. ref.
Translate file B: leer1
Archive: =H01 / V / / / 20
A B C D 9 - 124 VBSTB 4-FS
1
2 1 2
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
no. ref.
Translate file B: leer1
E E
Archive: =H01 / V / / / 21
A B C D 111 - 893 VBSTB 4-FS
1
2 1 2
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
no. ref.
Translate file B: leer1
Archive: =H01 / V / / / 22
A B C D 111 - 893 VBSTB 4-FS
1
2 1 2
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
no. ref.
Translate file B: leer1
E E
FBKLP2-13
Archive: =H01 / V / / / 23
A B C D 1 - 24 UPCV3K
1
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
no. ref.
Translate file B: leer1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 -XR1
1 =H00/G1.3 -F10 :2 =H02 +.B -XR1 :1 B
2 =H00/G1.3 -F10 :4 =H02 +.B -XR1 :2 B
3 =H00/G1.3 -F30 :2 =H02 +.B -XR1 :3 B
4 =H00/G1.3 -F30 :4 =H02 +.B -XR1 :4 B
5 =H00/G1.3 =H02 +.B -XR1 :5 B
6 =H00/G1.3 =H02 +.B -XR1 :6 B
7 =H00/G1.3 -KBSF6.1 :13 =H02 +.B -XR1 :7 B
C 8 =H00/G1.3 -KBSF6.1 :43 =H02 +.B -XR1 :8 B
C
9 =H00/G1.3 -KBSF6.2 :43 =H02 +.B -XR1 :9 B
10 =H00/G1.3 -KBSF6.2 :53 =H02 +.B -XR1 :10 B
-F151 :1 11 =H00/G1.3 =H02 +.B -XR1 :11 B
-F151 :N 12 =H00/G1.3 =H02 +.B -XR1 :12 B
library 2: PTD_M2_CoC_E
-XQ1 :533 A 13 =H00/G4.3 +.N -KVT1 :13 =H02 +.B -XR1 :13 B
14 =H00/G4.2 =H02 +.B -XR1 :14 B
library 1: PTD60617
D 20 =H00/G4.2 D
21 =H00/G7.3
22 =H00/G7.3
23 =H00/G7.3
24 =H00/G7.3
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
FBKLP2-11
Archive: =H01 / V / / / 24
1 - PE USST 4
1
1 =H01-W1 SIHSI-Cu 3x0,5mm2
2
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
7
1) Bridge insert
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -XSH
BK -R02 :1 1 /G2.2 -XQ0 :9 D
BK -R02 :2 2 /G2.2 -XQ0 :10 D
+.T -S20 :13 3 /G2.2 -B151 :L
+.T -S20 :21 4 /G2.3 -B151 :2
-F151 :2 5 /G2.3
GNYE -XPE :2 A PE /G2.2 -R02 :PE
C C
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
FBKLP2-11
Archive: =H01 / V / / / 25
A B 1 - 2 UT 2,5-MTD-DIO/L-R
1 1
2
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
7 1) Diode
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -XV
-XR1 :15 C 1 /M12.2 -XQ1 :830 A
2 /M12.3
C C
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E
FBKLP2-11
Archive: =H01 / V / / / 26
1 - PE USST 4
1
1 -W1 SIHSI-Cu 3x0,5mm2
2
3
Project: R:/ELCAD7.7.1/PROJECTS/RIYADH METRO_ALSTOM/8DA10/AS MANUF/RETROFITTING PP MV SWG/909611_PP6H2_R1.pro
A A
4
7
1) Bridge insert
8
A
9 Cable connection to termination FOR DETAILS SEE CIRCUIT DIAGRAM
B
Translate file C: C_FB_EN.etr, 04-11-24
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -XSH1
BK -R03 :1 1 /G2.3 +.B -XQ0 :9 C
BK -R03 :2 2 /G2.3 +.B -XQ0 :10 C
GNYE -R03 :PE PE /G2.3 =H01 +.B -PE
C C
library 2: PTD_M2_CoC_E
library 1: PTD60617
library 3:
library 4:
Symbol
Symbol
Symbol
Symbol
D D
CopyRight (C) Siemens AG 2014 All Rights Reserved
E E