Sujana Power (Tuticorin) Limited Sujana Power (Gangikondan) Limited
Sujana Power (Tuticorin) Limited Sujana Power (Gangikondan) Limited
Project :
Combined Cycle Power Plant, Tuticorin
Title:
SHORT CIRCUIT STUDY FOR POWER SUPPLY SYSTEM
Name Signature Date
G.Subramanian/ -sd-
Prepared 27.11.99
V.Krishnakumar
-sd-
Reviewed S.C.Saha 29.11.99
-sd-
Approved M.R.Rao 30.11.99 Sheet 1 of 45
Contract No.: CGL Doc. No.: Rev. No.:
S9901/S9902 CAL-E-0104 D
CONTENTS
CROMPTON GREAVES LIMITED
POWER PROJECTS DIVISION, CHENNAI
1.0 Introduction 3
3.0 Description 3
5.0 Calculation 13
6.0 Conclusion 44
1.0 Introduction
To estimate the short circuit rating of 110 kV equipment, 11 kV Switchgear, Generator transformers, 11
kV cables, Unit auxiliary transformer, LT auxiliary transformer, 6.6 kV Switchgear, 6.6 kV cables, 415
V PCC & MCC, short circuit study need to be carried for auxiliary power supply system. Procedures
and calculations are summarised below.
3.0 Description
Indicative Single line diagram of auxiliary power supplies distribution showing 110kV, 11 kV, 6.6 kV
and 415 V system is enclosed. To arrive at the short circuit rating, one GTG with its UAT is considered
to be in service feeding all the plant auxiliaries as indicated in Sketch-1 below.
For each system ‘line to line fault current’ and ‘line to earth fault current are to be carried out.
For 110 kV system source, fault has been considered at F11 & F12 (That is at SPTL & SPGL
Switchyard respectively) . Fault contribution from plant generators and remote end substations have
been considered. 110 kV substation & line particulars are based on TNEB data.
To derive fault current at 11 kV system, fault has been considered at F1 (at UAT tap off ) and at F2
(near GCB) and fault contribution from 110 kV grid, Generator , 6.6 kV motors & 415 V motors have
been worked out.
To derive fault rating of 11 kV steam turbine Generator (STG) cables, fault has been considered at F3
(near STG ) and fault contribution from 110 kV grid & Generator have been worked out.
To derive fault current at 6.6 kV system, fault has been considered at F4 (6.6 kV switchgear) and fault
contribution from 110 kV grid, Generator, 6.6 kV motors & 415 V motors have been worked out.
To derive fault current at 415 V PCC, fault has been considered at F5 (near PCC of 2.5 MVA
transformer) , at F6 (near PCC of 2 MVA transformer) and at F7 (near PCC of 250kVA sea water
intake system transformer). Fault contribution from 110 kV grid, Generator, 6.6 kV motors & 415 V
motors have been worked out.
Cable impedance considered are as per ‘Sizing calculation-11kV,6.6kV & 415V Cables’ (Doc.no. SPL-
C-CAL-E-0006)
4.1 Various symbols used here are summarised below as per IS 13234
C = Voltage factor
Un = Nominal system voltage
Ur = Rated voltage
S’’ k= Initial symmetrical short circuit power.
f = frequency
R= Resistance
X= Reactance
Z= Impedance
U k r= Rated short circuit voltage in percentage
Ib= Symmetrical short circuit breaking current (rms)
Ik= Steady state short circuit current (rms)
Ip= Peak short circuit current
Ir= Rated current
I’’k= Initial Symmetrical short circuit current
ILR= Locked rotor current of motor
K= Correction factor for impedance.
PkRT =Winding loss in transformer at rated current
Sr= Rated apparent power of electrical equipment.
X”d= Sub transient reactance of Generator
x= Factor for calculation of peak short circuit current
y= Factor for calculation of steady state short circuit current
u= Factor for calculation of the symmetrical short circuit breaking current.
4.2 Generator Transformer (GTR-1 to 6)
According to clause 8.3.2.2 of IS 13234, Positive sequence short circuit impedance of the Generator
transformer is given by:
ZTHV = U k rT / 100 . U2 rTHV / S rT
For generator transformer considering the values as follows:
U k r T = 10.8 % (with –10% tolerance on nominal impedance of 12%)
U rTHV = 115 kV
S rT = 50 MVA
ZTHV = 10.8 / 100 x 115 2 / 50 = 28.566 ohms
RTHV = P k rT x U2 rTHV / S2 rT
P k rT = 0.150 MW for 50 MVA Transformer ( Winding loss is 150 kW as indicated by the transformer
manufacturer)
RTHV = 0.15 x 1152 / 502 = 0.7935 ohms
XTHV = (Z2 rTHV - R2 rTHV )
XTHV = (28.5662 - 0.79352 ) = 28.555 ohms
Impedance referred to 11 kV system is,
ZTLV = (0.7935 + j28.555) x 11 2 / 115 2
= (0.00726 + j 0.2614) = 0.2613 88.408 ohms
Cable impedance between Gas turbine Generator & Generator transformer , Generator transformer &
Unit auxiliary transformer are neglected as these lengths are smaller.
Title: CGL Doc. No.: CAL-E-0104 Rev. No.:
SHORT CIRCUIT STUDY FOR Sheet. 4 of 45 D
POWER SUPPLY SYSTEM
File: GSM//conversion/tmp/activity_task_scratch/536171487.doc
CROMPTON GREAVES LIMITED
POWER PROJECTS DIVISION, CHENNAI
4.6 SPTL 110 kV system (Remote end substations & O.H lines)
Tuticorin town substation
S''k 1860.00 MVA
Z(=1.1x110x110/1860) 7.16 ohms
X (=0.995Z) 7.12 ohms
R (=0.1X) 0.71 ohms
Angle 84.29 degree
Tuticorin sipcot 230/110 kV substation
S''k 2740.00 MVA
Z(=1.1x110x110/2740) 4.86 ohms
X (=0.995Z) 4.83 ohms
R (=0.1X) 0.48 ohms
Angle 84.29 degree
kayatharu substation
S''k 2735.00 MVA
Z(=1.1x110x110/2735) 4.87 ohms
X (=0.995Z) 4.84 ohms
R (=0.1X) 0.48 ohms
Angle 84.29 degree
Line Impedance
Positive sequence R , ohms /kM 0.15
Positive sequence X , ohms/kM 0.40
Zero sequence R0 , ohms /kM 0.30
Zero sequence X0 , ohms/kM 1.32
Tuticorin town substation -SPTL
Line distance 15.00 km
R 2.32 ohms
X 5.96 ohms
Ro 4.56 ohms
Xo 19.80 ohms
Tuticorin Sipcot substation- SPTL
Line distance 15.00 km
R 2.32 ohms
Title: CGL Doc. No.: CAL-E-0104 Rev. No.:
SHORT CIRCUIT STUDY FOR Sheet. 6 of 45 D
POWER SUPPLY SYSTEM
File: GSM//conversion/tmp/activity_task_scratch/536171487.doc
CROMPTON GREAVES LIMITED
POWER PROJECTS DIVISION, CHENNAI
X 5.96 ohms
Ro 4.56 ohms
Xo 19.80 ohms
Kayatharu substation -SPTL
Line distance 56.00 km
R 8.66 ohms
X 22.26 ohms
Ro 17.04 ohms
Xo 73.92 ohms
Line Impedance
Positive sequence R , ohms /kM 0.155
Positive sequence X , ohms/kM 0.398
Zero sequence R0 , ohms /kM 0.304
Zero sequence X0 , ohms/kM 1.320
Tuticorin sipcot 110 kV substation-
SPGL
Line distance 17.000 km
R 2.630 ohms
X 6.758 ohms
Ro 5.173 ohms
Xo 22.440 ohms
Tuticorin sipcot 230/110 kV substation-
SPGL
Line distance 17.000 km
R 2.630 ohms
X 6.758 ohms
Ro 5.173 ohms
Xo 22.440 ohms
Eppodum vendran substation-SPGL
Line distance 25.000 km
R 3.868 ohms
X 9.938 ohms
Ro 7.608 ohms
Title: CGL Doc. No.: CAL-E-0104 Rev. No.:
SHORT CIRCUIT STUDY FOR Sheet. 7 of 45 D
POWER SUPPLY SYSTEM
File: GSM//conversion/tmp/activity_task_scratch/536171487.doc
CROMPTON GREAVES LIMITED
POWER PROJECTS DIVISION, CHENNAI
Xo 33.000 ohms
I rBM / I LrB =6
ZBM = (1 / 6 ) x 6.62 / 0.48356 = 15.013 ohms
XBM = 0.989 x 15.013 = 14.848 ohms
RBM = 0.15 x 14.848 = 2.2278 ohms
6.6 kV Cable size between motor & 6.6 kV Switchgear : 3cx150 sq.mm
Cable distance : 150 M
Resistance of cable /km : 0.265 ohms
Reactance of cable / km : 0.0952 ohms
Cable resistance for 150 M : 0.265 x 0.15 = 0.03975 ohms
Cable reactance for 150 M : 0.0952 x 0.15 = 0.01428 ohms
Resistance of motor with cable : 2.2278 +0.03975 : 2.267 ohms
Reactance of motor with cable : 14.848 +0.01428 : 14.862 ohms
Impedance referred to 11 kV system for BFP pump is,
ZBM = (2.267 + j 14.862 ) x 11 2 / 6.8 2
= (5.93 + j 38.89) = 39.34 81.32 ohms
4.18 250 kVA LT auxiliary Transformer for sea water intake system
According to clause 8.3.2.2 of IS 13234, Positive sequence short circuit impedance of the LT auxiliary
transformer is given by:
ZBHV = U k rB / 100 . U2 rBHV / S rB
For 0.25 MVA auxiliary transformer considering the values as follows:
U k r B = 4.05 % (with –10% tolerance on nominal impedance of 4.5 %))
U rBHV = 6.6 kV
S rB = 0.25 MVA
ZBHV = 4.05 / 100 x 6.6 2 / 0.25 = 7.0567 ohms
RBHV = P k rB x U2 rBHV / S2 rB
P k rB = 0.0045 MW for 0.25 MVA Transformer ( Winding loss is 4.5 kW as indicated by transformer
manufacturer)
RBHV = 0.0045 x 6.62 / 0.252 = 3.136 ohms
XBHV = (Z2 rBHV - R2 rBHV )
XBHV = (7.05672 - 3.1362 ) = 6.321 ohms
6.6 kV Cable size between LT Transformer & 6.6 kV Switchgear : 3cx150 sq.mm
Cable distance : 1500 M
Title: CGL Doc. No.: CAL-E-0104 Rev. No.:
SHORT CIRCUIT STUDY FOR Sheet. 12 of 45 D
POWER SUPPLY SYSTEM
File: GSM//conversion/tmp/activity_task_scratch/536171487.doc
CROMPTON GREAVES LIMITED
POWER PROJECTS DIVISION, CHENNAI
Considering future expansion of 110 kV system , impedance of 110 kV Network is considered based
on 31.5 kA fault level in the following calculations.
Z38
As per clause 12.2.1.1 of IS 13234, Initial symmetrical short circuit current I"k = c x
Un /(1.732 x Zk)
Where, c=1.1 as per Table I of IS 13234, Un=11 kV,
Zk=Z38
I''k 44.25437 kA
Fault contribution from Generator is I"kg=I"k x Zk
/Z2
I"kg 16.77890 kA
Symmetrical short circuit breaking current Ibg= u
I''Kg
u= 0.71 +0.51 e-0.3 I''kg/Irg for t=0.05 s
For 46.475 MVA rating, 11 kV rated 2.44 kA
current is (Irg)
u= 0.71 +0.51 e-0.3 I''kg/Irg for t=0.05 s 0.77
Ibg 13.00 kA
Fault contribution from 110 kV grid is I"ks=I"k x
Zk /Z37
I"ks 24.80741 kA
Steady state short circuit current(Ik) = 37.80720 kA
Ibg+I''ks (as per 12.2.3.3 of IS 13234
Fault contribution from motors is I"km=I"k x Zk
/Z36
I''km 2.71768 kA
As per clause 12.2.3.3 of IS 13234, symmetrical short circuit breaking current (Ib) is I"ks + Ibm +Ibg
……………..(A)
As per table II of IS 13234, symmetrical short circuit breaking current of motors (Ibm) = u q
I"km…………………………(B)
As per equation 67 of IS 13234, q= 0.79 +0.12 ln (m) for tmin =0.05 s, Where, m is rated active power
of motors per pair of pole. (assuming 6 pole for CW motors and 2 pole for all other motors)
Considering m as (4x650 + 2 x 810 +4x400 +2 x 1200/3+162 )
= 6782 kW
m 6.78200 MW
q = 0.79 +0.12 ln (m) = 1.01971
As per equation 47 of IS 13234, u= 0.71 +0.51 e (- 0.3 I"km /Irm
).
For a rating of (4x650 + 2 x 810 +4x400 +2 x 1200+162), with 0.85 efficiency and 0.85 PF on an
aveage, Irm is = 8382/ (1.732 x 6.6 x 0.85 x 0.85)
Irm 1.01486 kA
u 0.93839
I"km 2.71768 kA
Sustituting in equation (B)
Ibm 2.60051 kA
Substituting in equation (A) , Ib 40.408 kA
As per clause 12.2.3.3, of IS 13234
ip=ips+ipm+ipg
As per clause 9.1.1.2 of IS 13234 ips=x sqrt (2) I''ks
X/R ratio 16.944
x=1.02+0.98e-3R/X 1.84098
ips 64.58696 kA
As per clause 9.1.1.2 of IS 13234 ipm=x sqrt (2)
I''km
For X/R ratio of 4.24, x value as per Fig 8 1.50000
of IS 13234 is
Title: CGL Doc. No.: CAL-E-0104 Rev. No.:
SHORT CIRCUIT STUDY FOR Sheet. 25 of 45 D
POWER SUPPLY SYSTEM
File: GSM//conversion/tmp/activity_task_scratch/536171487.doc
CROMPTON GREAVES LIMITED
POWER PROJECTS DIVISION, CHENNAI
ipm 5.76507 kA
As per clause 9.1.1.2 of IS 13234 ipg=xg sqrt (2)
I''kg
X/R ratio of Generator 14.347
xg=1.02+0.98e-3R/X 1.81508
ipg 43.07004 kA
ip=ips +ipm +ipg 113.422
11 kV UAT tap off to be sized for
Rated peak short circuit current 113.422 kA
Rated short time withstand current 40.408 kA
5.6 Estimation of fault current for a fault at F2 near
GCB
For 11 kV GCB selection, higher of generator contribution and system + UAT contribution to be
considered. Accordingly,
ip=ips+ipm 70.352 kA
ib= ibs +ibm 27.408
5.7 Calculation of 'line to ground' fault
current
For 11 kV system, line to ground fault current is too low and is governed by impedance value of
Neutral grounding transformer of Generators.
5.8 For a fault at Steam turbine Generator
at F3
Z1, Z3 in series is calculated as follows, (that is ZA)
Z Angle R X
Z1 0.02030 84.28941 0.00202 0.0202
Z3 0.26136 88.40825 0.00726 0.2613
Summing up, R&X of ZA is 0.00928 0.2815
X/R ratio of ZA 30.33079
ZA 0.28161 ohms 88.11165 Angle
Z Angle 1/Z Angle G B
ZA 0.28161 88.11165 3.55105 -88.1117 0.117 -3.549
Z2A 0.41447 85.99501 2.41272 -85.9950 0.169 -2.407
1/ZA+1/Z2A= 1/ZB 0.286 -5.956
Summing up, G&B of 1/ZB is
1/ZB is 5.96279 ohms -87.255 Angle
ZB is 0.16771 ohms 87.255 Angle
R & X of ZB is 0.00803 0.16751
At short circuit location , Short circuit impedance is
Zk that is ZB
As per clause 12.2.1.1 of IS 13234, Initial symmetrical short circuit current I"k = c x
Un /(1.732 x Zk)
Where, c=1.1 as per Table I of IS 13234, Un=11 kV,
Zk=ZB
I''k 41.656 kA
Fault contribution from Generator is I"kg=I"k x Zk
/Z2A
I"kg 16.85514 kA
Fault contribution from 110 kV grid is I"ks=I"k x
Zk /ZA
I"ks 24.80741 kA
As system contribution is higher than generator contribution, 11 kV cables connecting STG &
transformer need to be sized for system fault rating. Accordingly,
C 1.10000
System voltage 6.60000 kV
X/R ratio of Z31 is 3.40117
At short circuit location , Short circuit 0.24150
impedance is Zk that is
As per clause 12.2.1.1 of IS 13234, Initial symmetrical short circuit current I"k = cUn /(1.732
x Zk)
Where, c=1.1 as per Table I of IS 13234,
Un=6.6 kV
I"k = 1.1 x 6.6 /(1.732 x Zk)
I''k 17.35659 kA
Fault contribution from Generator & grid is I"ks=I"k
x Z43 /Z42
I"ks 14.02783 kA
Fault contribution from motors is I"km=I"k x Z43
/Z31
Ikm'' 3.38752 kA
Fault contribution from other group of 2.73784
motors through Z34 is (I''ks x Z41/Z34)
As per clause 12.2.3.3 of IS 13234, steady 11.290 kA
state short circuit current (Ik) is I"ks
which is
As per clause 12.2.3.3 of IS 13234, symmetrical short circuit breaking current (Ib) is I"ks +
Ibm ……………….(C)
As per table II of IS 13234, symmetrical short circuit breaking current of motors (Ibm) = u q
I"km……………………..(D)
As per equation 67 of IS 13234, q= 0.79 +0.12 ln (m) for tmin =0.05 s, Where, m is rated active power
of motors per pair of pole. (assuming 6 pole for CW motors and 2 pole for all other motors)
Considering m as (4x650 + 2 x 810 +4x400 +2 x 1200/3+162 )
= 6782 kW
m 6.78200 MW
q = 0.79 +0.12 ln (m) = 1.01971
5.15 For a fault at F7 that is at 415V PCC of sea water intake system bus,
Z7, Z9, Z10, Z25,Z29 ,Z26 in parallel is Z Angle 1/Z Angle G B
calculated as follows, (that is Z74 )
Z7 12.13907 80.55047 0.08238 -80.5505 0.014 -0.081
Z9 39.34256 81.32750 0.02542 -81.3275 0.004 -0.025
Z10 39.34256 81.32750 0.02542 -81.3275 0.004 -0.025
Z25 25.19951 68.58429 0.03968 -68.5843 0.014 -0.037
Z29 20.85703 69.15137 0.04795 -69.1514 0.017 -0.045
Z26 25.19951 68.58429 0.03968 -68.5843 0.014 -0.037
1/Z7+1/Z9+1/Z10+1/Z25+1/Z26+1/Z26=
1/Z74
Summing up, G&B of 1/Z74 is 0.067 -0.250
1/Z74 is 0.25908 -74.9594
Z74 is 3.85976 74.9594
Transformation ratio from 11 kV to 415 V 0.04056
is ((0.433/6.6) *(6.8/11))
Z74 referred to 415 V system is 0.00635 ohms 74.95938 Angle
Transformation ratio from 6.6 kV to 415 0.06561
V is (0.433/6.6)
Z42 referred to 415 V system is 0.00125 ohms 81.99940 Angle
R, X of Z42 is 0.000174 0.001241
Z42, Z74 in parallel is calculated as follows, (that is
Z75)
Z Angle 1/Z Angle G B
Z42 0.00125 81.99940 797.744 -81.999 111.03 -790.0
Z74 0.00635 74.95938 157.514 -74.959 40.88 -152.1
1/Z42+1/Z74 = 1/Z75
Summing up, G&B of 1/Z74 is 151.91 -942.1
1/Z75 is 954.266 -80.840
Z75 is 0.00105 80.84019
Transformation ratio from 11 kV to 415 V 0.04056
is ((0.433/6.6) *(6.8/11))
Z51 referred to 415 V system is 19.27815 ohms 61.33586 Angle
R, X of Z51 is 9.247237 16.91554
6
Z53 referred to 415 V system is 0.14459 ohms 67.21759 Angle
Z75, Z51 in series is calculated as follows, that is Z76
Z Angle R X
Z51 referred to 415 V system is 0.03171 61.33586 0.01521 0.0278
Z75 0.00105 80.84019 0.00017 0.0010
Summing up, R&X of Z76 is 0.01538 0.0289
Z76 0.03270 61.94894
Z53, Z76 in parallel is calculated as follows, that is
Z77
Z Angle 1/Z Angle G B
Z53 0.14459 67.2176 6.9163 -67.2176 2.678 -6.38
Z76 is 0.03270 61.9489 30.5821 -61.9489 14.381 -27.0
1/Z53+1/Z76 = 1/Z77
Summing up, G&B of 1/Z77 is 17.060 -33.4
1/Z77 is 37.474 -62.9200
Z77 is 0.02668 62.91999
0.01215 0.02376
R & X of Z77 is 0.01215 0.02376
X/R ratio of Z77 is 1.95585
Title: CGL Doc. No.: CAL-E-0104 Rev. No.:
SHORT CIRCUIT STUDY FOR Sheet. 40 of 45 D
POWER SUPPLY SYSTEM
File: GSM//conversion/tmp/activity_task_scratch/536171487.doc
CROMPTON GREAVES LIMITED
POWER PROJECTS DIVISION, CHENNAI
ipm 15.35957 kA
ip=ips +ipm 17.186 kA
5.16 Calculation of 'line to earth' fault current at 415 V PCC of sea water
intake system
Motor contribution is not applicable for zero sequence fault
current
Positive sequence Impedance of source , 0.000115 0.001468
that is R40,X40 referred to 415V side, in
ohms, (R40,X40)x.433x.433/6.6/6.6
Positive sequence Impedance of 0.25 0.01350 0.02721
MVA LT transformer , referred to 415V
side, in ohms
Positive sequence Impedance of source & 0.01361 0.02868
LT transformer , in ohms, (R1,X1)
Negative sequence Impedance of source 0.013614 0.028677
referred to 415 V side (Same as +ve
sequence impedance) , that is R2,X2 in
ohms
Zero sequence Impedance of LT 0.01215 0.02449
transformer (90% of +ve sequence
impedance of LT) ; R0=0.9 x R15;
X0=0.9x X15 , ohms
Total impedance (R1+R2+R0) & 0.03938 0.08184
(X1+X2+X0) , ohms
Total Impedance (Z) , ohms 0.09082
X/R ratio 2.07835
System voltage(Un) , volts 415
Earth fault current = sqrt(3) x c x Un /Z , 8310.13
amps, where c is 1.05
Actual earth fault current will be still less considering impedance of earthing
conductors and earth.
As per clause 9.1.1.2 of IS 13234 , peak short circuit current , ips=x sqrt (2)
I''ks
X/R ratio 2.078
x=1.02+0.98e-3R/X 1.25139
ips 14.70671 kA
415 V Breakers will be sized for
Rated short circuit breaking current 7.485 kA
Rated short time withstand current (equal 7.485 kA
to Ib)
Rated peak withstand current 17.186 kA
5.17 Calculation of earth fault current at 415 V MCC/Motors
Zero sequence impedance of cables are normally 2 to 3 times positive sequence impedance. In view of
nn availability of correct data, zero sequence impedance is considered same as that of positive sequence,
as it would result in worst fault current.
Feed Feeder Cable No.of R/km X/km in Distanc R1 in X1 in Ro in Xo in
er size cables in ohms e in ohms ohms ohms ohms
no. ohms metre
L1 PCC-3 to RO MCC 1cx630 2 0.0647 0.0843 100 0.0032 0.004 0.0032 0.004
L2 PCC-3 to CW MCC 1cx630 2 0.0647 0.0843 15 0.0004 0.001 0.0004 0.001
L3 PCC-3 to FF MCC 1cx630 2 0.0647 0.0843 25 0.0008 0.001 0.0008 0.001
L4 PCC-3 to DM MCC 3.5cx185 1 0.211 0.072 100 0.0211 0.007 0.0211 0.007
Title: CGL Doc. No.: CAL-E-0104 Rev. No.:
SHORT CIRCUIT STUDY FOR Sheet. 42 of 45 D
POWER SUPPLY SYSTEM
File: GSM//conversion/tmp/activity_task_scratch/536171487.doc
CROMPTON GREAVES LIMITED
POWER PROJECTS DIVISION, CHENNAI
L5 PCC-1 to GT-1 MCC 1cx630 2 0.0647 0.0843 100 0.0032 0.004 0.0032 0.004
L6 PCC-1 to ST MCC-1 1cx630 2 0.0647 0.0843 15 0.0004 0.001 0.0004 0.001
L7 PCC-1 to Fuel forwarding 3.5cx185 1 0.211 0.0718 200 0.0422 0.014 0.0422 0.014
MCC
L8 PCC-1 to Fuel unloading 3.5cx300 1 0.130 0.0705 500 0.065 0.035 0.065 0.035
MCC
L9 PCC-1 to HRSG MCC 3.5cx400 1 0.102 0.0704 15 0.0015 0.001 0.0015 0.001
L10 PCC-1 to Station MCC 3.5cx400 1 0.102 0.0704 15 0.0015 0.001 0.0015 0.001
L11 Station MCC to MLDB 3.5cx95 1 0.410 0.0724 15 0.0061 0.001 0.0061 0.001
L12 MCC to 160 kW motor 3cx300 1 0.130 0.0705 15 0.0019 0.001 0.0019 0.001
L13 MCC to 90 kW motor 3cx150 1 0.265 0.0716 15 0.0039 0.001 0.0039 0.001
L14 MCC to 30 kW motor 3cx35 1 1.110 0.0783 15 0.0166 0.001 0.0166 0.001
L15 MCC to 5.5 kW motor 3cx6 1 6.020 0.1040 15 0.0903 0.002 0.0903 0.002
Calculation
S.no Description R1 in X1 in Ro in Xo in (2R1+ (2X1+ Z in Fault
ohms ohms ohms ohms Ro ) in X0) in ohms curren
ohms ohms t in
kA
1 Fault current at PCC-3 is 1.05x 0.0010 0.0068 0.0008 0.0048 0.0028 0.0184 0.0186 40.59
sqrt(3)x0.415/(2Z1+Z0 of source)
2 Fault current at RO MCC is 1.05x 0.0043 0.0110 0.0040 0.0090 0.0125 0.0310 0.0334 22.56
sqrt(3)x0.415/(2Z1+Z0 of source &
feeder L1)
3 Fault current at CW MCC is 1.05x 0.0015 0.0074 0.0013 0.0054 0.0043 0.0203 0.0207 36.42
sqrt(3)x0.415/(2Z1+Z0 of source &
feeder L2)
4 Fault current at FF MCC is 1.05x 0.0018 0.0078 0.0016 0.0058 0.0053 0.0215 0.0221 34.04
sqrt(3)x0.415/(2Z1+Z0 of source &
feeder L3)
5 Fault current at DM MCC is 1.05x 0.0221 0.0140 0.0219 0.0120 0.0661 0.0399 0.0772 9.77
sqrt(3)x0.415/(2Z1+Z0 of source&
feeder L4)
6 Fault current at GT MCC is 1.05x 0.0043 0.0110 0.0040 0.0090 0.0125 0.0310 0.0334 22.56
sqrt(3)x0.415/(2Z1+Z0 of source &
feeder L5)
7 Fault current at ST MCC is 1.05x 0.0015 0.0074 0.0013 0.0054 0.0043 0.0203 0.0207 36.42
sqrt(3)x0.415/(2Z1+Z0 of source &
feeder L6)
8 Fault current at FO forwarding MCC 0.0432 0.0212 0.0430 0.0192 0.1294 0.0615 0.1432 5.27
is 1.05x sqrt(3)x0.415/(2Z1+Z0 of
source & feeder L7)
9 Fault current at FO unloading MCC 0.0660 0.0420 0.0658 0.0400 0.1978 0.1241 0.2335 3.23
is 1.05x sqrt(3)x0.415/(2Z1+Z0 of
source & feeder L8)
10 Fault current at HRSG MCC is 0.0025 0.0078 0.0023 0.0058 0.0074 0.0215 0.0227 33.12
1.05x sqrt(3)x0.415/(2Z1+Z0 of
source & feeder L9)
11 Fault current at Station MCC is 0.0025 0.0078 0.0023 0.0058 0.0074 0.0215 0.0227 33.12
1.05x sqrt(3)x0.415/(2Z1+Z0 of
source & feeder L10)
Considering maximum earth fault current of 36.42 kA at MCC (Other than fuel handling MCC ) ,
fault current at motors is calculated as follows.
12 Source Impedance & fault current at 0.0015 0.0074 0.0013 0.0054 0.0043 0.0203 0.0207 36.42
MCC
13 Fault current at MLDB is 1.05x 0.0077 0.0085 0.0013 0.0054 0.0166 0.0224 0.028 27.04
sqrt(3)x0.415/(2Z1+Z0 of MCC
source & feeder L11)
14 Fault current at 160kW motor is 0.0035 0.0085 0.0013 0.0054 0.0082 0.0224 0.024 31.66
1.05x sqrt(3)x0.415/(2Z1+Z0 of
MCC source & feeder L12)
15 Fault current at 90kW motor is 0.0055 0.0085 0.0013 0.0054 0.0122 0.0224 0.026 29.54
1.05x sqrt(3)x0.415/(2Z1+Z0 of
MCC source & feeder L13)
16 Fault current at 30kW motor is 0.0182 0.0086 0.0013 0.0054 0.0376 0.0226 0.044 17.20
1.05x sqrt(3)x0.415/(2Z1+Z0 of
MCC source & feeder L14)
17 Fault current at 5.5kW motor is 0.0918 0.0090 0.0013 0.0054 0.1849 0.0234 0.186 4.05
1.05x sqrt(3)x0.415/(2Z1+Z0 of
MCC source & feeder L15)
5.0 Conclusion
Based on the above mentioned short circuit study, results are summarised as follows:
Item Max value of estimated fault current in kA
Ib , Isym Ip
110 kV system 17.755 38.1
11 kV GCB 27.408 70.352
11 kV Generator cables 27.408
11 kV UAT cables 37.8
6.6 kV Switchgear 17.128 38.871
415 V Transformer, PCC-1/2/3 41.25 96.8
415V PCC of sea water intake system 8.31 17.186
Earth fault current rating for earth conductor sizing.
415 V MCC 36.42
415 V MCC of Fuel system 5.27
415V, above 90 kW and upto 160 kW Motor 31.66
415V, above 30 kW and upto 90 kW Motor 29.54
415V, above 5.5 kW and upto 30 kW Motor 17.2
415V, up to 5.5 kW Motor 4.05