EEE111 EXPERIMENT 6 - STUDENT VERSION (Finished)
EEE111 EXPERIMENT 6 - STUDENT VERSION (Finished)
EEE111 EXPERIMENT 6 - STUDENT VERSION (Finished)
ELECTRO-TECHNOLOGY
(EEE111)
EXPERIMENT 6
Figure 6.14: Wiring diagram for lighting circuit in trunking
Table 6.1: Test Result
Insulation test Phase & Neutral Phase & CPC Neutral & CPC
√ X √ X √ X
QUESTIONS
1. What are the two types of breaker that are used in this experiment?
= Miniature Circuit Breaker(MCB), Residual Current Circuit Breaker(RCCB)
2. What is the function of the earthing wire?
= Earthing wire is used to protect someone from an electric shock as it flow the current back to the
source.
3. What are the differences between one way switch and two way switch?
= One way switch has two terminals while two way switch have three terminals
4. Why we need to do the wiring testing?
= To avoid electrical leakage from the circuit
5. What are the electrical wire colour codes?
=Blue for Neutral, Brown for Live, Green for Earth.
INSTRUCTIONS TO STUDENTS
1. All experimental results and answers must be recorded in the Lab Manual.
2. Write a short report which include results, questions, discussion and conclusion.
3. Submit your report through MS teams.
Discussion
There are main switch and insulation tester where Miniature Circuit
Breaker(MCB) and Residual Current Circuit Breaker(RCCB) comes into play. MCB is
an electromechanical device designed to protect an electric circuit from over-current or
short circuit. RCCB is a device to detect and trip against electrical leakage currents.
Moreover, there two types of switches mentioned in this experiment which are
one-way switch, and two-way switch. One-way switch is used when there are one
switch for a light, for example a bedroom ceiling light. One-way switch has two
terminals. Two-way switch is used for a light from two different locations and mostly
used in the case of stairs, or toilet. One way switch has three terminals.
Based on the experiment, Table 6.1, shows that the resistance are the same
which is infinity for three types of insulation test, phase & neutral, phase & CPC,
neutral & CPC. For the continuity test on phase, neutral and CPC, the resistance is
also the same which is 0.8Ω. Lastly for polarity test, three of them has continuity.
Conclusion
In a nutshell, student are able to understand the basic concepts of electrical power,
earthing, distribution systems and wiring. There are also able to understand the wiring
diagram and wiring installation method for a lighting circuit. Then, they understand
trunking system. Moreover, the student also understands the wiring of one-way switch
nad two-way switch. Furthermore, they are also able to understand the inspection and
testing method for a wiring circuit. Lastly, they understands the steps and safety to
power up the lighting circuit.