Karnal SBR 20 MLD - R0!23!05-18 - Client
Karnal SBR 20 MLD - R0!23!05-18 - Client
Karnal SBR 20 MLD - R0!23!05-18 - Client
CLIENT :
PROJECT :
TITLE :
NAME SIGN DATE
PRED KA 23.05.2018
CHKD MB 23.05.2018
STRUCTURAL DESIGN CALCULATION OF SEQUENTIAL
APPD PK 23.05.2018
DOC.No. T A T A - K A R N A L 2 0 - S B R - D C - 0 2
KA MB PK
Prepared Checked Approved
KARNAL
SIZE REV.
A4 0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
CONTENTS
S Description Page No
No
1 INTRODUCTION AND DESIGN BASIS 4
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
This document contains design calculations for Sequential Batch Reactor for
20MLD STP at Karnal
Design Method: STAAD Model has been prepared for Decanter Columns &
Beams. Reactions are used in the excel sheet for design of Decanter footing.
Design of walls has been done using coefficients from IS 3370 (Part 4). Slabs,
Footings and other components have been designed using standard excel sheets.
Hydrodyamnic loads have been added to the calculated moments in Design
sheets.
Limiting Crack width has been taken as 0.2 mm
IS : 3370 - 2009 Code of Practice for for Concrete Structures for Storage of
Liquids
DESIGN CONSTANTS
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Clear Cover on Soil Face
Wall Footings have been designed to rest at a depth of 1.1 m below NGL except
for walls W4 and W6, which are resting at 0.5 m below NGL.
Analysis of wall footing has been done along with the design of respective walls to
show that bearing pressures are within the allowable SBC.
Loads acting from top of Grade Slab to the bottom of PCC are as below:
Total load is less than Gross SBC at this level. Hence OK.
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
30 N/mm2
500 N/mm2
0.2 mm
0.133
10.3 kN/m3
18.0 kN/m3
0.33
50 mm
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
30 mm
50 mm
25 mm
243.00 m
243.00 m
1.10 m
84.6 kN/m2
104.4 kN/m2
56.0 kN/m2
65.0 kN/m2
50.0 kN/m2
5.0 kN/m2
2.4 kN/m2
57.4 kN/m2
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
HYDRODYNAMIC
CALCULATIONS FOR SBR BASIN
MENT NO.
AL20-SBR-DC-02
23.05.2018
R0
BASIN
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Grade of concrete
Density of concrete
Density of Liquid
Earthquake zone
Shape of Tank
Wall Height hw
Liquid Height h
Projection of Raft
WEIGHT CALCULATIONS
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Mass of Superstructure mt
B= 57.00 m
h/L = 5/29
mi/m= Refer fig 3(a) of IS 1893 Part 2
mi = 0.199x8677828.75
mc/m= Refer fig 3(b) of IS 1893 Part 2
mc = 0.76x8677828.75
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Total of impulsive and convective mass is about 4.1 % less than mass of liquid
TIME PERIOD
ACI 350.3 (2001) and NZS 3106 (1986) have suggested a simpler approach for
obtaining deflection, d for tanks without roof. As per this approach, assuming that
wall takes pressure q by cantilever action, one can find the deflection, d, by
considering wall strip of unit width and height _h , which is subjected to
concentrated load, P = q h
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
mmw = 57x5.5x0.5x25x10.3x1000/9.81
`h = ((1726888/2)x1.88+4114488x(5.5/2))/((1726888/2)+4114488)
q= ((((1726888/2+4114488)x9.81)/(57x5))/1000)
P= 171.3x5x1
d= (856.5x2.599^3)/(3x27386127.88x0.01)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
(Ah)c = 0.16x1.5x0.203/(2x2.5)
BASE SHEAR
Piw (y = 0) = 0.87x0.12x1050x9.81x5/1000
Pib=Qib(x)(Ahi)ρgh
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
(1.x0.12x1050x9.81x5)/1000
Qcw (y) = Coefficient of Convective Hydrodynamic Pressure on wall from Fig 11 (a)
corresponding to h/L = 0.172 at y = 0
Pcw (y = 0) = 0.36x0.01x1050x9.81x29/1000
Pcw (y = h) 0.417x0.01x1050x9.81x29/1000
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Qcb (x) = Coefficient of Convective Hydrodynamic Pressure on wall from Fig 11 (b)
corresponding to h/L = 0.172 at x = 0.5L
Convective pressure on top of base slab at x = 0.5L
Pcb = 0.325x0.01x1050x9.81x29/1000
will be as follows:
�_𝑖= (�_𝑖
(4ℎ−6ℎ_𝑖))/ℎ^2
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
�_𝑖= (�_𝑖
(4ℎ−6ℎ_𝑖))/ℎ^2 17.83x(4x5-6x1.88)/(5^2)
5.38 6.22
kN/m2 kN/m2
Ht from CG of load
Pressure Total Load Moment
Bottom from Bottom
4.13 1.84 0.39 1.20 0.47
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
�_𝑐= (�_𝑐
(4ℎ−6ℎ_𝑐))/ℎ^2 5.68x(4x5-6x2.56)/(5^2)
1.22
1.24 kN/m2
kN/m2
1.08 1.05
kN/m2 kN/m2
Ht from CG of load
Pressure Total Load Moment
Bottom from Bottom
4.13 1.19 0.44 1.05 0.46
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
ANCHORAGE REQUIREMENT
h/ D =
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
M-30
25 kN/m3
10.3 kN/m3
9.81 m/s2
1050 kg/m3
III
Rectangular
29.00 m
57.00 m
5.50 m
5.00 m
0.50 m
0.30 m
2.00 m
0.00 m
1920.00 m2
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
11963.00 kN
1219470.00 kg
14400.00 kN
1467889.91 kg
0 kN
0 kg
85129.50 kN
8677828.75 kg
0.172
0.199
1726888 kg
0.760
6595150 kg
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
0.375 m
1.88 m
0.512
2.56
2.387
11.94 m
3.800
19.00 m
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
4114488.0 kg/m3
2.60 m
171.30 kN/m2
856.50 kN
2.74E+07 kN/m2
0.0104 m4
0.01760 m
0.27 sec
5.02
8.630 Sec
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
0.16
1.5
2.5
2.5
0.12
1.75
0.20
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
0.01
3468.45 kN
646.98 kN
3528.28 kN
97092.50 kN
3.63%
0.87
5.38 kN/m2
1.000
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
6.2 kN/m2
0.36
1.08 kN/m2
0.4165
1.24 kN/m2
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
0.33
0.97 kN/m2
17.83 kN-m
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
6.22 kN/m2
0.91 kN/m2
17.83 kN/m
1.88 m
33.50 kN-m/m
5.68 kN-m
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
1.05 kN/m2
1.22 kN/m2
5.68 kN/m
2.56 m
14.54 kN-m/m
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
0.36 m
0.172
8.3
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Grade of concrete
Density of concrete
Density of Liquid
Earthquake zone
Shape of Tank
Wall Height hw
Liquid Height h
Projection of Raft
WEIGHT CALCULATIONS
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Mass of Superstructure mt
B= 29.00 m
h/L = 5/57
mi/m= Refer fig 3(a) of IS 1893 Part 2
mi = 0.101x8677828.75
mc/m= Refer fig 3(b) of IS 1893 Part 2
mc = 0.814x8677828.75
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Total of impulsive and convective mass is about 8.5 % less than mass of liquid
TIME PERIOD
ACI 350.3 (2001) and NZS 3106 (1986) have suggested a simpler approach for
obtaining deflection, d for tanks without roof. As per this approach, assuming that
wall takes pressure q by cantilever action, one can find the deflection, d, by
considering wall strip of unit width and height _h , which is subjected to
concentrated load, P = q h
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
mmw = 29x5.5x0.5x25x10.3x1000/9.81
`h = ((876461/2)x1.88+2093336x(5.5/2))/((876461/2)+2093336)
q= ((((876461/2+2093336)x9.81)/(29x5))/1000)
P= 171.3x5x1
d= (856.5x2.599^3)/(3x27386127.88x0.01)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
(Ah)c = 0.16x1.5x0.107/(2x2.5)
BASE SHEAR
Piw (y = 0) = 0.87x0.12x1050x9.81x5/1000
Pib=Qib(x)(Ahi)ρgh
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
(1.x0.12x1050x9.81x5)/1000
Qcw (y) = Coefficient of Convective Hydrodynamic Pressure on wall from Fig 11 (a)
corresponding to h/L = 0.088 at y = 0
Pcw (y = 0) = 0.4x0.005x1050x9.81x57/1000
Pcw (y = h) 0.417x0.005x1050x9.81x57/1000
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Qcb (x) = Coefficient of Convective Hydrodynamic Pressure on wall from Fig 11 (b)
corresponding to h/L = 0.088 at x = 0.5L
Convective pressure on top of base slab at x = 0.5L
Pcb = 0.361x0.005x1050x9.81x57/1000
will be as follows:
�_𝑖= (�_𝑖
(4ℎ−6ℎ_𝑖))/ℎ^2
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
�_𝑖= (�_𝑖
(4ℎ−6ℎ_𝑖))/ℎ^2 17.79x(4x5-6x1.88)/(5^2)
5.38 6.21
kN/m2 kN/m2
Ht from CG of load
Pressure Total Load Moment
Bottom from Bottom
4.13 1.84 0.39 1.20 0.47
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
�_𝑐= (�_𝑐
(4ℎ−6ℎ_𝑐))/ℎ^2 5.97x(4x5-6x2.52)/(5^2)
1.22
1.22 kN/m2
kN/m2
1.17 1.17
kN/m2 kN/m2
Ht from CG of load
Pressure Total Load Moment
Bottom from Bottom
4.13 1.21 0.44 1.06 0.47
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
ANCHORAGE REQUIREMENT
h/ D =
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
M-30
25 kN/m3
10.3 kN/m3
9.81 m/s2
1050 kg/m3
III
Rectangular
29.00 m
57.00 m
5.50 m
5.00 m
0.50 m
0.30 m
2.00 m
0.00 m
1920.00 m2
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
11963.00 kN
1219470.00 kg
14400.00 kN
1467889.91 kg
0 kN
0 kg
85129.50 kN
8677828.75 kg
0.088
0.101
876461 kg
0.814
7063753 kg
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
0.375 m
1.88 m
0.503
2.52
4.811
24.06 m
13.500
67.50 m
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
2093336.0 kg/m3
2.60 m
171.30 kN/m2
856.50 kN
2.74E+07 kN/m2
0.0104 m4
0.01761 m
0.27 sec
6.79
16.370 Sec
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
0.16
1.5
2.5
2.5
0.12
1.75
0.11
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
0.005
2467.33 kN
346.48 kN
2491.54 kN
97092.50 kN
2.57%
0.87
5.38 kN/m2
1.000
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
6.2 kN/m2
0.40
1.17 kN/m2
0.4165
1.22 kN/m2
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
0.36
1.06 kN/m2
17.79 kN-m
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
6.21 kN/m2
0.91 kN/m2
17.80 kN/m
1.88 m
33.46 kN-m/m
5.97 kN-m
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
1.17 kN/m2
1.22 kN/m2
5.98 kN/m
2.52 m
15.04 kN-m/m
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
0.36 m
0.088
8.3
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DESIGN OF WALL W1
& FOOTING
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
1
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Es = 2.00E+05 N/mm2
TOW = 248.300
Fill TOF HOF b/a Design Methodology
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
5.50
5.50 0.0000 1713.7 0.00 0.00
4.13 -0.0026 1713.7 -4.46 0.00
2.75 -0.0208 1713.7 -35.64 0.00
1.38 -0.0703 1713.7 -120.47 0.00
0.00 -0.1667 1713.7 -285.67 0.00
5.50
5.50 0.0000 1.3 0.00 0.00
4.13 -0.0026 1.3 0.00 0.00
2.75 -0.0208 1.3 0.00 -0.03
1.38 -0.0703 1.3 0.00 -0.09
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.00 -0.1667 1.3 0.00 -0.22
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � ���1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Fill 1 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.000 333.71 500.57 750 692 1736 875 1736
Fill 2 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Fill 1 Reinforcement at Mid Point
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
5.50 200 350 350
5.50 0.00 0.00 200 135 0 350 350
4.13 0.00 0.00 200 135 0 350 350
2.75 0.00 0.00 330 265 0 578 578
1.38 0.00 0.00 540 475 0 875 875
0.00 0.00 0.00 750 685 0 875 875
c' = 50+10+0.5x10 = 65 mm
Fill 1 Reinforcement at Edge
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
5.50 200 350 350
5.50 0.00 0.00 200 135 0 350 350
4.13 0.00 0.00 200 135 0 350 350
2.75 0.00 0.00 330 265 0 578 578
1.38 0.00 0.00 540 475 0 875 875
0.00 0.00 0.00 750 685 0 875 875
c' = 30+10+0.5x10 = 45 mm
Fill 2 reinforcement at Mid Point
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
4.13 0.00 0.00 200 155 0 350 350
2.75 0.00 0.00 330 285 0 578 578
1.38 0.00 0.00 540 495 0 875 875
0.00 0.00 0.00 750 705 0 875 875
c' = 30+10+0.5x10 = 45 mm
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Curtail at
Fill 1 / Fill 2 1.60 4.00 4.00
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
2.75 655 655 655 655
1.38 982 982 982 982
0.00 982 982 982 982
Bottom Top
23.05.2018
R0
N/mm2
mm
242.800
248.3-242.8 5.50 m
248.3-242.4 5.90 m
5.50 m
One Side
eight of Fill
eight of Wall
= k * r * HOF^2 * HOW
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x5.5^2x5.5 1713.7
Earth
0.33x18x0.2^2x5.5 1.3
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x5.5^2x5.5 1713.7
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Earth
0.33x18x0.2^2x5.5 1.3
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Provided Reinf
Fill 2
491
491
491
982
982
982
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
NT
POINT
FILL 2
350
350
350
578
875
875
NT
POINT
FILL 2
00-000+10-140
00-000+10-140
00-000+10-140
00-000+10-120
00-000+10-080
00-000+10-080
NT
POINT
FILL 2
561
561
561
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
655
982
982
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
WALL W1 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x80)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x6.74x(692-133.8)/133.8
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
333.71 kN-m
9.33
692 mm
35 mm
80 mm
62.5 mm
133.8 mm
d - d ') = M
6.74 N/mm2
262.3 N/mm2
750 mm
1.45E-03
5.78E-04
8.70E-04
0.157 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
WALL W1 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x80)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x6.74x(692-133.8)/133.8
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
154.10 kN-m
9.33
642 mm
53 mm
180 mm
99.1 mm
99.73 mm
d - d ') = M
4.48 N/mm2
227.5 N/mm2
700 mm
1.26E-03
1.49E-03
-2.28E-04
-0.058 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Es = 2.00E+05 N/mm2
G1 = 0.252 G2 = 0.498
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
2-(2x1000x(2x200+500)/((3x(200+500)))/1000)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Weight of Fill 1 on footing 118.12 3.68 -434.09 4.6-0.925
Weight of Fill 2 on footing - - -
Self weight of footing on Fill 1 side 16.19 3.54 -57.35 4.6-1.057
Self weight of footing on Fill 2 side 17.50 1.143 -20.00 1.143
Eccentricity = 0.5x4.6-1.8
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Base Pressure at S = (131.66/4.6)x(1+(6x0.188/4.6))
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Check for overturning = Resisting/ overturning moments =
Total vertical load P (kN/m) = (-118.12+28.8+16.188+17.5+9.375+59.8)
Net moment (kN-m/m) = ABS((285.67-0.22-434.091-28.8-57.352-20.003-
22.266-149.387))
Eccentricity = 0.5x4.6-1.71
MOMENT ENVELOPE
Description Case 1 Case 2 Case 3
Moment at Q (base) = -79.13 27.36 -81.43
Moment at R (base) = 125.58 23.43 124.51
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Envelope unfactored moments at R Top 23.43
kN-m/m
Bottom 125.58
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � ���1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Min reinforcement is calculated as per the provisions of IS 3370 (Part 2) - 2009
Percentage of min reinforcement % = 0.35
Location Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
unfactor Mu Factor Th D Mu required
M
Reinf
Location Reinforcement Provided
required
Q - Top 875 00-000+12-120 942
Q - Bot 875 00-000+16-140 1436
R - Top 875 00-000+12-120 942
R - Bot 1019 00-000+16-140 1436
DISTRIBUTION REINFORCEMENT
Fill 1 Side, Average th from 0 to 0.925 m (500+0.5x(500+200))/2
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
N/mm2
mm
242.800
Overturning moment
kN-m/m
285.67
0.22
29.00
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
1.85+2+0.252+0.498 4.60
200)x1.85x25/1000) 16.19
3x(200+500)))/1000) 1.057
00+200)x2x25/1000) 17.50
3x(200+500)))/1000) 1.143
3x1.85+0.4x18x1.85 118.12
0.5x1.85 0.93
0.2x18x2+0.6x18x2 28.80
0.5x2 1.00
0.252+0.498 0.75 m
+500)x0.75x25/1000 9.38
242.4+500/1000)x18 104.4
23.05.2018
R0
4.6-0.925
4.6-1.057
1.143
0.5x0.75+2
2+0.498
285.67
683.10
683.099/285.67 2.39
8+17.5+9.375+59.8) 220.98
352-20.003-22.266- 397.43
149.387))
397.43/220.98 1.800
0.5x4.6-1.8 0.50
/4.6)x(1-(6x0.5/4.6)) 16.71
37-16.71)/4.6)x1.85 41.91
71)/4.6)x(1.85+0.75) 52.13
4.6)x(1+(6x0.5/4.6)) 79.37
x(16.71+41.91)x1.85 54.22
))/(3x(16.71+41.91)) 0.79
57)-118.12x0.5x1.85 -79.13
0.5x(52.13+79.37)x2 131.50
))/(3x(52.13+79.37)) 1.07
.069-17.5x(2-1.143) 125.58
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
4.6-1
1.057
4.6-1.143
0.5x0.75+1.85
1.85+0.252
0.22
327.84
327.84/0.22 ###
8+17.5+9.375+59.8) 131.66
8+20.859+125.693)) 327.62
327.62/131.66 2.49
4.6-2.488 2.11
0.5x4.6-2.112 0.19
6)x(1-(6x0.188/4.6)) 21.59
65-21.59)/4.6)x1.85 27.24
59)/4.6)x(1.85+0.75) 29.54
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
6)x(1+(6x0.188/4.6)) 35.65
x(21.59+27.24)x1.85 45.17
))/(3x(21.59+27.24)) 0.89
16.188x(1.85-1.057) 27.36
0.5x(29.54+35.65)x2 65.19
))/(3x(29.54+35.65)) 1.03
2-1.143)-28.8x0.5x2 23.43
4.6-0.925
0.5x2
4.6-1.057
1.143
0.5x0.75+2
2+0.498
285.67
712.12
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
2.49
8+17.5+9.375+59.8) 249.78
28.8-57.352-20.003- 426.45
22.266-149.387))
426.449/249.78 1.71
1.71 1.71
0.5x4.6-1.71 0.59
4.6)x(1-(6x0.59/4.6)) 12.51
12.51+18.17x1.85 46.12
1+18.17x(1.85+0.75) 59.75
.6)x(1+(6x0.59/4.6)) 96.09
x(12.51+46.12)x1.85 54.23
))/(3x(12.51+46.12)) 0.75
57)-118.12x0.5x1.85 -81.43
0.5x(59.75+96.09)x2 155.84
))/(3x(59.75+96.09)) 1.08
2-1.143)-28.8x0.5x2 124.51
Case 3
-81.43
124.51
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
TRENGTH
0+0.5x(500+200))/2 425
N(0.5x425,250)/100 744
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
808
0+0.5x(500+200))/2 275
N(0.5x275,250)/100 481
628
0+0.5x(500+200))/2 425
N(0.5x425,250)/100 744
808
0+0.5x(500+200))/2 275
N(0.5x275,250)/100 481
628
155.79
59.80
43.06
118.12
59.8+43.063+118.12 220.98
0.45
99.44
56.35
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
FTG W1 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x140)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x5.84x(442-90)/90
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
125.58 kN-m
9.33
442 mm
36 mm
140 mm
82.9 mm
90.0 mm
d - d ') = M
5.84 N/mm2
213.1 N/mm2
500 mm
1.24E-03
5.54E-04
6.87E-04
0.150 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
FTG W1 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x12)^2)-0.5x12
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x4.33x(444-72.4)/72.4
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
81.43 kN-m
9.33
444 mm
38 mm
120 mm
76.1 mm
72.4 mm
d - d ') = M
4.33 N/mm2
207.4 N/mm2
500 mm
1.19E-03
8.71E-04
3.22E-04
0.070 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
FTG W1 CALCULATION OF CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure
= 359x90/(359+359)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
= (56.345x359/(359+359))
= (56.345x359/(359+359))
Distance from comp face to point where crack width is being calculated, a
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Max spacing of bars, S =
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x220)^2+(50+0.5x10)^2)-0.5x10
23.05.2018
R0
Part 2 - 2009, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
0.0 kN-m
56.35 kN-m
9.33
90.0 mm
45.0 mm
-2.5 kN-m
OCUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
145 mm
55 mm
28.2 kN
28.2 kN
78.5 N/mm2
2.1E+05 mm2
0.27 N/mm2
200 mm
OCUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
220 mm
118.0 mm
3.92E-04
9.29E-04
-5.36E-04
-0.190 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
23.05.2018
R0
AND
TING
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
WALL W1A DESIGN OF CANTILEVER WALL
Es = 2.00E+05 N/mm2
TOW = 248.600
Fill TOF HOF b/a Design Methodology
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
5.80
5.80 0.0000 2009.7 0.00 0.00
4.35 -0.0026 2009.7 -5.23 0.00
2.90 -0.0208 2009.7 -41.80 0.00
1.45 -0.0703 2009.7 -141.28 0.00
0.00 -0.1667 2009.7 -335.02 0.00
5.80
5.80 0.0000 1.4 0.00 0.00
4.35 -0.0026 1.4 0.00 0.00
2.90 -0.0208 1.4 0.00 -0.03
1.45 -0.0703 1.4 0.00 -0.10
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.00 -0.1667 1.4 0.00 -0.23
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � ���1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Fill 1 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.000 383.06 574.59 750 692 2007 875 2007
Fill 2 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Fill 1 Reinforcement at Mid Point
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
5.80 500 875 875
5.80 0.00 0.00 500 429 0 875 875
4.35 0.00 0.00 500 429 0 875 875
2.90 0.00 0.00 549 478 0 875 875
1.45 0.00 0.00 649 578 0 875 875
0.00 0.00 0.00 750 679 0 875 875
c' = 50+16+0.5x10 = 71 mm
Fill 1 Reinforcement at Edge
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
5.80 500 875 875
5.80 0.00 0.00 500 429 0 875 875
4.35 0.00 0.00 500 429 0 875 875
2.90 0.00 0.00 549 478 0 875 875
1.45 0.00 0.00 649 578 0 875 875
0.00 0.00 0.00 750 679 0 875 875
c' = 30+16+0.5x10 = 51 mm
Fill 2 reinforcement at Mid Point
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
4.35 0.00 0.00 500 449 0 875 875
2.90 0.00 0.00 549 498 0 875 875
1.45 0.00 0.00 649 598 0 875 875
0.00 0.00 0.00 750 699 0 875 875
c' = 30+16+0.5x10 = 51 mm
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Curtail at
Fill 1 / Fill 2 1.50 1.50
Break at
Fill 1 / Fill 2
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
2.90 982 982 982 982
1.45 982 982 982 982
0.00 982 982 982 982
Bottom Top
Case 1 335.02
Case 2 0.23
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
N/mm2
mm
242.800
248.6-242.8 5.80 m
248.6-242.5 6.10 m
5.80 m
One Side
eight of Fill
eight of Wall
= k * r * HOF^2 * HOW
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x5.8^2x5.8 2009.7
Earth
0.33x18x0.2^2x5.8 1.4
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x5.8^2x5.8 2009.7
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Earth
0.33x18x0.2^2x5.8 1.4
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Provided Reinf
Fill 2
1257
1257
1257
1257
1257
2513
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
NT
POINT
FILL 2
875
875
875
875
875
875
NT
POINT
FILL 2
00-000+10-080
00-000+10-080
00-000+10-080
00-000+10-080
00-000+10-080
00-000+10-080
NT
POINT
FILL 2
982
982
982
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
982
982
982
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
WALL W1A CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
Limiting crack width, w
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x80)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x6.34x(692-139)/139
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
383.06 kN-m
9.33
692 mm
38 mm
80 mm
62.5 mm
139.0 mm
d - d ') = M
6.34 N/mm2
235.3 N/mm2
750 mm
1.30E-03
4.48E-04
8.52E-04
0.154 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
1 Reactions of Case 1
2 Reactions of Case 2
These reaction are applied in the footing design sheet of respective load case.
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
G1 = 0.300 G2 = 0.450
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
2.2-(2.2x1000x(2x600+600)/((3x(600+600)))/1000)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Weight of Fill 1 on footing 179.22 4.45 -797.53 5.95-1.5
Weight of Fill 2 on footing - - -
Self weight of footing on Fill 1 side 45.00 4.45 -200.25 5.95-1.5
Self weight of footing on Fill 2 side 33.00 1.100 -36.30 1.1
Addl vertical load on Fill 1 side, Load 1 -30.00 3.75 112.50 -240x1/8,
0.8+0.3+0.45+2.2
Reaction Node - Col - Vertical (STAAD) 38.45 1.10 -42.30 307.606/8, 2.2-1.1
Eccentricity = 0.5x5.95-2.29
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
CG of base pressure P-Q from Q = (3x(2x16.26+53.77))/(3x(16.26+53.77))
Moment at Q (base), kN-m/m = 105.045x1.232-45x(3-1.5)-179.22x0.5x3
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Base Pressure at P = (186.57/5.95)x(1-(6x0.234/5.95))
Base Pressure at Q (interpolated) = 23.96+((38.76-23.96)/5.95)x3
Base Pressure at R (interpolated) = 23.96+((38.76-23.96)/5.95)x(3+0.75)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Addl vertical load on Fill 1 side, Load 1 -30.00 3.75 112.50
Addl moment on Fill 1 side, Load 3 0.00 0.00 12.81
Reaction Node - Wall - Vertical (STAAD) -48.22 2.65 127.78
Reaction Node - Col - Vertical (STAAD) 38.45 1.10 -42.30
Reaction Node - Wall - Moment (STAAD) 0.00 0.00 9.36
Reaction Node - Col - Moment (STAAD) 0.00 0.00 17.08
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Eccentricity = 0.5x5.95-2.26
MOMENT ENVELOPE
Description Case 1 Case 2 Case 3
Moment at Q (base) = -206.90 51.29 -209.03
Moment at R (base) = 160.91 44.37 160.57
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR
Envelope unfactored moments at Q REV R0
kN-m/m
Bottom 51.29
Envelope unfactored moments at R Top 44.37
kN-m/m
Bottom 160.91
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � 1- 1-
��� �
� fy ��� fck �1000 �d 2 �
�
Min reinforcement is calculated as per the provisions of IS 3370 (Part 2) - 2009
Percentage of min reinforcement % = 0.35
Location Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
unfactor Mu Factor Th D Mu required
M
Reinf
Location Reinforcement Provided
required
Q - Top 1390 12-180+16-180 1745
Q - Bot 875 00-000+16-140 1436
R - Top 875 00-000+16-180 1117
R - Bot 1059 00-000+16-140 1436
Dist 875 00-000+12-120 942
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
N/mm2
mm
242.800
Overturning moment
kN-m/m
335.02
0.23
17.67
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
3+2.2+0.3+0.45 5.95
00+600)x3x25/1000) 45.00
3x(600+600)))/1000) 1.500
+600)x2.2x25/1000) 33.00
3x(600+600)))/1000) 1.100
5.8x10.3x3 179.22
0.5x3 1.50
0.2x18x2.2 7.92
0.5x2.2 1.10
0.3+0.45 0.75 m
+600)x0.75x25/1000 11.3
242.5+600/1000)x18 104.4
23.05.2018
R0
5.95-1.5
5.95-1.5
1.1
0.5x0.75+2.2
2.2+0.45
-240x1/8,
0.8+0.3+0.45+2.2
50x1x(1.6+0.5x0.3
+0.3)/8
-385.738/8
307.606/8, 2.2-1.1
74.858/8
136.644/8
-30-48.217+38.451) 318.10
200.25-36.3-28.969- 727.71
.5+12.813+127.784-
296+9.357+17.081))
727.71/318.1 2.290
0.5x5.95-2.29 0.69
5)x(1-(6x0.69/5.95)) 16.26
0.66-16.26)/5.95)x3 53.77
6.26)/5.95)x(3+0.75) 63.15
5)x(1+(6x0.69/5.95)) 90.66
0.5x(16.26+53.77)x3 105.05
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
))/(3x(16.26+53.77)) 1.23
3-1.5)-179.22x0.5x3 -206.90
5x(63.15+90.66)x2.2 169.19
))/(3x(63.15+90.66)) 1.17
x1.166-33x(2.2-1.1) 160.91
5.95-1.1
1.5
5.95-1.1
0.5x0.75+3
3+0.3
+45+33+11.25+89.4) 186.57
ABS((+0.23- 598.71
5+37.969+295.004))
598.71/186.57 3.21
5.95-3.209 2.74
0.5x5.95-2.741 0.23
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
)x(1-(6x0.234/5.95)) 23.96
8.76-23.96)/5.95)x3 31.42
3.96)/5.95)x(3+0.75) 33.29
x(1+(6x0.234/5.95)) 38.76
0.5x(23.96+31.42)x3 83.07
))/(3x(23.96+31.42)) 1.43
.07x1.43-45x(3-1.5) 51.29
5x(33.29+38.76)x2.2 79.26
))/(3x(33.29+38.76)) 1.13
.2-1.1)-7.92x0.5x2.2 44.37
5.95-1.5
0.5x2.2
5.95-1.5
1.1
0.5x0.75+2.2
2.2+0.45
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
+33+11.25+89.4-30- 326.02
48.217+38.451)
-8.712-200.25-36.3- 736.66
.5+12.813+127.784-
296+9.357+17.081))
736.657/326.02 2.26
2.26 2.26
0.5x5.95-2.26 0.72
5)x(1-(6x0.72/5.95)) 15.01
15.01+13.373x3 55.13
01+13.373x(3+0.75) 65.16
5)x(1+(6x0.72/5.95)) 94.58
0.5x(15.01+55.13)x3 105.21
))/(3x(15.01+55.13)) 1.21
3-1.5)-179.22x0.5x3 -209.03
5x(65.16+94.58)x2.2 175.71
))/(3x(65.16+94.58)) 1.17
.2-1.1)-7.92x0.5x2.2 160.57
Case 3
-209.03
160.57
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
D-FTG-M CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x6.51x(542-110.1)/110.1
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
209.03 kN-m
9.33
542 mm
58 mm
90 mm
65.4 mm
110.1 mm
d - d ') = M
6.51 N/mm2
238.3 N/mm2
600 mm
1.35E-03
5.31E-04
8.20E-04
0.151 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
D-FTG-M CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x140)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x5.54x(542-102.4)/102.4
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
160.91 kN-m
9.33
542 mm
58 mm
140 mm
82.9 mm
102.4 mm
d - d ') = M
5.54 N/mm2
221.9 N/mm2
600 mm
1.26E-03
6.54E-04
6.02E-04
0.132 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
G1 = 0.300 G2 = 0.450
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
2.2-(2.2x1000x(2x600+600)/((3x(600+600)))/1000)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Weight of Fill 1 on footing 179.22 4.45 -797.53 5.95-1.5
Weight of Fill 2 on footing - - -
Self weight of footing on Fill 1 side 45.00 4.45 -200.25 5.95-1.5
Self weight of footing on Fill 2 side 33.00 1.100 -36.30 1.1
Addl vertical load on Fill 1 side, Load 1 -30.00 3.75 112.50 -240x1/8,
0.8+0.3+0.45+2.2
Reaction Node - Col - Vertical (STAAD) -22.21 1.10 24.43 -177.704/8, 2.2-
1.1
Reaction Node - Wall - Moment (STAAD) 0.00 0.00 -9.41 -75.265/8
Eccentricity = 0.5x5.95-2.73
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
CG of base pressure P-Q from Q = (3x(2x47.53+63.68))/(3x(47.53+63.68))
Moment at Q (base), kN-m/m = 166.815x1.427-45x(3-1.5)-179.22x0.5x3
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Base Pressure at P = (186.57/5.95)x(1-(6x0.234/5.95))
Base Pressure at Q (interpolated) = 23.96+((38.76-23.96)/5.95)x3
Base Pressure at R (interpolated) = 23.96+((38.76-23.96)/5.95)x(3+0.75)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Addl vertical load on Fill 1 side, Load 1 -30.00 3.75 112.50
Addl moment on Fill 1 side, Load 3 0.00 0.00 12.81
Reaction Node - Wall - Vertical (STAAD) 72.45 2.65 -192.00
Reaction Node - Col - Vertical (STAAD) -22.21 1.10 24.43
Reaction Node - Wall - Moment (STAAD) 0.00 0.00 -9.41
Reaction Node - Col - Moment (STAAD) 0.00 0.00 -17.43
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Eccentricity = 0.5x5.95-2.7
MOMENT ENVELOPE
Description Case 1 Case 2 Case 3
Moment at Q (base) = -98.22 51.29 -98.64
Moment at R (base) = 146.70 44.37 144.99
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR
Envelope unfactored moments at Q REV R0
kN-m/m
Bottom 51.29
Envelope unfactored moments at R Top 44.37
kN-m/m
Bottom 146.70
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � 1- 1-
��� �
� fy ��� fck �1000 �d 2 �
�
Min reinforcement is calculated as per the provisions of IS 3370 (Part 2) - 2009
Percentage of min reinforcement % = 0.35
Location Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
unfactor Mu Factor Th D Mu required
M
Reinf
Location Reinforcement Provided
required
Q - Top 875 12-180+16-180 1745
Q - Bot 875 00-000+16-140 1436
R - Top 875 00-000+16-180 1117
R - Bot 962 00-000+16-140 1436
Dist 875 00-000+12-120 942
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
N/mm2
mm
242.800
Overturning moment
kN-m/m
335.02
0.23
17.67
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
3+2.2+0.3+0.45 5.95
00+600)x3x25/1000) 45.00
3x(600+600)))/1000) 1.500
+600)x2.2x25/1000) 33.00
3x(600+600)))/1000) 1.100
5.8x10.3x3 179.22
0.5x3 1.50
0.2x18x2.2 7.92
0.5x2.2 1.10
0.3+0.45 0.75 m
+600)x0.75x25/1000 11.3
242.5+600/1000)x18 104.4
23.05.2018
R0
5.95-1.5
5.95-1.5
1.1
0.5x0.75+2.2
2.2+0.45
-240x1/8,
0.8+0.3+0.45+2.2
50x1x(1.6+0.5x0.3
+0.3)/8
579.572/8
-177.704/8, 2.2-
1.1
-75.265/8
-139.41/8
-30+72.447-22.213) 378.10
200.25-36.3-28.969- ###
.996+24.434-9.408-
17.426))
1034.04/378.1 2.730
0.5x5.95-2.73 0.25
5)x(1-(6x0.25/5.95)) 47.53
9.57-47.53)/5.95)x3 63.68
7.53)/5.95)x(3+0.75) 67.72
5)x(1+(6x0.25/5.95)) 79.57
0.5x(47.53+63.68)x3 166.82
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
))/(3x(47.53+63.68)) 1.43
3-1.5)-179.22x0.5x3 -98.22
5x(67.72+79.57)x2.2 162.02
))/(3x(67.72+79.57)) 1.13
x1.129-33x(2.2-1.1) 146.70
5.95-1.1
1.5
5.95-1.1
0.5x0.75+3
3+0.3
+45+33+11.25+89.4) 186.57
ABS((+0.23- 598.71
5+37.969+295.004))
598.71/186.57 3.21
5.95-3.209 2.74
0.5x5.95-2.741 0.23
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
)x(1-(6x0.234/5.95)) 23.96
8.76-23.96)/5.95)x3 31.42
3.96)/5.95)x(3+0.75) 33.29
x(1+(6x0.234/5.95)) 38.76
0.5x(23.96+31.42)x3 83.07
))/(3x(23.96+31.42)) 1.43
.07x1.43-45x(3-1.5) 51.29
5x(33.29+38.76)x2.2 79.26
))/(3x(33.29+38.76)) 1.13
.2-1.1)-7.92x0.5x2.2 44.37
5.95-1.5
0.5x2.2
5.95-1.5
1.1
0.5x0.75+2.2
2.2+0.45
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
25+89.4-30+72.447- 386.02
22.213)
-8.712-200.25-36.3- ###
13-191.996+24.434-
9.408-17.426))
1042.979/386.02 2.70
2.7 2.70
0.5x5.95-2.7 0.28
5)x(1-(6x0.28/5.95)) 46.56
46.56+6.158x3 65.03
6.56+6.158x(3+0.75) 69.65
5)x(1+(6x0.28/5.95)) 83.20
0.5x(46.56+65.03)x3 167.39
))/(3x(46.56+65.03)) 1.42
3-1.5)-179.22x0.5x3 -98.64
.5x(69.65+83.2)x2.2 168.14
5))/(3x(69.65+83.2)) 1.13
.2-1.1)-7.92x0.5x2.2 144.99
Case 3
-98.64
144.99
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
D-FTG-M CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x3.07x(542-110.1)/110.1
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
98.64 kN-m
9.33
542 mm
58 mm
90 mm
65.4 mm
110.1 mm
d - d ') = M
3.07 N/mm2
112.4 N/mm2
600 mm
6.37E-04
5.31E-04
1.06E-04
0.020 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
D-FTG-M CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x140)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x5.05x(542-102.4)/102.4
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
146.70 kN-m
9.33
542 mm
58 mm
140 mm
82.9 mm
102.4 mm
d - d ') = M
5.05 N/mm2
202.3 N/mm2
600 mm
1.14E-03
6.54E-04
4.91E-04
0.108 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DESIGN OF WALL W1 D
& FOOTING
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
1D
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Es = 2.00E+05 N/mm2
TOW = 248.500
Fill TOF HOF b/a Design Methodology
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
5.70
5.70 0.0000 1907.5 0.00 0.00
4.28 -0.0026 1907.5 -4.96 0.00
2.85 -0.0208 1907.5 -39.68 0.00
1.43 -0.0703 1907.5 -134.10 0.00
0.00 -0.1667 1907.5 -317.98 0.00
5.70
5.70 0.0000 1.4 0.00 0.00
4.28 -0.0026 1.4 0.00 0.00
2.85 -0.0208 1.4 0.00 -0.03
1.43 -0.0703 1.4 0.00 -0.10
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.00 -0.1667 1.4 0.00 -0.23
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � ���1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Fill 1 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.000 366.02 549.03 750 692 1913 875 1913
Fill 2 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Fill 1 Reinforcement at Mid Point
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
5.70 250 438 438
5.70 0.00 0.00 250 185 0 438 438
4.28 0.00 0.00 250 185 0 438 438
2.85 0.00 0.00 354 289 0 620 620
1.43 0.00 0.00 552 487 0 875 875
0.00 0.00 0.00 750 685 0 875 875
c' = 50+10+0.5x10 = 65 mm
Fill 1 Reinforcement at Edge
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
5.70 250 438 438
5.70 0.00 0.00 250 185 0 438 438
4.28 0.00 0.00 250 185 0 438 438
2.85 0.00 0.00 354 289 0 620 620
1.43 0.00 0.00 552 487 0 875 875
0.00 0.00 0.00 750 685 0 875 875
c' = 30+10+0.5x10 = 45 mm
Fill 2 reinforcement at Mid Point
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
4.28 0.00 0.00 250 205 0 438 438
2.85 0.00 0.00 354 309 0 620 620
1.43 0.00 0.00 552 507 0 875 875
0.00 0.00 0.00 750 705 0 875 875
c' = 30+10+0.5x10 = 45 mm
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Curtail at
Fill 1 / Fill 2 1.60 4.00 4.00
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
2.85 655 655 655 655
1.43 982 982 982 982
0.00 982 982 982 982
Bottom Top
23.05.2018
R0
N/mm2
mm
242.800
248.5-242.8 5.70 m
248.5-242.4 6.10 m
5.70 m
One Side
eight of Fill
eight of Wall
= k * r * HOF^2 * HOW
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x5.7^2x5.7 1907.5
Earth
0.33x18x0.2^2x5.7 1.4
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x5.7^2x5.7 1907.5
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Earth
0.33x18x0.2^2x5.7 1.4
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Provided Reinf
Fill 2
491
491
491
982
982
982
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
NT
POINT
FILL 2
438
438
438
620
875
875
NT
POINT
FILL 2
00-000+10-140
00-000+10-140
00-000+10-140
00-000+10-120
00-000+10-080
00-000+10-080
NT
POINT
FILL 2
561
561
561
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
655
982
982
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
WALL W1D CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
Limiting crack width, w
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x80)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x7.39x(692-133.8)/133.8
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
366.02 kN-m
9.33
692 mm
35 mm
80 mm
62.5 mm
133.8 mm
d - d ') = M
7.39 N/mm2
287.6 N/mm2
750 mm
1.59E-03
5.78E-04
1.01E-03
0.182 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Es = 2.00E+05 N/mm2
G1 = 0.254 G2 = 0.496
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
2-(2x1000x(2x200+500)/((3x(200+500)))/1000)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Weight of Fill 1 on footing 121.93 3.68 -448.09 4.6-0.925
Weight of Fill 2 on footing - - -
Self weight of footing on Fill 1 side 16.19 3.54 -57.35 4.6-1.057
Self weight of footing on Fill 2 side 17.50 1.143 -20.00 1.143
Eccentricity = 0.5x4.6-1.71
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Base Pressure at S = (137.46/4.6)x(1+(6x0.173/4.6))
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Check for overturning = Resisting/ overturning moments =
Total vertical load P (kN/m) = (-121.93+28.8+16.188+17.5+9.375+65.6)
Net moment (kN-m/m) = ABS((317.98-0.23-448.093-28.8-57.352-20.003-
22.266-163.766))
Eccentricity = 0.5x4.6-1.63
MOMENT ENVELOPE
Description Case 1 Case 2 Case 3
Moment at Q (base) = -88.16 29.74 -90.75
Moment at R (base) = 140.06 25.54 138.17
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Envelope unfactored moments at R Top 25.54
kN-m/m
Bottom 140.06
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � ���1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Min reinforcement is calculated as per the provisions of IS 3370 (Part 2) - 2009
Percentage of min reinforcement % = 0.35
Location Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
unfactor Mu Factor Th D Mu required
M
Reinf
Location Reinforcement Provided
required
Q - Top 875 00-000+12-120 942
Q - Bot 875 00-000+16-140 1436
R - Top 875 00-000+12-120 942
R - Bot 1142 00-000+16-140 1436
DISTRIBUTION REINFORCEMENT
Fill 1 Side, Average th from 0 to 0.925 m (500+0.5x(500+200))/2
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
23.05.2018
R0
N/mm2
mm
242.800
Overturning moment
kN-m/m
317.98
0.23
29.00
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
1.85+2+0.254+0.496 4.60
200)x1.85x25/1000) 16.19
3x(200+500)))/1000) 1.057
00+200)x2x25/1000) 17.50
3x(200+500)))/1000) 1.143
3x1.85+0.4x18x1.85 121.93
0.5x1.85 0.93
0.2x18x2+0.6x18x2 28.80
0.5x2 1.00
0.254+0.496 0.75 m
+500)x0.75x25/1000 9.38
242.4+500/1000)x18 104.4
23.05.2018
R0
4.6-0.925
4.6-1.057
1.143
0.5x0.75+2
2+0.496
317.98
711.48
711.479/317.98 2.24
8+17.5+9.375+65.6) 230.59
352-20.003-22.266- 393.50
163.766))
393.5/230.59 1.710
0.5x4.6-1.71 0.59
4.6)x(1-(6x0.59/4.6)) 11.55
.71-11.55)/4.6)x1.85 42.58
55)/4.6)x(1.85+0.75) 55.16
.6)x(1+(6x0.59/4.6)) 88.71
x(11.55+42.58)x1.85 50.07
))/(3x(11.55+42.58)) 0.75
57)-121.93x0.5x1.85 -88.16
0.5x(55.16+88.71)x2 143.87
))/(3x(55.16+88.71)) 1.08
.078-17.5x(2-1.143) 140.06
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
4.6-1
1.057
4.6-1.143
0.5x0.75+1.85
1.85+0.254
0.23
340.14
340.141/0.23 ###
8+17.5+9.375+65.6) 137.46
8+20.859+137.994)) 339.91
339.91/137.46 2.47
4.6-2.473 2.13
0.5x4.6-2.127 0.17
6)x(1-(6x0.173/4.6)) 23.15
62-23.15)/4.6)x1.85 28.57
15)/4.6)x(1.85+0.75) 30.76
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
6)x(1+(6x0.173/4.6)) 36.62
x(23.15+28.57)x1.85 47.84
))/(3x(23.15+28.57)) 0.89
16.188x(1.85-1.057) 29.74
0.5x(30.76+36.62)x2 67.38
))/(3x(30.76+36.62)) 1.03
2-1.143)-28.8x0.5x2 25.54
4.6-0.925
0.5x2
4.6-1.057
1.143
0.5x0.75+2
2+0.496
317.98
740.51
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
2.33
8+17.5+9.375+65.6) 259.39
28.8-57.352-20.003- 422.53
22.266-163.766))
422.529/259.39 1.63
1.63 1.63
0.5x4.6-1.63 0.67
4.6)x(1-(6x0.67/4.6)) 7.11
7.11+21.426x1.85 46.75
+21.426x(1.85+0.75) 62.82
.6)x(1+(6x0.67/4.6)) 105.67
5x(7.11+46.75)x1.85 49.82
5))/(3x(7.11+46.75)) 0.70
57)-121.93x0.5x1.85 -90.75
5x(62.82+105.67)x2 168.49
/(3x(62.82+105.67)) 1.08
2-1.143)-28.8x0.5x2 138.17
Case 3
-90.75
138.17
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
TRENGTH
0+0.5x(500+200))/2 425
N(0.5x425,250)/100 744
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
808
0+0.5x(500+200))/2 275
N(0.5x275,250)/100 481
628
0+0.5x(500+200))/2 425
N(0.5x425,250)/100 744
808
0+0.5x(500+200))/2 275
N(0.5x275,250)/100 481
628
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
FTG W1D CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x140)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x6.51x(442-90)/90
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
140.06 kN-m
9.33
442 mm
36 mm
140 mm
82.9 mm
90.0 mm
d - d ') = M
6.51 N/mm2
237.6 N/mm2
500 mm
1.38E-03
5.54E-04
8.29E-04
0.180 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
FTG W1D CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x12)^2)-0.5x12
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x4.83x(444-72.4)/72.4
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
90.75 kN-m
9.33
444 mm
38 mm
120 mm
76.1 mm
72.4 mm
d - d ') = M
4.83 N/mm2
231.3 N/mm2
500 mm
1.33E-03
8.71E-04
4.60E-04
0.090 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DESIGN OF WALL W2
& FOOTING
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
2
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
WALL W2 DESIGN OF CANTILEVER WALL
Es = 2.00E+05 N/mm2
TOW = 248.300
Fill TOF HOF b/a Design Methodology
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
5.50
5.50 0.0000 1713.7 0.00 0.00
4.13 -0.0026 1713.7 -4.46 0.00
2.75 -0.0208 1713.7 -35.64 0.00
1.38 -0.0703 1713.7 -120.47 0.00
0.00 -0.1667 1713.7 -285.67 0.00
5.50
5.50 0.0000 1.3 0.00 0.00
4.13 -0.0026 1.3 0.00 0.00
2.75 -0.0208 1.3 0.00 -0.03
1.38 -0.0703 1.3 0.00 -0.09
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.00 -0.1667 1.3 0.00 -0.22
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � ���1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Fill 1 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.000 334.17 501.26 750 692 1739 875 1739
Fill 2 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Fill 1 Reinforcement at Mid Point
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
5.50 200 350 350
5.50 0.00 0.00 200 135 0 350 350
4.13 0.00 0.00 200 135 0 350 350
2.75 0.00 0.00 330 265 0 578 578
1.38 0.00 0.00 540 475 0 875 875
0.00 0.00 0.00 750 685 0 875 875
c' = 50+10+0.5x10 = 65 mm
Fill 1 Reinforcement at Edge
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
5.50 200 350 350
5.50 0.00 0.00 200 135 0 350 350
4.13 0.00 0.00 200 135 0 350 350
2.75 0.00 0.00 330 265 0 578 578
1.38 0.00 0.00 540 475 0 875 875
0.00 0.00 0.00 750 685 0 875 875
c' = 30+10+0.5x10 = 45 mm
Fill 2 reinforcement at Mid Point
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
4.13 0.00 0.00 200 155 0 350 350
2.75 0.00 0.00 330 285 0 578 578
1.38 0.00 0.00 540 495 0 875 875
0.00 0.00 0.00 750 705 0 875 875
c' = 30+10+0.5x10 = 45 mm
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Curtail at
Fill 1 / Fill 2 1.60 4.00 4.00
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
2.75 655 655 655 655
1.38 982 982 982 982
0.00 982 982 982 982
Bottom Top
23.05.2018
R0
N/mm2
mm
242.800
248.3-242.8 5.50 m
248.3-242.4 5.90 m
5.50 m
One Side
eight of Fill
eight of Wall
= k * r * HOF^2 * HOW
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x5.5^2x5.5 1713.7
Earth
0.33x18x0.2^2x5.5 1.3
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x5.5^2x5.5 1713.7
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Earth
0.33x18x0.2^2x5.5 1.3
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Provided Reinf
Fill 2
491
491
491
982
982
982
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
NT
POINT
FILL 2
350
350
350
578
875
875
NT
POINT
FILL 2
00-000+10-140
00-000+10-140
00-000+10-140
00-000+10-120
00-000+10-080
00-000+10-080
NT
POINT
FILL 2
561
561
561
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
655
982
982
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
WALL W2 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x80)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x6.75x(692-133.8)/133.8
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
334.17 kN-m
9.33
692 mm
35 mm
80 mm
62.5 mm
133.8 mm
d - d ') = M
6.75 N/mm2
262.7 N/mm2
750 mm
1.45E-03
5.78E-04
8.73E-04
0.157 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Es = 2.00E+05 N/mm2
G1 = 0.252 G2 = 0.498
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
2-(2x1000x(2x200+500)/((3x(200+500)))/1000)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Weight of Fill 1 on footing 118.12 3.68 -434.09 4.6-0.925
Weight of Fill 2 on footing - - -
Self weight of footing on Fill 1 side 16.19 3.54 -57.35 4.6-1.057
Self weight of footing on Fill 2 side 17.50 1.143 -20.00 1.143
Eccentricity = 0.5x4.6-1.8
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Base Pressure at S = (131.66/4.6)x(1+(6x0.188/4.6))
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Check for overturning = Resisting/ overturning moments =
Total vertical load P (kN/m) = (-118.12+28.8+16.188+17.5+9.375+59.8)
Net moment (kN-m/m) = ABS((285.67-0.22-434.091-28.8-57.352-20.003-
22.266-149.387))
Eccentricity = 0.5x4.6-1.71
MOMENT ENVELOPE
Description Case 1 Case 2 Case 3
Moment at Q (base) = -79.13 27.36 -81.43
Moment at R (base) = 125.58 23.43 124.51
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Envelope unfactored moments at R Top 23.43
kN-m/m
Bottom 125.58
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � ���1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Min reinforcement is calculated as per the provisions of IS 3370 (Part 2) - 2009
Percentage of min reinforcement % = 0.35
Location Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
unfactor Mu Factor Th D Mu required
M
Reinf
Location Reinforcement Provided
required
Q - Top 875 00-000+12-120 942
Q - Bot 875 00-000+16-140 1436
R - Top 875 00-000+12-120 942
R - Bot 1019 00-000+16-140 1436
DISTRIBUTION REINFORCEMENT
Fill 1 Side, Average th from 0 to 0.925 m (500+0.5x(500+200))/2
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
N/mm2
mm
242.800
Overturning moment
kN-m/m
285.67
0.22
57.00
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
1.85+2+0.252+0.498 4.60
200)x1.85x25/1000) 16.19
3x(200+500)))/1000) 1.057
00+200)x2x25/1000) 17.50
3x(200+500)))/1000) 1.143
3x1.85+0.4x18x1.85 118.12
0.5x1.85 0.93
0.2x18x2+0.6x18x2 28.80
0.5x2 1.00
0.252+0.498 0.75 m
+500)x0.75x25/1000 9.38
242.4+500/1000)x18 104.4
23.05.2018
R0
4.6-0.925
4.6-1.057
1.143
0.5x0.75+2
2+0.498
285.67
683.10
683.099/285.67 2.39
8+17.5+9.375+59.8) 220.98
352-20.003-22.266- 397.43
149.387))
397.43/220.98 1.800
0.5x4.6-1.8 0.50
/4.6)x(1-(6x0.5/4.6)) 16.71
37-16.71)/4.6)x1.85 41.91
71)/4.6)x(1.85+0.75) 52.13
4.6)x(1+(6x0.5/4.6)) 79.37
x(16.71+41.91)x1.85 54.22
))/(3x(16.71+41.91)) 0.79
57)-118.12x0.5x1.85 -79.13
0.5x(52.13+79.37)x2 131.50
))/(3x(52.13+79.37)) 1.07
.069-17.5x(2-1.143) 125.58
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
4.6-1
1.057
4.6-1.143
0.5x0.75+1.85
1.85+0.252
0.22
327.84
327.84/0.22 ###
8+17.5+9.375+59.8) 131.66
8+20.859+125.693)) 327.62
327.62/131.66 2.49
4.6-2.488 2.11
0.5x4.6-2.112 0.19
6)x(1-(6x0.188/4.6)) 21.59
65-21.59)/4.6)x1.85 27.24
59)/4.6)x(1.85+0.75) 29.54
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
6)x(1+(6x0.188/4.6)) 35.65
x(21.59+27.24)x1.85 45.17
))/(3x(21.59+27.24)) 0.89
16.188x(1.85-1.057) 27.36
0.5x(29.54+35.65)x2 65.19
))/(3x(29.54+35.65)) 1.03
2-1.143)-28.8x0.5x2 23.43
4.6-0.925
0.5x2
4.6-1.057
1.143
0.5x0.75+2
2+0.498
285.67
712.12
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
2.49
8+17.5+9.375+59.8) 249.78
28.8-57.352-20.003- 426.45
22.266-149.387))
426.449/249.78 1.71
1.71 1.71
0.5x4.6-1.71 0.59
4.6)x(1-(6x0.59/4.6)) 12.51
12.51+18.17x1.85 46.12
1+18.17x(1.85+0.75) 59.75
.6)x(1+(6x0.59/4.6)) 96.09
x(12.51+46.12)x1.85 54.23
))/(3x(12.51+46.12)) 0.75
57)-118.12x0.5x1.85 -81.43
0.5x(59.75+96.09)x2 155.84
))/(3x(59.75+96.09)) 1.08
2-1.143)-28.8x0.5x2 124.51
Case 3
-81.43
124.51
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
TRENGTH
0+0.5x(500+200))/2 425
N(0.5x425,250)/100 744
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
808
0+0.5x(500+200))/2 275
N(0.5x275,250)/100 481
628
0+0.5x(500+200))/2 425
N(0.5x425,250)/100 744
808
0+0.5x(500+200))/2 275
N(0.5x275,250)/100 481
628
155.79
59.80
43.06
118.12
59.8+43.063+118.12 220.98
0.45
99.44
56.35
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
FTG W2 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x140)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x5.84x(442-90)/90
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
125.58 kN-m
9.33
442 mm
36 mm
140 mm
82.9 mm
90.0 mm
d - d ') = M
5.84 N/mm2
213.1 N/mm2
500 mm
1.24E-03
5.54E-04
6.87E-04
0.150 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
FTG W2 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x12)^2)-0.5x12
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x4.33x(444-72.4)/72.4
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
81.43 kN-m
9.33
444 mm
38 mm
120 mm
76.1 mm
72.4 mm
d - d ') = M
4.33 N/mm2
207.4 N/mm2
500 mm
1.19E-03
8.71E-04
3.22E-04
0.070 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
FTG W2 CALCULATION OF CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure
= 359x90/(359+359)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
= (56.345x359/(359+359))
= (56.345x359/(359+359))
Distance from comp face to point where crack width is being calculated, a
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Max spacing of bars, S =
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x220)^2+(50+0.5x10)^2)-0.5x10
23.05.2018
R0
Part 2 - 2009, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
0.0 kN-m
56.35 kN-m
9.33
90.0 mm
45.0 mm
-2.5 kN-m
OCUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
145 mm
55 mm
28.2 kN
28.2 kN
78.5 N/mm2
2.1E+05 mm2
0.27 N/mm2
200 mm
OCUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
220 mm
118.0 mm
3.92E-04
9.29E-04
-5.36E-04
-0.190 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DESIGN OF WALL W3
& FOOTING
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
3
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Es = 2.00E+05 N/mm2
TOW = 248.300
Fill TOF HOF b/a Design Methodology
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
5.50
5.50 0.0000 1713.7 0.00 0.00
4.13 -0.0026 1713.7 -4.46 0.00
2.75 -0.0208 1713.7 -35.64 0.00
1.38 -0.0703 1713.7 -120.47 0.00
0.00 -0.1667 1713.7 -285.67 0.00
5.50
5.50 0.0000 1713.7 0.00 0.00
4.13 -0.0026 1713.7 0.00 -4.46
2.75 -0.0208 1713.7 0.00 -35.64
1.38 -0.0703 1713.7 0.00 -120.47
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.00 -0.1667 1713.7 0.00 -285.67
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � ���1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Fill 1 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.000 334.17 501.26 750 692 1739 875 1739
Fill 2 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Fill 1 Reinforcement at Mid Point
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
5.50 200 350 350
5.50 0.00 0.00 200 129 0 350 350
4.13 0.00 0.00 200 129 0 350 350
2.75 0.00 0.00 330 259 0 578 578
1.38 0.00 0.00 540 469 0 875 875
0.00 0.00 0.00 750 679 0 875 875
c' = 50+16+0.5x10 = 71 mm
Fill 1 Reinforcement at Edge
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
5.50 200 350 350
5.50 0.00 0.00 200 129 0 350 350
4.13 0.00 0.00 200 129 0 350 350
2.75 0.00 0.00 330 259 0 578 578
1.38 0.00 0.00 540 469 0 875 875
0.00 0.00 0.00 750 679 0 875 875
c' = 50+16+0.5x10 = 71 mm
Fill 2 reinforcement at Mid Point
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
4.13 0.00 0.00 200 129 0 350 350
2.75 0.00 0.00 330 259 0 578 578
1.38 0.00 0.00 540 469 0 875 875
0.00 0.00 0.00 750 679 0 875 875
c' = 50+16+0.5x10 = 71 mm
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Curtail at
Fill 1 / Fill 2 1.60 4.00 1.60 4.00
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
2.75 714 714 714 714
1.38 982 982 982 982
0.00 982 982 982 982
Bottom Top
23.05.2018
R0
N/mm2
mm
242.800
248.3-242.8 5.50 m
248.3-242.4 5.90 m
5.50 m
Both Sides
eight of Fill
eight of Wall
= k * r * HOF^2 * HOW
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x5.5^2x5.5 1713.7
Liquid
1x10.3x5.5^2x5.5 1713.7
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x5.5^2x5.5 1713.7
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x5.5^2x5.5 1713.7
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Provided Reinf
Fill 2
707
707
707
1198
1198
1964
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
NT
POINT
FILL 2
350
350
350
578
875
875
NT
POINT
FILL 2
00-000+10-150
00-000+10-150
00-000+10-150
00-000+10-110
00-000+10-080
00-000+10-080
NT
POINT
FILL 2
524
524
524
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
714
982
982
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
WALL W3 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
Limiting crack width, w
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x80)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc f sc = (1.5m -1) A sc f c (d - ) + A sc fsc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x6.31x(692-127.1)/127.1
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
334.17 kN-m
9.33
692 mm
38 mm
80 mm
62.5 mm
127.1 mm
d - d ') = M
6.31 N/mm2
261.7 N/mm2
750 mm
1.44E-03
5.83E-04
8.59E-04
0.155 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Es = 2.00E+05 N/mm2
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
1.8-(1.8x1000x(2x200+500)/((3x(200+500)))/1000)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Weight of Fill 2 on footing - - -
Self weight of footing on Fill 1 side 15.75 3.32 -52.31 4.35-1.029
Self weight of footing on Fill 2 side 15.75 1.029 -16.21 1.029
Eccentricity = 0.5x4.35-1.53
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Total base pressure P-Q, kN = 0.5x(92.56+58.21)x1.8
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Distance resultant from respective point, S (m) = 724.746/337.02
Eccentricity = 0.5x4.35-2.15
MOMENT ENVELOPE
Description Case 1 Case 2 Case 3
Moment at Q (base) = -87.41 119.48 7.91
Moment at R (base) = 120.28 -87.39 6.13
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � �
�� 1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Min reinforcement is calculated as per the provisions of IS 3370 (Part 2) - 2009
Percentage of min reinforcement % = 0.35
Location Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
unfactor Mu Factor Th D Mu required
M
DISTRIBUTION REINFORCEMENT
Fill 1 Side, Average th from 0 to 0.9 m (500+0.5x(500+200))/2
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
23.05.2018
R0
N/mm2
mm
242.800
Overturning moment
kN-m/m
285.67
285.67
57.00
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
.8+1.8+0.375+0.375 4.35
+200)x1.8x25/1000) 15.75
3x(200+500)))/1000) 1.029
+200)x1.8x25/1000) 15.75
3x(200+500)))/1000) 1.029
0.3x1.8+0.4x18x1.8 114.93
0.5x1.8 0.90
0.3x1.8+0.6x18x1.8 121.41
0.5x1.8 0.90
0.375+0.375 0.75 m
+500)x0.75x25/1000 9.4
242.4+500/1000)x18 104.4
4.35-0.9
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
4.35-1.029
1.029
0.5x0.75+1.8
1.8+0.375
285.67
615.48
615.477/285.67 2.15
+15.75+9.375+59.8) 215.61
306-16.207-20.391- 329.81
130.065))
329.81/215.61 1.530
0.5x4.35-1.53 0.65
5)x(1-(6x0.65/4.35)) 5.13
((94-5.13)/4.35)x1.8 41.90
13)/4.35)x(1.8+0.75) 57.23
5)x(1+(6x0.65/4.35)) 94.00
0.5x(5.13+41.9)x1.8 42.33
1.9))/(3x(5.13+41.9)) 0.67
029)-114.93x0.5x1.8 -87.41
0.5x(57.23+94)x1.8 136.11
.23))/(3x(57.23+94)) 0.97
3-15.75x(1.8-1.029) 120.28
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
4.35-0.9
1.029
4.35-1.029
0.5x0.75+1.8
1.8+0.375
285.67
637.83
637.833/285.67 2.23
+15.75+9.375+59.8) 222.09
ABS((-285.67- 352.16
6+20.391+130.065))
352.16/222.09 1.59
4.35-1.586 2.76
0.5x4.35-2.764 -0.59
x(1-(6x-0.589/4.35)) 92.56
55-92.56)/4.35)x1.8 58.21
56)/4.35)x(1.8+0.75) 43.90
x(1+(6x-0.589/4.35)) 9.55
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
5x(92.56+58.21)x1.8 135.69
))/(3x(92.56+58.21)) 0.97
7-15.75x(1.8-1.029) 119.48
0.5x(43.9+9.55)x1.8 48.11
3.9))/(3x(43.9+9.55)) 0.71
029)-121.41x0.5x1.8 -87.39
4.35-0.9
0.5x1.8
4.35-1.029
1.029
0.5x0.75+1.8
1.8+0.375
285.67
###
3.54
+15.75+9.375+59.8) 337.02
07-20.391-130.065)) 724.75
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
724.746/337.02 2.15
2.15 2.15
0.5x4.35-2.15 0.02
5)x(1-(6x0.02/4.35)) 75.34
75.34+0.982x1.8 77.11
34+0.982x(1.8+0.75) 77.84
5)x(1+(6x0.02/4.35)) 79.61
5x(75.34+77.11)x1.8 137.21
))/(3x(75.34+77.11)) 0.90
029)-114.93x0.5x1.8 7.91
5x(77.84+79.61)x1.8 141.71
))/(3x(77.84+79.61)) 0.90
029)-121.41x0.5x1.8 6.13
Case 3
7.91
6.13
TRENGTH
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
0+0.5x(500+200))/2 425
N(0.5x425,250)/100 744
808
0+0.5x(500+200))/2 275
N(0.5x275,250)/100 481
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
628
0+0.5x(500+200))/2 425
N(0.5x425,250)/100 744
808
0+0.5x(500+200))/2 275
N(0.5x275,250)/100 481
628
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
FTG W3 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x140)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x5.59x(442-90)/90
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
120.28 kN-m
9.33
442 mm
36 mm
140 mm
82.9 mm
90.0 mm
d - d ') = M
5.59 N/mm2
204.0 N/mm2
500 mm
1.19E-03
5.54E-04
6.34E-04
0.136 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DESIGN OF WALL W4
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
4
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
WALL W4 DESIGN OF CANTILEVER WALL
Es = 2.00E+05 N/mm2
TOW = 248.300
Fill TOF HOF b/a Design Methodology
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
5.50
2.51 0.0000 162.9 0.00 0.00
1.88 -0.0026 162.9 -0.42 0.00
1.26 -0.0208 162.9 -3.39 0.00
0.63 -0.0703 162.9 -11.45 0.00
0.00 -0.1667 162.9 -27.16 0.00
5.50
2.51 0.0000 162.9 0.00 0.00
1.88 -0.0026 162.9 0.00 -0.42
1.26 -0.0208 162.9 0.00 -3.39
0.63 -0.0703 162.9 0.00 -11.45
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.00 -0.1667 162.9 0.00 -27.16
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � ���1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Fill 1 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.000 27.16 40.74 250 195 502 300 502
Fill 2 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
ENVELOPE HORIZONTAL MOMENTS ON FILL 1 & FILL 2 FACE
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
5.50 250 300 300
2.51 0.00 0.00 250 185 0 300 300
1.88 0.00 0.00 250 185 0 300 300
1.26 0.00 0.00 250 185 0 300 300
0.63 0.00 0.00 250 185 0 300 300
0.00 0.00 0.00 250 185 0 300 300
c' = 50+10+0.5x10 = 65 mm
Fill 1 Reinforcement at Edge
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
5.50 250 300 300
2.51 0.00 0.00 250 185 0 300 300
1.88 0.00 0.00 250 185 0 300 300
1.26 0.00 0.00 250 185 0 300 300
0.63 0.00 0.00 250 185 0 300 300
0.00 0.00 0.00 250 185 0 300 300
c' = 50+10+0.5x10 = 65 mm
Fill 2 reinforcement at Mid Point
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
c' = 50+10+0.5x10 = 65 mm
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.63 0.00 0.00 250 185 0 300 300
0.00 0.00 0.00 250 185 0 300 300
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
1.88 00-000+10-180 00-000+10-180 00-000+10-180 00-000+10-180
1.26 00-000+10-180 00-000+10-180 00-000+10-180 00-000+10-180
0.63 00-000+10-180 00-000+10-180 00-000+10-180 00-000+10-180
0.00 00-000+10-180 00-000+10-180 00-000+10-180 00-000+10-180
Break at
Fill 1 / Fill 2
Bottom Top
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Weight of wall per RM = 34.4 kN/m
Case 1 27.16
Case 2 27.16
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
N/mm2
mm
242.800
248.3-242.8 5.50 m
248.3-242.8 5.50 m
2.51 m
Both Sides
eight of Fill
eight of Wall
= k * r * HOF^2 * HOW
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x2.51^2x2.51 162.9
Liquid
1x10.3x2.51^2x2.51 162.9
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x2.51^2x2.51 162.9
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x2.51^2x2.51 162.9
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Provided Reinf
Fill 2
393
393
393
393
785
785
NT
POINT
FILL 2
300
300
300
300
300
300
NT
POINT
FILL 2
00-000+10-180
00-000+10-180
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
00-000+10-180
00-000+10-180
00-000+10-180
00-000+10-180
NT
POINT
FILL 2
436
436
436
436
436
436
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
WALL W4 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
Limiting crack width, w
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x100)^2+(50+0.5x10)^2)-0.5x10
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x6.18x(195-44.8)/44.8
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
27.16 kN-m
9.33
195 mm
35 mm
100 mm
69.3 mm
44.8 mm
d - d ') = M
6.18 N/mm2
193.3 N/mm2
250 mm
1.32E-03
5.91E-04
7.29E-04
0.128 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Es = 2.00E+05 N/mm2
G1 = 0.125 G2 = 0.125
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.9-(0.9x1000x(2x200+200)/((3x(200+200)))/1000)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Weight of Fill 1 on footing 23.27 1.60 -37.23 2.05-0.45
Weight of Fill 2 on footing - - -
Self weight of footing on Fill 1 side 4.50 1.60 -7.20 2.05-0.45
Self weight of footing on Fill 2 side 4.50 0.450 -2.03 0.45
Eccentricity = 0.5x2.05-0.82
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Base Pressure at S = (67.92/2.05)x(1+(6x-0.203/2.05))
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Check for overturning = Resisting/ overturning moments =
Total vertical load P (kN/m) = (-23.27+23.27+4.5+4.5+1.25+34.4)
Net moment (kN-m/m) = ABS((27.16-27.16-37.232-10.472-7.2-2.025-1.281-
35.26))
Eccentricity = 0.5x2.05-1.03
MOMENT ENVELOPE
Description Case 1 Case 2 Case 3
Moment at Q (base) = -4.91 17.06 5.81
Moment at R (base) = 17.23 -4.71 5.22
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Envelope unfactored moments at R Top 4.71
kN-m/m
Bottom 17.23
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � ���1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Min reinforcement is calculated as per the provisions of IS 3370 (Part 2) - 2009
Percentage of min reinforcement % = 0.24
Location Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
unfactor Mu Factor Th D Mu required
M
Reinf
Location Reinforcement Provided
required
Q - Top 240 00-000+08-150 335
Q - Bot 427 00-000+10-150 524
R - Top 240 00-000+08-150 335
R - Bot 431 00-000+10-150 524
DISTRIBUTION REINFORCEMENT
Fill 1 Side, Average th from 0 to 0.45 m (200+0.5x(200+200))/2
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
23.05.2018
R0
N/mm2
mm
242.800
Overturning moment
kN-m/m
27.16
27.16
9.52
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
.9+0.9+0.125+0.125 2.05
+200)x0.9x25/1000) 4.50
3x(200+200)))/1000) 0.450
+200)x0.9x25/1000) 4.50
3x(200+200)))/1000) 0.450
2.51x10.3x0.9 23.27
0.5x0.9 0.45
2.51x10.3x0.9 23.27
0.5x0.9 0.45
0.125+0.125 0.25 m
+200)x0.25x25/1000 1.25
242.8+200/1000)x18 54.2
23.05.2018
R0
2.05-0.45
2.05-0.45
0.45
0.5x0.25+0.9
0.9+0.125
27.16
83.00
82.998/27.16 3.06
4.5+4.5+1.25+34.4) 67.92
2.025-1.281-35.26)) 55.84
55.84/67.92 0.820
0.5x2.05-0.82 0.21
5)x(1-(6x0.21/2.05)) 12.77
3.5-12.77)/2.05)x0.9 30.65
77)/2.05)x(0.9+0.25) 35.62
5)x(1+(6x0.21/2.05)) 53.50
5x(12.77+30.65)x0.9 19.54
))/(3x(12.77+30.65)) 0.39
0.45)-23.27x0.5x0.9 -4.91
.5x(35.62+53.5)x0.9 40.10
2))/(3x(35.62+53.5)) 0.48
x0.48-4.5x(0.9-0.45) 17.23
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
2.05-0.45
0.45
2.05-0.45
0.5x0.25+0.9
0.9+0.125
27.16
83.00
82.998/27.16 3.06
4.5+4.5+1.25+34.4) 67.92
+7.2+1.281+35.26)) 55.84
55.84/67.92 0.82
2.05-0.822 1.23
0.5x2.05-1.228 -0.20
x(1-(6x-0.203/2.05)) 52.80
3.46-52.8)/2.05)x0.9 35.53
.8)/2.05)x(0.9+0.25) 30.73
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
x(1+(6x-0.203/2.05)) 13.46
.5x(52.8+35.53)x0.9 39.75
3))/(3x(52.8+35.53)) 0.48
x0.48-4.5x(0.9-0.45) 17.06
5x(30.73+13.46)x0.9 19.89
))/(3x(30.73+13.46)) 0.39
0.45)-23.27x0.5x0.9 -4.71
2.05-0.45
0.5x0.9
2.05-0.45
0.45
0.5x0.25+0.9
0.9+0.125
27.16
120.63
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
4.44
4.5+4.5+1.25+34.4) 91.19
72-7.2-2.025-1.281- 93.47
35.26))
93.47/91.19 1.03
1.03 1.03
0.5x2.05-1.03 -0.01
5)x(1-(6x-0.01/2.05)) 45.78
45.78-1.268x0.9 44.64
78-1.268x(0.9+0.25) 44.32
)x(1+(6x-0.01/2.05)) 43.18
5x(45.78+44.64)x0.9 40.69
))/(3x(45.78+44.64)) 0.45
0.45)-23.27x0.5x0.9 5.81
5x(44.32+43.18)x0.9 39.38
))/(3x(44.32+43.18)) 0.45
0.45)-23.27x0.5x0.9 5.22
Case 3
5.81
5.22
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
TRENGTH
0+0.5x(200+200))/2 200
N(0.5x200,250)/100 240
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
335
0+0.5x(200+200))/2 200
N(0.5x200,250)/100 240
335
0+0.5x(200+200))/2 200
N(0.5x200,250)/100 240
335
0+0.5x(200+200))/2 200
N(0.5x200,250)/100 240
335
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
FTG W4 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(50+0.5x10)^2)-0.5x10
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x7.79x(145-33.2)/33.2
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
17.23 kN-m
9.33
145 mm
34 mm
150 mm
88.0 mm
33.2 mm
d - d ') = M
7.79 N/mm2
244.8 N/mm2
200 mm
1.83E-03
7.87E-04
1.04E-03
0.190 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
FTG W4 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(50+0.5x8)^2)-0.5x8
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x2.76x(146-28.6)/28.6
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
4.91 kN-m
9.33
146 mm
35 mm
150 mm
88.4 mm
28.6 mm
d - d ') = M
2.76 N/mm2
105.7 N/mm2
200 mm
7.72E-04
1.25E-03
-4.81E-04
-0.090 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DESIGN OF WALL W6
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
6
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Es = 2.00E+05 N/mm2
TOW = 245.260
Fill TOF HOF b/a Design Methodology
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
2.46
2.46 0.0000 153.3 0.00 0.00
1.84 -0.0026 153.3 -0.40 0.00
1.23 -0.0208 153.3 -3.19 0.00
0.61 -0.0703 153.3 -10.78 0.00
0.00 -0.1667 153.3 -25.56 0.00
2.46
2.46 0.0000 153.3 0.00 0.00
1.84 -0.0026 153.3 0.00 -0.40
1.23 -0.0208 153.3 0.00 -3.19
0.61 -0.0703 153.3 0.00 -10.78
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.00 -0.1667 153.3 0.00 -25.56
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
ENVELOPE VERTICAL MOMENTS ON FILL 1 & FILL 2 FACE
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � ���1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Fill 1 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Fill 2 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
ρ = 10.3 kN/m3 HOF = 2.46 m HOW = 2.46 m
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Ht from Coefficients Multiplier Moment Mid Point Moment Edge
bottom
of wall Mid Point Edge FILL 1 FILL 2 FILL 1 FILL 2
(m)
2.46
2.46 0.000 0.000 153.3 0.00 0.00 0.00 0.00
1.84 0.000 0.000 153.3 0.00 0.00 0.00 0.00
1.23 0.000 0.000 153.3 0.00 0.00 0.00 0.00
0.61 0.000 0.000 153.3 0.00 0.00 0.00 0.00
0.00 0.000 0.000 153.3 0.00 0.00 0.00 0.00
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
2.46 200 240 240
2.46 0.00 0.00 200 135 0 240 240
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
1.84 0.00 0.00 200 135 0 240 240
1.23 0.00 0.00 200 135 0 240 240
0.61 0.00 0.00 200 135 0 240 240
0.00 0.00 0.00 200 135 0 240 240
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
c' = 50+10+0.5x10 = 65 mm
Fill 1 Reinforcement at Edge
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
2.46 200 240 240
2.46 0.00 0.00 200 135 0 240 240
1.84 0.00 0.00 200 135 0 240 240
1.23 0.00 0.00 200 135 0 240 240
0.61 0.00 0.00 200 135 0 240 240
0.00 0.00 0.00 200 135 0 240 240
c' = 50+10+0.5x10 = 65 mm
Fill 2 reinforcement at Mid Point
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
c' = 50+10+0.5x10 = 65 mm
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
2.46 200 240 240
2.46 0.00 0.00 200 135 0 240 240
1.84 0.00 0.00 200 135 0 240 240
1.23 0.00 0.00 200 135 0 240 240
0.61 0.00 0.00 200 135 0 240 240
0.00 0.00 0.00 200 135 0 240 240
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.61 240 240 240 240
0.00 240 240 240 240
Break at
Fill 1 / Fill 2
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Bottom Top
Case 1 25.56
Case 2 25.56
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
N/mm2
mm
242.800
245.26-242.8 2.46 m
245.26-242.8 2.46 m
2.46 m
Both Sides
eight of Fill
eight of Wall
= k * r * HOF^2 * HOW
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x2.46^2x2.46 153.3
Liquid
1x10.3x2.46^2x2.46 153.3
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x2.46^2x2.46 153.3
Liquid
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
1x10.3x2.46^2x2.46 153.3
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Provided Reinf
Fill 2
491
491
491
491
982
982
NT
POINT
FILL 2
240
240
240
240
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
240
240
NT
POINT
FILL 2
00-000+10-160
00-000+10-160
00-000+10-160
00-000+10-160
00-000+10-160
00-000+10-160
NT
POINT
FILL 2
491
491
491
491
491
491
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
WALL W6 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
Limiting crack width, w
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x80)^2+(50+0.5x10)^2)-0.5x10
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x8.66x(145-41.6)/41.6
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
25.56 kN-m
9.33
145 mm
35 mm
80 mm
63.0 mm
41.6 mm
d - d ') = M
8.66 N/mm2
200.8 N/mm2
200 mm
1.54E-03
4.09E-04
1.13E-03
0.183 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Es = 2.00E+05 N/mm2
G1 = 0.100 G2 = 0.100
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.9-(0.9x1000x(2x200+200)/((3x(200+200)))/1000)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Weight of Fill 1 on footing 22.80 1.55 -35.34 2-0.45
Weight of Fill 2 on footing - - -
Self weight of footing on Fill 1 side 4.50 1.55 -6.98 2-0.45
Self weight of footing on Fill 2 side 4.50 0.450 -2.03 0.45
Eccentricity = 0.5x2-0.71
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Base Pressure at S = (45.1/2)x(1+(6x-0.289/2))
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Check for overturning = Resisting/ overturning moments =
Total vertical load P (kN/m) = (-22.8+22.8+4.5+4.5+1+12.3)
Net moment (kN-m/m) = ABS((25.56-25.56-35.34-10.26-6.975-2.025-1-
12.3))
Eccentricity = 0
MOMENT ENVELOPE
Description Case 1 Case 2 Case 3
Moment at Q (base) = -8.71 12.66 1.47
Moment at R (base) = 12.67 -8.69 1.47
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Envelope unfactored moments at R Top 8.69
kN-m/m
Bottom 12.67
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � ���1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Min reinforcement is calculated as per the provisions of IS 3370 (Part 2) - 2009
Percentage of min reinforcement % = 0.24
Location Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
unfactor Mu Factor Th D Mu required
M
Reinf
Location Reinforcement Provided
required
Q - Top 240 00-000+08-150 335
Q - Bot 312 00-000+10-150 524
R - Top 240 00-000+08-150 335
R - Bot 313 00-000+10-150 524
DISTRIBUTION REINFORCEMENT
Fill 1 Side, Average th from 0 to 0.45 m (200+0.5x(200+200))/2
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
23.05.2018
R0
N/mm2
mm
242.800
Overturning moment
kN-m/m
25.56
25.56
7.50
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
0.9+0.9+0.1+0.1 2.00
+200)x0.9x25/1000) 4.50
3x(200+200)))/1000) 0.450
+200)x0.9x25/1000) 4.50
3x(200+200)))/1000) 0.450
2.46x10.3x0.9 22.80
0.5x0.9 0.45
2.46x10.3x0.9 22.80
0.5x0.9 0.45
0.1+0.1 0.20 m
0+200)x0.2x25/1000 1.00
242.8+200/1000)x18 54.2
23.05.2018
R0
2-0.45
2-0.45
0.45
0.5x0.2+0.9
0.9+0.1
25.56
57.64
57.64/25.56 2.26
2.8-4.5+4.5+1+12.3) 45.10
6.975-2.025-1-12.3)) 32.08
32.08/45.1 0.710
0.5x2-0.71 0.29
5.1/2)x(1-(6x0.29/2)) 2.93
((42.17-2.93)/2)x0.9 20.59
7-2.93)/2)x(0.9+0.2) 24.51
.1/2)x(1+(6x0.29/2)) 42.17
.5x(2.93+20.59)x0.9 10.58
9))/(3x(2.93+20.59)) 0.34
9-0.45)-22.8x0.5x0.9 -8.71
5x(24.51+42.17)x0.9 30.01
))/(3x(24.51+42.17)) 0.49
x0.49-4.5x(0.9-0.45) 12.67
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
2-0.45
0.45
2-0.45
0.5x0.2+0.9
0.9+0.1
25.56
57.64
57.64/25.56 2.26
.8+4.5+4.5+1+12.3) 45.10
025+6.975+1+12.3)) 32.08
32.08/45.1 0.71
2-0.711 1.29
0.5x2-1.289 -0.29
1/2)x(1-(6x-0.289/2)) 42.08
((3.02-42.08)/2)x0.9 24.50
-42.08)/2)x(0.9+0.2) 20.60
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
/2)x(1+(6x-0.289/2)) 3.02
.5x(42.08+24.5)x0.9 29.96
5))/(3x(42.08+24.5)) 0.49
x0.49-4.5x(0.9-0.45) 12.66
0.5x(20.6+3.02)x0.9 10.63
0.6))/(3x(20.6+3.02)) 0.34
9-0.45)-22.8x0.5x0.9 -8.69
2-0.45
0.5x0.9
2-0.45
0.45
0.5x0.2+0.9
0.9+0.1
25.56
93.46
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
3.66
.8+4.5+4.5+1+12.3) 67.90
0.26-6.975-2.025-1- 67.90
12.3))
67.9/67.9 1.00
1 1.00
0 0.00
(67.9/2)x1 33.95
33.95 33.95
33.95+0x(0.9+0.2) 33.95
(67.9/2)x1 33.95
5x(33.95+33.95)x0.9 30.56
))/(3x(33.95+33.95)) 0.45
9-0.45)-22.8x0.5x0.9 1.47
5x(33.95+33.95)x0.9 30.56
))/(3x(33.95+33.95)) 0.45
9-0.45)-22.8x0.5x0.9 1.47
Case 3
1.47
1.47
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
TRENGTH
0+0.5x(200+200))/2 200
N(0.5x200,250)/100 240
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
335
0+0.5x(200+200))/2 200
N(0.5x200,250)/100 240
628
0+0.5x(200+200))/2 200
N(0.5x200,250)/100 240
942
0+0.5x(200+200))/2 200
N(0.5x200,250)/100 240
942
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
FTG W6 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(50+0.5x10)^2)-0.5x10
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x-3.73x(145+51.7)/-51.7
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
12.67 kN-m
9.33
145 mm
34 mm
150 mm
88.0 mm
-51.7 mm
d - d ') = M
-3.73 N/mm2
132.4 N/mm2
200 mm
8.47E-04
1.02E-03
-1.71E-04
-0.030 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
FTG W6 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(50+0.5x8)^2)-0.5x8
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x4.89x(146-28.6)/28.6
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
8.71 kN-m
9.33
146 mm
35 mm
150 mm
88.4 mm
28.6 mm
d - d ') = M
4.89 N/mm2
187.3 N/mm2
200 mm
1.37E-03
1.25E-03
1.15E-04
0.020 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DESIGN OF WALL W7
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
7
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Es = 2.00E+05 N/mm2
TOW = 244.550
Fill TOF HOF b/a Design Methodology
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
1.55
1.55 0.0000 38.4 0.00 0.00
1.16 -0.0026 38.4 -0.10 0.00
0.78 -0.0208 38.4 -0.80 0.00
0.39 -0.0703 38.4 -2.70 0.00
0.00 -0.1667 38.4 -6.40 0.00
1.55
1.55 0.0000 0.0 0.00 0.00
1.16 -0.0026 0.0 0.00 0.00
0.78 -0.0208 0.0 0.00 0.00
0.39 -0.0703 0.0 0.00 0.00
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.00 -0.1667 0.0 0.00 0.00
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
ENVELOPE VERTICAL MOMENTS ON FILL 1 & FILL 2 FACE
�
0.5 �fck � 1000 �d � � 4.6 �Mu � 106 �
Ast = � ���1 - 1 - �
� fy ��� fck �1000 �d 2 �
�
Fill 1 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Fill 2 reinforcement
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
ρ = 18.0 kN/m3 HOF = 0.00 m HOW = 1.55 m
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Ht from Coefficients Multiplier Moment Mid Point Moment Edge
bottom
of wall Mid Point Edge FILL 1 FILL 2 FILL 1 FILL 2
(m)
1.55
1.55 0.000 0.000 0.0 0.00 0.00 0.00 0.00
1.16 0.000 0.000 0.0 0.00 0.00 0.00 0.00
0.78 0.000 0.000 0.0 0.00 0.00 0.00 0.00
0.39 0.000 0.000 0.0 0.00 0.00 0.00 0.00
0.00 0.000 0.000 0.0 0.00 0.00 0.00 0.00
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
1.55 150 180 180
1.55 0.00 0.00 150 88 0 180 180
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
1.16 0.00 0.00 150 88 0 180 180
0.78 0.00 0.00 150 88 0 180 180
0.39 0.00 0.00 150 88 0 180 180
0.00 0.00 0.00 150 88 0 180 180
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
c' = 50+8+0.5x8 = 62 mm
Fill 1 Reinforcement at Edge
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
1.55 150 180 180
1.55 0.00 0.00 150 88 0 180 180
1.16 0.00 0.00 150 88 0 180 180
0.78 0.00 0.00 150 88 0 180 180
0.39 0.00 0.00 150 88 0 180 180
0.00 0.00 0.00 150 88 0 180 180
c' = 30+8+0.5x8 = 42 mm
Fill 2 reinforcement at Mid Point
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
c' = 30+8+0.5x8 = 42 mm
Height Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
from unfactor Mu Factor Th D Mu required
bottom M
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
m kN-m/m kN-m/m mm mm mm2 mm2 mm2
1.55 150 180 180
1.55 0.00 0.00 150 108 0 180 180
1.16 0.00 0.00 150 108 0 180 180
0.78 0.00 0.00 150 108 0 180 180
0.39 0.00 0.00 150 108 0 180 180
0.00 0.00 0.00 150 108 0 180 180
Curtail at
Fill 1 / Fill 2
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
0.39 180 180 180 180
0.00 180 180 180 180
Break at
Fill 1 / Fill 2
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Bottom Top
Case 1 6.4
Case 2 0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
N/mm2
mm
243.000
244.55-243 1.55 m
244.55-243 1.55 m
1.55 m
Both Sides
eight of Fill
eight of Wall
= k * r * HOF^2 * HOW
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x1.55^2x1.55 38.4
Earth
00
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Liquid
1x10.3x1.55^2x1.55 38.4
Earth
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
00
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
Provided Reinf
Fill 2
279
279
279
279
279
279
NT
POINT
FILL 2
180
180
180
180
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
180
180
NT
POINT
FILL 2
00-000+08-180
00-000+08-180
00-000+08-180
00-000+08-180
00-000+08-180
00-000+08-180
NT
POINT
FILL 2
279
279
279
279
279
279
OCUMENT NO.
ARNAL20-SBR-DC-02
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
WALL W7 CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
Limiting crack width, w
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(50+0.5x8)^2)-0.5x8
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + Asc fsc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst =0
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
0.00 kN-m
9.33
96 mm
34 mm
150 mm
88.4 mm
23.1 mm
0.00 N/mm2
0.0 N/mm2
150 mm
0.00E+00
1.11E-03
-1.11E-03
-0.183 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DESIGN OF CHANNEL
ON WALL W8
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
EL
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Clear Cover =
m=
Provide Thickness =
No of Layers of reinforcment
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
k= = 1.3
Permissible shear stress in slabs (IS 456: 2000 Cl B-5.2, Table 23) = k tc =
Height of Fill =
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Effective Depth,d=
k= = ((0.3x(225-150)/150)+1.3)
Permissible shear stress in slabs (IS 456: 2000 Cl B-5.2, Table 23) = k tc =
23.05.2018
R0
29.00 m
247.500 m
248.500 m
30
500
45
9.33
1.00 m
1.72 KN-m/m
70 mm
150 mm
Double
101 mm
263 mm2
263 mm2
335 mm2
0.33%
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
5.15 KN/m
0.05 N/mm2
1.3
0.34
OK
0.98 m
1.00 m
225 mm
5.63 kN/m/m
10.30 kN/m/m
15.93 kN/m/m
3.94 KN/m
3.75 KN/m
7.69 KN/M
1.72 KN-m/m
174 mm
16.90 KN-m/m
219 mm
394 mm2
859 mm2
1131 mm2
0.65%
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
174 mm
305 mm2
305 mm2
335 mm2
23.30 N/mm2
0.13 N/mm2
1.45
0.51
OK
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV
Channel CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(50+0.5x8)^2)-0.5x8
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x1.9x(96-23.3)/23.3
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
1.72 kN-m
9.33
96 mm
34 mm
150 mm
88.4 mm
23.3 mm
d - d ') = M
1.90 N/mm2
55.3 N/mm2
150 mm
4.82E-04
1.11E-03
-6.23E-04
-0.103 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV
Channel CALCULATION OF CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x100)^2+(50+0.5x12)^2)-0.5x12
(x - d ') bxf c x
Asc fsc = (1.5m -1) Asc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
fc (d - x)
Ast fst = (m -1) Ast Solve these equations to get fc
x
Stress in extreme compression fibre, fc
Stress in Tension reinforcement, fst = 9.33x4.31x(169-49)/49
Distance from compression face to point where crack width is being calculated, a
23.05.2018
R0
9, Annexure B)
0.2 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
16.90 kN-m
9.33
169 mm
34 mm
100 mm
69.1 mm
49.0 mm
d - d ') = M
4.31 N/mm2
98.5 N/mm2
225 mm
7.22E-04
3.81E-04
3.41E-04
0.058 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DESIGN OF SLABS
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
L(y)/L(x)
Clear Cover =
Provided Thickness =
Dead Load
Water Load
Live Load
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
k= = 1.3
Permissible shear stress in slabs (IS 456: 2000 Cl B-5.2, Table 23) = k tc =
l/d Required
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
2.30 m
3.54 m
0.65
Simply Supported
Two Way
30
500
45
150 mm
99 mm
3.75 KN/m2
5.00 KN/m2
0.00 KN/m2
0.00 KN/m2
8.75 KN/m2
13.13 KN/m2
0.151
0.849
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
2.07 kN-m
3.11 kN-m
11.63 kN-m
17.45 kN-m
0.21
0.32
1.19
1.78
49 mm2
73 mm2
284 mm2
438 mm2
335 mm2
335 mm2
524 mm2
524 mm2
22.58 kN
0.23 N/mm2
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
1.3
0.53%
0.42
OK
0.44%
1.09
35.76
43.60
Ok
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DESIGN OF BEAMS
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Beam Span =
Width of Beam
Grade of Concrete
Clear Cover =
Provided Thickness =
Limiting Moment Mu
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Permissible shear stress in slabs (IS 456: 2000 Cl B-5.2, Table 23) =
No. of Legs
Stirrup Spacing
Max Spacing
Provided Spacing
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Span/Eff d Required
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
2.30 m
300 mm
Simply Supported
30
500
50
300 mm
242 mm
2.25 kN/m
4.75 KN/m2
5.00 KN/m2
9.75 KN/m2
8.04 kN/m
15.44 kN/m
70.10 kN-m
123 mm2
6.81 kN-m
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
10.21 kN-m
339 mm2
427 mm2
17.76 kN
0.20 N/mm2
0.59
0.53 N/mm2
8 mm
364 mm
182 mm
150 mm
0.17%
0.59%
2.00
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
0.47%
1.14
9.50
45.60
OK
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Beam Span =
Width of Beam
Grade of Concrete
Clear Cover =
Provided Thickness =
Limiting Moment Mu
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Permissible shear stress in slabs (IS 456: 2000 Cl B-5.2, Table 23) =
No. of Legs
Stirrup Spacing
Max Spacing
Provided Spacing
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Span/Eff d Required
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
4.80 m
300 mm
Simply Supported
30
500
50
450 mm
390 mm
3.38 kN/m
4.75 KN/m2
5.00 KN/m2
9.75 KN/m2
4.88 kN/m
12.39 kN/m
182.06 kN-m
199 mm2
23.79 kN-m
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
35.68 kN-m
603 mm2
603 mm2
29.74 kN
0.22 N/mm2
0.52
0.50 N/mm2
8 mm
364 mm
293 mm
200 mm
0.19%
0.52%
2.00
CUMENT NO.
RNAL20-SBR-DC-02
23.05.2018
R0
0.52%
1.15
12.31
46.00
OK
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DESIGN OF BRACKETS
SUPPORTING PIPE
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
TS
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
BR1 DESIGN OF BRACKET FOR PIPE SUPPORT
Clear Cover 40 mm
DESIGN OF BRACKET
Cantilever length =
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
�0.5 �DESIGN
STRUCTURAL �d � �
fck �1000CALCULATION 4.6 �Mu �10 6 � DATE 23.05.2018
TITLE: Ast = � BATCH
SEQUENTIAL REACTOR
1 - 1 - OF
��� �
fy 2
fck �1000 �d � REV R0
� ��
� �
Ast Required =
Provided Reinforcement = 0-00 + 3-12 Ast Provided =
23.05.2018
R0
3.00 m
1.55 kN/m
0.51 kN/m
6.18 kN
0.00 kN/m
0.00 kN/m
0.00 kN
6.18 kN
0.80 m
3.38 kN/m
1.30 m
11.7 KN-m
15.9 KN
404 mm
ENT NO.
20-SBR-DC-02
23.05.2018
R0
224 mm2
339 mm2
0.13 N/mm2
0.28%
0.39 N/mm2
3.50 N/mm2
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
BR2 DESIGN OF BRACKET FOR PIPE SUPPORT
Clear Cover 40 mm
DESIGN OF BRACKET
Cantilever length =
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
�0.5 �DESIGN
STRUCTURAL �d � �
fck �1000CALCULATION 4.6 �Mu �10 6 � DATE 23.05.2018
TITLE: Ast = � BATCH
SEQUENTIAL REACTOR
1 - 1 - OF
��� �
fy 2
fck �1000 �d � REV R0
� ��
� �
Ast Required =
Provided Reinforcement = 0-00 + 3-12 Ast Provided =
23.05.2018
R0
3.00 m
2.00 kN/m
0.73 kN/m
8.19 kN
0.00 kN/m
0.00 kN/m
0.00 kN
8.19 kN
0.65 m
3.38 kN/m
1.15 m
11.3 KN-m
14.0 KN
404 mm
ENT NO.
20-SBR-DC-02
23.05.2018
R0
216 mm2
339 mm2
0.12 N/mm2
0.28%
0.39 N/mm2
3.50 N/mm2
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
BR3 DESIGN OF BRACKET FOR PIPE SUPPORT
Clear Cover 40 mm
DESIGN OF BRACKET
Cantilever length =
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
�0.5 �DESIGN
STRUCTURAL �d � �
fck �1000CALCULATION 4.6 �Mu �10 6 � DATE 23.05.2018
TITLE: Ast = � BATCH
SEQUENTIAL REACTOR
1 - 1 - OF
��� �
fy 2
fck �1000 �d � REV R0
� ��
� �
Ast Required =
Provided Reinforcement = 0-00 + 3-12 Ast Provided =
23.05.2018
R0
5.00 m
1.00 kN/m
0.00 kN/m
12.50 kN
0.00 kN/m
0.00 kN/m
0.00 kN
12.50 kN
0.45 m
3.38 kN/m
0.90 m
10.5 KN-m
17.1 KN
404 mm
ENT NO.
20-SBR-DC-02
23.05.2018
R0
201 mm2
339 mm2
0.14 N/mm2
0.28%
0.39 N/mm2
3.50 N/mm2
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DESIGN OF STAIRCASE
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
SE
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Landing 1=
Going =
Landing 2 =
Riser =
Tread =
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
19.65
0 0
a L1 = 0 m L2 = 3.8 m L3 = 0 m b
Ra Rb
Reactions Ra and Rb
Taking moments of all forces about B
Ra x 3.8 = +19.65x3.8x(3.8x0.5)
Ra = 141.87/3.8
Reaction at b = (+19.65x3.8)-37.33
Maximum BM Occurs at the point 'x' where SF is Zero or Changes its sign.
Point of Maximum Moment =
Maximum BM, kN-m = 37.33x1.9-19.65x0.5x1.9^2
Distribution Steel
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Check for Shear
Span of Beam =
Width of Beam =
Depth of Beam =
Mu/bd2 = 34x10^6/300/419^2
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Ast Required =
23.05.2018
R0
0.00 m
3.80 m
0.00 m
3.80 m
Simply Supported
177 mm
250 mm
150 mm
306 mm
4.59
1.3
2.21
8.1
13.1
19.65
3.75
1.3
T NO.
SBR-DC-02
23.05.2018
R0
5.05
10.05
15.08
T NO.
SBR-DC-02
23.05.2018
R0
141.87
37.33 KN/m
37.34 KN/m
1.90 m
35.46
37.34 KN
119 mm
2.504
768 mm2
905 mm2
251 mm2
0.21%
T NO.
SBR-DC-02
23.05.2018
R0
0.314
0.761 %
3.50
0.59
OK
144 mm
222 mm
191 mm
0.402 %
0.474 %
1.23
19.90
20.00
24.60
OK
1.35 m
300 mm
450 mm
37.34 KN/m
419 mm
34.0 KN-m
0.646
T NO.
SBR-DC-02
23.05.2018
R0
188 mm2
427 mm2
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
DESIGN OF COLUMNS
UMENT NO.
AL20-SBR-DC-02
23.05.2018
R0
NS
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Es = 2.00E+05 N/mm2
Clear Cover = 40 mm
23.05.2018
R0
N/mm2
17.76
6.81
0.00
6.81
76x1000/30/300/300 0.0066
x10^6/30/300/300^2 0.0084
0.02x30 0.6
0.6x300x300/100 540
4x201+4x113 1256
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-02
DATE 23.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
Es = 2.00E+05 N/mm2
Clear Cover = 40 mm
Factored Vertical Load on Column (kN), Pu (Refer Stair Case Beam Design)=
89.62x300x(7.44x1000)^2/2000/300^2/1000
23.05.2018
R0
N/mm2
89.62
34.00
2000/300^2/1000 8.27
42.27
62x1000/30/450/300 0.0221
x10^6/30/450/300^2 0.0348
0.02x30 0.6
0.6x450x300/100 810
4x201+4x113 1256
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TATA-KARNAL20-SBR-DC-04
DATE 18.05.2018
STRUCTURAL DESIGN CALCULATION OF
TITLE: SEQUENTIAL BATCH REACTOR REV R0
SOIL REPORT
RECCOMENDATIONS
UMENT NO.
AL20-SBR-DC-04
18.05.2018
R0