Boq Proposed Single Vintlation Improved Pit Latrine: General Preliminary Item Description QTY Unit Rate Amount

This document contains a bill of quantities for proposed improvements to a single pit latrine. It includes items for excavation and earthworks, reinforced concrete work, masonry walling, roof construction, doors, and other items. The quantities and costs are broken down into substructure, superstructure, roof construction, and doors sections. The document provides detailed descriptions and measurements for various construction materials and components needed to complete the latrine.

Uploaded by

Eng Hinji Rudge
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
418 views

Boq Proposed Single Vintlation Improved Pit Latrine: General Preliminary Item Description QTY Unit Rate Amount

This document contains a bill of quantities for proposed improvements to a single pit latrine. It includes items for excavation and earthworks, reinforced concrete work, masonry walling, roof construction, doors, and other items. The quantities and costs are broken down into substructure, superstructure, roof construction, and doors sections. The document provides detailed descriptions and measurements for various construction materials and components needed to complete the latrine.

Uploaded by

Eng Hinji Rudge
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

BoQ; PROPOSED SINGLE VINTLATION IMPROVED PIT LATRINE

GENERAL PRELIMINARY
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
GENERAL PRELIMINARY
Allow contractual requirements, training levy
with holding tax and other GoK statutes
necessary to commence and proceed with the
works to completion.
A 1.0 SUM -
Allow preliminaries to cover overheads,
transport, security, storage, water for
construction, power supply, clients safety
requirements, "Contractors all risks"
andother insurances as required by the
general Conditions of Contract, all temporary
Works not covered elsewhere under specific
items of Bills of Quantities (Provisional Sum
not to exceed 10% of Contract Sum)

B 1.0 SUM -

Total Carried Forward to Summary -

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


SUBDTRUCTURE
Preambles
(i) Clearing the site is measured in the external
works section of these Bills of Quantities.

(ii) The substructure has been measured up to and


including the surface slab.

"(iii) Unless otherwise stated all excavations shall be


in ""pickable" " materials"" as described."

Excavations and Earthworks


Excavate oversite average 150 mm deep to remove
top soil and wheel spread and level on site where
A directed 1.2 m3 -

Excavate for toilet pit commencing


from reduced levels and not exceeding a further
B 1.5 metres deep. 11.8 m3 -

Excavate for toilet pit commencing


from 1.5metres deep and not exceeding a
further
C 3.0 metres deep. 11.8 m3 -

Excavate for toilet pit commencing


from 3.0 metres deep and not exceeding a
further
D 4.5 metres deep. 11.8 m3 -

Extra over for excavating in

E Rock class I 1.0 m3 -


F Rock class II 1.0 m 3
-
-
Vibrated reinforced Concrete Class 25 in 200mm
bedas described -
In Foundation Footing 200mm X 6000mm, laid on
G blinding (sub-base material). 1.2 m3 -
-
Walling -
200mm solid concrete blocks (filled with
concrete)
honey comb wall construction. With open joints
H after first layer from footing. 25.0 m2 -
-
Form work in any position -
I Sides of concrete surfaces 15.0 m -
-
J Soffits of concrete surface 2.0 m -
-
K Soffits of concrete surface but left in position 39.2 m -
-
Steel reinforcement in substructure -
L 8mm bars 50.0 m -
-
M 12mm bars 50.0 m -
-
N 6mm links 20.0 -
-
CONCETRE WORK IN SUBSTRUCTRE -
Vibrated reinforced concrete class 25 -
In 200 X 200mm ring beam at 2400mm from
O footing. 0.36 m3 -
-
P In 100 mm Surface Slab 0.6 m3 -
-
In 200 x 200mm beam under superstructre back
wall
Q (as shown in engineer's drawing). 0.1 m3 -
-
Fillings -
Return, fill and ram average of 200mm thick
stone or
R broken brick fillings up to ring bean level. 4.54 m3 -
-
Damp proofing in c/s mortar 1:4 -
S 200mm wide between surface slab and block works* 5.4 m2 -
-
Plinth -
12mm thick mortar cement and sand (1:4)
rendered to
T plinths 0.06 m3 -
-
Termite Treatment as Described -
Ant proofing as described to exposed surfaces of
U excavations,800mm from slab soffit 2.5 Ltr -
-
-
SUBSTRUCTURE TOTAL TO SUMMARY -

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


SUPERSTRUCTURE

WALLING
Masonry walls bedded and jointed in cement
and
sand (1:4) mortar in:
150mm thick brick walls reinforced with
32x2mm hoop
iron every alternate third course.
A Brickforce reinforcement as described every 22.54 m2 -
third course
B To 150 mm wall in superstructure walls 42.3 m -
Lintel beam -
C Vibrated reinforced concrete beam hoisted to posi 0.034 m -
-
Lourver Block -
Precast concrete louvered vent blocks bedded
and
D jointed in mortar cement and sand (1:4) 2 No. -
-
Ventilation -
E holding AC socket or sleeve cast in conrete 1 No. -
-
F Vent pipe 1 No. -
-
G Veint pipe's holder bracket 2 No. -
-
-

TOTAL FOR SUPERSTRUCTURE CARRIED TO SUMMARY -

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


ROOF CONSTRUCTION

A 150x 50mm softwood purlins 5.8 m -


-
B 6mm diameter steel wires for fixing purlins 10 m -
-
concrete
padstones with hook bolts (Gauge 0.4mm)
including all
C necessary connections 8.1 m2 -
-
-
-
TOTAL FOR ROOF CONSTRUCTION CARRIED TO SUMMARY -

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


DOORS

A 40mm thick semi solid core door size 820x2000 1.0 No. -
-
Door frames and finishings Wrot mahogany -
Standard pressed steel 2M rebated frame factory
finished, dipped in red oxide. Painted with gloss
enamel paint, 3 coats colour as per schedule. -
B 820mm X 2000mm SINGLE 1.0 No. -
-
Iron Mongery -
Supply the following items of ironmongery with
matching screw stall as ''union'' or any other
equal
and approved:- -
C 100mm pressed steel butt hinges 2.0 No. -
-
D Door Mortice locks 1.0 No. -
-
-

TOTAL FOR DOORS CARRIED TO SUMMARY -

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


FINISHES

In-situ Finishings -
A 20mm thick screed steel trowelled whilst green 4.2 m2 -
One coat wooden float finish cement sand (1:4) -
plaster -
B 15 mm to walls externally including eveals 22.54 m2 -
-
One coat smooth wood float finish cement sand
(1:4) plaster -
C 15mm to walls internally including reveals 22.54 m2 -
-
Roughcasting; 1:4 C/S -
D To externally plastered walls 22.54 m2 -
-

FNISHES TO SUMMARY -
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
SUMMARY

1 GENERAL PRELIMINARY -

2 SUBDTRUCTURE -

3 SUPERSTRUCTURE -

4 ROOF CONSTRUCTION -

5 DOORS -

6 FINISHES -

GRAND TOTAL VAT INCLUSIVE -