Msolwa Ujamaa Irrigation Scheme: Bill of Quantity
Msolwa Ujamaa Irrigation Scheme: Bill of Quantity
Msolwa Ujamaa Irrigation Scheme: Bill of Quantity
BILL OF QUANTITY
GRAND TOTAL
BILL OF QUANTITIES – IRRIGATION INFRASTRUCTURE WORKS
Civil works
BILL NO: 2 MAIN SUPPLY CANAL :
2.1 Site clearance Sqm 67,200
2.2 Striping area Sqm 32,100
Headworks
2.3 Supply Stop Log set (50mm x 100mm x 600mm) to suit No. 3
opening for full closure
Location C2 – C3
2.4 Repair Masonry canal and make good (no leaks), without m 210
altering shape of canal by applying( 1:3 mortar)
2.5 Replace or Repair and make good Sluice gate valves No. 2
Location C3 – C4
2.8 Fill existing canal section, compact, excavate to profile m 270
and grade, construct parabolic canal with 75mm thick
concrete. Chamfer joint to connect existing road syphon
crossing.
Location C4- C5
2.9 Clean existing canal, repair cracks and leaks(apply 1;3 m 205
mortar).
Location C5 – W
2.10 Fill existing canal section, compact, excavate to profile m 2015
and grade, construct concrete canvas. Chamfer joint to
drainage line crossing at C6. Chamfer to syphon crossing
at C7.
2.15 Cutting, fill and compact new earth channel canal lining. m 510
2.16 Excavate to profile, spoil removal to the cutting new earth Cm 2520
channel canal lining,
Location W – Z
2.17 Import material, place, compact per specification Cm 8082
2.18 Excavate to profile, construct canal on grade as indicated m 862
in drawings.
2.19 Construct concrete lined canvas. Chamfer joint to m 968
drainage line as per drawing.
Location X
2.20 Construct off take box as per drawing(Reinforced No. 1
concrete Class A to walls, diaphragm wall,deck slab &
base )
Location Y
2.21 Construct off take box as per drawing (Reinforced No. 1
concrete Class A to intake walls, diaphragm wall,deck
slab & base )
2.22 Stone masonry to division box of random rabble less than Cm 188
250mm thick in 1:3 cement sand mortar
SUB-TOTAL CARRIED OVER TO GRAND SUMMARY
BILL NO: 3 NIGHT STORAGE RESEIVOIR
3.1 Excavation for the cutoff trench Cm 1,920
3.2 Formation of homogeneous embankment and core from Cm 12,800
selected fill material and compacted to 95% proctor from
material within 2km
3.3 Importation of material to embankment, placement and Cm.km 4,200
compaction material beyond 2 km.
3.4 Earth fill to the spillway guide bund Cm 600
3.5 Excavation of spillway Cm 780
3.6 Provide earth fill to the cutoff trench including compaction Cm 1,640
4.1 Excavate to profile and gradient, fill and compact where m 796
required, as per information on drawings.
4.2 Construct concrete canvas with 75mm thick concrete as m 796
per information on drawings.
4.3 Construct drop falls to maintain design gradient as m 72
required.
4.4 Construct off take boxes at locations B, C, D and E as per m 14
drawings
Tertiary Canals
4.5 Excavate in material placed by other contractor, feeder m 9500
canals to shape indicated in drawings. Where required
place drop falls to maintain gradient as specified on
drawings