10m3 Roto and WP
10m3 Roto and WP
10m3 Roto and WP
General Summary
BILL SUMMARIES
Description of item Currency Price
S/N
Rebate(-------%)
Eth. Birr
15 % VAT
Eth. Birr
1 Earth work
1.1 Site clearing & grubbing up to a average depth of 20cm M2 2.00
to remove top vegetated soil
1.4 Cart away surplus excavated materials from the site to a M3 0.40
distance not less 100m
2 Masonry Work
2.1 Placing 25cm thick basaltic or equivalent hardcore well M2 1.40
rolled, consolidated and blinded with crushed stone
3 Concrete work
3.1 Pouring 50mm thick lean concrete (1:2:6 mix) over the M2 1.40
hardcore
4 Wall work
4.1 15cm HCB OR BRICKS M3 3.00
4.2 Supply, cut, bend and fix in position reinforcement bars Kg 21.00
Of Ф10mm
4.3 Fixing of good quality wooden or metal form work firmly M2 7.00
with strong strutting & tight to avoid bleeding & bulking
out
5 Pipe work
5.1 Pipe line extension from existing pipe line with HDPE of 1 m 200.00
1/4" for all sites
6.2 Apply 25mm thick cement screed mix 1:3 for floor base of M2 2.20
Hand washing with 1% sloping towards the drainage.
6.3 Plastering the HCB with three coats of cement sand m2 2.20
mortar of mix 1:3
6.4 Pointing the whole external face of the masonry wall with m2 4.00
cement mortar mix 1:4
7.2 install one taps (one faucet)in compound for both health No 2
centers
Total 0
BOQ FOR WATER POINT
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-